Loading...
HomeMy WebLinkAbout2022-07-05 J12 Starbucks_Site PlanAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: July 5, 2022 AGENDA ITEM:Consideration of approval of a resolution approving a site plan for Starbucks FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: Recor Properties requests approval of a site plan to authorize the construction of a single-tenant Starbucks building located at the southwest corner of SE University Avenue and SE Waco Place / 98th Street. The building will be approximately 2,000 square-feet and one story. A drive- thru is proposed along the east side of the building with queueing space for approximately 17 vehicles wrapping around the south side of the property. Access to the site will be provided via private drive along the north property boundary that can be entered from SE University Avenue. A secondary drive access will be constructed off of SE Waco Place / 98th Street north of SE Bishop Drive. The applicant has provided elevations for the proposed building on the site. The design and materials are consistent with the Site Plan Ordinance. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this project at the June 14, 2022, Commission Meeting and recommended approval subject to remaining staff comments: Approval of a Site Plan for Starbucks (1500 SE University Avenue) City planner, Bill Mettee, introduced the request for approval of a site plan for a Starbucks coffee shop and drive thru. The subject property is generally located at the southwest corner of the intersection of SE University Avenue and SE Waco Place/ 98th Street and contains approximately 1.21 Acres. Mr. Mettee advised that the site plan identifies the construction of one Starbucks coffee shop approximately 2,000 square feet in size and one-story, approximately 18 feet, in height, which includes a drive-thru option along the east side of the building. The site plan also shows a trash enclosure near the southwest corner of the site, as well as a monument sign. Access is provided off of SE Waco Place/ 98th Street and another access through the drive aisle that accesses to SE University Avenue. Public utilities will serve the site. All landscaping, open space, lighting, and elevation requirements have been met at this time. Staff would recommend approval of a site plan for Starbucks coffee shop subject to any remaining staff comments. J12 Commissioner Tessau questioned where the stormwater is being held. Sam Malinowski, a representative for the applicant, advised that there is stormwater detention in the area just south of the building and in the parking island. Additionally, Community Development Director, Andy Kass, advised that there is some regional detention intended south of the site on Lot 2 of this development and a maintenance agreement exists to share the responsibility of that detention between the two lots. Commissioner Broderick moved to approve the site plan for Starbucks (1500 SE University Avenue) subject to any remaining staff comments. Commissioner Tessau seconded the motion. Ayes: Hoifeldt, Inman, Broderick, Koshy, and Tessau. Nays: none. Motion Carried. STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan subject to remaining staff comments. RECOMMENDATION: Approve the resolution subject to remaining staff comments. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan & Elevations PREPARED BY:Bill Mettee, Planner REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 2022- APPROVING THE SITE PLAN FOR STARBUCKS IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Starbucks, subject to remaining staff comments on June 14, 2022; AND, WHEREAS, the Site Plan for Starbucks is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Starbucks is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 5th day of July, 2022 that the Site Plan for Starbucks is approved. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman Pierce R. Charles Bottenberg Chris Crone Larry R. Lyon Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Starbucks Site Plan PREPARED BY: Bill Mettee – Planner REPORT DATE: June 10, 2022 MEETING DATE: June 14, 2022 GENERAL INFORMATION Owner/Applicant: Recor Properties [Brandon Haverty] Owner’s Representative: Sam Malinowski, SM Engineering Request: The applicant is requesting approval of a site plan for a Starbucks coffee shop. Location and Size: Property is located at the southwest corner of the intersection of SE University Avenue and SE Waco Place / 98th Street and contains approximately 1.21 acres. Property Address: 1500 SE University Avenue AREA MAP ABOVE: Aerial of subject property (outlined in RED) in relation to the surrounding area. June 10, 2022 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant - Undeveloped Community Commercial C-1 (Community and Highway Service Commercial District) / PD-1 (Planned Development Overlay) North Single-Family Residential [Williams Pointe Plat 1] Single-Family Residential R-2 (Single-Family Residential District) / PD-1 (Planned Development Overlay) South Bricktowne Waukee Condos Medium-Density Residential C-1 (Community and Highway Service Commercial District) / PD-1 (Planned Development Overlay) East Vacant / Undeveloped N/A City of West Des Moines West Vacant - Undeveloped Community Commercial