AGENDA ITEM:Consideration of approval of a resolution approving MidAmerican Energy
Company Refundable Advance for Construction, Underground Electric
Distribution Extension Proposal for Speculative use [Triumph Park, WMIS
2851607]
FORMAT:Resolution
SYNOPSIS INCLUDING PRO & CON: This proposal is for MidAmerican Energy Company to
extend its electrical lines underground to provide electrical service to the
proposed facilities within Triumph Park. The estimated cost of this work is an
upfront Advance for Construction costs, which is refundable to the City over a
period of six years at the rate of 50% of the annual metered electric service
bill for the park.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $135,909.88
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve the resolution.
ATTACHMENTS: I. Proposed Resolution
II. MidAmerican Refundable Advance for Construction Underground Electric
Service Extension Proposal
PREPARED BY: Beth Richardson
REVIEWED BY: Rudy Koester RK
PUBLIC NOTICE INFORMATION –
NAME OF PUBLICATION:
DATE OF PUBLICATION:
I1N
THE CITY OF WAUKEE, IOWA
RESOLUTION 2020-
APPROVING MIDAMERICAN ENERGY COMPANY REFUNDABLE ADVANCE FOR
CONSTRUCTION, UNDERGROUND ELECTRIC DISTRIBUTION EXTENSION
PROPOSAL FOR SPECULATIVE USE [TRIUMPH PARK, WMIS 2851607]
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA
WHEREAS, the City of Waukee is a duly organized municipality within Dallas County; AND,
WHEREAS, the City of Waukee requested a proposal from MidAmerican Energy Company to
extend its electrical lines underground to provide electrical service to the proposed facilities
within Triumph Park;
NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council that the City of
Waukee hereby approves the MidAmerican Energy Company Refundable Advance for
Construction, Underground Electric Distribution Extension Proposal for Speculative use
[Triumph Park, WMIS #2851607].
Passed by the City Council of the City of Waukee, Iowa, and approved the 16th day of
November, 2020.
____________________________
Courtney Clarke, Mayor
Attest:
___________________________________
Rebecca D. Schuett, City Clerk
RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN
Anna Bergman
R. Charles Bottenberg
Chris Crone
Larry R. Lyon
Ben Sinclair
October 29th, 2020
City of Waukee
Attn: Rudy J. Koester, P.E.
805 University Ave.
Waukee, IA 50263
rkoester@waukee.org
Reference: Install three (3) – 277/480 volt transformers to serve new facilities at Triumph
Park in Waukee, IA. WMIS: 2851607
Dear Mr. Koester:
We are pleased to submit the Refundable Advance for Construction Underground
Electric Service Extension Proposal for Speculative Use for the above project. This
proposal is valid for 90 days and if MidAmerican Energy construction has not
commenced within 12 months it may be voided.
Please sign and return the proposal as soon as you are ready to commit to the work.
You may withhold payment until after MidAmerican Energy Company has completed the
work. In the meantime, please keep me informed of your schedule.
If you have any questions, please call me at (515) 252-6742.
Sincerely,
MidAmerican Energy Company
Scot Enger
Customer Project Coordinator
2 | P a g e
MIDAMERICAN ENERGY COMPANY
REFUNDABLE ADVANCE FOR CONSTRUCTION
UNDERGROUND ELECTRIC DISTRIBUTION EXTENSION PROPOSAL
FOR SPECULATIVE USE – WMIS: 2851607
MidAmerican Energy Company, an Iowa corporation and City of Waukee ("Applicant"),
agree as follows:
1. MidAmerican Energy Company will extend its electric lines underground to serve
three (3) - 277/480 volt transformers with 400 amps each for the new Triumph
Park located on NW 10th St. in Waukee, IA as shown on the attached drawings.
2. MidAmerican Energy Company will furnish the necessary labor and materials
required to fulfill its undertaking, as specified above, and will commence such work
as soon as reasonable and practicable after the execution of this Proposal and
receipt of Applicant's cash deposit indicated below, and will prosecute such work
to completion with reasonable diligence.
3. In consideration of the signed proposal and agreement to pay the actual costs
after the completion of work, MidAmerican Energy Company agrees to construct
necessary electric facilities as set forth above. The estimated cost of this work is
$135,909.88 which is a refundable Advance for Construction. Since the
estimated cost of construction is over $100,000, Applicant is required by tariff to
pay actual costs upon completion of the work, which could result in an additional
charge or a refund to the Applicant. If MidAmerican Energy Company is caused
by Applicant to work during the winter construction season, Applicant agrees to
pay in cash an additional sum of $4.96 per trench foot as a refundable Advance
for Construction for all required trenching.
4. The Advance for Construction shall be subject to refund by MidAmerican Energy
Company to Applicant based upon the following terms and conditions:
a. Advances shall not accrue interest and shall be subject to refund
from the date of original advance payment. This will span a six-
year period at the rate of fifty percent (50%) of the annual metered
electric service bill of the above Applicant.
b. If additional customers are connected to the above described line
extension, the above Applicant shall receive refunds equal to three
times estimated base revenue for each additional new customer to
the extent the base revenue exceeds the additional distribution
construction costs incurred by MidAmerican Energy Company.
