CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: February 22, 2022
AGENDA ITEM:Consideration of approval of a resolution awarding contract [Warrior
Lane Improvements Phase 2 Project]
FORMAT:Resolution
SYNOPSIS INCLUDING PRO & CON: This project includes all materials, equipment, for
the construction of Warrior Lane roadway improvements between Park Rd/Ford Ln and Waukee
Middle School north entrance drive. Also included is construction of parking lot improvements at
the west side of Waukee Middle School. The construction consists of approximately 10,100
square yards of PCC pavement, 690 linear feet of water main, 1,660 linear feet of storm sewer,
earthwork, subgrade preparation, manholes, intakes, sidewalk and shared use path paving, surface
restoration, landscape plantings, unit pavers, and other associated work.
The City received bids on February 8, 2022 with three (3) contractors submitting bids. Absolute
Concrete Construction, Inc. of Slater, IA submitted the lowest bid with a base bid of
$2,536,969.55 which is approximately 1% over the engineer’s estimate of $2,515,111.40.
This project is included in the draft FY 2023-2027 Capital Improvements Plan with a total project
budget of $3,270,000. This project has an interim completion date for the Middle School Parking
lot of August 12, 2022 and a substantial completion date of November 18, 2022 for the remaining
improvements.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $2,536,969.55
STAFF REVIEW AND COMMENT: Staff recommends awarding the project to Absolute
Concrete Construction, Inc. of Slater, IA in the amount of $2,536,969.55.
RECOMMENDATION: Approve the resolution.
ATTACHMENTS: I. Letter of Recommendation
II. Bid Tab
III. Resolution
PREPARED BY:Beth Richardson
REVIEWED BY: Rudy Koester RK
H3B
RESOLUTION 2022-
RESOLUTION MAKING AWARD OF CONSTRUCTION
CONTRACT FOR THE WARRIOR LANE IMPROVEMENTS -
PHASE 2
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE
OF IOWA:
Section 1.That the following bid for the construction of certain public improvements
described in general as the Warrior Lane Improvements - Phase 2, described in the plans and
specifications heretofore adopted by this Council on February 22, 2022, be and is hereby accepted,
the same being the lowest responsive, responsible bid received for such work, as follows:
Contractor:Absolute Concrete Construction, Inc.,of Slater, IA
Amount of bid:$2,536,969.55
Portion of project:All construction work
Section 2.That the Mayor and Clerk are hereby directed to execute the contract with the
contractor for the construction of the public improvements, such contract not to be binding on the
City until approved by this Council.
Section 3.That the contract to be executed shall include the enhancement payment
previously approved following public hearing on February 22, 2022.
PASSED AND APPROVED this 22nd day of February, 2022.
Mayor
ATTEST:
City Clerk
Project #4203290
February 11, 2022
Rudy Koester, Public Works Director/City Engineer
City of Waukee
805 University Avenue
Waukee, IA 50263
RE: Bid Review Letter and Tabulation
Warrior Lane Improvements - Phase 2
City of Waukee
Dear Mr. Koester:
Three (3) bids were received on February 8, 2022 for the above referenced project. We recommend the
City of Waukee waive informalities and irregularities, consider the proposals, and award the contract to
Absolute Concrete Construction, Inc. on the basis of their low bid of $2,536,969.55.
This award is subject to submittal of acceptable bonds and insurance. We are also enclosing a copy of
the bid tabulation for your use.
Upon a decision to award, we will proceed with obtaining the agreement, bonds, and insurance.
We look forward to continuing to work with you and the City of Waukee on the Warrior Lane
Improvements project. Please contact our office if you have any questions or comments regarding the
project or this recommendation.
Sincerely,
SHIVE-HATTERY, INC.