C-1 (Community and Highway Service Commercial District) / PD-1 (Planned Development Overlay) BACKGROUND In October 2021, Community Development staff were asked to review a Preliminary Plat and Final Plat for the property at the southwest corner of SE University Avenue and SE Waco Place / 98th Street. The Plats were reviewed by Planning & Zoning Commission at their January 25, 2022 meeting followed with City Council approval at their April 4, 2022 meeting. The subject lot is platted as Coffee Bean Addition Plat 1 Lot 1. PROJECT DESCRIPTION The project includes the construction of one Starbucks Coffee shop approximately 2,000-square feet in size and one-story in height, which includes a drive-thru option along the east side of the building. The building at its highest point will be just over 18-feet tall. A trash enclosure will be provided near the southwest corner of the site. The trash enclosure will be constructed with the same materials as the building. One monument sign has been proposed on the site plan. ACCESS AND PARKING Standard vehicular access for the proposed site will occur in a couple of way. There will an access drive entering the site from SE Waco Place / 98th Street and an access drive constructed through Coffee Bean Addition Plat 1 Lot 2 that will connect to the drive aisle at The Shine Shop Car Wash ultimately providing access from SE University Avenue. Staff has worked with City of West Des Moines Traffic Engineering staff to ensure turn arrows are painted in the appropriate locations along SE Waco Place / 98th Street. Thirty-one parking spaces, which include two van-accessible handicapped spaces will be provided on site. Bicycle parking is also required due to the location within Kettlestone. The applicant has provided the required amount of bicycle parking with a bicycle rack located on the north side of the building. June 10, 2022 3 of 3 SIDEWALKS/TRAILS One 5-foot-wide sidewalk will be installed along the property boundary on SE University Avenue. An additional sidewalk will be installed to provide pedestrian access into the site from SE University Avenue. Additional private sidewalks will be installed interior to the site to provide further pedestrian access. A 10- foot-wide trail will be installed along the west side of SE Waco Place / 98th Street. UTILITIES All necessary utilities are installed in the vicinity of the subject parcel and these services will be extended to service the building. LANDSCAPING & OPEN SPACE A minimum of 20% of the site area is required to be open space. The total amount of open space provided is 34.3%. The applicant has provided plantings in accordance with the Landscaping and Open Space Ordinance. ELEVATIONS The elevations of the building are proposed to be constructed of modular face brick, cement stucco and glass. Total fenestration will be 49% on street-facing facades. Elevations have been provided for review. LIGHTING PLAN The applicant has submitted a photometric plan and manufacturer’s cut sheets and the plan meets the lighting requirements of the Site Plan Ordinance. STAFF RECOMMENDATION Staff recommends approval of the proposed site plan subject to remaining staff comments. s h e e t C1.0 Civil p e r m i t COVER SHEET Revisions ST A R B U C K S 15 0 0 S E U N I V E R S I T Y A V E WA U K E E , I O W A 17 DECEMBER 2021 2-15-22 CITY COMMENTS 3-29-22 CITY COMMENTS 4-20-22 CITY COMMENTS 5-12-22 CITY COMMENTS 6-2-22 CITY COMMENTS 6-21-22 CITY COMMENTS INDEX OF SHEETS C-1 COVER SHEET C-2 EXISTING CONDITIONS C-3 SITE PLAN C-4 UTILITY PLAN C-5 GRADING PLAN C-5.1 ADA RAMPS C-6 STORM LINE A & B PLAN AND PROFILE C-7 98th ST PAVEMENT MARKING C-8 EROSION AND SEDIMENT CONTROL PLAN C-9 EROSION AND SEDIMENT CONTROL DETAILS C-10 DETAILS C-11 DETAILS C-12 DETAILS C-13 LANDSCAPE PLAN STARBUCKS FOR SITE PLANS ENGINEER SM ENGINEERING 5507 HIGH MEADOW CIRCLE MANHATTAN KANSAS, 66503 SMCIVILENGR@GMAIL.COM 785.341.9747 DEVELOPER RECOR PROPERTIES 5925 BEVERLY AVE. MISSION KS, 66202 BRANDON HAVERTY 913-948-9960 SURVEYOR BISHOP ENGINEERING 3501 104th ST DES MOINES, IA 50322 515-276-0467 SAMUEL D. MALINOWSKY PROFESSIONAL ENGINEEER LICENSE EXPIRES 12-31-22 UTILITY STATEMENT: THE UNDERGROUND UTILITIES SHOWN HEREON ARE FROM FIELD SURVEY INFORMATION OF ONE- CALL LOCATED UTILITIES, FIELD SURVEY INFORMATION OF ABOVE GROUND OBSERVABLE EVIDENCE, AND/OR THE SCALING AND PLOTTING OF EXISTING UTILITY MAPS AND DRAWINGS AVAILABLE TO THE SURVEYOR AT THE TIME OF SURVEY. THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. FURTHERMORE, THE SURVEYOR DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES BY EXCAVATION UNLESS OTHERWISE NOTED ON THIS SURVEY. SAFETY NOTICE TO CONTRACTOR IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICE, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. WARRANTY/DISCLAIMER THE DESIGNS REPRESENTED IN THESE PLANS ARE IN ACCORDANCE WITH ESTABLISHED PRACTICES OF CIVIL ENGINEERING FOR THE DESIGN FUNCTIONS AND USES INTENEDED BY THE OWNER AT THIS TIME. HOWEVER, NEITHER SM ENGINEERING NOR ITS PERSONNEL CAN OR DO WARRANTY THESE DESIGNS OR PLANS AS CONSTRUCTED, EXCEPT IN THE SPECIFIC CASES WHERE SM ENGINEERING PERSONNEL INSPECT AND CONTROL THE PHYSICAL CONSTRUCTION ON A CONTEMPORARY BASIS AT THE SITE. CAUTION- NOTICE TO