Loading...
HomeMy WebLinkAbout2022-03-21 H08B Public Works 2nd Floor Expansion_Award ContractAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: March 21, 2022 AGENDA ITEM:Consideration of approval of resolution awarding contract [Waukee Public Works 2nd Floor Expansion Project] FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: The bids are for furnishing of all labor, equipment, and materials for the construction of improvements for the build-out of a 3,045 SF open space on the 2nd floor into offices, IT data room, work room and an open office area. New egress stairs from the existing mezzanine into the engineering bay are also included. Bids were received on March 10, 2022, with seven general contractors submitting bids. The engineer’s estimate for the project was $487,735, which did not include Bid Alternate 1 prior to the bid opening. Bid Alternate 1 was estimated to be $3,128, which entailed removal and replacement of all existing vinyl tile on the 2nd Floor. Base bid and Bid Alternate 1 combines for a total estimate of $490,863.00. The apparent low bid including Bid Alternate No. 1 was submitted by Core Construction Services, LLC. This bid is approximately 26% below the most recent cost estimate. Based on review of the bids received and the project budget, Farnsworth Group recommends award of the Base Bid and Bid Alternate 1 for a total amount of $490,863.00 to Core Construction Services, LLC. The total project budget is $650,000.00. This project has a completion date of December 16, 2022. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $490,863.00 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Staff recommend approval of the resolution awarding the Base Bid and Bid Alternate 1 to Core Construction Services, LLC of Des Moines, IA [Waukee Public Works – 2nd Floor Expansion Project]. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Bid Summary II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Rudy Koester RK H8B RESOLUTION 2022- RESOLUTION MAKING AWARD OF CONSTRUCTION CONTRACT FOR THE WAUKEE PUBLIC WORKS BUILDING 2ND FLOOR EXPANSION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1.That the following bid for the construction of certain public improvements described in general as the Waukee Public Works Building 2nd Floor Expansion, described in the plans and specifications heretofore adopted by this Council on March 21, 2022, be and is hereby accepted, the same being the lowest responsive, responsible bid received for such work, as follows: Contractor:Core Construction Services, LLC,of Des Moines, IA Amount of bid:$389,550.00 Portion of project:All construction work Section 2.That the Mayor and Clerk are hereby directed to execute the contract with the contractor for the construction of the public improvements, such contract not to be binding on the City until approved by this Council. PASSED AND APPROVED this 21st day of March, 2022. Mayor ATTEST: City Clerk ENGINEERS | ARCHITECTS | SURVEYORS | SCIENTISTS 14225 University Avenue, Suite 110 Waukee, Iowa 50263 p 515.225.3469 www.f-w.com March 14, 2022 City of Waukee 805 University Avenue Waukee, Iowa 50263 Attn: Rudy Koester, Public Works Director Re: Bid Results and Recommendation for the Waukee Public Works – 2nd Floor Expansion Project Dear Mr. Koester: We received the bids for the Waukee Public Works – 2nd Floor Expansion project on Thursday March 10, 2022, at 2:00 p.m. We had great participation with (7) general contractors submitting a bid. We distributed paper and electronic plans to over 40 different General Contractor and Subcontractor companies. We feel this was a very good response to the timing for this bid and it is a clear indication of the cost of this project. Enclosed is the Certified Bid Tabulation for your use and review of the bids received. The most recent Architect’s Cost Estimate, dated February 2, 2022, was $487,735, which did not include Alternate #1. Prior to the bid opening, we estimated Alternate #1 at $3,128, which combines for a total estimate of $490,863. The apparent low bid including Alternate No. 1, submitted by Core Construction Services LLC, is $387,000 + $2,550 = $389,550 which is about 26 percent below the most recent cost estimate. There was only a 0.76% difference between the low bid and the second low bid. Based on the strong participation and the bids received, we recommend moving forward with awarding the contract for construction, including Alternate #1, for the Waukee Public Works – 2nd Floor Expansion project, in the amount of $389,550 to Core Construction Services, LLC of Des Moines, Iowa. Sincerely, FARNSWORTH GROUP, INC. Kristofer J. Orth, AIA Architecture Principal Enclosures: Certified Bid Tabulation Thursday, March 10, 2022 @ 2:00 PM Bid Base Bid Alternate 1 Sec. GENERAL CONTRACTOR 10%12 Core Construction Services, LLC Des Moines, IA X X X Munro Construction Johnston, IA X X X Edge Commercial Grimes, IA X X X Lang Construction Grimes, IA X X X GTG Construction Johnston, IA X X X Eick & Day Construction, LLC Johnston, IA X X X Burkett Construction De Soto, IA X X X $487,735.00 $3,128.00Farnsworth Group Estimate $397,699.00 $3,650.00 $460,900.00 $3,500.00 $516,000.00 $4,100.00 $427,400.00 $3,200.00 $439,917.00 $2,569.00 $389,000.00 $3,500.00 Remove & Replace Existing Vinyl Composition Tile CERTIFIED BID TABULATION SHEET Waukee Public Works 2nd Floor Expansion Waukee, Iowa Add. Add. $387,000.00 $2,550.00 KRISTOFER J. ORTH, AIA I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL SUBMISSION DESCRIBED BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL SUPERVISION AND RESPONSIBLE CHARGE. I AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF IOWA. SIGNATURE: NAME: LICENSE RENEWAL DATE: PAGES OR DIVISIONS COVERED: 06/30/2023 CERTIFIED BID TABULATION SHEET