Blake T. Peterson, PE
Civil Engineer
Cc: Becky Schuett, City Clerk
Enc: Bid Tabulation
Bid Date: February 8, 2022 @ 2:00 PM
Client: City of Waukee Bid Location: Waukee City Hall
Project Name: Warrior Lane Improvements Phase 2 S-H Project No.: 4203290
Park Road/Ford Lane to Waukee Middle School
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
1 2010-C-1000 CLEARING AND GRUBBING LS 1.0 $20,000.00 $20,000.00 $8,200.00 $8,200.00 $18,397.75 $18,397.75 $10,000.00 $10,000.00
2 2010-D-1000 TOPSOIL CY 4,433 $10.00 $44,330.00 $7.00 $31,031.00 $7.50 $33,247.50 $7.50 $33,247.50
3 2010-E-1000 EXCAVATION, CLASS 10, ROADWAY CY 717 $10.00 $7,170.00 $38.00 $27,246.00 $40.00 $28,680.00 $40.00 $28,680.00
4 2010-E-1000 EXCAVATION, CLASS 10, ROADWAY, WASTE CY 5,636 $12.00 $67,632.00 $14.00 $78,904.00 $14.75 $83,131.00 $14.50 $81,722.00
5 2010-E-1000 EXCAVATION, CLASS 10, PARKING LOT LS 1.0 $20,000.00 $20,000.00 $45,000.00 $45,000.00 $47,308.00 $47,308.00 $50,000.00 $50,000.00
6 2010-G-1000 SUBGRADE PREPARATION, 12 IN. SY 12,867 $4.00 $51,468.00 $3.50 $45,034.50 $3.70 $47,607.90 $3.75 $48,251.25
7 2010-I-1012 SUBGRADE TREATMENT - CEMENT STABILIZATION TON 159.0 $350.00 $55,650.00 $290.00 $46,110.00 $709.75 $112,850.25 $300.00 $47,700.00
8 2010-I-1000 MODIFIED SUBBASE SY 5,850 $10.00 $58,500.00 $12.50 $73,125.00 $13.25 $77,512.50 $13.00 $76,050.00
9 4020-A-1015 STORM SEWER G-MAIN, TRENCHED, RCP CLASS III, 15 IN. LF 358 $95.00 $34,010.00 $80.00 $28,640.00 $84.25 $30,161.50 $85.00 $30,430.00
10 4020-A-1018 STORM SEWER G-MAIN, TRENCHED, RCP CLASS III, 18 IN. LF 204 $100.00 $20,400.00 $90.00 $18,360.00 $94.75 $19,329.00 $96.00 $19,584.00
11 4020-A-1024 STORM SEWER G-MAIN, TRENCHED, RCP CLASS III, 24 IN. LF 806 $110.00 $88,660.00 $100.00 $80,600.00 $105.25 $84,831.50 $105.00 $84,630.00
12 4020-A-1030 STORM SEWER G-MAIN, TRENCHED, RCP CLASS III, 30 IN. LF 98 $130.00 $12,740.00 $125.00 $12,250.00 $131.50 $12,887.00 $135.00 $13,230.00
13 4020-A-1036 STORM SEWER G-MAIN, TRENCHED, RCP CLASS III, 36 IN. LF 62 $145.00 $8,990.00 $150.00 $9,300.00 $157.75 $9,780.50 $165.00 $10,230.00
14 4020-A-1118 STORM SEWER G-MAIN, TRENCHED, HDPE DUAL-WALL, 18 IN. LF 174 $75.00 $13,050.00 $70.00 $12,180.00 $73.75 $12,832.50 $75.00 $13,050.00
15 4020-D-1036 REMOVAL OF STORM SEWER PIPE LESS THAN OR EQUAL TO 36 IN. LF 340 $30.00 $10,200.00 $20.00 $6,800.00 $21.50 $7,310.00 $20.00 $6,800.00