CONTRACTOR THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANY AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. THE CONTRACTOR SHALL EXPOSE EXISTING UTILITIES AT LOCATIONS OF POSSIBLE CONFLICTS PRIOR TO ANY CONSTRUCTION. LOCATION MAP PROJECT LOCATION LEGAL DESCRIPTION: COFFEE BEAN ADDITION PLAT 1 LOT 1 OF WAUKEE, DALLAS COUNTY, IOWA WATER, SANITARY SEWER, GAS CITY OF WAUKEE 230 W. HICKMAN ROAD WAUKEE, IA 50263 515-978-7920 ELECTRIC SERVICE MIDAMERICAN ENERGY P.O. BOX 657 DES MOINES, IA 50306-0657 888-427-5632 COMMUNICATION CENTURY LINK 877-862-9343 UTILITIES I-80 SM Engineering 5507 High Meadow Circle Manhattan Kansas, 66503 smcivilengr@gmail.com 785.341.9747 Drawings and/or Specifications are original proprietary work and property of the Engineer and intended specifically for this project. Use of items contained herein without consent of the Engineeris prohibited. Drawings illustrate best information available to the Engineer. Field verification of actual elements, conditions, and dimensions is required. SE UNIVERSITY AVE I- 3 5 1500 SE UNIVERSITY AVE WAUKEE, IOWA SE W A C O S T / 9 8 t h S T SE ASHWORTH R D NOTE: ALL CONSTRUCTION SHALL FOLLOW THE 2020 WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS AND 2022 SUDAS. STARBUCKS SUBMITTAL DATES:CITY COMMENTS SENT 2-1-22 2-10-22 3-8-22 3-18-22 3-31-22 4-14-22 4-20-22 4-29-22 5-12-22 5-27-22 6-6-22 6-15-22 F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F / O F/ O F/ O F/ O F/ O F/ O F/ O F/ O F/ O F/ O F/ O F/ O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O WV S EX SAN MH RIM=1056.29 INV(S)=1042.24 INV(W)=1042.19 H Y D EX INTAKE T/C=1052.19 FL(S)=1047.49 DEX STORM MH RIM=1052.18 FL(E)=1047.33 D EX STORM MH RIM=1048.73 FL(W)=1043.68 FL(E)=1043.58 EX INTAKE T/C=1045.72 EX INTAKE T/C=1045.70 FL(S)=1041.10 D EX STORM MH RIM=1045.70 FL(N)=1041.15 FL(W)=1041.15 D EX STORM MH RIM=1046.15 FL(NW)=1042.40 FL(N)=1041.30 FL(S)=1041.05 EX INTAKE T/C=1046.16 FL(E)=1041.41 D EX STORM MH RIM=1048.84 FL(N)=1043.99 FL(S)=1043.84 EX INTAKE T/C=1048.88 FL(E)=1044.13 EX INTAKE T/C=1051.74 D EX STORM MH RIM=1051.82 FL(NW)=1047.57 FL(S)=1046.27 F/O H Y D D EX STORM MH RIM=1053.43 FL(SE)=1048.98 FL(W)=1048.53 FL(E)=1043.98 EMF/O E E F/O F/O EX INTAKE T/C=1053.27 EX 12" RCP FES FL=1041.39 WV WV WV WVWV EX INTAKE T/C=1052.07 FL(N)=1048.57 EX INTAKE T/C=1045.73 EX INTAKE T/C=1045.71 FL(N)=1040.86 EX 4" PVC FL=1047.37 E EX INTAKE T/C=1048.81 FL(W)=1045.16 EX INTAKE T/C=1051.73 FL(W)=1048.83 F/ O U/E F/O F/O F/O F/O F/O F/O F/O EX INTAKE RIM=1058.52 S EX SAN MH RIM=1059.76 INV(E)=1041.47 INV(S)=1041.41 INV(W)=1041.37 SURVEY COULD NOT SEE PIPE DIAMATERS D EX STORM MH RIM=1059.35 BOTTOM OF STRUCTURE=1052.38 SURVEYOR COULD NOT MEASURE PIPES D EX STORM MH RIM=1058.04 BOTTOM OF STRUCTURE=1051.44 SURVEYOR COULD NOT MEASURE PIPES EX 30" FES FL=1050.98 D EX STORM MH RIM=1055.34 BOTTOM OF STRUCTURE=1051.19 SURVEYOR COULD NOT MEASURE PIPES EX INTAKE RIM=1056.52 FL(N)=1051.16 D EX STORM MH RIM=1057.36 BOTTOM OF STRUCTURE=1050.93 SURVEYOR COULD NOT MEASURE PIPES D EX STORM MH RIM=1058.91 FL(NE)=1052.51 FL(SW)=1053.46 DIRT MOUND SPEED LIMIT SIGN METER PIT ST 15" ST 15"ST 15" ST 30" ST 30 " ST 30 " ST 30 " ST 30 " ST 30" ST 15 " S T 18 " 30 " ST 30 " ST 24 " ST 24 " ST 24 " ST 24 " ST 24 " ST 24 " ST 24 " ST 24 " ST 24 " S T 2 4 " ST 24"ST 24" ST 30"ST 30"ST 30"ST 30"ST 30"ST 30" SA N 12 " SA N 12 " S A N 12 " S A N 12 " S A N 12 " SA N SAN W8" W 8" W 8 " W 8 " W 8 " W 8" W 8" W8" W8"W8"W 8"W 8"W8" W 8" W W16 " W16 " W16 " W16 " W16 " W16 " W16 " W16 " W16 " W 1 6 " W16 " W W G G G G G G G G G G G G G G G EX LOCATION PER CITY OF WAUKEE MAP CROSSWALK POST F/O F/O F/O F/O F/ O F/O F/O F/O F / O F / O F/ O F/ O F/O F/O F/O F/O F/O F/O F/O EX LOCATION PER CITY OF WAUKEE MAP EX LOCATION PER LUMEN (CENTURYLINK) WAUKEE MAP EX LOCATION PER UPN MAP F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O EX LOCATION PER WINDSTREAM MAP U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E O/E O/E O/E O/E O/E O/E O/E O/E O/E O/E O/E O/E U/ E U/ E U/E U/ E O/ E U/ E U/ E U / E U / E U/ E U/ E U/E U/E U/E U/E EX LOCATION PER MIDAM MAP SE UNIVERSITY AVENUE (PUBLIC STREET - CONCRETE SURFACE - 120' R.O.W.) SE W A C O P L A C E / 9 8 T H S T R E E T (P U B L I C S T R E E T - C O N C R E T E S U R F A C E - 8 5 ' R . O . W . ) SE BISHOP DRIVE (PUBLIC STREET - CONCRETE SURFACE - 70' R.O.W.) LOT 3 (198,612 SQUARE FEET - 4.55 ACRES) LO T 4 OW N E R : S P L A S H E X P R E S S , L L C ) (S 89°48'38"E 439.03') (S 44°44'26" E) (14.12') (S 0 ° 1 9 ' 4 7 " W 4 7 9 . 8 0 ' ) (N 89°48'40" W 162.60') (δ=55° 4 5 ' 1 0 R T R = 2 1 5 ' L=209 . 2 1 ' C H = 2 0 1 . 0 5 ' N 6 1 ° 5 6 ' 0 5 " W ) (δ = 2 9 ° 0 2 ' 4 9 L T R = 2 8 5 ' L= 1 4 4 . 4 9 ' C H = 1 4 2 . 9 4 ' N 4 8 ° 3 4 ' 5 4 " W ) (S 0 ° 1 1 ' 2 0 " W 3 0 1 . 