Loading...
HomeMy WebLinkAbout2022-05-16 I01H_10 NW Douglas Pkwy Culvert and Pond Improvements_Pmt Est 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 16, 2022 AGENDA ITEM:Consideration of approval of Payment Estimate No. 1 to Elder Corporation for the NW Douglas Parkway Culvert and Pond Improvements Project, in the amount of $289,968.07. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Elder Corporation requested Payment Estimate No. 1 for the work completed on the NW Douglas Parkway Culvert Improvements Project, in the amount of $289,968.07.Veenstra & Kimm, Inc. has reviewed the payment estimate and recommends payment. The partial payment is for the pay period ending April 30, 2022. This pay estimate is for mobilization, testing, construction staking, clearing and grubbing, topsoil stripping, special backfill, excavation, pond dredging, structural concrete, and SWPPP preparation and management. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $289,968.07 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Payment Estimate No. 1 ATTACHMENTS: I. Payment Estimate No. 1 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1H10 May 12, 2022 Rudy Koester Public Works Director City of Waukee 805 University Avenue Waukee, Iowa 50263 WAUKEE, IOWA NW DOUGLAS PARKWAY CULVERT AND POND IMPROVEMENTS PAY ESTIMATE NO. 1 Enclosed are three copies of Partial Payment Estimate No. 1 for the period between December 20, 2021 and April 30, 2022 in accordance with the contract between the City of Waukee and Elder Corporation for the above mentioned project. Partial Payment Estimate No. 1 is for pond dredging, grading, and the pedestrian underpass. We have checked the estimate and recommend payment by the City Council of the City of Waukee to Elder Corporation in the amount of $289,968.07. Please sign all three copies of Partial Payment Estimate No. 1 in the space provided. Return one signed copy to our office and one signed copy with payment to Elder Corporation. The remaining copy is for the City of Waukee’s records. If you have any questions or comments, please contact us at 515-225-8000. VEENSTRA & KIMM, INC. Jordan Kappos JDK 292292 Enclosures cc: Becky Schuett, City of Waukee (via e-mail) Sara Kappos, City of Waukee (via e-mail) Beth Richardson, City of Waukee (via e-mail) Tracy Lovetinsky, City of Waukee (via e-mail) Elder Corporation (via e-mail) QUANTITY VALUE ESTIMATED AUTHORIZED COMPLETED COMPLETED ITEM NO. DESCRIPTION UNIT (ORIG. CONT.) (INCL. C.O.'S) TO DATE UNIT PRICE TO DATE 1 Mobilization LS 1.00 1.00 0.20 $179,341.71 $35,868.34 2 Traffic Control LS 1.00 1.00 0.00 $1,950.00 $0.00 3 Testing LS 1.00 1.00 0.10 $12,875.00 $1,287.50 4Construction Staking LS 1.00 1.00 0.10 $12,000.00 $1,200.00 5Construction Entrance EA 2.00 2.00 0.00 $3,900.00 $0.00 6 Clearing and Grubbing LS 1.00 1.00 1.00 $13,500.00 $13,500.00 7 Topsoil, Strip, Salvage and Respread CY 21,000.00 21,000.00 7,182.00 $5.00 $35,910.00 8Special Backfill TONS 550.00 550.00 118.81 $60.75 $7,217.71 9Compacting Backfill Adjacent to Bridges, Culverts or Structures CY 285.00 285.00 0.00 $16.00 $0.00 10 Flooded Backfill CY 295.00 295.00 0.00 $84.00 $0.00 11 Compaction with Moisture Control (Structures) CY 8,850.00 8,850.00 0.00 $2.50 $0.00 12 Excavation, Class 20 CY 8,400.00 8,400.00 6,158.00 $11.00 $67,738.00 13 Pond Dredging CY 16,879.00 16,879.00 9,356.00 $9.25 $86,543.00 14 Trail Grading CY 5,723.00 5,723.00 0.00 $3.00 $0.00 15 Forebay Grading CY 7,683.00 7,683.00 0.00 $6.75 $0.00 16 Roadway Grading CY 1,335.00 1,335.00 0.00 $3.00 $0.00 17 Dam Grading CY 3,039.00 3,039.00 0.00 $4.25 $0.00 18 Dam Drainage System LF 200.00 200.00 0.00 $60.50 $0.00 19 Dam Outlet for Pond LS 1.00 1.00 0.00 $146,900.00 $0.00 20 15" RCP Storm Sewer LF 180.00 180.00 0.00 $87.00 $0.00 21 18" RCP Storm Sewer LF 69.00 69.00 0.00 $90.50 $0.00 22 72" RCP Storm Sewer LF 145.00 145.00 0.00 $570.00 $0.00 23 15" Headwall and