16 4020-F-1000 STORM SEWER ABANDONMENT, PLUG EA 2 $750.00 $1,500.00 $875.00 $1,750.00 $920.00 $1,840.00 $1,000.00 $2,000.00
17 4030-B-1015 APRON, CONCRETE, 15 IN. DIA. EA 2 $2,500.00 $5,000.00 $2,500.00 $5,000.00 $2,628.25 $5,256.50 $2,500.00 $5,000.00
18 4040-A-1006 SUBDRAIN, 6 IN. LF 920 $15.00 $13,800.00 $25.00 $23,000.00 $26.50 $24,380.00 $13.00 $11,960.00
19 4040-C-1001 SUBDRAIN CLEANOUT EA 5 $900.00 $4,500.00 $825.00 $4,125.00 $867.50 $4,337.50 $500.00 $2,500.00
20 4040-D-1001 SUBDRAIN OUTLETS EA 17 $400.00 $6,800.00 $325.00 $5,525.00 $341.75 $5,809.75 $400.00 $6,800.00
21 SPECIAL REMOVAL OF SUBDRAIN LF 226 $5.00 $1,130.00 $10.00 $2,260.00 $10.75 $2,429.50 $15.00 $3,390.00
22 SPECIAL ROCK CHIMNEY LF 405 $30.00 $12,150.00 $25.00 $10,125.00 $26.50 $10,732.50 $25.00 $10,125.00
23 5010-A-1008 WATER MAIN, TRENCHED, PVC, 8 IN. LF 92 $85.00 $7,820.00 $50.00 $4,600.00 $52.75 $4,853.00 $55.00 $5,060.00
24 5010-A-1012 WATER MAIN, TRENCHED, PVC, 12 IN. LF 466 $95.00 $44,270.00 $85.00 $39,610.00 $89.50 $41,707.00 $90.00 $41,940.00
25 5010-A-2012 WATER MAIN, TRENCHLESS, PVC, 12 IN. LF 100 $200.00 $20,000.00 $200.00 $20,000.00 $210.50 $21,050.00 $210.00 $21,000.00
26 5010-C-1008 FITTING, DUCTILE IRON, 8 IN. EA 4 $900.00 $3,600.00 $750.00 $3,000.00 $788.50 $3,154.00 $800.00 $3,200.00
27 5010-C-1012 FITTING, DUCTILE IRON, 12 IN. EA 15 $1,000.00 $15,000.00 $1,250.00 $18,750.00 $1,314.25 $19,713.75 $1,300.00 $19,500.00
28 SPECIAL CONNECTION TO EXISTING WATER SYSTEM EA 5 $1,500.00 $7,500.00 $3,500.00 $17,500.00 $3,679.50 $18,397.50 $3,500.00 $17,500.00
29 SPECIAL REMOVAL OF WATER MAIN LF 579 $25.00 $14,475.00 $20.00 $11,580.00 $21.25 $12,303.75 $20.00 $11,580.00
30 5020-A-1008 VALVE, GATE, DIP, 8 IN. EA 1 $2,500.00 $2,500.00 $2,000.00 $2,000.00 $2,102.75 $2,102.75 $2,500.00 $2,500.00
31 5020-A-1012 VALVE, GATE, DIP, 12 IN. EA 3 $3,000.00 $9,000.00 $3,500.00 $10,500.00 $3,679.50 $11,038.50 $3,600.00 $10,800.00
32 5020-C-1000 FIRE HYDRANT ASSEMBLY, WM-201 EA 1 $6,500.00 $6,500.00 $6,500.00 $6,500.00 $6,833.50 $6,833.50 $7,000.00 $7,000.00
33 5020-H-1000 FIRE HYDRANT ADJUSTMENT EA 1 $2,000.00 $2,000.00 $1,250.00 $1,250.00 $1,314.25 $1,314.25 $1,350.00 $1,350.00
34 SPECIAL FIRE HYDRANT RELOCATION EA 1 $5,000.00 $5,000.00 $3,750.00 $3,750.00 $3,942.50 $3,942.50 $4,000.00 $4,000.00
