Loading...
HomeMy WebLinkAbout2022-06-20 I01L_12 NW Douglas Pkwy Culvert and Pond Improvements_Pmt Est 2AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: June 20, 2022 AGENDA ITEM:Consideration of approval of Payment Estimate No. 2 to Elder Corporation for the NW Douglas Parkway Culvert and Pond Improvements Project, in the amount of $490,372.76. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Elder Corporation requested Payment Estimate No. 2 for the work completed on the NW Douglas Parkway Culvert Improvements Project, in the amount of $490,372.76. Veenstra & Kimm, Inc. has reviewed the payment estimate and recommends payment. The partial payment is for the pay period ending May 31, 2022. This pay estimate is for pond dredging, grading, the pedestrian underpass, and the reinforced concrete box culvert. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $490,372.76 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Payment Estimate No. 2 ATTACHMENTS: I. Payment Estimate No. 2 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1L12 June 15, 2022 Rudy Koester Public Works Director City of Waukee 805 University Avenue Waukee, Iowa 50263 WAUKEE, IOWA NW DOUGLAS PARKWAY CULVERT AND POND IMPROVEMENTS PAY ESTIMATE NO. 2 Enclosed are three copies of Partial Payment Estimate No. 2 for the period between May 1, 2022 and May 31, 2022 in accordance with the contract between the City of Waukee and Elder Corporation for the above mentioned project. Partial Payment Estimate No. 2 is for pond dredging, grading, the pedestrian underpass, and the reinforced concrete box culvert. We have checked the estimate and recommend payment by the City Council of the City of Waukee to Elder Corporation in the amount of $490,372.76 Please sign all three copies of Partial Payment Estimate No. 2 in the space provided. Return one signed copy to our office and one signed copy with payment to Elder Corporation. The remaining copy is for the City of Waukee’s records. If you have any questions or comments, please contact us at 515-225-8000. VEENSTRA & KIMM, INC. Jordan Kappos JDK 292292 Enclosures cc: Becky Schuett, City of Waukee (via e-mail) Sara Kappos, City of Waukee (via e-mail) Beth Richardson, City of Waukee (via e-mail) Tracy Lovetinsky, City of Waukee (via e-mail) Elder Corporation (via e-mail) QUANTITY VALUE ESTIMATED AUTHORIZED COMPLETED COMPLETED ITEM NO.DESCRIPTION UNIT (ORIG. CONT.)(INCL. C.O.'S)TO DATE UNIT PRICE TO DATE 1 Mobilization LS 1.00 1.00 0.35 $179,341.71 $62,769.60 2 Traffic Control LS 1.00 1.00 0.10 $1,950.00 $195.00 3 Testing LS 1.00 1.00 0.35 $12,875.00 $4,506.25 4 Construction Staking LS 1.00 1.00 0.30 $12,000.00 $3,600.00 5 Construction Entrance EA 2.00 2.00 1.00 $3,900.00 $3,900.00 6 Clearing and Grubbing LS 1.00 1.00 1.00 $13,500.00 $13,500.00 7 Topsoil, Strip, Salvage and Respread CY 21,000.00 21,000.00 7,182.00 $5.00 $35,910.00 8 Special Backfill TONS 550.00 550.00 118.81 $60.75 $7,217.71 9 Compacting Backfill Adjacent to Bridges, Culverts or Structures CY 285.00 285.00 0.00 $16.00 $0.00 10 Flooded Backfill CY 295.00 295.00 0.00 $84.00 $0.00 11 Compaction with Moisture Control (Structures)CY 8,850.00 8,850.00 0.00 $2.50 $0.00 12 Excavation, Class 20 CY 8,400.00 8,400.00 8,400.00 $11.00 $92,400.00 13 Pond Dredging CY 16,879.00 16,879.00 13,196.00 $9.25 $122,063.00 14 Trail Grading CY 5,723.00 5,723.00 0.00 $3.00 $0.00 15 Forebay Grading CY 7,683.00 7,683.00 0.00 $6.75 $0.00 16 Roadway Grading CY 1,335.00 1,335.00 0.00 $3.00 $0.00 17 Dam Grading CY 3,039.00 3,039.00 0.00 $4.25 $0.00 18 Dam Drainage System LF 200.00 200.00 0.00 $60.50 $0.00 19 Dam Outlet for Pond LS 1.00 1.00 0.00 $146,900.00 $0.00 20 15" RCP Storm Sewer LF 180.00 180.00 0.00 $87.00 $0.00 21 18" RCP Storm Sewer LF 69.00 69.00 0.00 $90.50 $0.00 22 72" RCP Storm Sewer LF 145.00 145.00 0.00 $570.00 $0.00 23 15" Headwall and Flapgate EA 1.00 1.00 0.00 $12,900.00 $0.00 24 18" Headwall and Flapgate EA 1.00 1.00 0.00 $13,900.00 $0.00 25 18" Culvert Flared End Section EA 1.00 1.00 0.00 $2,800.00 $0.00 26 72" Culvert Flared End Section EA 1.00 1.00 0.00 $28,000.00 $0.00 27 SW-512 Intake EA 1.00 1.00 0.00 $2,600.00 $0.00 28 Structural Concrete (RCB Culvert)CY 932.60 932.60 394.60 $618.00 $243,862.80 29 Reinforcing Steel LB 131,036.00 131,036.00 61,272.00 $2.16 $132,347.52 30 Rip-Rap, Class E Revetment TONS 662.00 662.00 0.00 $63.50 $0.00 31 Gabion Baskets CY 120.00 120.00 0.00 $380.00 $0.00 32 Rolled Erosion Control Products, Type 3 SY 3,000.00 3,000.00 0.00 $1.70 $0.00 33 Filter Socks, 8"LF 4,000.00 4,000.00 1,686.00 $2.32 $3,911.52 34 Curtain Wall LF 200.00 200.00 80.00 $41.20 $3,296.00 35 Stormwater Pollution Prevention Plan (SWPPP) Preparation LS 1.00 1.00 1.00 $1,550.00 $1,550.00 36 Stormwater Pollution Prevention Plan (SWPPP) Management LS 1.00 1.00 0.20 $3,400.00 $680.00 37 Hydro-Seeding, Fertilize and Mulch, Type 1 AC 6.50 6.50 0.00 $4,789.50 $0.00 38 Hydro-Seeding, Fertilize and Mulch, Type 2 AC 15.00 15.00 0.00 $3,811.00 $0.00 39 City Borrow, Douglas Pkwy Site CY 17,000.00 17,000.00 0.00 $4.50 $0.00 40 Prairie Rose Plat 2 Borrow CY 22,000.00 22,000.00 0.00 $3.25 $0.00 41 Native Seed Preparation AC 7.50 7.50 0.00 $309.00 $0.00 42 Native Seeding AC 7.50 7.50 0.00 $1,854.00 $0.00 43 Ornamental Metal Railing on Culvert LF 178.50 178.50 0.00 $216.30 $0.00 44 Ornamental Metal Gate, 14' Wide LS 1.00 1.00 0.00 $1,905.50 $0.00 45 Ornamental Metal Railing on Footing LF 201.00 201.00 0.00 $227.63 $0.00 ESTIMATE OF CONSTRUCTION COMPLETED PARTIAL PAYMENT NO. 2 $2,514,850.00 Date: 6/13/22 BID ITEMS PROJECT TITLE: NW Douglas Parkway Culvert and Pond Improvements Contractor: Elder Corportation Original Contract Amount: Pay Period: May 1, 2022 to May 31, 2022 292292 Page 1 of 3 QUANTITY VALUE ESTIMATED AUTHORIZED COMPLETED COMPLETED ITEM NO.DESCRIPTION UNIT (ORIG. CONT.)(INCL. C.O.'S)TO DATE UNIT PRICE TO DATE BID ITEMS 46 Temporary Stream Diversion EA 1.00 1.00 1.00 $65,600.00 $65,600.00 47 Underpass Lighting LS 1.00 1.00 0.00 $18,421.55 $0.00 48 Anti-Graffiti Coating SY 750.00 750.00 0.00 $23.69 $0.00 49 Form Liner Mockup LS 1.00 1.00 1.00 $4,635.00 $4,635.00 50 Form Liner SY 105.00 105.00 105.00 $185.40 $19,467.00 $821,411.40Total Value Completed - Bid Items 292292 Page 2 of 3 Total Completed $821,411.40 Total Completed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Completed $821,411.40 Total Completed $0.00 $821,411.40 $41,070.57 $780,340.83 $289,968.07 $490,372.76 $490,372.76 is recommended for approval for payment in accordance with the terms of the Contract. $2,514,850.00 $2,514,850.00 $490,372.76 $780,340.83 $1,734,509.17 32.7% Elder Corporation Signature Signature Signature Name Jordan Kappos Name Name Title Project Engineer Title Title Date Date Date 9 10 Partial Payment No. APPROVED PARTIAL PAYMENTS Revised Contract Price $0.00 8 $0.00 $0.00 Total Approved $2,514,850.00 Total Materials Stored Retainage (5%) Total Earned Less Retainage Total Completed Plus Materials Stored Total Change Orders APPROVED CHANGE ORDERS $0.00 $0.00 $0.00 $0.00 $0.00 4 5 Change Order No. 1 Total Approved $0.00 $0.00 $0.00 $0.00 $0.00 $289,968.07 Recommended By:Contractor: Note: The amount 6 7 4 5 8 2 3 $0.00 $0.00 December 20, 2021 to April 30, 2022 Period $0.00 Veenstra & Kimm, Inc. 9 10 Total Previously Approved City of Waukee Approved: CONTRACT SUMMARY $0.00 BALANCE ORIGINAL CONTRACT AMOUNT TOTAL PARTIAL PAYMENTS INCL THIS PAYMENT PERCENT COMPLETE TOTAL CONTRACT AMOUNT PLUS CHANGE ORDERS THIS PARTIAL PAYMENT $0.00 Amount Due This Request $0.00 SUMMARY Bid Item Subtotal $2,514,850.00 Original Contract 1 Description/Notes 2 3 6 7 $0.00 Total Approved 292292 Page 3 of 3