Loading...
HomeMy WebLinkAbout2022-04-04 I03B NW Meredith Dr Overlay, NW 10th St to N Warrior Ln_Award ContractAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: April 4, 2022 AGENDA ITEM:Consideration of approval of resolution awarding contract [NW Meredith Drive Overlay Project, NW 10th Street to N Warrior Lane] FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: The bids are for furnishing of all materials, labor and equipment necessary for installation of approximately: 130 CY of grading, 16,000 SY of subgrade preparation, 300 tons of subgrade treatment, 4,600 tons of HMA pavement, 800 tons of granular shoulders, 66 LF of storm sewer, 200 stations of durable pavement marking, temporary traffic control, 40 tons of rip rap, and miscellaneous related work and appurtenances. Bids were received on March 30, 2022, with three general contractors submitting bids. The engineer’s estimate for the project was $649,747.00, The apparent low bid was submitted by InRoads, LLC of Des Moines, Iowa for $638,555.30. This bid is approximately 1.72% below the engineer’s estimate. Based on review of the bids received and the project budget, Foth recommends award of the project for a total amount of $638,555.30 to InRoads, LLC. The total project budget is $850,000.00. This project has a completion date of July 29, 2022. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $490,863.00 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Staff recommend approval of the resolution awarding the contract to InRoads, LLC of Des Moines, IA [NW Meredith Drive Overlay Project, 10th Street to N. Warrior Lane ]. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Bid Summary II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Rudy Koester RK I3B RESOLUTION 2022- RESOLUTION MAKING AWARD OF CONSTRUCTION CONTRACT FOR THE NW MEREDITH DRIVE OVERLAY NW 10TH STREET TO N. WARRIOR LANE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1.That the following bid for the construction of certain public improvements described in general as the NW Meredith Drive Overlay NW 10th Street to N. Warrior Lane, described in the plans and specifications heretofore adopted by this Council on April 4, 2022, be and is hereby accepted, the same being the lowest responsive, responsible bid received for such work, as follows: Contractor:InRoads, LLC,of Des Moines, IA Amount of bid:$638,555.30 Portion of project:All construction work Section 2.That the Mayor and Clerk are hereby directed to execute the contract with the contractor for the construction of the public improvements, such contract not to be binding on the City until approved by this Council. PASSED AND APPROVED this 4th day of April, 2022. Mayor ATTEST: City Clerk 8191 Birchwood Court, Suite L Johnston, IA 50131 Phone: (515) 254-1393 Fax: (515) 254-1642 March 31, 2022 Rudy Koester Director of Public Works 805 University Avenue Waukee, IA 50263 RE: Recommendation of Award of Contract NW Meredith Drive Overlay NW 10th Street to N. Warrior Lane Dear Mr. Koester: The Bid Letting for the referenced Project was held on March 30, 2022 and bids were received from a total of three (3) different bidders. A summary of the bids is as follows: Bidder Location Total Bid Amount InRoads, LLC Des Moines, IA $638,555.30 OMG Midwest Inc. Ankeny, IA $640,389.88 Grimes Asphalt & Paving Corp. Des Moines, IA $719,003.65 Our Engineer’s Opinion of Probable Cost for the Total Bid Amount for this project was $649,747.00. However, the Engineer’s Opinion of Probable Cost used a different quantity of Rip Rap than was included with the plans and project specifications. The Engineer’s Opinion of Probable Cost should have been $645,407.00. Attached please find a detailed Tabulation of Bids for your information. We have reviewed the lowest responsive bid and bid attachments and everything appears to be in order. It is recommended that the City of Waukee award contract for this work to InRoads, LLC, of Des Moines, Iowa in the amount of $638,555.30. Appropriate contract documents have been prepared for signatures and forwarded to the Contractor for City Council award on April 4, 2022. Please let me know if you have any questions or need additional information. Sincerely, Foth Infrastructure and Environment, LLC Robert Kline, P.E. Lead Civil Engineer Encl: Tabulation of Responsive Bids