35 SPECIAL VALVE BOX ADJUSTMENT EA 3 $500.00 $1,500.00 $300.00 $900.00 $315.50 $946.50 $350.00 $1,050.00
36 6010-A-1060 MANHOLE, STORM SEWER, SW-401, 60 IN. EA 2 $7,000.00 $14,000.00 $6,000.00 $12,000.00 $6,307.50 $12,615.00 $6,500.00 $13,000.00
37 6010-A-1084 MANHOLE, STORM SEWER, SW-401, 84 IN. EA 1 $11,000.00 $11,000.00 $10,500.00 $10,500.00 $11,038.75 $11,038.75 $10,750.00 $10,750.00
38 6010-B-1501 INTAKE, SW-501 EA 7 $3,500.00 $24,500.00 $3,500.00 $24,500.00 $3,679.75 $25,758.25 $3,700.00 $25,900.00
39 6010-B-1503 INTAKE, SW-503 EA 6 $4,500.00 $27,000.00 $5,500.00 $33,000.00 $5,782.25 $34,693.50 $5,700.00 $34,200.00
40 6010-B-1505 INTAKE, SW-505 EA 2 $6,000.00 $12,000.00 $5,500.00 $11,000.00 $5,782.25 $11,564.50 $5,900.00 $11,800.00
41 6010-B-2505 INTAKE, SW-505, MODIFIED EA 1 $15,000.00 $15,000.00 $12,000.00 $12,000.00 $12,615.50 $12,615.50 $13,000.00 $13,000.00
42 6010-B-1506 INTAKE, SW-506 EA 3 $8,000.00 $24,000.00 $9,000.00 $27,000.00 $9,461.75 $28,385.25 $9,500.00 $28,500.00
43 6010-B-1513 INTAKE, SW-513 EA 1 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,256.50 $5,256.50 $5,500.00 $5,500.00
44 6010-E-1200 MANHOLE/INTAKE ADJUSTMENT, MINOR EA 5 $2,000.00 $10,000.00 $1,500.00 $7,500.00 $1,577.00 $7,885.00 $1,600.00 $8,000.00
45 6010-F-1200 MANHOLE/INTAKE ADJUSTMENT, MAJOR EA 1 $4,000.00 $4,000.00 $2,500.00 $2,500.00 $2,628.25 $2,628.25 $2,500.00 $2,500.00
46 6010-G-1000 CONNECTION TO EXISTING MANHOLE EA 1 $2,500.00 $2,500.00 $2,000.00 $2,000.00 $2,102.75 $2,102.75 $2,000.00 $2,000.00
47 6010-G-2000 CONNECTION TO EXISTING INTAKE EA 1 $5,000.00 $5,000.00 $2,000.00 $2,000.00 $2,102.75 $2,102.75 $2,000.00 $2,000.00
48 6010-H-1200 REMOVAL OF INTAKE/MANHOLE EA 2 $1,200.00 $2,400.00 $1,000.00 $2,000.00 $1,051.50 $2,103.00 $1,000.00 $2,000.00
49 SPECIAL CONNECTION TO EXISTING STORM SEWER SYSTEM EA 2 $1,500.00 $3,000.00 $2,500.00 $5,000.00 $2,628.25 $5,256.50 $2,500.00 $5,000.00
Engineer's Estimate
Absolute Concrete
Construction, Inc.
Slater, Iowa
Concrete Technologies, Inc.
Grimes, Iowa
Alliance Construction
Group, LLC
Urbandale, Iowa
Item
Number Item Code Unit Estimated
QuantityDescription
Page 1 of 3
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate
Absolute Concrete
Construction, Inc.
Slater, Iowa
Concrete Technologies, Inc.
