HomeMy WebLinkAbout2019-12-16-J11 Waukee Elementary #10 Plat 1_Final Plat AGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: December 16, 2019
AGENDA ITEM: Consideration of approval of a Final Plat for Waukee Elementary #10
Plat 1
FORMAT: Resolution
SYNOPSIS INCLUDING PRO & CON: Waukee Community School District, is requesting
approval of a final plat for an approximately 19.05-acre subdivision
located north of Ashworth Road and west of R-22/Ute Avenue. The
proposed final plat includes one (1) lot which is to be the site of a new
elementary school.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:
COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning
Commission reviewed the request on October 1, 2019 and recommended approval:
Approval of a Final Plat for Waukee Elementary #10
City Planner, Melissa DeBoer, introduced the request for the approval of a preliminary plat, final
plat, and site plan for the development of an elementary school as proposed by the applicant,
Waukee Community School District. The subject property is generally located north of Ashworth
Road and west of R-22/ Ute Ave, and contains approximately 19.05 acres.
Mrs. DeBoer advised that the project would include one lot that would contain an elementary
school approximately 101,417 square feet in size. Additionally, the project would include a
playground to the west of the school building, bicycle parking, a trash enclosure, and a muti-use
enclosure, similar to other recently constructed elementary schools in the area. The construction
is proposed to begin in Spring of 2020 with a completion and opening date of Fall 2022.
Mrs. DeBoer advised that primary access to the site will be off of Ashworth Road with staff
parking and school bus drop off zones off of a one way access on Serenity Drive. The site plan
indicates 160 parking spaces across the site, and pedestrian walk ways installed through out the
site. 10 foot wide trails will be installed along Ashworth Road and Serenity Drive. Utilities were
provided to the site with the public improvements associated with Ashworth Acres Plat 1, and
Stormwater will be routed to the southeast detention pond. All landscaping, open space, and
lighting plans meet the requirements for the zoning district.
At this time staff would recommend approval of the preliminary plat, final plat, and site plan for
Waukee Elementary #10, subject to any remaining staff comments and review of the legal
documents.
J11
Director of Development, Brad Deets, added to the staff presentation that the paving in front of
the school and adjacent residential plat is nearing completion, and that a hard overlay will be
placed on Ashworth road to R-22 by the time the school opens. Mr. Deets also pointed out that
this particular project is taking notes from previous projects and includes additional cueing space
to allow for less road blockage during peak hours of operation.
Commissioner Hoifeldt questioned if the entrance to the school would be lighted. Mr.
Deets advised that it would be a good location for one in the future, but at the time of
opening, it is not intended to be lighted. Mr. Deets sited maple grove elementary which
was operational for several years before lights were installed at the intersection.
Commissioner Tietz questioned what the multi-use enclosure was. Mrs. DeBoer advised
it was just green space, not an actual practice field.
Commissioner Koshy questioned if the extended sidewalks will be included to R-22 for
pedestrian travel to the school. Mr. Deets advised that as the area gets built out, sidewalks
or a trail will be built on the north side of Ashworth.
Commissioner Koshy moved to approve a Final Plat for Waukee Elementary #10 Subject to any
remaining staff comments and review of the legal documents. The motion was seconded by
commissioner Broderick. Ayes: Tietz, Broderick, Hoifeldt, and Koshy. Nays: None. Motion
Carries.
STAFF REVIEW AND COMMENT: Staff would recommend approval of the final plat.
RECOMMENDATION: Approve the resolution.
ATTACHMENTS: I. Proposed Resolution
II. Staff Report
III. Final Plat
PREPARED BY: Andy Kass, Senior Planner
REVIEWED BY:
PUBLIC NOTICE INFORMATION –
NAME OF PUBLICATION:
DATE OF PUBLICATION:
THE CITY OF WAUKEE, IOWA
RESOLUTION 19-
APPROVING THE FINAL PLAT FOR WAUKEE ELEMENTARY #10 PLAT 1
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA
WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal
Organization; AND,
WHEREAS, Waukee Community School District, has requested final plat approval of Waukee Elementary
#10 Plat 1 (the “Plat”); AND,
WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Plat on
October 1, 2019, subject to remaining staff comments and review of the legal documents; AND,
WHEREAS, the Final Plat for Waukee Elementary #10 Plat 1 and the documents relating thereto will
comply with Section §303 - Land Subdivision Ordinance of the Waukee Municipal Code.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 16th
day of December, 2019, that the Final Plat for Waukee Elementary #10 Plat 1 be and the same is hereby
accepted and approved by the City Council of the City of Waukee.
