Loading...
HomeMy WebLinkAbout2020-08-31-D03 Kettlestone Greenway Improvements Phase 2_Award ContractCITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: August 31, 2020 AGENDA ITEM:Consideration of approval of a resolution awarding contract [Kettlestone Greenway Improvements Phase 2] FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: The extent of the work on this project is the furnishing of all labor, equipment and materials for the construction of approximately 5,479 LF of 10’ wide, 6” thick PCC trail with associated earthwork; 745 LF of 5’ wide, 6” thick PCC sidewalk with associated earthwork; 22 bollard lights along trail; one (1) floating fountain in existing pond; diffusion aeration system in existing pond; three (3) rest areas that include PCC pavement, benches, bike racks, litter receptacles, and drinking fountain; landscaping that includes deciduous overstory and understory trees, evergreen trees, shrubs, sod, native seed areas; irrigation system that utilizes the pond as water source and includes pump station with water meter and backflow assembly, pop-up sprinklers and turf rotors, and all necessary system components; limited storm sewer to include 18” and 36” CL.III RCP, 24” and 36” diameter SW- 512 intakes, concrete flared end sections; electric distribution system that includes transformer, meter socket, cabinets and panel boards to supply site lighting and fountain pump systems. The City received bids on August 25, 2020 with seven contractors submitting bids. Caliber Concrete, LLC submitted the low bid in the amount of $785,047.14, which is approximately 42% below the engineer’s estimate of $1,358,507.50. There was one irregularity with an extended dollar amount for bid item no. 4 noted on the attached bid tab. The designer was able to inform the contractor of the discrepancy and confirmed they are comfortable with their submitted bid and have a complete understanding of the project scope. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $785,047.14 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Staff recommends awarding the project to Caliber Concrete, LLC of Adair, IA in the amount of $785,047.14. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Letter of Recommendation II. Bid Tab PREPARED BY:Beth Richardson REVIEWED BY: Rudy Koester RK AGENDA ITEM: D3 RESOLUTION 2020- RESOLUTION MAKING AWARD OF CONSTRUCTION CONTRACT FOR THE KETTLESTONE GREENWAY IMPROVEMENTS PHASE 2 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1.That the following bid for the construction of certain public improvements described in general as the Kettlestone Greenway Improvements Phase 2, described in the plans and specifications heretofore adopted by this Council on August 17, 2020, be and is hereby accepted, the same being the lowest responsive, responsible bid received for such work, as follows: Contractor: Caliber Concrete, LLC, of Adair, IA Amount of bid: $785,047.14 Portion of project: All construction work Section 2.That the Mayor and Clerk are hereby directed to execute the contract with the contractor for the construction of the public improvements, such contract not to be binding on the City until approved by this Council. PASSED AND APPROVED this 31st day of August, 2020. Mayor ATTEST: City Clerk August 26, 2020 Mr. Brad Deets, Director Development Services City of Waukee 230 W. Hickman Road Waukee, IA 50263 RE: Summary of Bid Opening Kettlestone Greenway Improvements Phase 2, Project No. 18309 Dear Mr. Deets: Seven bids were received on August 25, 2020 for the Kettlestone Greenway Phase 2 Improvements project. All bids were under the Opinion of Probable Cost. The apparent low bid submitted by Caliber Concrete, LLC is deemed responsive, with one irregularity that is noted in the attached bid summary. The extended amount