HomeMy WebLinkAbout2020-08-17-J01Q NW 10th St, W Hickman to NW Douglas Pkwy_Change Order 2AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: August 17, 2020 AGENDA ITEM:Consideration of approval of Change Order No. 2 to Absolute Concrete Construction, Inc. for the NW 10th Street Improvements, W Hickman Road to NW Douglas Parkway increasing the contract price in the amount of $15,182.39. FORMAT:Motion SYNOPSIS INCLUDING PRO & CON: Change Order No. 2 is for Flexamat to maintain consistency with current erosion control measures from the new storm sewer outlets to the existing low flow channel located northeast of the roundabout at NW Sunrise Drive and NW 6th Street, time and material for water main lowering underneath NW Sunrise Drive east of NW 10th Street. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $15,182.39. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Motion to Approve. ATTACHMENTS: I. Change Order No. 2 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: J1Q 8191 Birchwood Court, Suite L Johnston, IA 50131 Phone: (515) 254-1393 Fax: (515) 254-1642 August 7, 2020 Sara Kappos, P.E. Assistant Director of Public Works 805 University Avenue Waukee, IA 50263 RE: Change Order #2 NW 10th Street Improvements W Hickman Rd to NW Douglas Parkway Dear Ms. Kappos: Attached please find a detailed Change Order for City Council approval on August 17, 2020. Change Description  Item CO2.1 Flexamat o To maintain consistency with current erosion control measures, Flexamat will be utilitized from the new storm sewer outlets to the existing low flow channel located northeast of the Roundabout at NW Sunrise Drive and NW 6th Street.  Item CO2.1 Time and Material for Water Main lowering underneath NW Sunrise Drive East of NW 10th Street. We have reviewed the submitted quotes from Absolute Concrete Construction, Inc. and they appear to be in order with current industry pricing. If City Staff concurs with this pricing, we recommend the City of Waukee Increase the contract price in the amount of $15,182.39 to complete the additional work associated with Change Order #02. Please let me know if you have any questions or need additional information. Sincerely, Foth Infrastructure and Environment, LLC Joshua C. DeBower, P.E. Lead Civil Engineer Encl: Change Order #2 dated 08/07/2020 CHANGE ORDER 02 Distribution: Owner - Finance ____ Owner - Public Works ____ Engineer ____ Contractor ____ Contractor:Absolute Concrete Construction, Inc. 1000 West 6th Avenue PO Box 148 $9,845,649.70 November 5, 2019 Slater, Iowa 50244 CO 2.1 SF $22.00 240 $5,280.00 CO 2.2 LS $9,902.39 1 $9,902.39 $15,182.39 $9,845,649.70 $137,723.71 $9,983,373.41 $15,182.39 $9,998,555.80 0 Days Recommended By: Absolute Concrete Construction, Inc. Signature: Name: Logan Petersen Title: Project Manager Date: Owner:City of Waukee □ ≤$500 Department Director X_______________________________________Date___________________ □ $501 to $2,500 City Administrator X_______________________________________Date___________________ □ Date___________________ □ >$2,501 City Council approved or ratified at Council meeting on Date___________________ 2 Title: Lead Civil Engineer Signature: The Contract Sum will be increased by this Change Order in the amount of Net Change by previously authorized Change Orders Title: City Administrator Value Adjustment NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER Foth Infrastructure & Environment, LLC The Contract Sum prior to This Change Order was THE CONTRACT IS CHANGED AS FOLLOWS: Addition of Flexamat to provide scour protection from new concrete aprons to existing low flow channel on the second High School site northeast of the NW 6th Street Roundabout, and time and material to lower a section of existing water main under NW Sunrise Drive. Unit The new Contract Sum including this Change Order will be Signature: Name: Joshua C. DeBower, P.E. Date: Name: Tim Moerman Checked By: Prepared By: Date: The Contract Time will be increased by CHANGE ORDER SUMMARY Item No.Quantity AdjustmentUnit Price Special TIME AND MATERIAL FOR LOWERING WATER MAIN UNDERNEATH NW SUNRISE DRIVE EAST OF NW 10TH STREET The Original Contract Sum was City of Waukee Special Description Project Title Waukee Project File Number Item Code August 7, 2020 Foth Project File Number Orig. Contract Amount & Date Date Change Order Number NW 10th Street Improvements W. Hickman Road to NW Douglas Parkway FLEXAMAT 19W003.00 Department of Public Works 805 University Avenue Waukee, IA 50263 (515) 987-7920 Fax (515) 987-3979 CO#02-2020-0807-NW 10th Street Improvements.xls Change Order 1 Page 1 of 1