Loading...
HomeMy WebLinkAbout2020-10-05-J08 Waukee Towne Center Plat 1_Final Plat AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: October 5, 2020 AGENDA ITEM: Consideration of approval of a resolution approving a final plat for Waukee Towne Center Plat 1 FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: The applicant is requesting approval of a final plat for an approximately 13-acre subdivision that is intended for commercial/retail development. The final plat includes seven (7) lots. The lots range in size from 1.09-acres to 1.84-acres. As part of the public improvements, an extension of the SE Laurel Street will be constructed to provide access to the development. In addition, water main and sanitary sewer will be extended through the plat. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed the request at their meeting on November 26, 2020, and recommended approval: Approval of a Final Plat for Waukee Towne Center Plat 1 Senior Planner, Andy Kass, introduced the request of approval of a preliminary plat and final plat for a commercial development as submitted by the applicant, Waukee Town Center, LLC. The subject property is located south of Hickman Road, and west of SE Alice’s Road, just south of the current Waukee Marketplace development. The lot is currently zoned C-1 and C-1A, however staff anticipates a possible rezoning in the future in order to unify the zoning of the area. Mr. Kass advised that the plats identify a total of 7 lots ranging from 1.09 acres to 1.84 acres in size. As part of the development, SE Laurel Street will be extended from the Westgate neighborhood and will eventually connect to SE Alice’s Road at an already signaled intersection. All utilities are available to the site, with storm water detention in regional ponds on lots 3 and 4. These ponds will be owned and maintained by the owners association. Currently, there are no trails planned for this development. Five foot wide sidewalks will be constructed as each lot develops. At this time staff recommends approval subject to any staff comments. J8 Commissioner Hoifeldt questioned if there is a connection to the car wash. Mr. Kass advised that was correct, a right in- right out between lots 4 and 5. Commissioner Streit questioned why SE Laurel curved instead of taking the usual 90 degree approach. A representative for the applicant, Ed Arp, advised that there were a few different lay outs in order to create these lots. In the grand scheme the plan is to have a life style center south of this current development and the road wraps around that. The pond further to the south is more of a feature and for over detaining as the lot is so flat and the release rates are restricted. Courtney Clark, a resident at 1130 SE Bluegrass Circle, questioned if there would be other access points available to the Waukee Marketplace development off through the current project. Mr. Kass advised that staff has requested more connections between the two developments, however the owner to the north as not agreed at this time. the only reason the current access exists is because the Car Wash has a separate owner. Commissioner Streit questioned if there was a solution for the connections. Mr. Arp advised that it is an issue of the owner to the north not wanting to take on maintenance obligations that do not directly benefit that development. There is also a concern that having easements for the connections may restrict what tenants can build on the still available lots. Commissioner Koshy moved to approve the Preliminary Plat for Waukee Towne Center Plat 1 subject to any remaining staff comments. Commissioner Ward seconded the motion. Ayes: Ward, Tietz, Streit, Hoifeldt, Koshy, and Freund. Nays: None. Motion Carries. Commissioner Koshy Moved to approve the Final Plat for Waukee Towne Center Plat 1 subject to any remaining staff comments. Comssioner Tietz seconded the motion. Ayes: Ward, Tietz, Streit, Hoifeldt, Koshy, and Freund. Nays: None. Motion Carries. STAFF REVIEW AND COMMENT: Staff’s position is that the proposed final plat meets the intent and the requirements of the Zoning and Subdivision Ordinance. RECOMMENDATION: Staff recommends approval of the Final Plat for Waukee Towne Center Plat 1. ATTACHMENTS: I. Resolution II. Staff Report III. Final Plat PREPARED BY: Andy Kass, Senior Planner REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: THE CITY OF WAUKEE, IOWA RESOLUTION 2020- APPROVING THE FINAL PLAT FOR WAUKEE TOWNE CENTER PLAT 1 IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, Robert F. Etzel Living Trust, has requested final plat approval of Waukee Towne Center Plat 1 (the “Plat”); AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Plat on November 26, 2019, subject to remaining staff comments and review of the legal documents; AND, WHEREAS, the Final Plat for Landing at Kettlestone and the documents relating thereto will comply with Section §303 - Land Subdivision Ordinance of the Waukee Municipal Code. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 5th day of October, 2020, that the Final Plat for Waukee Towne Center Plat 1 be and the same is hereby accepted and approved by the City Council of the City of Waukee. BE IT FURTHER RESOLVED that the City of Waukee does hereby accept the following easements and documents to be filed with the Plat: 1. Warranty Deed (Street Lot A) 2. Public Utility & Snow Storage Easement; 3. Public Sanitary Sewer Easement; 4. Public Storm Sewer Easement; 5. Public Water Main Easement; 6. Private Storm Sewer Easement; 7. Private Water Main Easement; 8. Private Temporary Storm Sewer Easement; 9. Private Ingress/Egress Easement; 10. Private Temporary Detention Easement; 11. Temporary Grading Easement; and 12. Storm Water Detention Maintenance Covenant & Permanent Easement Agreement ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman R. Charles Bottenberg Chris Crone Larry R. Lyon Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Waukee Towne Center Plat 1 – Preliminary Plat & Final Plat PREPARED BY: Andy Kass AICP, Senior Planner REPORT DATE: November 22, 2019 MEETING DATE: November 26, 2019 GENERAL INFORMATION Applicant: Waukee Towne Center, LLC Owner: Robert F. Etzel Owner’s Representative: Ed Arp, PLA with CEC Request: The applicant is requesting approval of a preliminary plat & final plat for a commercial development. Location and Size: Property is generally located south Hickman Road and west of SE Alice’s Road containing approximately 13.41 acres more or less. AREA MAP ABOVE: Aerial of Property identifying the proposed plat (outlined in BLUE). November 22, 2019 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant – Undeveloped Community Commercial C-1 (Community & Highway Service Commercial) / PD-1 (Planned Development Overlay) & C-1A (Neighborhood Commercial District) / PD-1 (Planned Development Overlay) North Waukee Marketplace Community Commercial C-1 (Community & Highway Service Commercial) / PD-1 (Planned Development Overlay) South Vacant – Undeveloped Neighborhood Commercial C-1 (Community & Highway Service Commercial) / PD-1 (Planned Development Overlay) & C-1A (Neighborhood Commercial District) / PD-1 (Planned Development Overlay) East U-Haul Mixed Use M-1 (Light Industrial District) West Westgate Neighborhood Single Family Residential R-2 (One & Two Family Residential District) HISTORY The subject property is located south of Hickman Road and west of SE Alice’s Road. The property is zoned a mix of C- 1/PD-1 and C-1A/PD-1. Staff anticipates a rezoning in the future to clean-up the overlapping zoning, but is comfortable moving forward at this time with the zoning of the plat as it is today. PROJECT DESCRIPTION LOTS The preliminary plat and final plat identify seven (7) lots to be platted at this time. The lots range in size from 1.09-acres to 1.84-acres. The lots are intended for commercial development. Table 1: Category C-1 (minimum) Lot Area No minimum Lot Width No minimum Front Yard Setback 30 feet Rear Yard Setback 30 feet Side Yard Setback No minimum STREETS AND TRAIL As part of the improvements for the development the applicant will construct an extension of SE Laurel Street from where it dead-ends at the east plat line of Westgate Plat 2. The extension of SE Laurel Street will continue to the November 22, 2019 3 of 3 southeast and connect to SE Alice’s Road. The access at SE Alice’s Road and SE Laurel Street is a signalized full access. The preliminary plat also shows a proposed right-in/right-out access along the joint lot line of Lots 4 and 5 this access will be privately owned and maintained. All other future streets in the development will be privately owned and maintained. No trails are planned within the development at this time. Five-foot sidewalks will be constructed as each lot develops. UTILITIES Sanitary sewer and water main through the development will be public utilities. The storm sewer outside of the public right-of-way will be privately owned and maintained. Storm water detention for the development will be provided within two regional storm water ponds shown on Lots 3 and 4. The storm water ponds will be the maintenance responsibility of the owners association of the development. STAFF RECOMMENDATION The proposed lots meet the minimum requirements of the Zoning Ordinance. The preliminary plat and final plat are in general conformance with the Subdivision Ordinance. Staff recommends approval subject to remaining staff comments. CECCivil Engineering Consultants, Inc.2400 86th Street . Unit 12 . Des Moines, Iowa 50322515.276.4884 . Fax: 515.276.7084 . mail@ceclac.comQ:\A-FILES\A-1900\A1996\_C3D Drawings\Plat\A1996 (01) FP.dwg, 12/31/2019 10:38:21 AM, jagaddis, 1:1 LOT 4 LOT 6 OUTLOT 'Z' LOT 2 LOT 5 LOT 3 LOT 'A' OUTLOT 'Y' LOT 1 LOT 7 LOT 'A' OUTLOT 'X'CECCivil Engineering Consultants, Inc.2400 86th Street . Unit 12 . Des Moines, Iowa 50322515.276.4884 . Fax: 515.276.7084 . mail@ceclac.comQ:\A-FILES\A-1900\A1996\_C3D Drawings\Plat\A1996 (02) FP.dwg, 12/31/2019 10:38:42 AM, jagaddis, 1:1 LOT 4 LOT 6 OUTLOT 'Z' LOT 2 LOT 5 LOT 3 OUTLOT 'Y' LOT 'A' LOT 'A' LOT 1 LOT 'A' LOT 7 CECCivil Engineering Consultants, Inc.2400 86th Street . Unit 12 . Des Moines, Iowa 50322515.276.4884 . Fax: 515.276.7084 . mail@ceclac.comQ:\A-FILES\A-1900\A1996\_C3D Drawings\Plat\A1996 (03) FP.dwg, 12/31/2019 10:38:45 AM, jagaddis, 1:1 LOT 4 LOT 6 OUTLOT 'Z' LOT 2 LOT 3 LOT 5 OUTLOT 'Y' LOT 1 LOT 'A' LOT 'A' LOT 7 LOT 4 LOT 5 OUTLOT 'Y'CECCivil Engineering Consultants, Inc.2400 86th Street . Unit 12 . Des Moines, Iowa 50322515.276.4884 . Fax: 515.276.7084 . mail@ceclac.comQ:\A-FILES\A-1900\A1996\_C3D Drawings\Plat\A1996 (04) FP.dwg, 12/31/2019 10:38:46 AM, jagaddis, 1:1 LOT 4 LOT 6 OUTLOT 'Z' LOT 2 LOT 5 LOT 3 LOT 1 OUTLOT 'Y' LOT 'A' LOT 'A' LOT 7 CECCivil Engineering Consultants, Inc.2400 86th Street . Unit 12 . Des Moines, Iowa 50322515.276.4884 . Fax: 515.276.7084 . mail@ceclac.comQ:\A-FILES\A-1900\A1996\_C3D Drawings\Plat\A1996 (05) FP.dwg, 12/31/2019 10:38:47 AM, jagaddis, 1:1