HomeMy WebLinkAbout2022-05-16 I01H_10 NW Douglas Pkwy Culvert and Pond Improvements_Pmt Est 1AGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: May 16, 2022
AGENDA ITEM:Consideration of approval of Payment Estimate No. 1 to Elder
Corporation for the NW Douglas Parkway Culvert and Pond
Improvements Project, in the amount of $289,968.07.
FORMAT:Consent Agenda
SYNOPSIS INCLUDING PRO & CON: Elder Corporation requested Payment Estimate No. 1
for the work completed on the NW Douglas Parkway Culvert Improvements Project, in the
amount of $289,968.07.Veenstra & Kimm, Inc. has reviewed the payment estimate and
recommends payment.
The partial payment is for the pay period ending April 30, 2022. This pay estimate is for
mobilization, testing, construction staking, clearing and grubbing, topsoil stripping, special
backfill, excavation, pond dredging, structural concrete, and SWPPP preparation and
management.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $289,968.07
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve Payment Estimate No. 1
ATTACHMENTS: I. Payment Estimate No. 1
II. Letter of Recommendation
PREPARED BY:Beth Richardson
REVIEWED BY:Sara Kappos SKK
PUBLIC NOTICE INFORMATION –
NAME OF PUBLICATION:
DATE OF PUBLICATION:
I1H10
May 12, 2022
Rudy Koester
Public Works Director
City of Waukee
805 University Avenue
Waukee, Iowa 50263
WAUKEE, IOWA
NW DOUGLAS PARKWAY CULVERT AND POND IMPROVEMENTS
PAY ESTIMATE NO. 1
Enclosed are three copies of Partial Payment Estimate No. 1 for the period between December
20, 2021 and April 30, 2022 in accordance with the contract between the City of Waukee and
Elder Corporation for the above mentioned project.
Partial Payment Estimate No. 1 is for pond dredging, grading, and the pedestrian underpass.
We have checked the estimate and recommend payment by the City Council of the City of
Waukee to Elder Corporation in the amount of $289,968.07.
Please sign all three copies of Partial Payment Estimate No. 1 in the space provided. Return one
signed copy to our office and one signed copy with payment to Elder Corporation. The
remaining copy is for the City of Waukee’s records.
If you have any questions or comments, please contact us at 515-225-8000.
VEENSTRA & KIMM, INC.
Jordan Kappos
JDK
292292
Enclosures
cc: Becky Schuett, City of Waukee (via e-mail)
Sara Kappos, City of Waukee (via e-mail)
Beth Richardson, City of Waukee (via e-mail)
Tracy Lovetinsky, City of Waukee (via e-mail)
Elder Corporation (via e-mail)
QUANTITY VALUE
ESTIMATED AUTHORIZED COMPLETED COMPLETED
ITEM NO. DESCRIPTION UNIT (ORIG. CONT.) (INCL. C.O.'S) TO DATE UNIT PRICE TO DATE
1 Mobilization LS 1.00 1.00 0.20 $179,341.71 $35,868.34
2 Traffic Control LS 1.00 1.00 0.00 $1,950.00 $0.00
3 Testing LS 1.00 1.00 0.10 $12,875.00 $1,287.50
4Construction Staking LS 1.00 1.00 0.10 $12,000.00 $1,200.00
5Construction Entrance EA 2.00 2.00 0.00 $3,900.00 $0.00
6 Clearing and Grubbing LS 1.00 1.00 1.00 $13,500.00 $13,500.00
7 Topsoil, Strip, Salvage and Respread CY 21,000.00 21,000.00 7,182.00 $5.00 $35,910.00
8Special Backfill TONS 550.00 550.00 118.81 $60.75 $7,217.71
9Compacting Backfill Adjacent to Bridges, Culverts or Structures CY 285.00 285.00 0.00 $16.00 $0.00
10 Flooded Backfill CY 295.00 295.00 0.00 $84.00 $0.00
11 Compaction with Moisture Control (Structures) CY 8,850.00 8,850.00 0.00 $2.50 $0.00
12 Excavation, Class 20 CY 8,400.00 8,400.00 6,158.00 $11.00 $67,738.00
13 Pond Dredging CY 16,879.00 16,879.00 9,356.00 $9.25 $86,543.00
14 Trail Grading CY 5,723.00 5,723.00 0.00 $3.00 $0.00
15 Forebay Grading CY 7,683.00 7,683.00 0.00 $6.75 $0.00
16 Roadway Grading CY 1,335.00 1,335.00 0.00 $3.00 $0.00
17 Dam Grading CY 3,039.00 3,039.00 0.00 $4.25 $0.00
18 Dam Drainage System LF 200.00 200.00 0.00 $60.50 $0.00
19 Dam Outlet for Pond LS 1.00 1.00 0.00 $146,900.00 $0.00
20 15" RCP Storm Sewer LF 180.00 180.00 0.00 $87.00 $0.00
21 18" RCP Storm Sewer LF 69.00 69.00 0.00 $90.50 $0.00