BE IT FURTHER RESOLVED that the City of Waukee does hereby accept the following easements and
documents to be filed with the Plat:
1. Public Utility Easement;
2. Public Sanitary Sewer Easement; and
3. Storm Water Maintenance Covenants and Permanent Easement Agreement.
____________________________
William F. Peard, Mayor
Attest:
___________________________________
Rebecca D. Schuett, City Clerk
RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN
Anna Bergman
R. Charles Bottenberg
Courtney Clarke
Shelly Hughes
Larry R. Lyon
PLANNING AND ZONING COMMISSION STAFF REPORT
PROJECT: Waukee Elementary #10 – Preliminary
Plat, Final Plat & Site Plan
PREPARED BY: Andy Kass, AICP, Senior Planner
REPORT DATE: September 20, 2019
MEETING DATE: September 24, 2019
GENERAL INFORMATION
Applicant: Waukee Community School District
Owner: Waukee Community School District
Engineer: Joel Jackson, P.E., Bishop Engineering
Request: The applicant is requesting approval of a
preliminary plat, final plat, and site plan for the
development of an elementary school.
Location and Size: Property is generally located north of Ashworth
Road, west of R-22/Ute Ave containing
approximately 19.05 acres.
Legal Description: Lot 1, Waukee Elementary #10 (965 Ashworth Road)
AREA MAP
ABOVE: Aerial of subject property (outlined in BLUE) in relation to the surrounding area.
September 20, 2019
2 of 3
LAND USES AND ZONING
Location Existing Land Use Comprehensive Plan Current Zoning
Property in
Question
Vacant – Undeveloped Single Family Residential R-2 (One and Two
Family Residential)
North Vacant – Undeveloped Single Family Residential R-1 (Single Family
Residential)
South Vacant – Undeveloped Single Family Residential A-1 (Agricultural)
East Single Family Residential Single Family Residential R-1 (Single Family
Residential) & R-2 (One
& Two Family
Residential)
West Vacant – Undeveloped Single Family Residential A-1 (Agricultural)
HISTORY
In 2018, a rezoning was approved for the Ashworth Acres development. The concept plan for Ashworth
Acres identified a possible location for a future elementary school in the southwest corner of the
development. In the time since the rezoning was approved, the Waukee Community School District
purchased the 19.05-acre parcel and is now requesting approval of a preliminary plat, final plat, and site plan
for the construction of a new elementary school.
PROJECT DESCRIPTION
Preliminary Plat & Final Plat
The preliminary plat and final plat identify the creation of one (1) lot that is 19.05-acres in area. Lot 1 is
proposed to have an elementary school and associated parking and accessory uses located on it. All required
easements are identified on the preliminary plat and final plat.
Site Plan
The site plan for the elementary school identifies the construction of a 101,417 square foot elementary school
that is proposed to be approximately 28-feet in height at its highest point. The site plan indicates that there
are 36 classrooms in the building. The playground is shown to the west of the school building. A multi-use
field is shown southwest of the building. Bicycle parking is provided on the south side of the building. A trash
enclosure is located on the west side of the building and will be integral to the building similar to other
recently constructed elementary schools. Construction of the proposed elementary school is planned to begin
in Spring 2020 with a completion and opening date of Fall 2022.
ACCESS AND PARKING
The primary access for the school will be on the south side from Ashworth Road. Pick-up and drop-off for
students will use the south access point. Two lanes are planned to accommodate pick-up and drop offs. A
pavement stripe for the entire length of the lanes will be provided to assist in traffic direction. The School
District also plans to have staff direct traffic during pick-up and drop-off times. Secondary access is provided
from Serenity Drive on the east side of the property. This access will be one-way and will be utilized for staff
parking and bus drop-off.
September 20, 2019
3 of 3
The Zoning Ordinance requires 151 parking spaces for the elementary school. The site plan indicates 160
parking spaces across the site, including seven (7) accessible parking spaces.
