HomeMy WebLinkAbout2022-05-16 I01H_05 Public Work Site Expansion Phase 1_Change Order 1AGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: May 16, 2022
AGENDA ITEM:Consideration of approval of Change Order No. 1 to Core Construction
Services for the Waukee Public Works Site Expansion– Phase 1 project
increasing the contract amount by $15,712.16.
FORMAT:Consent Agenda
SYNOPSIS INCLUDING PRO & CON: Change Order No. 1 is to increase the depth of
underslab drainage piping to reduce potential frost heave and add additional piping to connect to
deeper storm sewer.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this
Change Order increases the contract price in the amount of $15,712.16.
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve the change order.
ATTACHMENTS: I. Change Order No. 1
II. Letter of Recommendation
PREPARED BY:Beth Richardson
REVIEWED BY:Sara Kappos SKK
PUBLIC NOTICE INFORMATION –
NAME OF PUBLICATION:
DATE OF PUBLICATION:
I1H5
ENGINEERS | ARCHITECTS | SURVEYORS | SCIENTISTS
14225 University Avenue, Suite 110
Waukee, Iowa 50263
p 515.225.3469
www.f-w.com
May 11, 2022
City of Waukee
805 University Avenue
Waukee, Iowa 50263
Attn: Rudy Koester, Public Works Director
Re: Change Order #001
Waukee Public Works Site Expansion Phase 1
Dear Mr. Koester:
Attached please find a detailed Change Order for City Council approval on May 16, 2022.
Change Description:
1. Sheet S1.1 – OVERALL FOUNDATION PLAN
a. Revise Underslab Drainage Plan, by increasing depth of 670 LF of piping, 2’-3”, to lower
the water table and therefore reduce the potential frost heave of the subgrade within
the unheated building.
b. Adjust routing of piping and add 112 LF of underslab drainage pipe to connect to deeper
storm sewer piping.
We have reviewed the submitted quotes from Core Construction and they appear to be in line with
current industry pricing. If City Staff concurs with this proposed additional pricing, we recommend the
City of Waukee Increase the contract price in the amount of $15,712.16 to complete the additional work
associated with Change Order Number 001. If you have any questions, please contact me.
Sincerely,
FARNSWORTH GROUP, INC.
Kristofer J. Orth, AIA
Architecture Principal
Enclosures: Change Order #001, dated 05/10/2022
Brad Deets, City Administrator
COR #001 3093 NW Prairie Lane
Des Moines, IA 50313
(515) 264-5156 Office
(515) 257-4311 Fax
TO: Farnsworth Group PROJECT NAME:
14225 University Ave Suite 110 PROJECT NUMBER:
Waukee IA 50263 SUBJECT:
FROM:
ATTN: Kristofer Orth DATE:
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
1
2 Deepen and extend drain tile Prime $ 1.00 $ 14,753.20 $ 14,753.20
3
4
5
6
7
8
91
92
93
94
95
96
97
98
99
100
Subtotal -$ -$ -$ 14,753.20$ 14,753.20$
Small Tools Allowance 0.00%
Warranty 0.00% 0.00% 0.00% 0.00%
Overhead & Profit 10.00% 10.00% 10.00% 5.00% $ 737.66 $ 737.66
Bond 1.50% 1.50% 1.50% 1.50% $ 221.30 $ 221.30
The Contract Schedule will Increase / Decrease by:0 days TOTAL COR:
Clarifications & Exclusions:
Item #/
Cost Code Description Sub/Vendor Quantity Unit
15,712.16$
Labor Material Subcontractor TOTALEquipment
WPW Site Expansion Phase1
21114
Drain Tile Depth
Jeremy Roush
3/16/22
JobNo.COR-Log.JobName REV 7-17-19.xlsx 1 of 1 3/17/2022
PRIME EXCAVATING, INC
CHAD LUNNING 641-590-7694 CLUNNING@PRIMEEXCAVATINGINC.COM
GARY GRAF 515-210-7337 GGRAF@PRIMEEXCAVATINGINC.COM
GRANT ARNDORFER 515-341-6881 GARNDORFER@PRIMEEXCAVATINGINC.COM
ADDRESS 2136 MAMIE EISENHOWER AVE, BOONE, IA 50036
CHANGE ORDER
REASON FOR CHANGE ORDER
CHANGE IN QUANTITY AND DEPTH OF UNDERSLAB DRAINAGE PLAN. ORIGINAL PLAN CALLED
FOR APPROXIMATELY 670 LF OF 4" UNDERSLAB DRAIN ASSUMED TO BE 3' DEEP. NEW PLAN
CALLS FOR APPROXIMATELY 782 LF OF 4" UNDERSLAB DRAIN AT 5-6 FEET DEEP. THIS
CHANGE ORDER WILL ADD AN ADDITION LINEAR FOOTAGE COST TO THE ORIGINAL
QUANTITY FOR DEPTH & BACKFILL, ALONG WITH ADDITIONAL LINEAR FOOTAGE COST OF
ADDED PIPE. OUR ORIGINAL UNIT PRICE FOR THE 4" UNDERSLAB DRAINAGE PLAN WAS
$22/LF.