5 9 ' ) (6 0 ' ) (50') FEEDER MAIN EASEMENT FEEDER MAIN EASEMENT (BK. 2005 PG. 1875) STORM SEWER EASEMENT (10' PUBLIC UTILITY EASEMENT) (1 0 ' P U B L I C U T I L I T Y EA S E M E N T ) 20' STORM SEWER EASEMENT (10' S A N I T A R Y S E W E R EAS E M E N T ) (1 5 ' B U I L D I N G S E T B A C K L I N E - P E R P L A T ) (3 0 ' B U I L D I N G S E T B A C K L I N E - P E R Z O N E ) (30' BUILDING SETBACK LINE - PER ZONE) (30' BUILDING SETBACK LINE - PER ZONE) (20' PRIVATE STORM SEWER EASEMENT) (1 0 ' P U B L I C U T I L I T Y EA S E M E N T ) SIDE WALK EASEMENT 1055 1056 1057 1057 1055 1 0 5 6 1056 1056 10 5 6 10 5 5 1 0 5 5 1 0 5 4 105 1 10 5 2 10 5 6 10 5 5 10 5 4 10 5 0 104 9 1 0 5 5 10 5 2 10 4 8 1055 1050 1045 1045 1045 1046 1055 1050 1045 1048 1055 1057 1056 1057 1056 1057 10 5 7 1 0 5 8 10 5 8 1 0 5 9 105 9 10 5 8 10 5 7 10 5 6 10 5 4 10 5 5 1 0 5 0 1 0 4 9 1 0 4 7 1 0 4 6 1 0 4 7 1 0 4 8 105 0 1 0 5 1 1054 FEEDER MAIN EASEMENT (449.03') REFERENCE NUMBER: 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 DRAWN BY: CHECKED BY: REVISION DATE: PROJECT NUMBER: SHEET NUMBER: 14 5 0 S . E . U N I V E R S I T Y A V E N U E WA U K E E , I O W A AL T A / N S P S L A N D T I T L E S U R V E Y MDH 190663 210455 1 OF 1 RECOR PROPERTIES ALTA/NSPS LAND TITLE SURVEY IOWAONE CALL 1-800-292-8989 www.iowaonecall.com 811 Know what's below. Call before you dig. VICINITY MAP SCALE: 1' = 1,000' COPYRIGHT 2021 BISHOP ENGINEERING. THIS DOCUMENT AND THE INFORMATION CONTAINED MAY NOT BE REPRODUCED OR EXCERPTED WITHOUT THE EXPRESS WRITTEN PERMISSION OF BISHOP ENGINEERING. UNAUTHORIZED COPYING OR DISCLOSURE OF CONSTRUCTION USE ARE PROHIBITED BY COPYRIGHT LAW. ABBREVIATIONS: AC ACRES ASPH ASPHALT BK BOOK CONC CONCRETE D DEEDED DISTANCE EX EXISTING ENCL ENCLOSURE FF FINISHED FLOOR FL FLOW LINE FRAC FRACTIONAL INV INVERT M MEASURED DISTANCE MH MANHOLE OPC ORANGE PLASTIC CAP P PLATTED DISTANCE PG PAGE POB POINT OF BEGINNING POC POINT OF COMMENCEMENT PRA PREVIOUSLY RECORDED AS PUE PUBLIC UTILITY EASEMENT ROW RIGHT OF WAY RPC RED PLASTIC CAP SF SQUARE FEET SAN SANITARY TYP TYPICAL YPC YELLOW PLASTIC CAP N NORTH S SOUTH E EAST W WEST LEGEND: SAN SANITARY SEWER ST STORM SEWER W WATER LINE G GAS LINE U/E UNDERGROUND ELECTRIC O/E OVERHEAD ELECTRIC TELE TELEPHONE LINE F/O FIBER OPTIC CATV CABLE TV STORM MANHOLE CURB INTAKE SURFACE INTAKE FLARED END SECTION SANITARY MANHOLE CLEANOUT FIRE HYDRANT SPRINKLER IRRIGATION CONTROL VALVE WATER MANHOLE WELL WATER VALVE WATER SHUT OFF YARD HYDRANT ELECTRIC MANHOLE ELECTRIC METER ELECTRIC RISER ELECTRIC VAULT POWER POLE TRANSFORMER POLE LIGHT POLE ELECTRIC JUNCTION BOX ELECTRIC PANEL TRANSFORMER GROUND LIGHT GUY WIRE ELECTRIC HANDHOLE GAS METER GAS VALVE AIR CONDITIONING UNIT TELEPHONE RISER TELEPHONE VAULT TELEPHONE MANHOLE TRAFFIC SIGNAL MANHOLE FIBER OPTIC MANHOLE FIBER OPTIC RISER FIBER OPTIC VAULT CABLE TV RISER SIGN BOLLARD 7 DENOTES NUMBER OF PARKING STALLS PROPERTY CORNER - FOUND 1/2" IRON ROD W/ YPC LS19710 PROPERTY CORNER- PLACED 3/4" IRON PIPE WITH YELLOW PLASTIC CAP ID # 14775 SECTION CORNER - FOUND AS NOTED SITE CONTROL POINT - MONUMENT AS NOTED D S CO H Y D I CV W WS O Y A DR E EM E ELEC EJ EP GM GV A/C T TEL T TS FO F/O TV W WV FLOOD HAZARD CERTIFICATION: ACCORDING TO THE FIRM (FLOOD INSURANCE RATE MAP) ISSUED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) ON FLOOD INSURANCE RATE MAP 19049C0355F, WITH AN EFFECTIVE DATE OF 12/07/2018, THIS SITE IS LOCATED IN A ZONE "X", AN AREA DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN. THIS CERTIFICATION IS BASED ON THE LATEST KNOWN MAP FOR THIS PARCEL. L: \ L A N D P R O J E C T S 2 0 2 1 \ 2 1 0 4 5 5 R E C O R \ D W G \ C 0 A L T A S U R V E Y . D W G 9/ 1 0 / 2 0 2 1 4 : 2 2 : 0 0 P M UTILITY NOTE: THE LOCATION OF THE UTILITIES INDICATED ON THE PLANS HAVE BEEN TAKEN FROM THE FIELD SURVEY, EXISTING PUBLIC RECORDS, AND PLANS PROVIDED BY OTHERS. SURFACE UTILITY LOCATIONS HAVE BEEN FIELD LOCATED BY BISHOP ENGINEERING, UNLESS OTHERWISE NOTED. ALL UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE LOCATIONS ONLY. BISHOP ENGINEERING DOES NOT GUARANTEE THE UNDERGROUND LOCATION OF ANY UTILITIES SHOWN. IT SHALL BE THE DUTY OF THE CONTRACTOR TO DETERMINE THE LOCATION AND DEPTH OF ANY UNDERGROUND UTILITIES SHOWN AND IF ANY ADDITIONAL UTILITIES, OTHER THAN THOSE SHOWN ON THE PLANS, MAY BE PRESENT. A REQUEST WAS MADE TO IOWA ONE CALL FOR UTILITY PROVIDERS TO VERIFY, LOCATE, AND MARK THEIR UTILITIES IN THE FIELD. ALTA CERTIFICATION: TO LENDER ONE, FALCO, LLC, A KANSAS LIMITED LIABILITY COMPANY, INCLUDING THEIR SUBSIDIARIES, AFFILIATES, SUCCESSORS AND ASSIGNEES, AND CHICAGO TITLE INSURANCE COMPANY : THIS IS TO CERTIFY THAT THIS MAP OR PLAT AND THE SURVEY ON WHICH IT IS BASED WERE MADE IN ACCORDANCE WITH THE 2021 MINIMUM STANDARD DETAIL REQUIREMENTS FOR ALTA / NSPS LAND TITLE SURVEYS, JOINTLY ESTABLISHED AND ADOPTED BY ALTA AND NSPS, AND INCLUDES ITEMS 1, 2, 3, 4, 5, 7(A), 7(B)(1), 7(C) 8, 9, 10(A)(B), 11(A),13, 14, 16, 17, 18, 19, AND 20 OF TABLE A THEREOF. THE FIELDWORK WAS COMPLETED ON 9-07-2021. DATE OF PLAT OR MAP:________________________ _____________________________________________ BY: LARRY D. HYLER PLS # 14775 DATE BISHOP ENGINEERING CO., INC. 3501 104th Street, Des Moines, Iowa 50322 lhyler@bishopengr.com (515) 276-0467 bishopengr.com TITLE COMMITMENT NOTES: INFORMATION WAS PROVIDED BY CHICAGO TITLE INSURANCE COMPANY FROM COMMITMENT FOR TITLE INSURANCE, COMMITMENT NO. MN304083 WITH AN EFFECTIVE DATE OF 8-18-2021. SURVEY RELATED ITEMS FROM SCHEDULE B PART II - EXCEPTIONS ARE AS FOLLOWS: 1-11: STANDARD EXCEPTIONS 12. EASEMENT IN FAVOR OF IOWA POWER AND LIGHT COMPANY, DATED JULY 31, 1973, RECORDED DECEMBER 26, 1973, IN BOOK 513 OF MISCELLANEOUS, PAGE 52. DOES NOT AFFECT SUBJECT PROPERTY AND IS NOT SHOWN. 