HomeMy WebLinkAbout2022-03-21 I01J_02 Little Walnut Creek Trunk Sewer Phase 5_Set PHAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: March 21, 2022 AGENDA ITEM:Consideration of approval of a resolution ordering construction of the Little Walnut Creek Trunk Sewer Extension – Phase 5 and fixing a date for hearing thereon and taking bids therefor FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: The project is to construct the Little Walnut Creek Trunk Sewer Extension – Phase 5 project including all labor, materials and equipment necessary for approximately 3,000 linear feet of 8-inch diameter sanitary sewer in open cut and augured in steel casing, water main service pipe, manholes, excavation and backfill, surface restoration and miscellaneous associated work, including cleanup. Little Walnut Creek Trunk Sewer Extension – Phase 5 project is located along NW 10th Street north of NW Douglas Parkway. This project is part of the draft FY 2023 CIP with a total project budget of $1,400,000. The project schedule is set to take bids on April 12, 2022 with report of bids to occur at the April 18, 2022 regular City Council meeting. The project is anticipated to start construction in May 2022 with an interim completion date of November 25, 2022 for the sewer to be operational and a completion date of May 31, 2023 for all remaining work (primarily site restoration). FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the Resolution ATTACHMENTS: I. Notice of Public Hearing II. Resolution PREPARED BY:Beth Richardson REVIEWED BY:Rudy Koester RK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1J2 RESOLUTION 2022- RESOLUTION ORDERING CONSTRUCTION OF THE LITTLE WALNUT CREEK TRUNK SEWER EXTENSION - PHASE 5, AND FIXING A DATE FOR HEARING THEREON AND TAKING OF BIDS THEREFOR WHEREAS, it is deemed advisable and necessary to construct certain public improvements described in general as the Little Walnut Creek Trunk Sewer Extension - Phase 5; and WHEREAS, the City has caused to be prepared plans, specifications and form of contract, together with estimate of cost, which are now on file in the office of the City Clerk for public inspection, for the construction of the public improvements; and WHEREAS, the plans, specifications and form of contract are deemed suitable for the making of the public improvements; and WHEREAS, before the plans, specifications, form of contract and estimate of cost may be adopted, and a contract for the construction of the public improvements is entered into, it is necessary, pursuant to Chapter 26, Code of Iowa, to hold a public hearing and to advertise for bids: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1.That it is hereby determined that it is necessary and advisable to construct certain public improvements described in general as the Little Walnut Creek Trunk Sewer Extension - Phase 5, in the manner set forth in the plans and specifications and form of contract, above referred to, the cost thereof to be paid in accordance with the provisions as set out in the posted Notice to Bidders and published Notice of Public Hearing; the public improvements being more generally described as follows: Construct Little Walnut Creek Trunk Sewer Extension – Phase 5 including all labor, materials and equipment necessary for approximately 3,000 linear feet of 8-inch through 24-inch diameter sanitary sewer in open cut and augured in steel casing, water main service pipe, manholes, excavation and backfill, surface restoration and miscellaneous associated work, including cleanup. The Little Walnut Creek Trunk Sewer Extension – Phase 5 project is located along NW 10th Street north of NW Douglas Parkway. Section 2.That the amount of the bid security to accompany each bid shall be in an amount which shall conform to the provisions of the notice to bidders approved as a part of the specifications. BE IT FURTHER RESOLVED, that the City Clerk be and is hereby directed to post a notice to bidders once in a relevant contractor plan room service with statewide circulation and a relevant construction lead generating service with statewide circulation and on an internet site sponsored by either the City or a statewide association that represents the City. Posting shall be not less than thirteen clear days nor more than forty-five days prior to April 12, 2022, which is hereby fixed as the date for receiving bids. The bids are to be filed prior to 2:00 P.M., on such date. The City Council hereby delegates to the City Administrator or his designee the duty of receiving, opening and tabulating bids for construction of the Project. Bids shall be received and opened as provided in the public notice and the results of the bids shall be considered at the meeting of this Council on April 18, 2022, at 5:30 P.M. BE IT FURTHER RESOLVED, that the City Clerk be and is hereby directed to publish notice of hearing once in a legal newspaper, printed wholly in the English language, published at least once weekly and having general circulation in this City. Publication shall be not less than four clear days nor more than twenty days prior to the date hereinafter fixed as the date for a public hearing on the plans, specifications, form of contract and estimate of costs for the project, the hearing to be at 5:30 P.M. on April 18, 2022. PASSED AND APPROVED this 21st day of March, 2022. Mayor ATTEST: City Clerk NPH-1 275347 NOTICE OF PUBLIC HEARING NOTICE OF PUBLIC HEARING ON PLANS AND SPECIFICATIONS, PROPOSED FORM OF CONTRACT AND ESTIMATE OF COST FOR CONSTRUCTION OF THE LITTLE WALNUT CREEK TRUNK SEWER EXTENSION – PHASE 5 FOR THE CITY OF WAUKEE, IOWA. The City Council of Waukee, Iowa, will hold a public hearing on the proposed Plans, Specifications, Form of Contract and Estimate of Costs for the construction of the above referenced public improvements at 5:30 P.M. on April 18, 2022. At said hearing, any interested person may appear and file objections thereto or to the cost of the improvements. The work to be done is as follows: LITTLE WALNUT CREEK TRUNK SEWER EXTENSION – PHASE 5 Construct Little Walnut Creek Trunk Sewer Extension – Phase 5 including all labor, materials and equipment necessary for approximately 3,000 linear feet of 8-inch through 24-inch diameter sanitary sewer in open cut and augured in steel casing, water main service pipe, manholes, excavation and backfill, surface restoration and miscellaneous associated work, including cleanup. The Little Walnut Creek Trunk Sewer Extension – Phase 5 project is located along NW 10th Street north of NW Douglas Parkway. Due to public health concerns and guidance, in accordance with Iowa Code Sections 21.4(1)(b) and 21.8, this meeting of the Waukee City Council will be conducted with two different options for public participation: 1) Members of the public wishing to attend in person may do so in the Council Chambers at Waukee City Hall. 2) Members of the public wishing to participate electronically may do so via Zoom at the following link or phone numbers: https://zoom.us/j/352651371 Meeting ID: 352-651-371 Or by phone: +1 646-558-8656 or +1 312-626-6799 or +1 301-715-8592 In-person meetings are subject to change under certain circumstances, including but not limited to higher than average participation or changes in health guidelines. If the meeting shall be held electronically only, notice shall be posted to the City website (Waukee.org) and City NPH-2 275347 social media. Questions regarding meeting format may also be directed to the City Clerk’s office at 515-978-7904. All persons wishing to observe or participate in this meeting may do so via Zoom or telephone. Please contact the City Clerk’s office at 978-7904 or bschuett@waukee.org if you have questions or electronic accessibility issues. This notice is given by order of the Council of the City of Waukee, Iowa. CITY OF WAUKEE, IOWA Courtney Clarke, Mayor ATTEST: Rebecca D. Schuett, City Clerk