CHANGE ORDER NUMBER
1001
BILL TO OWNER OF PROJECT PROJECT NAME & LOCATION GENERAL CONTRACTOR CHANGE ORDER DATE PREPARED BY
CITY OF WAUKEE CITY OF WAUKEE
WAUKEE PUBLIC WORKS SITE
EXPANSION PHASE 1 -
WAUKEE, IA
CORE CONSTRUCTION 03/03/2022 GRANT ARNDORFER
QUANTITY UNIT TYPE DESCRIPTION UNIT PRICE TOTAL
670 LF ADDITIONAL 2-3' DEPTH TO ORIGINAL UNDERSLAB DRAINAGE PLAN $14.00 $9,380.00
112 LF ADDITIONAL LENGTH OF UNDERSLAB DRAINAGE PLAN $36.00 $4,032.00
$0.00 $0.00
$0.00 $0.00
NOTES $0.00 $0.00
THE UNIT PRICE FOR ADDITIONAL DEPTH TRANSLATES INTO $5/FT FOR EQUIPMENT, $5/FT
FOR LABOR, AND $4/FT FOR BACKFILL MATERIAL, TOTALING $14/FT.
$0.00 $0.00
$0.00 $0.00
THE UNIT PRICE FOR ADDITIONAL LENGTH TRANSLATES INTO $10/FT FOR EQUIPMENT,
$20/FT FOR LABOR, AND $6/FT FOR MATERIAL, TOTALING $36/FT.
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
10.00%PERCENT OVERHEAD AND PROFIT $13,412.00 $1,341.20
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
THIS CHANGE ORDER INCLUDES ALL LABOR, EQUIPMENT, MATERIALS, SHORING, AND DEWATERING TO INSTALL ABOVE
ITEMS.TOTAL $14,753.20
SIGNATURE OF ACCEPTANCE:DATE:
Proposal Request
14225 University Avenue, Suite 110 | Waukee, IA 50263 | p 515.225.3469 | www.f-w.com
ENGINEERS | ARCHITECTS | SURVEYORS | SCIENTISTS
Proposal Request Number: 01
Issue Date: February 9, 2022 Owner: City of Waukee, Iowa
Project Name: Waukee Public Works Site Expansion Ph1
Project Number: 0201440.00
To: Core Construction Services, LLC
Contract for: General Construction
Contract Dated: December 17, 2021
Please submit an itemized quotation for changes in the contract sum and time incidental to proposed modifications to the contract
documents described above.
THIS IS NOT A CHANGE ORDER OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED BELOW.
Description:
Sheet S1.1 – OVERALL FOUNDATION PLAN
1. REVISE Underslab Drainage Plan per attached Supplementary Drawing S1.1-2.
Issued By:
FARNSWORTH GROUP, INC.
Kristofer J. Orth, AIA
Architecture Principal
Attachments:
S1.1-2 Underslab Drainage Plan PR-01
CONNECT TO STORM
SEWER-SEE CIVIL
DWGS
4"⌀PERFORATED
DRAIN PIPE-TYP
CONNECT TO STORM
SEWER-SEE CIVIL
DWGS
STORM SEWER PIPE
& STRUCTURES -SEE
CIVIL DWGS
STORM SEWER PIPE &
STRUCTURES -SEE CIVIL DWGS
STORM SEWER PIPE
& STRUCTURES -SEE
CIVIL DWGS
IE 1018.00'
IE 1016.0'
CONTRACTOR
OPTION: CONNECT
TO EAST SW PIPE IN
LIEU OF NORTH PIPEIE 1018.00'IE 1017.50'IE 1016.25'IE 1016.00'
IE 1018.00'
IE 1016.50'
IE 1016.25'
IE 1016.00'
IE 1016.25'
BUILDING FFE 1021.50'
PROVIDE 8' LENGTH OF
SOLID PIPE BELOW FTG
PROVIDE 8' LENGTH OF
SOLID PIPE BELOW FTG
4"
⌀
PE
R
F
O
R
A
T
E
D
DR
A
I
N
P
I
P
E
-TY
P
REVIEWED:
DATE:
DRAWN:
PROJECT NO.:
2/
9
/
2
0
2
2
1
0
:
5
7
:
2
0
A
M
02/09/22
PR-01 S1.1-2
NTK
NTK
0201440.00
UNDERSLAB DRAINAGE PLAN
Waukee Public Works Site Expansion Phase 1
City of Waukee, Iowa
1" = 40'-0"3 UNDERSLAB DRAINAGE PLAN
PR-01