Grimes, Iowa
Alliance Construction
Group, LLC
Urbandale, Iowa
Item
Number Item Code Unit Estimated
QuantityDescription
50 7010-A-1006 STD / S-F PCC PAVEMENT, CLASS C, CLASS III, 6 IN. SY 1,507.2 $57.50 $86,664.00 $56.00 $84,403.20 $60.00 $90,432.00 $60.00 $90,432.00
51 7010-A-1007 STD / S-F PCC PAVEMENT, CLASS C, CLASS III, 7 IN. SY 3,726.5 $60.00 $223,590.00 $60.00 $223,590.00 $62.50 $232,906.25 $65.00 $242,222.50
52 7010-A-1009 STD / S-F PCC PAVEMENT, CLASS C, CLASS III, 9 IN. SY 4,242.7 $75.00 $318,202.50 $90.00 $381,843.00 $87.50 $371,236.25 $98.50 $417,905.95
53 7020-B-1008 PAVEMENT, HMA, 8 IN. SY 634.5 $50.00 $31,725.00 $50.00 $31,725.00 $52.75 $33,469.88 $55.00 $34,897.50
54 SPECIAL GRANULAR SHOULDERS, TYPE A TON 46.3 $45.00 $2,083.50 $50.00 $2,315.00 $52.75 $2,442.33 $60.00 $2,778.00
55 7030-A-1200 REMOVAL OF SIDEWALK/SHARED USE PATH SY 936.7 $10.00 $9,367.00 $12.00 $11,240.40 $12.75 $11,942.93 $13.00 $12,177.10
56 7030-A-3000 REMOVAL OF DRIVEWAY SY 4,379.7 $15.00 $65,695.50 $12.00 $52,556.40 $12.75 $55,841.18 $12.50 $54,746.25
57 7030-C-1006 SHARED USE PATH, PCC, 6 IN. SY 1,058.5 $60.00 $63,510.00 $48.00 $50,808.00 $42.25 $44,721.63 $55.00 $58,217.50
58 7030-D-1012 SPECIAL SUBGRADE PREPARATION FOR SHARED USE PATH SY 1,400.4 $6.00 $8,402.40 $6.00 $8,402.40 $6.50 $9,102.60 $6.50 $9,102.60
59 7030-E-1004 SIDEWALK, PCC, 4 IN. SY 541.3 $50.00 $27,065.00 $50.00 $27,065.00 $44.25 $23,952.53 $55.00 $29,771.50
60 7030-E-1005 SIDEWALK, PCC, 5 IN. SY 469.7 $50.00 $23,485.00 $65.00 $30,530.50 $47.50 $22,310.75 $60.00 $28,182.00
61 7030-G-1000 DETECTABLE WARNINGS SF 170 $65.00 $11,050.00 $50.00 $8,500.00 $47.50 $8,075.00 $80.00 $13,600.00
62 7030-H-1-1007 DRIVEWAY, PAVED, PCC, 7 IN. SY 735.0 $60.00 $44,100.00 $60.00 $44,100.00 $54.75 $40,241.25 $75.00 $55,125.00
63 7040-H-1000 PAVEMENT REMOVAL SY 2,616.0 $12.00 $31,392.00 $12.00 $31,392.00 $12.75 $33,354.00 $13.00 $34,008.00
64 SPECIAL RECTANGULAR RAPID FLASHING BEACON, REMOVE AND REINSTALL LS 1.0 $8,000.00 $8,000.00 $927.50 $927.50 $3,154.00 $3,154.00 $2,500.00 $2,500.00
65 8020-B-1000 PAINTED PAVEMENT MARKINGS, SOLVENT/WATERBORNE STA 37.47 $100.00 $3,747.00 $125.00 $4,683.75 $326.00 $12,215.22 $150.00 $5,620.50
66 8020-C-1000 PAINTED PAVEMENT MARKINGS, DURABLE STA 34.64 $300.00 $10,392.00 $85.00 $2,944.40 $226.00 $7,828.64 $100.00 $3,464.00
67 8020-G-1010 PAINTED SYMBOLS AND LEGENDS, SOLVENT/WATERBORNE EA 28 $200.00 $5,600.00 $125.00 $3,500.00 $105.25 $2,947.00 $135.00 $3,780.00
