Loading...
HomeMy WebLinkAbout2020-06-15-I01U Transite Water Main Replacement Phase 1_Pmt Est 3AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: June 15, 2020 AGENDA ITEM:Consideration of approval of Pay Estimate No. 3 to Busy Bee Construction, LLC for the Transite Water Main Replacement Phase 1 Project in the amount of $79,761.50 FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Busy Bee Construction, LLC has requested a partial pay estimate No. 3 for the Transite Water Main Replacement Phase 1 Project in the amount of $79,761.50. Veenstra & Kimm has reviewed the payment estimate and recommends payment. Pay Estimate No. 3 is for the period May 2, 2020 to June 5, 2020. Pay Estimate No. 3 is for installation of water main and water service pipe. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $79,761.50. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Pay Estimate No. 3 ATTACHMENTS: I. Letter of Recommendation II. Pay Estimate No. 3 PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1U Date: PAY ESTIMATE NO. 3 Project Title Contractor Original Contract Amount & Date $695,617.68 October 21, 2019 Pay Period May 2, 2020 to June 5, 2020 BID ITEMS Estimated Extended Quantity Value Description Unit Quantity Unit Price Price Complete Completed 1.1 Mobilization LS 1 25,000.00$ 25,000.00$ 85%21,250.00$ 1.2 Traffic Control LS 1 8,000.00$ 8,000.00$ 60%4,800.00$ 1.3 LS 1.0 30,000.00$ 30,000.00$ 0 -$ 1.4 LF 3,795 56.12$ 212,975.40$ 1,752 98,322.24$ 1.5 8" DI Water Main w/Viton Gaskets LF 90 106.51$ 9,585.90$ 90 9,585.90$ 1.6 EA 72 444.65$ 32,014.80$ 7 3,112.55$ 1.7 1" Curb Stop and Box EA 72 493.26$ 35,514.72$ 7 3,452.82$ 1.8 LF 380 23.85$ 9,063.00$ 0 -$ 1.9 LF 2,015 26.85$ 54,102.75$ 304 8,162.40$ 1.10 EA 12 7,026.25$ 84,315.00$ 5 35,131.25$ 1.11 EA 5 1,973.20$ 9,866.00$ 4 7,892.80$ 1.12 EA 1 4,230.00$ 4,230.00$ 0 -$ 1.13 SY 245 150.00$ 36,750.00$ 0 -$ 1.14 SY 60 150.00$ 9,000.00$ 0 -$ 1.15 SF 1,410 10.00$ 14,100.00$ 0 -$ 1.16 SF 24 70.00$ 1,680.00$ 0 -$ 1.17 TONS 15 40.00$ 600.00$ 0 -$ 1.18 EA 5 5,300.00$ 26,500.00$ 1 5,300.00$ 1.19 EA 2 4,804.00$ 9,608.00$ 0 -$ 1.20 LF 60 76.00$ 4,560.00$ 0 -$ 0 2.1 LS 1 2,000.00$ 2,000.00$ 100%2,000.00$ 2.2 LS 1 5,000.00$ 5,000.00$ 0 -$ 2.3 LF 225 101.94$ 22,936.50$ 225 22,936.50$ 2.4 Ea.5 444.65$ 2,223.25$ 5 2,223.25$ 2.5 Ea.1 742.50$ 742.50$ 1 742.50$ 2.6 Ea.5 493.26$ 2,466.30$ 5 2,466.30$ 2.7 Ea.1 764.00$ 764.00$ 0 -$ 2.8 LF 25 23.85$ 596.25$ 25 596.25$ 2.9 LF 20 28.41$ 568.20$ 4 113.64$ June 8, 2020 Sodding 8" PVC Water Main Directional Bored in Place 2" Water Service Pipe in Open Cut 8" DI Water Main w/Viton Gaskets Directional Bored in Place 1" Water Service Connection 1" Curb Stop and Box 2" Water Service Connection 1" Water Service Pipe in Open Cut Sodding 12" Gate Valve PCC Pavement PCC Driveway PCC Sidewalk Traffic Control Tapping Valve & Sleeve RCP Storm Sewer with O-Ring Gasket 2" Curb Stop and Box Busy Bee Construction, LLC 15691 State Highway 6 Lewiston, MO 63452 Connection to Existing System Granular Surfacing TRANSITE WATER MAIN REPLACEMENT - PHASE 1 WAUKEE, IOWA 1" Water Service Connection 1" Water Service Pipe in Open Cut Hydrant Assembly 8" Gate Valve 1" Water Service Pipe Directional Bored in Place Detectable Warning Panels VEENSTRA & KIMM, INC. 3000 Westown Parkway West Des Moines, Iowa 50266-1320 515-225-8000 515-225-7848(FAX) 800-241-8000 (WATS) V-K Job No. 275300 BID ITEMS Estimated Extended Quantity Value Description Unit Quantity Unit Price Price Complete Completed 2.10 LF 205 26.85$ 5,504.25$ 217 5,826.45$ 2.11 Ea.1 1,941.86$ 1,941.86$ 1 1,941.86$ 2.12 SY 120 150.00$ 18,000.00$ 32.3 4,845.00$ 2.13 SY 15 150.00$ 2,250.00$ 0 -$ 2.14 SF 150 10.00$ 1,500.00$ 18 180.00$ 2.15 Ea.1 5,052.00$ 5,052.00$ 1 5,052.00$ 2.16 Ea.1 5,087.00$ 5,087.00$ 1 5,087.00$ 2.17 LF 20 76.00$ 1,520.00$ 0 -$ Total 695,617.68$ 251,020.71$ RCP Storm Sewer with O-Ring Gasket PCC Pavement PCC Driveway PCC Sidewalk Connection to Existing System Tapping Valve & Sleeve 1" Water Service Pipe Directional Bored in Place 8" Gate Valve V-K Job No. 275300 MATERIALS STORED SUMMARY Number of Description Units Unit Price Extended Cost 8" DI Water Main 17 31.55$ 536.29$ 8" PVC Water Main 2,048 14.92$ 30,556.16$ 6" Gate Valve 7 545.00$ 3,815.00$ 8" Gate Valve 3 859.56$ 2,578.68$ 12" Gate Valve 1 1,695.00$ 1,695.00$ Fire Hydrant 7 2,650.00$ 18,550.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 57,731.13$ TOTAL MATERIALS STORED V-K Job No. 275300 SUMMARY Contract Price Value Completed Original Contract Price $695,617.68 251,020.71$ Approved Change Orders (list each) TOTAL ALL CHANGE ORDERS -$ -$ Revised Contract Price 695,617.68$ 251,020.71$ Materials Stored 57,731.13$ Value of Completed Work and Materials Stored 308,751.84$ Less Retained Percentage (5%)15,437.59$ Net Amount Due This Estimate 293,314.25$ Less Estimate(s) Previously Approved No.1 107,962.41$ No.2 105,590.34$ No.3 No.4 No.5 No.6 No. 7 No. 8 No. 9 No. 10 No. 11 No. 12 Less Total Pay Estimates Previously Approved 213,552.75$ Amount Due This Estimate 79,761.50$ The amount 79,761.50$ is recommended for approval for payment in accordance with the terms of the contract. Quantities Complete Submitted By:Recommended By:Approved By: Signature:Signature:Signature: Name:Name:Name: Title:Title:Engineer Title: Date:Date:Date: Busy Bee Construction, LLC Veenstra & Kimm, Inc. V-K Job No. 275300