for the line item Clear & Grubb does not equal the quantity multiplied by the unit price which results in a bid total that is $9,000 lower than it should be. Caliber would still be the low bid even if given the opportunity to correct this. All Star Concrete, LLC also has several extended amounts that do not calculate and are noted. Therefore, we are recommending award of the contract to Caliber Concrete, LLC. Please let me know if you have any questions as you review. Respectfully, Confluence Jim Host, ASLA Associate Cc: Project File City of Waukee____________________________________________________________Project: Kettlestone Greenway Improvements Phase 2 / Proj. No. 18309Date: 25-Aug-20Location: Waukee City Hall - Waukee, IowaLANDSCAPE ITEM UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT1 General Permit #2 and COSESCO 1 LS $28,000.00 $28,000.00 $42,000.00 $42,000.00 $10,000.00 $10,000.00 $22,990.00 $22,990.00 $25,000.00 $25,000.00 $8,000.00 $8,000.00 $17,000.00 $17,000.00 $6,300.00 $6,300.002 Mobilization 1 LS $95,000.00 $95,000.00 $37,900.00 $37,900.00 $54,000.00 $54,000.00 $82,563.36 $82,563.36 $14,033.00 $14,033.00 $55,000.00 $55,000.00 $71,000.00 $71,000.00 $56,575.00 $56,575.003 Construction Survey 1 LS $25,000.00 $25,000.00 $6,000.00 $6,000.00 $7,875.00 $7,875.00 $6,270.00 $6,270.00 $16,500.00 $16,500.00 $7,500.00 $7,500.00 $13,000.00 $13,000.00 $6,295.00 $6,295.004 Clear & Grubb 10.00 AC $1,000.00 $10,000.00 $1,000.00 $1,000.00 $250.00 $2,500.00 $261.25 $2,612.50 $275.00 $2,750.00 $750.00 $7,500.00 $290.00 $2,900.00 $160.00 $1,600.005Tile Repair and Installation 1,000 LF $13.00 $13,000.00 $26.00 $26,000.00 $3.00 $3,000.00 $5.23 $5,225.00 $26.75 $26,750.00 $30.00 $30,000.00 $30.50 $30,500.00 $30.00 $30,000.006Materials Testing1 LS $15,000.00 $15,000.00 $4,000.00 $4,000.00 $6,250.00 $6,250.00 $6,061.00 $6,061.00 $7,250.00 $7,250.00 $7,500.00 $7,500.00 $10,000.00 $10,000.00 $8,600.00 $8,600.007 Earthwork 1 LS $225,000.00 $225,000.00 $28,014.00 $28,014.00 $47,250.00 $47,250.00 $41,591.00 $41,591.00 $58,000.00 $58,000.00 $99,792.50 $99,792.50 $156,000.00 $156,000.00 $55,935.00 $55,935.008 10' Wide, 6" Thick, PCC Trail 54,790 SF $6.50 $356,135.00 $4.647 $254,587.39 $3.900 $213,681.00 $4.960 $271,963.86 $4.300 $235,597.00 $4.250 $232,857.50 $4.150 $227,378.50 $6.350 $347,916.509 5' Wide, 6" Thick, PCC Sidewalk 3,725 SF $6.50 $24,212.50 $4.87 $18,140.75 $5.95 $22,163.75 $5.49 $20,436.28 $4.50 $16,762.50 $5.00 $18,625.00 $6.15 $22,908.75 $7.30 $27,192.5010 Irrigation System 1 LS $140,000.00 $140,000.00 $70,000.00 $70,000.00 $76,000.00 $76,000.00 $55,385.00 $55,385.00 $56,000.00 $56,000.00 $60,000.00 $60,000.00 $77,000.00 $77,000.00 $54,555.00 $54,555.0011 Native Seed Mixes 5.10 AC $11,000.00 $56,100.00 $2,000.00 $10,200.00 $3,850.00 $19,635.00 $3,135.00 $15,988.50 $2,350.00 $11,985.00 $5,000.00 $25,500.00 $2,100.00 $10,710.00 $3,985.00 $20,323.5012 Sod 142,500 SF $0.50 $71,250.00 $0.35 $49,875.00 $0.55 $78,375.00 $0.42 $59,565.00 $0.59 $84,075.00 $0.50 $71,250.00 $0.40 $57,000.00 $0.55 $78,375.0013 Overstory Trees 41 EA $500.00 $20,500.00 $375.00 $15,375.00 $385.00 $15,785.00 $449.35 $18,423.35 $428.50 $17,568.50 $450.00 $18,450.00 $290.00 $11,890.00 $400.00 $16,400.0014 Understory Trees 42 EA $450.00 $18,900.00 $350.00 $14,700.00 $365.00 $15,330.00 $350.08 $14,703.15 $348.00 $14,616.00 $400.00 $16,800.00 $290.00 $12,180.00 $375.00 $15,750.0015 Evergreen Trees 15 EA $450.00 $6,750.00 $825.00 $12,375.00 $805.00 $12,075.00 $940.50 $14,107.50 $931.00 $13,965.00 $1,500.00 $22,500.00 $350.00 $5,250.00 $840.00 $12,600.0016 Deciduous Shrubs 93 EA $65.00 $6,045.00 $60.00 $5,580.00 $66.00 $6,138.00 $67.93 $6,317.03 $72.00 $6,696.00 $75.00 $6,975.00 $41.00 $3,813.00$68.50 $6,370.5017 Floating Fountain 1 EA $52,000.00 $52,000.00 $5,280.00 $5,280.00 $22,000.00 $22,000.00 $17,765.00 $17,765.00 $19,100.00 $19,100.00 $23,000.00 $23,000.00 $24,000.00 $24,000.00 $20,105.00 $20,105.0018 Diffusion Aeration System 1 EA $33,000.00 $33,000.00 $7,150.00 $7,150.00 $3,600.00 $3,600.00 $7,315.00 $7,315.00 $10,800.00 $10,800.00 $4,000.00 $4,000.00 $3,200.00 $3,200.00 $3,600.00 $3,600.0019 Bollard Lighting 22 EA $2,650.00 $58,300.00 $3,865.00 $85,030.00 $3,350.00 $73,700.00 $3,030.50 $66,671.00 $3,495.00 $76,890.00 $4,000.00 $88,000.00 $3,100.00 $68,200.00 $4,185.00 $92,070.0020Trail Rest Area 3 EA $11,000.00 $33,000.00 $11,000.00 $33,000.00 $15,000.00 $45,000.00 $9,918.79 $29,756.36 $8,500.00 $25,500.00 $7,500.00 $22,500.00 $15,000.00 $45,000.00 $16,775.00 $50,325.0021Detectable Warning Plates 68 SF $80.00 $5,440.00 $55.00 $3,740.00 $45.00 $3,060.00 $52.25 $3,553.00 $70.50 $4,794.00 $25.00 $1,700.00 $46.50 $3,162.00 $44.50 $3,026.0022Signage and Markings 1 LS $2,925.00 $2,925.00 $2,250.00 $2,250.00 $7,875.00 $7,875.00 $3,657.50 $3,657.50 $7,525.00 $7,525.00 $5,000.00 $5,000.00 $7,700.00 $7,700.00 $3,675.00 $3,675.0023Pedestrian Underpass Maintenance 1 LS $3,150.00 $3,150.00 $5,000.00 $5,000.00 $7,500.00 $7,500.00 $3,135.00 $3,135.00 $14,800.00 $14,800.00 $3,500.00 $3,500.00 $11,000.00 $11,000.00 $8,585.00 $8,585.0024Storm Sewer, Trenched, Cl. III RCP, 18" 120 LF $80.00 $9,600.00 $55.00 $6,600.00 $82.50 $9,900.00 $84.12 $10,094.70 $100.00 $12,000.00 $90.00 $10,800.00 $68.50 $8,220.00 $76.50 $9,180.0025Storm Sewer, Trenched, Cl. III RCP, 36" 50 LF $150.00 $7,500.00 $125.00 $6,250.00 $112.50 $5,625.00 $117.04 $5,852.00 $202.00 $10,100.00 $125.00 $6,250.00 $147.50 $7,375.00 $170.00 $8,500.002624" Dia. Intake, Type SW-512 w/Type 4B Casting2 EA $4,500.00 $9,000.00 $5,000.00 $10,000.00 $2,250.00 $4,500.00 $2,299.00 $4,598.00 $4,650.00 $9,300.00 $3,500.00 $7,000.00 $1,800.00 $3,600.00 $3,455.00 $6,910.0027PCC Flared End Section 4 EA $3,250.00 $13,000.00 $2,500.00 $10,000.00 $3,750.00 $15,000.00 $3,866.50 $15,466.00 $4,965.00 $19,860.00 $4,000.00 $16,000.00 $3,900.00 $15,600.00 $3,710.00 $14,840.0028Adjustment of Existing Storm Sewer1 LS $2,500.00 $2,500.00 $2,500.00 $2,500.00 $6,250.00 $6,250.00 $6,270.00 $6,270.00 $6,860.00 $6,860.00 $5,000.00 $5,000.00 $19,000.00 $19,000.00 $5,400.00 $5,400.0029Scourstop Mats 28 EA $650.00 $18,200.00 $125.00 $3,500.00 $255.00 $7,140.00 $240.35 $6,729.80 $58.00 $1,624.00 $250.00 $7,000.00 $103.00 $2,884.00 $263.00 $7,364.00Base Bid Total$1,358,507.50 $776,047.14 $801,207.75 $825,065.89 $826,701.00 $888,000.00 $947,471.25 $978,368.00General Conditions (8%) $108,680.60Overhead and Profit (8%) $108,680.60Contingency 10%$135,850.75Total$1,711,719.45 $776,047.14 $801,207.75 $825,065.89 $826,701.00 $888,000.00 $947,471.25 $978,368.00AMOUNT OF PROPOSAL GUARANTEE 10% Required 10% 10% 10% 10% 10% 10% 10%SURETY I hereby certify that the above is a true and correct summary of proposals received.Total should read $10,000.00Totals do not match extended amounts.COMMENTS Total should read $785,047.14Merchants Bonding CompanyConcrete Technologies, Inc.1001 SE 37th StreetGrimes, Iowa 50111Elder Corporation5088 East University AvenueDes Moines, Iowa 50327Merchants Bonding CompanyWestfield Insurance CompanyConcrete Connection, LLC5170 NW Beaver DriveJohnston, Iowa 50131Total should read $825,164.78Absolute Solutions505 1st AvenueSlater, Iowa 50244Merchants National Bonding, Inc.Merchants Bonding CompanyAll Star Concrete, LLC1403 SW Ordnance RoadAnkeny, Iowa 50023Merchants National Bonding, Inc.Total should read $825,164.78Howrey Construction, Inc.316 Austin StreetRockwell City, Iowa 50579SUMMARY OF PROPOSALS RECEIVED309 Audubon StreetAdair, Iowa 50002Westfield Insurance CompanyARCHITECT'SCOST OPINIONProject Manager: Jim Host, ConfluenceBASE BID ITEMSTotal should read $785,047.14Caliber Concrete, LLC