68 8020-G-1020 PAINTED SYMBOLS AND LEGENDS, DURABLE EA 12 $400.00 $4,800.00 $250.00 $3,000.00 $420.75 $5,049.00 $275.00 $3,300.00
69 8020-K-1000 PAVEMENT MARKINGS REMOVED STA 2.57 $500.00 $1,285.00 $450.00 $1,156.50 $525.25 $1,349.89 $500.00 $1,285.00
70 8020-M-1000 GROOVES CUT FOR PAVEMENT MARKINGS STA 34.64 $150.00 $5,196.00 $85.00 $2,944.40 $157.75 $5,464.46 $100.00 $3,464.00
71 8020-N-1000 GROOVES CUT FOR SYMBOLS AND LEGENDS EA 11 $250.00 $2,750.00 $125.00 $1,375.00 $184.00 $2,024.00 $150.00 $1,650.00
72 SPECIAL TYPE A SIGN EA 39 $175.00 $6,825.00 $150.00 $5,850.00 $319.00 $12,441.00 $175.00 $6,825.00
73 SPECIAL POSTS, STEEL, AS PER PLAN EA 29 $200.00 $5,800.00 $150.00 $4,350.00 $121.00 $3,509.00 $175.00 $5,075.00
74 SPECIAL REMOVAL OF TRAFFIC SIGN EA 18 $50.00 $900.00 $75.00 $1,350.00 $113.75 $2,047.50 $100.00 $1,800.00
75 8030-A-1000 TEMPORARY TRAFFIC CONTROL LS 1.0 $25,000.00 $25,000.00 $20,000.00 $20,000.00 $17,767.00 $17,767.00 $35,000.00 $35,000.00
76 9010-B-1010 HYDRAULIC SEED, FERTILIZE, MULCH TYPE 1 (URBAN) AC 2.2 $4,000.00 $8,800.00 $7,500.00 $16,500.00 $6,939.00 $15,265.80 $3,000.00 $6,600.00
77 9010-B-1040 HYDRAULIC SEED, FERTILIZE, MULCH TYPE 4 (TEMP URBAN) AC 3.0 $2,500.00 $7,500.00 $3,500.00 $10,500.00 $3,679.75 $11,039.25 $2,000.00 $6,000.00
78 SPECIAL 1 GALLON PERENNIAL EA 725 $16.00 $11,600.00 $25.00 $18,125.00 $16.00 $11,600.00 $13.00 $9,425.00
79 SPECIAL 2 GALLON PERENNIAL EA 50 $20.00 $1,000.00 $50.00 $2,500.00 $52.75 $2,637.50 $30.00 $1,500.00
80 SPECIAL 3 GALLON SHRUB EA 288 $50.00 $14,400.00 $60.00 $17,280.00 $63.25 $18,216.00 $60.00 $17,280.00
81 SPECIAL 1.75" B&B DECIDUOUS TREE EA 31 $450.00 $13,950.00 $450.00 $13,950.00 $473.25 $14,670.75 $350.00 $10,850.00
82 SPECIAL 2" B&B DECIDUOUS TREE EA 37 $650.00 $24,050.00 $525.00 $19,425.00 $552.00 $20,424.00 $375.00 $13,875.00
83 SPECIAL 6-8' HEIGHT DECIDUOUS B&B TREE - CLUMP EA 24 $350.00 $8,400.00 $450.00 $10,800.00 $473.25 $11,358.00 $375.00 $9,000.00
84 SPECIAL 8' HEIGHT B&B EVERGREEN TREE EA 25 $500.00 $12,500.00 $550.00 $13,750.00 $578.25 $14,456.25 $500.00 $12,500.00
85 SPECIAL 2.5" EXISTING TREE TRANSPLANTING EA 1 $1,000.00 $1,000.00 $750.00 $750.00 $788.50 $788.50 $1,250.00 $1,250.00
86 SPECIAL COMPOST AMENDMENT CY 4.7 $70.00 $329.00 $300.00 $1,410.00 $263.00 $1,236.10 $175.00 $822.50
87 SPECIAL IMPORTED PLANTING SOILS CY 183.7 $70.00 $12,859.00 $120.00 $22,044.00 $105.50 $19,380.35 $105.00 $19,288.50
