HomeMy WebLinkAbout2020-08-17-H03 Kettlestone Greenway Improvements Phase 2_PHAGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: August 17, 2020
AGENDA ITEM:On proposed plans, specifications, form of contract and estimate of cost
[Kettlestone Greenway Improvements Phase 2 Project]
FORMAT:Public Hearing
SYNOPSIS INCLUDING PRO & CON: The project is the development of a new trail and
amenities within the Kettlestone Greenway which includes the following:
Approximately 5,479 LF of 10’ wide, 6” thick PCC trail with associated
earthwork; 745 LF of 5’ wide, 6” thick PCC sidewalk with associated
earthwork; 22 bollard lights along trail; one (1) floating fountain in
existing pond; diffusion aeration system in existing pond; three (3) rest
areas that include PCC pavement, benches, bike racks, litter receptacles,
and drinking fountain; landscaping that includes deciduous overstory and
understory trees, evergreen trees, shrubs, sod, native seed areas;
irrigation system that utilizes the pond as water source and includes
pump station with water meter and backflow assembly, pop-up sprinklers
and turf rotors, and all necessary system components; limited storm
sewer to include 18” and 36” CL.III RCP, 24” and 36” diameter SW-512
intakes, concrete flared end sections; electric distribution system that
includes transformer, meter socket, cabinets and panel boards to supply
site lighting and fountain pump systems. Construction of the project is
anticipated to begin September 2020 and will be substantially completed
by May 21, 2021.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Hold Public Hearing.
ATTACHMENTS: I. Notice of Hearing and Letting
PREPARED BY: Matt Jermier
REVIEWED BY:
PUBLIC NOTICE INFORMATION –
NAME OF PUBLICATION: Dallas County News
DATE OF PUBLICATION: 08/06/2020
H3
NOTICE OF PUBLIC HEARING
KETTLESTONE GREENWAY IMPROVEMENTS
PHASE 2
The City Council of Waukee, Iowa, will hold a public hearing on the proposed Plans,
Specifications, Form of Contract and Estimate of Costs for the construction of the
above referenced public improvements at 5:30 p.m. on August 17, 2020 at the West
Conference Room in City Hall, 230 West Hickman Road, Waukee, Iowa 50263. At said
hearing, any interested person may appear and file objections thereto or to the cost of
the improvements.
Due to public health concerns and guidance, in accordance with Iowa Code
Sections 21.4(1)(b) and 21.8, this meeting of the Waukee City Council will be conducted
electronically as holding the meeting in person is impossible or impractical. However, the
public is encouraged to access the meeting electronically in the manner specified below.
The meeting shall be conducted via Zoom at the following link or phone numbers:
https://zoom.us/j/352651371
Meeting ID: 352-651-371
Or by phone:
+1 646-558-8656 or
+1 312-626-6799 or
+1 301-715-8592
This project includes the furnishing of all labor, equipment, and materials for the
construction of the Kettlestone Greenway Improvements Phase 2, located at the
southwest corner of Grand Prairie Parkway and SE Tallgrass Lane, Waukee, Iowa,
generally described as follows:
Approximately 5,479 LF of 10’ wide, 6” thick PCC trail with associated earthwork; 745
LF of 5’ wide, 6” thick PCC sidewalk with associated earthwork; 22 bollard lights along
trail; one (1) floating fountain in existing pond; diffusion aeration system in existing
pond; three (3) rest areas that include PCC pavement, benches, bike racks, litter
receptacles, and drinking fountain; landscaping that includes deciduous overstory and
understory trees, evergreen trees, shrubs, sod, native seed areas; irrigation system
that utilizes the pond as water source and includes pump station with water meter and
backflow assembly, pop-up sprinklers and turf rotors, and all necessary system
components; limited storm sewer to include 18” and 36” CL.III RCP, 24” and 36”
diameter SW-512 intakes, concrete flared end sections; electric distribution system
that includes transformer, meter socket, cabinets and panelboards to supply site
lighting and fountain pump systems.
Courtney Clarke, Mayor
ATTEST:
Rebecca D. Schuett, City Clerk