13. PERPETUAL EASEMENT FOR FEEDER MAIN IN FAVOR OF THE CITY OF WAUKEE, DATED OCTOBER 27, 2004, RECORDED FEBRUARY 10, 2005, IN BOOK 2005, PAGE 1875. AFFECTS SUBJECT PROPERTY AND IS SHOWN. 14. STORM SEWER AND OVERLAND STORM WATER DRAINAGE EASEMENT(S) IN FAVOR OF THE CITY OF WAUKEE, DATED JUNE 5, 2006, RECORDED AUGUST 22, 2006, IN BOOK 2006, PAGE 13760. AFFECTS SUBJECT PROPERTY AND IS SHOWN. 15. EASEMENTS AND SETBACK LINES DEPICTED ON, AND DECLARATION OF COVENANTS, CONDITIONS, RESTRICTIONS, AND RECIPROCAL EASEMENTS ATTACHED TO, THE PLAT OF COVE AT KETTLESTONE PLAT 1, RECORDED DECEMBER 30, 2015, IN BOOK 2015, PAGE 20833. 16.AGREEMENT TO COMPLETE PUBLIC IMPROVEMENTS DATED DECEMBER 7, 2015, RECORDED DECEMBER 30, 2015, IN BOOK 2015, PAGE 20836. NON-SURVEY RELATED ITEM. 17.PRIVATE STORM SEWER EASEMENT(S) DATED DECEMBER 22, 2015, RECORDED DECEMBER 30, 2015, IN BOOK 2015, PAGE 20839. AFFECTS SUBJECT PROPERTY AND IS SHOWN. 18.SANITARY SEWER EASEMENT IN FAVOR OF THE CITY OF WAUKEE, DATED NOVEMBER 30, 2015, RECORDED DECEMBER 30, 2015, IN BOOK 2015, PAGE 20843. AFFECTS SUBJECT PROPERTY AND IS SHOWN. 19.ORDINANCE NO. 2791 AMENDING ZONING ORDINANCE APPROVED NOVEMBER 2, 2015, RECORDED FEBRUARY 22, 2016, IN BOOK 2016, PAGE 2362. NON-SURVEY RELATED ITEM. 20.EASEMENTS AND SETBACK LINES DEPICTED ON, AND DECLARATION OF COVENANTS, CONDITIONS, RESTRICTIONS, AND RECIPROCAL EASEMENTS ATTACHED TO, THE PLAT OF COVE AT KETTLESTONE PLAT 2, RECORDED NOVEMBER 8, 2019, IN BOOK 2019, PAGE 21469. CERTIFICATION RE: DECLARATION OF COVENANTS, CONDITIONS, RESTRICTIONS, AND RECIPROCAL EASEMENTS DATED OCTOBER 22, 2020, RECORDED OCTOBER 26, 2020 IN BOOK 2020, PAGE 29613. AFFECTS SUBJECT PROPERTY AND IS SHOWN. 21.INGRESS-EGRESS EASEMENT(S) DATED OCTOBER 28, 2019, RECORDED NOVEMBER 8, 2019, IN BOOK 2019, PAGE 21473. DOES NOT AFFECT SUBJECT PROPERTY AND IS NOT SHOWN. 22.PUBLIC SIDEWALK EASEMENT IN FAVOR OF THE CITY OF WAUKEE, DATED NOVEMBER 7, 2019, RECORDED NOVEMBER 8, 2018, IN BOOK 2019, PAGE 21474. AFFECTS THE SUBJECT PROPERTY AND IS SHOWN. 23.PUBLIC UTILITY EASEMENT IN FAVOR OF THE CITY OF WAUKEE, DATED NOVEMBER 7, 2019, RECORDED NOVEMBER 8, 2018, IN BOOK 2019, PAGE 21475. AFFECTS THE SUBJECT PROPERTY AND IS SHOWN. 24.PUBLIC STORM SEWER EASEMENT IN FAVOR OF THE CITY OF WAUKEE, DATED OCTOBER 28, 2019, RECORDED NOVEMBER 8, 2019, IN BOOK 2019, PAGE 21476. DOES NOT AFFECT THE SUBJECT PROPERTY AND IS NOT SHOWN. 25.SHARED DRIVEWAY CONSTRUCTION AND EASEMENT AGREEMENT DATED NOVEMBER 8, 2019, RECORDED NOVEMBER 8, 2009, IN BOOK 2019, PAGE 21480. DOES NOT AFFECT THE SUBJECT PROPERTY AND IS NOT SHOWN. 26.EASEMENTS AND SETBACK LINES DEPICTED ON THE PLAT OF COVE AT KETTLESTONE PLAT 3, RECORDED AUGUST 27, 2020, IN BOOK 2020, PAGE 22558. AFFECTS THE SUBJECT PROPERTY AND IS SHOWN. 27.PUBLIC INGRESS/EGRESS EASEMENT IN FAVOR OF THE CITY OF WAUKEE, DATED AUGUST 24, 2020, RECORDED AUGUST 27, 2020, IN BOOK 2020, PAGE 22559. AFFECTS SUBJECT PROPERTY AND IS BLANKET IN NATURE. 28. NON-SURVEY RELATED ITEM PROPERTY DESCRIPTION: PER TITLE COMMITMENT # MN304083 LOT 3, COVE AT KETTLESTONE PLAT 3, AN OFFICIAL PLAT, NOW INCLUDED IN AND FORMING A PART OF THE CITY OF WAUKEE, DALLAS COUNTY, IOWA. AREA: 198,612 SQUARE FEET (4.55 ACRES) OWNER: HAWTHORNE POINTE, LLC, AN IOWA LIMITED LIABILITY COMPANY 9500 UNIVERSITY AVENUE, SUITE 2112 WEST DES MOINES, IOWA 50266 PREPARED FOR: BRANDON HAVERTY 5925 BEVERLY AVENUE MISSION, KANSAS 66202 913.948.9960 ZONING: INFORMATION OBTAINED FROM CITY OF WAUKEE (WWW.WAUKEE.ORG) ZONED: C-1/PD-1 COMMUNITY AND HIGHWAY SERVICE COMMERCIAL DISTRICT (ORDINANCE 2791) SETBACKS PER CITY OF WAUKEE COMMERCIAL ZONING: FRONT: 30 FEET REAR: 30 FEET SIDE: 0 FEET, OR 30 FEET ALONG RESIDENTIAL DISTRICTS FOR AN OFFICIAL ZONING REPORT PLEASE CALL: CITY OF WAUKEE AT 515-978-7900 NOTES: 1. ADJACENT PROPERTY OWNER INFORMATION OBTAINED FROM DALLAS COUNTY ASSESSORS WEB PAGE 2. WETLANDS WERE NOT DELINEATED BY A QUALIFIED SPECIALIST FOR THIS SITE, AND ARE THEREFORE NOT SHOWN ON THIS PLAN. 3. NO EVIDENCE OF CEMETERIES OR BURIAL GROUNDS WERE FOUND OR OBSERVED DURING FIELDWORK. 4. NO EVIDENCE OF SPRINGS, PONDS, LAKES, STREAMS, RIVERS, CANALS, DITCHES, MARSHES OR SWAMPS WERE OBSERVED WITHIN 5 FEET OF BOUNDARY DURING FIELDWORK. XX GRAPHIC SCALE 030 15 30 60 SCALE: 1" =30' F/O SITE 13 13 14 15 15 15 15 1517 18 20 20 20 20 20 20 22 23 26 26 26 26 26 26 26 OR FOUND AS NOTED 13 C- 1/ P D - 1 C O M M U N I T Y & H W Y SE R V I C E C O M M E R C I A L DI S T R I C T / P L A N N E D DE V E L O P M E N T O V E R L A Y U G P U G P U G P U G P U G P U G P U G P U G P U G P TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG T U G TU G TU G TU G TU G TU G TU G TU G TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG DEX STORM MHRIM=1048.84 EX INTAKET/C=1048.88 EX INTAKET/C=1051.74 DEX STORM MHRIM=1051.82 H Y D DEX STORM MHRIM=1053.43 EX INTAKET/C=1053.27 EX INTAKET/C=1048.81 EX INTAKET/C=1051.73 EX SAN MH DEX STORM MHRIM=1059.35 DEX STORM MHRIM=1058.04 DEX STORM MHRIM=1055.34 EX INTAKERIM=1056.52 DEX STORM MHRIM=1057.36 DIRT MOUND ST. ST. ST. ST . ST . ST . ST . ST . ST . ST . ST . ST . ST. ST. ST. S T . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST. ST. S T . S T . ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST. SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN S A N SA N SAN WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R W A T E R W A T E R W A T E R WA T E R WA T E R WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER GAS GAS TUG TUG TUG TUG T U G TUG GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS EX LOCATIONS PER CITY OF WAUKEE MAP TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP UGP UGP UGP UGP UG P UG P UG P OH P OH P OH P OH P SE UNIVERSITY AVENUE SE W A C O P L A C E / 9 8 T H S T R E E T LO T 4 OW N E R : S P L A S H E X P R E S S , L L C ZO N E D : C - 1 / P D - 1 C O M M U N I T Y A N D H I G H W A Y SE R V I C E C O M M E R C I A L D I S T R I C T / P L A N N E D DE V E L O P M E N T O V E R L A Y (S 89°48'38"E 439.03') (S 44°44'26" E) (14.12') (S 0 ° 1 9 ' 4 7 " W 4 7 9 . 8 0 ' ) (δ= 2 9 ° 0 2 ' 4 9 L T R = 2 8 5 ' L=1 4 4 . 4 9 ' C H = 1 4 2 . 9 4 ' N 4 8 ° 3 4 ' 5 4 " W ) (S 0 ° 1 1 ' 2 0 " W 3 0 1 . 5 9 ' ) EX INTAKET/C=1059.44 EX 6" CMPFL=1056.90 S T . proposed Starbucks 2,020sf Lot 4 R19 . 5 ' R2 0 . 5 ' R9.5 ' R2. 5 ' R 2 . 5 ' R19. 5 ' R44.5 ' R 2 4 . 5 ' R 4 0 . 5 ' R 2 5 . 0 ' R15 . 0 ' 25 . 0 ' 31.0' 31 . 0 ' 18.5'30.0'18.5' 9. 0 ' 9. 0 ' 14 . 6 ' 20 . 0 ' 4. 5 ' 26 . 0 ' 25.0' 12.7' 13 . 0 ' 12.7' 13. 0 ' 4.0' 12 . 0 ' 4 12 31 STALLS 10.0' 14.0' 10 . 0 ' 7.0' 5. 0 ' T T T T 13.7' R 1 5 . 0 ' R20 . 0 ' 5.0' 13 R 1 0 . 0 ' R3.0 ' R 3 . 0 ' R1 0 . 0 ' 2 R1 5 . 0 ' R 5 0 . 0 ' 11 . 5 ' 11 . 5 ' 73 . 3 ' 29.3' 5.0' 12 . 6 ' R5. 0 ' R4 . 3 ' R 5 . 0 ' 15.0' 15 . 0 ' R2 0 . 0 ' R2 5 . 0 ' R25. 0 ' R 1 0 . 0 ' R5.0' GAS GA S GA S GA S GA S GA S GA S GA S GA S GA S GA S 0 20'10' 1"=20' s h e e t C3.0 Civil p e r m i t SITE PLAN Revisions ST A R B U C K S 15 0 0 S E U N I V E R S I T Y A V E WA U K E E , I O W A 17 DECEMBER 2021 2-15-22 CITY COMMENTS 3-29-22 CITY COMMENTS 4-20-22 CITY COMMENTS 5-12-22 CITY COMMENTS 6-2-22 CITY COMMENTS 6-21-22 CITY COMMENTS SEE DETAIL SHEET FOR THE FOLLOWING DETAILS: PK-1 96" ACCESSIBLE & VAN ACCESSIBLE SPACE STRIPING PK-2 ACCESSIBLE SIGN SG-1 BOLLARD DETAIL CG-1 TYPE B CURB AND GUTTER CW1 CURB WALK AT BUILDING CW2 CONCRETE SIDEWALK CWS CONCRETE WHEEL STOP PV1 LIGHT DUTY CONCRETE PV3 CONCRETE PAVEMENT SW1 SIDEWALK RAMP TYPE A SUDAS TYPE A ENTRANCE NOTES: 8A DOOR (SEE ARCH. PLANS) 12K YELLOW PARKING LOT STRIPING (SHERWIN-WILLIAMS TM 2160 LEAD FREE OR APPROVED EQUAL) 12N 4" YELLOW STRIPES 3'-0" O.C. 510 CLEAN-OUT (SEE GRADING PLAN) 26 HOSEBIB & OUTLET SEE MEP DRAWINGS 27 24" H X 12" W CAST IN PLACE CONCRETE KNEE WALL 28 LIGHT POLE BASE (SEE MEP) 29 OUTDOOR PATIO SEATING BK INSTALL 1 BIKE RACK FOR 2 BIKE PARKING OLYMPIA MODEL SKOLY BLACK TW 10' WIDE CONCRETE TRAIL NOTE: 1. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF ENTRANCE. SLOPED PAVING, EXIT PORCHES. RAMPS, TRUCK DOCKS. PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. 2. THESE PLANS HAVE NOT BEEN VERIFIED WITH FINAL ARCHITECTURAL CONTRACT DRAWINGS. CONTRACTOR SHALL VERIFY AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES. CONTRACTOR IS FULLY RESPONSIBLE FOR REVIEW AND COORDINATION OF ALL DRAWINGS AND CONTRACTOR DOCUMENTS. 3. ALL DIMENSIONS ARE TO BACK OF CURB UNLESS NOTED OTHERWISE 4. ALL DIMENSIONS ARE PERPENDICULAR TO PROPERTY LINE. 5. ACTUAL SIGN LOCATIONS TO BE COORDINATED WITH CONSTRUCTION MANAGER. 6. CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE CITY OF WAUKEE COMMUNITY DEVELOPMENT PRIOR TO MAKING ANY CHANGES. THE CONTRACTOR IS RESPONSIBLE FOR ANY CHANGES MADE WITHOUT APPROVAL FROM THE CITY OF WAUKEE CONSTRUCTION NOTES: 1. COORDINATE START-UP AND ALL CONSTRUCTION ACTIVITIES WITH OWNER. 2. CONSTRUCTION METHODS AND MATERIALS NOT SPECIFIED IN THESE PLANS ARE TO MEET OR EXCEED THE STANDARD SPECIFICATIONS. 3. ALL CONSTRUCTION WORK AND UTILITY WORK OUTSIDE OF PROPERTY BOUNDARIES SHALL BE PERFORMED IN COOPERATION WITH AND IN ACCORDANCE WITH REGULATIONS OF THE AUTHORITIES CONCERNED. 4. PUBLIC CONVENIENCE AND SAFETY: THE CONTRACTOR SHALL CONDUCT THE WORK IN A MANNER THAT WILL INSURE, AS FAR AS PRACTICABLE, THE LEAST OBSTRUCTION TO TRAFFIC, AND SHALL PROVIDE FOR TI-1E CONVENIENCE AND SAFETY OF THE GENERAL PUBLIC AND RESIDENTS ALONG AND ADJACENT TO HIGHWAYS IN THE CONSTRUCTION AREA. 5. ALL DIMENSIONS SHOWN ARE TO THE BACK OF CURB UNLESS OTHERWISE NOTED. 6. ACCESSIBLE STALLS SHOWN WITH A "VAN" SHALL BE 16'-0" MIN. AND SHALL HAVE A SIGN DESIGNATING "VAN-ACCESSIBLE". SEE DETAIL102. 12K SITE DATA: TOTAL SITE 1.20ac (52,673sf) PROPOSED BUILDING 2,020sf TOTAL PAVEMENT 32,544sf TOTAL IMPERVIOUS 34,564 (65.6%) TOTAL OPEN SPACE 18,109sf (34.3%) PARKING REQUIRED 2.020 X 15 = 30.3 TOTAL PARKING PROVIDED 31 12N 8A PK1 CW1 CG1 PV1 PV3 DUMPSTER SCREENING 19.3' X 10.2' OUT TO OUT SEE ARCH PLANS CONCRETE FLUME SEE DETAIL SM Engineering 5507 High Meadow Circle Manhattan Kansas, 66503 smcivilengr@gmail.com 785.341.9747 Drawings and/or Specifications are original proprietary work and property of the Engineer and intended specifically for this project. Use of items contained herein without consent of the Engineeris prohibited. Drawings illustrate best information available to the Engineer. Field verification of actual elements, conditions, and dimensions is required. 