Pedestrian walkways will be installed around the building and throughout the site. 10-foot-wide trails will be
installed along Ashworth Road and along Serenity Drive.
UTILITIES
Utilities were provided to the site with the public improvements associated with Ashworth Acres Plat 1.
Water and sanitary services will be extended from Serenity Drive. Storm water for the site will be detained in
ponds located in the southwest and southeast corners of the property. Stormwater will be routed to the
southeast pond and from there is it routed to the north and east towards the pond constructed with the
Ashworth Acres Plat 1 improvements. The School District will be responsible for the maintenance of the
ponds on their property.
LANDSCAPING & OPEN SPACE
A total of 20% open space is required for the development. The Site Plan indicates that 50% open space will
be provided. A 25-foot landscape buffer will be provided on the north, east, and west sides of the property to
provide screening from the adjacent residential uses. The site will be sodded and seeded with a variety of
grasses including native plantings.
ELEVATIONS
Elevations of the proposed buildings have been provided for review. Materials proposed include brick,
architectural metal paneling, and aluminum windows and curtain walls.
LIGHTING PLAN
Lighting plans for the building, parking areas, and athletic fields have been submitted and are in conformance with
the Site Plan Ordinance.
STAFF RECOMMENDATION
The proposed preliminary plat and site plan are in general conformance with the Zoning Ordinance,
Subdivision Ordinance, and Site Plan Ordinance. Staff recommends approval subject to remaining staff
comments.
LOT 1829623 SF19.05 AC15' SAN SEWER EASEMENT10' PUE10' PUE15' SAN SEWEREASEMENT25' SAN SEWEREASEMENT10' PUE25' LANDSCAPEBUFFER25' LANDSCAPE
BUFFER25' LANDSCAPEBUFFER10' PUE25' LANDSCAPEBUFFER27' SANITARYSEWER EASEMENT5' ELECTRICEASEMENT20' STORM SEWER& OVERLANDFLOWAGE EASEMENT5' ELECTRICEASEMENT8' PUE10' PUE LOT 45LOT 44LOT 43LOT 42LOT 41LOT 40LOT 39LOT 38LOT 37LOT 36LOT 35LOT 15LOT 14LOT 16LOT 17LOT 18LOT 27LOT 28LOT 29LOT 30LOT 31LOT 32LOT 33LOT34OUTLOT 'Z'30' SETBACK30' SETBACK30' SETBACK15' SETBACK45' ROWEASEMENTBK 425 PG 303BK 425 PG 38270' ROWASHWORTH ROAD105' ROW
SERENITY DRIVE
AUGUSTA COURT15'20'x30' ELECTRIC EASEMENTBOOK 2019 PAGE 9395DETENTION EASEMENT308.24'120.67'
253.60'305.03'283.00'N73°25'42"E304.99'S05°48'39"E72.10'
S00°18'08"W
128.18'N89°41'52"WR=150
.
0
0
'
Δ
=
9
0
°0
0'00"L=2
3
5
.