88 SPECIAL DOUBLE-SHREDDED HARDWOOD MULCH CY 75.3 $45.00 $3,388.50 $40.00 $3,012.00 $42.15 $3,173.90 $110.00 $8,283.00
89 SPECIAL WATERING FOR PLANTINGS MGAL 44.97 $60.00 $2,698.20 $60.00 $2,698.20 $63.25 $2,844.35 $100.00 $4,497.00
90 SPECIAL MOBILIZATION FOR WATERING EACH 12 $350.00 $4,200.00 $400.00 $4,800.00 $420.50 $5,046.00 $600.00 $7,200.00
91 SPECIAL IRRIGATION LS 1.0
$10,000.00 $10,000.00 $10,000.00 $10,000.00 $15,769.50 $15,769.50 $10,000.00 $10,000.00
92 9040-A-1000 SWPPP PREPARATION LS 1.0 $5,000.00 $5,000.00 $2,000.00 $2,000.00 $1,577.00 $1,577.00 $2,500.00 $2,500.00
93 9040-A-2000 SWPPP MANAGEMENT LS 1.0 $10,000.00 $10,000.00 $6,000.00 $6,000.00 $4,731.00 $4,731.00 $4,000.00 $4,000.00
94 9040-D-1009 FILTER SOCK, 9 IN. DIA. LF 1350 $2.50 $3,375.00 $2.75 $3,712.50 $3.00 $4,050.00 $2.25 $3,037.50
95 9040-D-2000 FILTER SOCK, REMOVAL LF 1350 $1.00 $1,350.00 $0.50 $675.00 $0.55 $742.50 $0.50 $675.00
96 9040-N-1001 SILT FENCE LF 1700 $2.50 $4,250.00 $1.75 $2,975.00 $1.85 $3,145.00 $2.25 $3,825.00
97 9040-N-2300 SILT FENCE, MAINTENANCE AND REMOVAL LF 3400 $1.00 $3,400.00 $0.05 $170.00 $0.05 $170.00 $0.75 $2,550.00
98 9040-O-2000 STABILIZED CONSTRUCTION ENTRANCE TON 160.0 $50.00 $8,000.00 $50.00 $8,000.00 $52.75 $8,440.00 $55.00 $8,800.00
99 9040-Q-2000 EROSION CONTROL MULCHING, HYDROMULCHING AC 3.0
$2,000.00 $6,000.00 $3,000.00 $9,000.00 $3,154.00 $9,462.00 $2,000.00 $6,000.00
100 9040-T-1000 INLET PROTECTION DEVICE, SEDIMENT FILTER EA 31.0 $500.00 $15,500.00 $180.00 $5,580.00 $189.25 $5,866.75 $175.00 $5,425.00
101 9040-T-2000 INLET PROTECTION DEVICE, MAINTENANCE AND REMOVAL EA 62 $100.00 $6,200.00 $40.00 $2,480.00 $42.25 $2,619.50 $30.00 $1,860.00
102 SPECIAL EXISTING HYDRODYNAMIC SEPARATOR CLEANOUT EA 10 $800.00 $8,000.00 $3,000.00 $30,000.00 $1,051.50 $10,515.00 $2,000.00 $20,000.00
103 9060-A-1000 CHAIN LINK FENCE, 72 IN. LF 453 $90.00 $40,770.00 $24.90 $11,279.70 $50.00 $22,650.00 $27.00 $12,231.00
104 9060-B-1000 GATE, CHAIN LINK, 72 IN. EA 1 $2,500.00 $2,500.00 $675.00 $675.00 $1,602.25 $1,602.25 $750.00 $750.00
105 9060-E-1000 REMOVAL OF FENCE LF 459 $15.00 $6,885.00 $3.00 $1,377.00 $6.50 $2,983.50 $3.50 $1,606.50
106 9072-A-1000 COMBINED CONCRETE SIDEWALK AND RETAINING WALL CY 40.9 $900.00 $36,810.00 $800.00 $32,720.00 $1,314.25 $53,752.83 $750.00 $30,675.00
Bid Tabulation - February 8, 2022
City of Waukee - Warrior Lane Improvements Phase 2 Page 2 of 3
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineer's Estimate
Absolute Concrete
Construction, Inc.