27 26 SAWCUT AND REMOVE EXISTING CURB FOR NEW ENTRANCE CONNECT TO EXISTING CURB & GUTTER AND MATCH EXISTING PAVEMENT ELEVATIONS PV1 PK2 PV3 PV3PV3 PV3 PV3 PV3 PV3 PV3 PV2 PV2 PV2 CG1 CG1 CG1 CONCRETE FLUME SEE DETAIL CW2 TW SW1 STORM WATER QUALITY STORM LINE A 28 28 28 28 28 28 28 28 28 28 30 ' AC C E S S EA S E M E N T 32' ACCESS EASEMENT 29 PV1 30 ' AC C E S S EA S E M E N T 15 ' S/ E PV1 BK MONUMENT SIGN RETAINING WALL SW1 4 WHITE STRIPES 1' WIDE X 5' SPACED @ 1' STORM WATER QUALITY PROPOSED 15' SANITARY EASEMENT 10' GAS EASEMENT PROPOSED 10' GAS EASEMENT TYPE A FIRE NOTE: 1. APPROVED FIRE APPARATUS ACCESS ROADS SHALL BE PROVIDED AS SOON AS CONSTRUCTION COMMENCES. IF PAVING IS NOT INSTALLED PRIOR TO BUILDING CONSTRUCTION COMMENCING AFTER FOOTINGS ARE INSTALLED, AN APPROVED ROUTE AROUND THE EXTERIOR OF THE BUILDING TO EXTEND WITHIN 100-FEET OF ALL PORTIONS OF THE EXTERIOR WALLS SHALL BE PROVIDED AND COMPLY WITH THE REQUIREMENTS OF SECTION 503.2 OF THE INTERNATIONAL FIRE CODE. U G P U G P U G P U G P U G P U G P TUG TUG TUG TUG TUG TUG TUG T U G TU G TU G TU G TU G TU G TU G TU G TUG TUG TUG TUG TUG TUG TUG TUG EX SAN MH RIM=1056.29 INV (S) 1042.24 INV (W) 1042.19 HYD EX INTAKET/C=1052.19 DEX STORM MHRIM=1052.18 DEX STORM MHRIM=1048.73 EX INTAKET/C=1045.72 EX INTAKET/C=1045.70 DEX STORM MHRIM=1045.70 DEX STORM MHRIM=1046.15 EX INTAKET/C=1046.16 DEX STORM MHRIM=1048.84 EX INTAKET/C=1048.88 EX INTAKET/C=1051.74 DEX STORM MHRIM=1051.82 H Y D DEX STORM MHRIM=1053.43 EX INTAKET/C=1053.27 EX 12" RCP FESFL=1041.39 EX INTAKET/C=1052.07 EX INTAKET/C=1045.73 EX INTAKET/C=1045.71 EX INTAKET/C=1046.04 EX INTAKET/C=1046.01 EX 4" PVCFL=1047.37 EX INTAKET/C=1048.81 EX INTAKET/C=1051.73 EX INTAKERIM=1058.45 EX INTAKERIM=1058.47 EX SAN MH RIM=1059.86 EX INTAKERIM=1058.44 EX INTAKERIM=1058.52 EX SAN MH RIM=1059.76 INV (E) 1041.47 INV (S) 1041.41 INV (W) 1041.37 DEX STORM MHRIM=1059.35 DEX STORM MHRIM=1058.04 DEX STORM MHRIM=1055.34 EX INTAKERIM=1056.52 DEX STORM MHRIM=1057.36 DEX STORM MHRIM=1058.91 DEX STORM MHRIM=1059.04 ST. ST. ST.ST.ST.ST. ST . ST. ST. ST . ST . ST . ST . ST . ST . ST. ST. ST . ST . ST . ST . ST. ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST. ST. S T . ST.ST.ST.ST.ST.ST.ST.ST.ST.ST. SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SA N SA N SA N SA N SA N S A N S A N S A N S A N S A N S A N SA N SA N SAN SAN SAN SAN WATER WAT E R WAT E R W A T E R W A T E R W A T E R W A T E R W A T E R W A T E R W A T E R WA T E R WA T E R WATER WATER WATER WATER WATER WATER WATER WA T E R WAT E R WAT E R W A T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R W A T E R W A T E R WA T E R WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WATER WA T E R WA T E R WA T E R GAS GAS GAS G A S G A S G A S G A S G A S GAS GAS GAS GAS GAS GAS GAS GAS GA S GA S TUG TUG TU G TUG TUG GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS TUG T U G T U G T U G TU G TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP UG P UG P UG P UGP UGP UGP UG P UG P OH P OH P OH P UGP UGP UGP U G P U G P U G P U G P U G P U G P U G P U G P U G P UG P UGP UGP UGP UGP UGP UGP SE UNIVERSITY AVENUE SE W A C O P L A C E / 9 8 T H S T R E E T SE BISHOP DRIVE LO T 4 OW N E R : S P L A S H E X P R E S S , L L C ZO N E D : C - 1 / P D - 1 C O M M U N I T Y A N D H I G H W A Y SE R V I C E C O M M E R C I A L D I S T R I C T / P L A N N E D DE V E L O P M E N T O V E R L A Y (S 89°48'38"E 439.03') (S 44°44'26" E) (14.12') (S 0 ° 1 9 ' 4 7 " W 4 7 9 . 8 0 ' ) (N 89°48'40" W 162.60') (δ=55 ° 4 5 ' 1 0 R T R = 2 1 5 ' L=209. 2 1 ' C H = 2 0 1 . 0 5 ' N 6 1 ° 5 6 ' 0 5 " W ) (δ= 2 9 ° 0 2 ' 4 9 L T R = 2 8 5 ' L=1 4 4 . 4 9 ' C H = 1 4 2 . 9 4 ' N 4 8 ° 3 4 ' 5 4 " W ) (S 0 ° 1 1 ' 2 0 " W 3 0 1 . 5 9 ' ) EX INTAKET/C=1059.44EX 6" CMPFL=1056.90 EX INTAKERIM=1059.82 S T . T T T S E B I S H O P D R I V E GAS GA S GA S GA S GA S GA S GA S GA S GA S GA S GA S GA S GA S U G P UG P T T T GA S GAS GAS 0 30'15' 1"=30' s h e e t C4.0 Civil p e r m i t UTILITY PLAN Revisions ST A R B U C K S 15 0 0 S E U N I V E R S I T Y A V E WA U K E E , I O W A 17 DECEMBER 2021 2-15-22 CITY COMMENTS 3-29-22 CITY COMMENTS 4-20-22 CITY COMMENTS 5-12-22 CITY COMMENTS 6-2-22 CITY COMMENTS 6-21-22 CITY COMMENTS NOTE: 1. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF ENTRANCE, SLOPED PAVING, EXIT PORCHES, RAMPS, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. 2. THESE PLANS HAVE NOT BEEN VERIFIED WITH FINAL ARCHITECTURAL CONTRACT DRAWINGS. CONTRACTOR SHALL VERIFY AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES. CONTRACTOR IS FULLY RESPONSIBLE FOR REVIEW AND COORDINATION OF ALL DRAWINGS AND CONTRACTOR DOCUMENTS. NOTES 17A POINT OF CONNECTION - GAS SERVICE 17B GAS SERVICE (BY GAS COMPANY) 17C GAS METER 18A POINT OF CONNECTION - TELEPHONE SERVICE - COORDINATE WITH TELEPHONE COMPANY 18B UNDERGROUND TELEPHONE SERVICE PER LOCAL TELEPHONE COMPANY 18C 2-2" CONDUIT INSTALLED BY CONTRACTOR - TELEPHONE SERVICE 19A POINT OF CONNECTION - ELECTRICAL SERVICE POLE MOUNTED TRANSFORMER WITH UNDERGROUND SERVICE TO BUILDING 19B ELECTRIC SERVICE BY POWER COMPANY 19C 4" CONDUIT INSTALLED BY CONTRACTOR - ELECTRIC SERVICE 20A POINT OF CONNECTION - WATER SERVICE 20B 2" WATER LINE INSTALLED BY CONTRACTOR (SEE NOTE 11) 20D 1" WATER METER FOR IRRIGATION (INSIDE BUILDING) 20E 2" WATER METER (INSIDE BUILDING) 20F 1" WATERLINE FOR IRRIGATION 59 6" SANITARY SEWER SERVICE LINE 60 6" GREASE LINE 61 SAMPLING PORT 62 2" VENT LINE GI GREASE INTERCEPTOR (2000 GALLON) DETAILS MS1 TRENCH AND BEDDING DETAILS SS2 CLEAN-OUT (2-WAY) 510 CLEANOUT UTILITY NOTES: 1. CONSTRUCTION SHALL NOT START ON ANY PUBLIC WATER OR SANITARY SEWER SYSTEM UNTIL WRITTEN APPROVAL OR PERMITS HAVE BEEN RECEIVED FROM THE CITY OF WAUKEE COMMUNITY DEVELOPMENT. 