Flapgate EA 1.00 1.00 0.00 $12,900.00 $0.00 24 18" Headwall and Flapgate EA 1.00 1.00 0.00 $13,900.00 $0.00 25 18" Culvert Flared End Section EA 1.00 1.00 0.00 $2,800.00 $0.00 26 72" Culvert Flared End Section EA 1.00 1.00 0.00 $28,000.00 $0.00 27 SW‐512 Intake EA 1.00 1.00 0.00 $2,600.00 $0.00 28 Structural Concrete (RCB Culvert) CY 932.60 932.60 80.00 $618.00 $49,440.00 29 Reinforcing Steel LB 131,036.00 131,036.00 0.00 $2.16 $0.00 30 Rip‐Rap, Class E Revetment TONS 662.00 662.00 0.00 $63.50 $0.00 31 Gabion Baskets CY 120.00 120.00 0.00 $380.00 $0.00 32 Rolled Erosion Control Products, Type 3 SY 3,000.00 3,000.00 0.00 $1.70 $0.00 33 Filter Socks, 8" LF 4,000.00 4,000.00 0.00 $2.32 $0.00 34 Curtain Wall LF 200.00 200.00 0.00 $41.20 $0.00 35 Stormwater Pollution Prevention Plan (SWPPP) Preparation LS 1.00 1.00 1.00 $1,550.00 $1,550.00 36 Stormwater Pollution Prevention Plan (SWPPP) Management LS 1.00 1.00 0.10 $3,400.00 $340.00 37 Hydro‐Seeding, Fertilize and Mulch, Type 1 AC 6.50 6.50 0.00 $4,789.50 $0.00 38 Hydro‐Seeding, Fertilize and Mulch, Type 2 AC 15.00 15.00 0.00 $3,811.00 $0.00 39 City Borrow, Douglas Pkwy Site CY 17,000.00 17,000.00 0.00 $4.50 $0.00 40 Prairie Rose Plat 2 Borrow CY 22,000.00 22,000.00 0.00 $3.25 $0.00 41 Native Seed Preparation AC 7.50 7.50 0.00 $309.00 $0.00 42 Native Seeding AC 7.50 7.50 0.00 $1,854.00 $0.00 43 Ornamental Metal Railing on Culvert LF 178.50 178.50 0.00 $216.30 $0.00 44 Ornamental Metal Gate, 14' Wide LS 1.00 1.00 0.00 $1,905.50 $0.00 45 Ornamental Metal Railing on Footing LF 201.00 201.00 0.00 $227.63 $0.00 BID ITEMS PROJECT TITLE: NW Douglas Parkway Culvert and Pond Improvements Contractor:   Elder Corportation Original Contract Amount:   Pay Period: December 20, 2021 to April 30, 2022 ESTIMATE OF CONSTRUCTION COMPLETED PARTIAL PAYMENT NO. 1 $2,514,850.00                Date:  5/11/22 292292 Page 1 of 4 QUANTITY VALUE ESTIMATED AUTHORIZED COMPLETED COMPLETED ITEM NO. DESCRIPTION UNIT (ORIG. CONT.) (INCL. C.O.'S) TO DATE UNIT PRICE TO DATE BID ITEMS 46 Temporary Stream Diversion EA 1.00 1.00 0.00 $65,600.00 $0.00 47 Underpass Lighting LS 1.00 1.00 0.00 $18,421.55 $0.00 48 Anti‐Graffiti Coating SY 750.00 750.00 0.00 $23.69 $0.00 49 Form Liner Mockup LS 1.00 1.00 1.00 $4,635.00 $4,635.00 50 Form Liner SY 105.00 105.00 0.00 $185.40 $0.00 $305,229.55Total Value Completed ‐ Bid Items 292292 Page 2 of 4 Item No. Description Unit Quantity Unit Price Extended Cost 1 $0.00 2 $0.00 3 $0.00 4 $0.00 5 $0.00 $0.00 MATERIALS STORED SUMMARY Total Materials Stored 292292 Page 3 of 4 Total Completed $305,229.55 Total Completed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Completed $305,229.55 Total Completed $0.00 $305,229.55 $15,261.48 $289,968.07 $0.00 $289,968.07 $289,968.07 is recommended for approval for payment in accordance with the terms of the Contract. $2,514,850.00 $2,514,850.00 $289,968.07 $289,968.07 $2,224,881.93 12.1% Elder Corporation Signature Signature Signature Name     Jordan Kappos Name Name Title     Project Engineer Title Title Date Date Date $0.00 SUMMARY Bid Item Subtotal $2,514,850.00 Original Contract 1 Description/Notes 2 3 6 7 $0.00 Total Approved Veenstra & Kimm, Inc. 9 10 Total Previously Approved City of Waukee Approved:   CONTRACT SUMMARY $0.00 BALANCE ORIGINAL CONTRACT AMOUNT TOTAL PARTIAL PAYMENTS INCL THIS PAYMENT PERCENT COMPLETE TOTAL CONTRACT AMOUNT PLUS CHANGE ORDERS THIS PARTIAL PAYMENT $0.00 Amount Due This Request $0.00 $0.00 $0.00 $0.00 $0.00 Recommended By: Contractor:   Note:  The amount 6 7 4 5 8 2 3 $0.00 $0.00 Period $0.00 Total Completed Plus Materials Stored Total Change Orders APPROVED CHANGE ORDERS $0.00 $0.00 $0.00 $0.00 $0.00 4 5 Change Order No. 1 Total Approved $0.00 9 10 Partial Payment No. APPROVED PARTIAL PAYMENTS Revised Contract Price $0.00 8 $0.00 $0.00 Total Approved $2,514,850.00 Total Materials Stored Retainage (5%) Total Earned Less Retainage 292292 Page 4 of 4