Base revenue shall be estimated annual kilowatt hours based on
similarly situated customers, less the cost of fuel.
3 | P a g e
c. Refunds shall be made on the anniversary date of the original
advance payment or sooner at the option of MidAmerican Energy
Company.
d. Revenue for un-metered private lighting shall not be included in any
refund.
e. No refunds shall be made for revenue received after six (6) years
from the date of the original advance payment.
f. Never shall the total of refunds exceed the refundable portion of the
payment stated above.
g. No refunds shall be made for customers served from a further
extension of the above described electric line extension.
5. Except as may hereinafter be provided, MidAmerican Energy Company shall:
a. Not tamp the backfill. Applicant agrees to indemnify and hold
MidAmerican Energy Company harmless from any and all damages
that may result from the non-tamping of backfill operations
conducted by MidAmerican Energy Company. In case any action
is brought against MidAmerican Energy Company, or any of its
agents or employees, relative to such backfill operations, the
Applicant shall assume full responsibility for the defense thereof.
Upon failure to do so on proper notice, MidAmerican Energy
Company reserves the right to defend such action and charge all
costs to the Applicant provided, however, that nothing herein shall
be construed as an assumption of liability by the Applicant for
damages and claims attributable to MidAmerican Energy Company
negligence.
6. Applicant shall provide, without cost to MidAmerican Energy Company, such
easements as are necessary and incidental to such installation and use of
MidAmerican Energy's facilities on private property within the area served. If a 3rd
party easement is required any cost associated in obtaining the easement will be
paid by the applicant.
7. Applicant shall be responsible for complying with all aspects of compliance as
required by any local, state, or federal permit or plan associated with storm water
pollution prevention or erosion control. It is specifically understood and agreed
that MidAmerican Energy Company is providing the service requested by the
Applicant solely for the Applicant. MidAmerican Energy Company will not become
or agree to become a co-permittee or operator for the purpose of applicants’
compliance with any local, state or federal permit or plan associated with storm
water pollution prevention or erosion control.
4 | P a g e
8. Applicant shall be responsible for locating and marking all privately owned systems
such as water services, culverts, irrigation systems, drain pipes, septic lines, and
underground wiring before MidAmerican Energy Company's construction.
9. It is specifically understood and agreed that any distribution systems, or other
facilities constructed or installed by MidAmerican Energy Company under terms of
this Proposal shall remain the sole property of MidAmerican Energy Company and
MidAmerican Energy Company shall determine, as its own judgment indicates, the
manner and method of utilization thereof and to extend the same or connect other
facilities there to and serve other customers there from as it shall see fit, subject
only to such obligations as MidAmerican Energy Company shall have assumed in
this Proposal; and no other person shall have any right, title, interest or claim, in
or to the said distribution system or other facilities by virtue of any provision of this
Proposal.
10. Applicant shall furnish, install, own and maintain all 4-inch ducts as shown on
attached prints. All ducts shall be black w/red stripe or grey in color, PVC type
schedule 40 or schedule 40 HDPE coil-able. Applicant shall install ducts a
minimum of forty-two (42) inches and a maximum of forty-eight (48) inches below
finish grade with capped and staked ends and equipped with pull wires.
MidAmerican Energy Company will provide marker balls for the duct ends. These
are available at MidAmerican Energy Company’s storeroom. Applicant is
responsible for correct placement and depth of conduit. Note: No more than ten
(10) conduits allowed within the secondary compartment of the transformer
pad.
Proposed this 29th day of October, 2020.
MIDAMERICAN ENERGY COMPANY
By:
Title:
Accepted this day of , 2020
APPLICANT:
By:
Title:
DD
D
D
D
D
D
D
D
D
D
D D DD
D
D
D
DDD
D
D
D
D
D
D
DD
D
D
D
D
282536002817828227C
4/0 AL PARA1/0 AL JACKETED1/0 AL JACKETED4/0 AL PARA
EM211
EM211EM211EM211
EM211UG309 OF 350 UG AL TRIPLEX
0004028638
35-5 WOOD
34-NULL STEEL
34-NULL STEEL
34-NULL STEEL
50T
30T
65T
65T
OPEN
150E
X455
X455A
X455A
SG161-03
X455B
SOLID BLADE
West High D XFMR
West High C XFMR
OPEN
300
1500
500
ABC PHS 2000 KVA
480/277
B PHS 25 KVA
120/240
ABC PHS 300 KVA
480/277
ABC PHS 300 KVA
480/277
ABC PHS 300 KVA
480/277
438614
STREET
150 EQUIV - LED
II - GRAY
150 EQUIV - LED
438616
STREET
150 EQUIV - LED
II - GRAY
PE High D
PE High E
1
2
3
5
6
7
1
4
7
9
12
15
17
18
19
13
5
4
9
11
12
2223
27
28
3238
39
41
45
46
1
2
3
4 5
6
7
8 9 10
11
12
13
14
15 16 17
18
19
16