22 72" RCP Storm Sewer LF 145.00 145.00 0.00 $570.00 $0.00
23 15" Headwall and Flapgate EA 1.00 1.00 0.00 $12,900.00 $0.00
24 18" Headwall and Flapgate EA 1.00 1.00 0.00 $13,900.00 $0.00
25 18" Culvert Flared End Section EA 1.00 1.00 0.00 $2,800.00 $0.00
26 72" Culvert Flared End Section EA 1.00 1.00 0.00 $28,000.00 $0.00
27 SW‐512 Intake EA 1.00 1.00 0.00 $2,600.00 $0.00
28 Structural Concrete (RCB Culvert) CY 932.60 932.60 80.00 $618.00 $49,440.00
29 Reinforcing Steel LB 131,036.00 131,036.00 0.00 $2.16 $0.00
30 Rip‐Rap, Class E Revetment TONS 662.00 662.00 0.00 $63.50 $0.00
31 Gabion Baskets CY 120.00 120.00 0.00 $380.00 $0.00
32 Rolled Erosion Control Products, Type 3 SY 3,000.00 3,000.00 0.00 $1.70 $0.00
33 Filter Socks, 8" LF 4,000.00 4,000.00 0.00 $2.32 $0.00
34 Curtain Wall LF 200.00 200.00 0.00 $41.20 $0.00
35 Stormwater Pollution Prevention Plan (SWPPP) Preparation LS 1.00 1.00 1.00 $1,550.00 $1,550.00
36 Stormwater Pollution Prevention Plan (SWPPP) Management LS 1.00 1.00 0.10 $3,400.00 $340.00
37 Hydro‐Seeding, Fertilize and Mulch, Type 1 AC 6.50 6.50 0.00 $4,789.50 $0.00
38 Hydro‐Seeding, Fertilize and Mulch, Type 2 AC 15.00 15.00 0.00 $3,811.00 $0.00
39 City Borrow, Douglas Pkwy Site CY 17,000.00 17,000.00 0.00 $4.50 $0.00
40 Prairie Rose Plat 2 Borrow CY 22,000.00 22,000.00 0.00 $3.25 $0.00
41 Native Seed Preparation AC 7.50 7.50 0.00 $309.00 $0.00
42 Native Seeding AC 7.50 7.50 0.00 $1,854.00 $0.00
43 Ornamental Metal Railing on Culvert LF 178.50 178.50 0.00 $216.30 $0.00
44 Ornamental Metal Gate, 14' Wide LS 1.00 1.00 0.00 $1,905.50 $0.00
45 Ornamental Metal Railing on Footing LF 201.00 201.00 0.00 $227.63 $0.00
BID ITEMS
PROJECT TITLE: NW Douglas Parkway Culvert and Pond Improvements
Contractor: Elder Corportation
Original Contract Amount:
Pay Period: December 20, 2021 to April 30, 2022
ESTIMATE OF CONSTRUCTION COMPLETED
PARTIAL PAYMENT NO. 1
$2,514,850.00
Date: 5/11/22
292292 Page 1 of 4
QUANTITY VALUE
ESTIMATED AUTHORIZED COMPLETED COMPLETED
ITEM NO. DESCRIPTION UNIT (ORIG. CONT.) (INCL. C.O.'S) TO DATE UNIT PRICE TO DATE
BID ITEMS
46 Temporary Stream Diversion EA 1.00 1.00 0.00 $65,600.00 $0.00
47 Underpass Lighting LS 1.00 1.00 0.00 $18,421.55 $0.00
48 Anti‐Graffiti Coating SY 750.00 750.00 0.00 $23.69 $0.00
49 Form Liner Mockup LS 1.00 1.00 1.00 $4,635.00 $4,635.00
50 Form Liner SY 105.00 105.00 0.00 $185.40 $0.00
$305,229.55Total Value Completed ‐ Bid Items
292292 Page 2 of 4
Item No. Description Unit Quantity Unit Price Extended Cost
1 $0.00
2 $0.00
3 $0.00
4 $0.00
5 $0.00
$0.00
MATERIALS STORED SUMMARY
Total Materials Stored
292292 Page 3 of 4
Total Completed
$305,229.55
Total Completed
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total Completed
$305,229.55
Total Completed
$0.00
$305,229.55
$15,261.48
$289,968.07
$0.00
$289,968.07
$289,968.07 is recommended for approval for payment in accordance with the terms of the Contract.
$2,514,850.00
$2,514,850.00
$289,968.07
$289,968.07
$2,224,881.93
12.1%
Elder Corporation
Signature Signature Signature
Name Jordan Kappos Name Name
Title Project Engineer Title Title
Date Date Date
$0.00
SUMMARY
Bid Item Subtotal $2,514,850.00
Original Contract
1
Description/Notes
2
3
6
7 $0.00
Total Approved
Veenstra & Kimm, Inc.
9
10
Total Previously Approved
City of Waukee
Approved:
CONTRACT SUMMARY
$0.00
BALANCE
ORIGINAL CONTRACT AMOUNT
TOTAL PARTIAL PAYMENTS INCL THIS PAYMENT
PERCENT COMPLETE
TOTAL CONTRACT AMOUNT PLUS CHANGE ORDERS
THIS PARTIAL PAYMENT
$0.00
Amount Due This Request
$0.00
$0.00
$0.00
$0.00
$0.00
Recommended By: Contractor:
Note: The amount
6
7
4
5
8
2
3
$0.00
$0.00
Period
$0.00
Total Completed Plus Materials Stored
Total Change Orders
APPROVED CHANGE ORDERS
$0.00
$0.00
$0.00
$0.00
$0.00
4
5
Change Order No.
1
Total Approved
$0.00
9
10
Partial Payment No.
APPROVED PARTIAL PAYMENTS
Revised Contract Price
$0.00
8 $0.00
$0.00
Total Approved
$2,514,850.00
Total Materials Stored
Retainage (5%)
Total Earned Less Retainage
292292 Page 4 of 4