6
2
'
C
H
=21
2.13'N4
5
°
1
8
'0
8
"E46.92'
S00°18'08"W
45.00'S89°41'52"EDETENTION EASEMENT965OWNER:
ASHWORH
ACRES
LLCZONING
:
R
-2OWNER:
ASHWORH
ACRES
LLCZONING
:
R
-2OWNER: ASHWORH ACRES LLCZONING: R-2OWNER: JWET HOLDINGS LLCZONING: A-1W 30 ACRESSE FRL 1/4SEC 6-78-26ASHWORTH RDR2
2
/
U
T
E
A
V
E SE WESTOWN PKWYSILVERLEAF LNDAYBREAK DRBELMONT BLVDSERENITY DR DAYBREAK DRROMAN RDCENTURY CR
SUNFLOW
E
R
D
R
SCENIC VI
E
W
D
R
CRESCENT RIDGE DR
JACKPINE DR
WHITEPINE CT CATERINE CTGRAPHIC SCALE0603060120M:\LAND PROJECTS 2017\170538\DWG\FINAL PLAT.DWG9/10/2019 11:46:30 AM WAUKEE ELEMENTARY #10 PLAT 1FINAL PLATVICINITY MAPNOT TO SCALECOPYRIGHT 2019 BISHOP ENGINEERING. THIS DOCUMENT AND THE INFORMATION CONTAINED MAY NOT BEREPRODUCED OR EXCERPTED WITHOUT THE EXPRESS WRITTEN PERMISSION OF BISHOP ENGINEERING.UNAUTHORIZED COPYING OR DISCLOSURE OF CONSTRUCTION USE ARE PROHIBITED BY COPYRIGHT LAW.PARCEL '18-79' AS RECORDED IN BOOK 2018 PAGE 11472SE1/4 SECTION 6-T78N-R26WDALLAS COUNTY, IOWAOWNER/PREPARED FOR:WAUKEE COMMUNITY SCHOOL DISTRICTATTN:KIRK JOHNSON560 SE UNIVERSITY AVEWAUKEE, IA 50263PH: 515-987-5161PREPARED BY:LARRY HYLER PLSBISHOP ENGINEERING3501 104TH STURBANDALE, IA 50322INDEX LEGENDABBREVIATIONS:ACACRESPUEPUBLIC UTILITY EASEMENTTYPTYPICALNNORTHSSOUTHEEASTWWESTYPCYELLOW PLASTIC CAPMPEMINIMUM PROTECTION ELEVATIONSFSQUARE FOOTAGE M MEASURED DISTANCEPRA PREVIOUSLY RECORDED ASPROPERTY CORNER - FOUND AS NOTEDPROPERTY CORNER- PLACED 3/4" IRON PIPEWITH YELLOW PLASTIC CAP ID #14775SECTION CORNER - FOUND AS NOTEDCUT "X" IN PAVEMENTADDRESSLEGEND:REFERENCE NUMBER:3501 104th Street
Des Moines, Iowa 50322-3825
Phone: (515)276-0467 Fax: (515)276-0217
"Planning Your Successful Development"
Bishop Engineering
Civil Engineering & Land Surveying Established 1959DRAWN BY:CHECKED BY:REVISION DATE:PROJECT NUMBER:SHEET NUMBER:WAUKEE ELEMENTARY #10 PLAT 1
WAUKEE, IA
FINAL PLATJMRLDH1705381 OF 1SURVEY NOTES:1.THIS PLAT HAS AN ERROR OR CLOSURE OF LESS THAN 1.0 FEET IN 10,000.0 FEET. EACH LOTWITHIN THIS PLAT HAS AN ERROR OF CLOSURE OF LESS THAN 1.0 FEET IN 5,000.0 FEET.2.ALL CORNERS HAVE BEEN PLACED WITH A 3/4 INCH IRON PIPE UNLESS NOTED OTHERWISE.ALL CORNERS PLACED HAVE A YELLOW PLASTIC IDENTIFICATION CAP NO. 14775.3.THE OWNER (WAUKEE COMMUNITY SCHOOL DISTRICT) SHALL BE RESPONSIBLE FOR OWNINGAND MAINTAINING THE DETENTION BASINS.ZONING:R-2: ONE AND TWO-FAMILY RESIDENTIAL DISTRICTBUILDING SETBACKS:FRONT YARD = 30 FEETSIDE YARD = 15 FEETREAR YARD = 40 FEETADDRESS:LOT 1:965 ASHWORTH RDWAUKEE, IA 50263SITEPROPERTY DESCRIPTION:(WARRANTY DEED - BOOK 2018, PAGE 13659)PARCEL '18-79' OF PLAT OF SURVEY RECORDED INBOOK 2018 PAGE 11472, BEING A PART OF PARCEL "A"AND PART OF PARCEL "B" OF PLAT OF SURVEYRECORDED IN BOOK 1998 PAGE 360, ALL BEING APART OF THE SE 1/4 OF SECTION 6, TOWNSHIP 78NORTH, RANGE 26 WEST OF THE 5TH P.M., DALLASCOUNTY, IOWA.SUBJECT TO AND TOGETHER WITH ANY AND ALLEASEMENTS AND RESTRICTIONS OF RECORD.SAID TRACT CONTAINS 19.05 ACRES.PRELIMINARYTHIS PAGE ONLY