SYNOPSIS INCLUDING PRO & CON: Staff presented three alternative layouts to Silverleaf
Lane within the proposed Hamilton Ridge development at the
worksession held on November 9, 2020.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:
COMMISSION/BOARD/COMMITTEE COMMENT: N/A
STAFF REVIEW AND COMMENT: Staff is requesting direction on which alignment to
proceed with as the developer is anxious to proceed forward on a
preliminary plat approval request.
RECOMMENDATION: Discussion and Direction Only
ATTACHMENTS: I. Alignment Concepts
PREPARED BY: Brad Deets, Development Services Director
REVIEWED BY:
PUBLIC NOTICE INFORMATION –
NAME OF PUBLICATION:
DATE OF PUBLICATION:
I13
22 Hamilton Ridge Street Network
Option 1: Silverleaf Lane Extension from Ute Avenue to Ashworth
33 Hamilton Ridge Street Network
Option 1: Silverleaf Lane Extension from Ute Avenue to Ashworth
Pros:
•Continues the street system connectivity through the neighborhoods which is a principle of
good neighborhood design
•Eliminates the current dead end on Silverleaf Lane which creates some maintenance issues
for Public Works
•Complies with the Waukee Fire Code
•Provides secondary emergency services access to Willow Pines neighborhood
•Provides access to Willow Pines neighborhood for future Ute Avenue reconstruction
Cons:
•Increased traffic and safety concern on Silverleaf Lane
44 Hamilton Ridge Street Network
Sugar Creek Attendance Boundary
55 Hamilton Ridge Street Network
Proposed Intersection Improvements
66 Hamilton Ridge Street Network
Option 2: Extend Silverleaf Lane as a cul de sac with no outlet to Ashworth
77 Hamilton Ridge Street Network
Pros:
•Reduces the amount of traffic along Silverleaf Lane with the addition of only 14 new homes
•Eliminates the maintenance concerns and provides a proper turnaround for Public Works
employees for snow removal
•Reduces the amount of grading required within the Hamilton Ridge Development along
Ashworth Road
Cons:
•Creates significant Fire Code compliance issues
•Reduces neighborhood connectivity
Option 2: Extend Silverleaf Lane as a cul de sac with no outlet to Ashworth
88 Hamilton Ridge Street Network
Option 3: Extend new cul de sac off of Ashworth Road and eliminate
connection to Willow Pines
99 Hamilton Ridge Street Network
Pros:
•Eliminates the traffic concerns on Silverleaf Lane within Willow Pines
Cons:
•Does not resolve existing Fire Code compliance issues
•Eliminates neighborhood connectivity
•Creates permanent maintenance issues for Public Works
•Opens new policy issues for future neighborhood development in Waukee
Option 3: Extend new cul de sac off of Ashworth Road and eliminate
connection to Willow Pines