Slater, Iowa
Concrete Technologies, Inc.
Grimes, Iowa
Alliance Construction
Group, LLC
Urbandale, Iowa
Item
Number Item Code Unit Estimated
QuantityDescription
107 SPECIAL COMMUNITY MARKER SIGN FOOTING EA 2 $2,000.00 $4,000.00 $475.00 $950.00 $3,679.75 $7,359.50 $1,000.00 $2,000.00
108 SPECIAL UNIT PAVERS ON GRANULAR BASE SF 1493.4 $22.00 $32,854.80 $28.00 $41,815.20 $29.50 $44,055.30 $25.00 $37,335.00
109 SPECIAL PCC EDGING BAND SY 126.7 $100.00 $12,670.00 $140.00 $17,738.00 $142.00 $17,991.40 $125.00 $15,837.50
110 11,010-A-1000 CONSTRUCTION SURVEY LS 1.0 $30,000.00 $30,000.00 $25,000.00 $25,000.00 $22,287.50 $22,287.50 $35,000.00 $35,000.00
111 11,020-A-1000 MOBILIZATION LS 1.0 $150,000.00 $150,000.00 $155,000.00 $155,000.00 $160,000.00 $160,000.00 $270,000.00 $270,000.00
112 11,050-A-1000 CONCRETE WASHOUT LS 1.0 $8,000.00 $8,000.00 $6,220.00 $6,220.00 $3,567.00 $3,567.00 $6,500.00 $6,500.00
113 SPECIAL NO EXCUSE ROADWAY AND PARKING LOT COMPLETION ENHANCEMENT PAYMENT LS 1.0 $60,000.00 $60,000.00 $60,000.00 $60,000.00 $60,000.00 $60,000.00 $60,000.00 $60,000.00
114 SPECIAL SITE LIGHTING - PARKING LOT LS 1.0 $40,000.00 $40,000.00 $35,000.00 $35,000.00 $30,725.00 $30,725.00 $50,000.00 $50,000.00
$2,515,111.40 $2,536,969.55 $2,694,039.72 $2,781,917.65
$2,536,969.55 $2,694,039.69 $2,781,917.65
$0.00 $0.03 $0.00
P P P
P P PPPP
I hereby certify that this document was prepared by me or under my direct personal supervision
and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.
BIDDER STATUS FORM INCLUDED
BID SECURITY INCLUDED
ADDENDUM NO. 1 ACKNOWLEDGED
TOTAL BASE BID FROM SUM OF EXTENDED UNIT PRICES
TOTAL BASE BID FROM TOTAL LINE ON PROPOSAL FORM
DIFFERENCE
Name: Blake T. Peterson, PE
Registration No.: 26370
Bid Irregularities (highlighted):
1.) Concrete Technologies, Inc had an incorrect total bid amount listed on the proposal
form; the sum of Extended Unit Prices is $0.03 greater than the total bid amount listed.
It did not affect the outcome of the low bid.
Bid Tabulation - February 8, 2022
City of Waukee - Warrior Lane Improvements Phase 2 Page 3 of 3