2. ALL UTILITY AND STORM SEWER TRENCHES CONSTRUCTED UNDER AREAS THAT RECEIVE PAVING SHALL BE BACKFILLED TO 18 INCHES ABOVE THE TOP OF THE PIPE WITH SELECT GRANULAR MATERIAL PLACED ON EIGHT-INCH LIFTS, AND COMPACTED TO 95% STANDARD PROCTOR DENSITY. 3. CONTRACTOR SHALL NOT OPEN, TURN OFF, INTERFERE WITH, OR ATTACH ANY PIPE OR HOSE TO OR TAP ANY WATER MAIN BELONGING TO THE CITY UNLESS DULY AUTHORIZED TO DO SO BY THE CITY. ANY ADVERSE CONSEQUENCE OF ANY SCHEDULED OR UNSCHEDULED DISRUPTIONS OF SERVICE TO THE PUBLIC ARE TO BE THE LIABILITY OF THE CONTRACTOR. SM ENGINEERING AND OWNER ARE TO BE HELD HARMLESS. 4. DISINFECTION AND PRESSURE TESTING OF WATERLINES SHALL BE PERFORMED BY OWNER AND WITNESSED BY WAUKEE PUBLIC WORKS. A MINIMUM OF 24 HOURS NOTICE TO WATER DEPARTMENT REQUIRED. 5. ALL WATER AND SANITARY SEWER SYSTEM MEET 2020 WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS AND 2022 SUDAS SHALL BE CONSTRUCTED IN ACCORDANCE WITH AND SHALL BE INSPECTED BY THE CITY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ASSURE THAT THIS INSPECTION OCCURS. 6. LOCATIONS SHOWN FOR PROPOSED WATER LINES ARE APPROXIMATE. VARIATIONS MAY BE MADE, WITH APPROVAL OF THE ENGINEER, TO AVOID CONFLICTS. 7. CONTRACTOR TO INSTALL TRACING TAPE ALONG ALL NON-METALLIC WATER MAINS AND SERVICE LINES PER 2020 WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS AND 2022 SUDAS 8.CONTRACTOR SHALL EXPOSE EXISTING UTILITIES AT LOCATIONS OF POSSIBLE CONFLICT AND POINTS OF CONNECTION PRIOR TO ANY CONSTRUCTION OF NEW UTILITIES. 9. WATER LINES SHALL HAVE A MINIMUM COVER OF 5.5 FEET. ALL VALVES ON MAINS AND FIRE HYDRANT LEADS SHALL BE WITH VALVE BOX ASSEMBLIES. THE SIZE OF VALVE BOX ASSEMBLY TO BE INSTALLED IS DETERMINED BY THE TYPE AND SIZE OF VALVE. VALVE BOX CAPS SHALL HAVE THE WORD "WATER". 10. A MINIMUM HORIZONTAL DISTANCE OF 10 FEET SHALL BE MAINTAINED BETWEEN PARALLEL WATER AND SANITARY SEWER LINES. WHEN IT IS NECESSARY FOR ANY WATER LINE TO CROSS A SANITARY SEWER LINE, THE SEWER LINE SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE AT LEAST 10 FEET EITHER SIDE OF THE WATER LINE UNLESS THE WATER LINE IS AT LEAST 2 FEET CLEAR DISTANCE ABOVE THE SANITARY SEWER LINE. 11. INSTALL 2" TYPE "K" COPPER FROM THE MAIN TO THE METER AND EITHER TYPE "K" OR POLYETHYLENE PLASTIC TUBING (PE 3608) FROM METER TO STOP AND WASTE VALVE INSIDE BUILDING. 12. CONTRACTOR TO TEST, CLEAN & TELEVISE ALL SANITARY & STORM SEWER PER CITY OF WAUKEE CRITERIA. UTILITY STATEMENT: THE UNDERGROUND UTILITIES SHOWN HEREON ARE FROM FIELD SURVEY INFORMATION OF ONE-CALL LOCATED UTILITIES, FIELD SURVEY INFORMATION OF ABOVE GROUND OBSERVABLE EVIDENCE, AND/OR THE SCALING AND PLOTTING OF EXISTING UTILITY MAPS AND DRAWINGS AVAILABLE TO THE SURVEYOR AT THE TIME OF SURVEY. THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. FURTHERMORE, THE SURVEYOR DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES BY EXCAVATION UNLESS OTHERWISE NOTED ON THIS SURVEY. SM Engineering 5507 High Meadow Circle Manhattan Kansas, 66503 smcivilengr@gmail.com 785.341.9747 Drawings and/or Specifications are original proprietary work and property of the Engineer and intended specifically for this project. Use of items contained herein without consent of the Engineeris prohibited. Drawings illustrate best information available to the Engineer. Field verification of actual elements, conditions, and dimensions is required. LEGEND TELEPHONE OVERHEAD POWER SANITARY SEWER UNDERGROUND POWER WATER WATERLINE GAS LINE TELEPHONE CABLE ELEVATION CONTOUR CONCRETE PAVEMENT T OHP SAN UGP WATER W/L GAS TC 918 17A 510 17B 17C 18A 18B 18C 19D 19B 19C 19A RELOCATE EXISTING FH 9' EAST 20A 20E FF E 1 0 5 7 . 0 0 510 F/L 1053.50 59 GI 61 F/L 1053.50 510F/L 1050.50 STORM LINE A 510F/L 1051.50 510 F/L 1052.50 15 ' S/ E 20A 20B EXISTING 16" WATERLINE EXISTING 16" WATERLINE EXISTING 24" STORM LINE EXISTING 24" STORM LINE 7.39' OF 6" SANITARY @ 6.7% F/L AT BUILDING 1054.00 18.50' OF 6" SANITARY @ 5.4% 28.41' OF 6" SANITARY @ 1.7% 60.46' OF 6" SANITARY @ 1.65% 60.51' OF 6" SANITARY @ 1.98% 75.83' OF 6" SANITARY @ 0.65% 510 F/L 1048.80 108.73' OF 6" SANITARY @ 1.37%510 F/L 1047.30 EXISTING STUB 6" STUB 74.8' FROM DOWNSTREAM MANHOLE F/L 1041.74 107.63' OF 6" SANITARY @ 5.16% SANITARY SEWER NOTES 1. ALL EXISTING UTILITIES INDICATED ON THE DRAWINGS ARE ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER; HOWEVER, ALL UTILITIES ACTUALLY EXISTING MAY NOT BE SHOWN. UTILITIES DAMAGED THROUGH THE NEGLIGENCE OF THE CONTRACTOR TO OBTAIN THE LOCATION OF SAME SHALL BE REPAIRED OR REPLACED IMMEDIATELY BY THE CONTRACTOR AT THEIR EXPENSE. 2. RELOCATION OF ANY WATER LINE, SEWER LINE OR SERVICE LINE THEREOF REQUIRED FOR THE CONSTRUCTION OF THIS PROJECT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE AT THEIR EXPENSE. 3. ALL ROADS TO BE KEPT FREE FROM CONSTRUCTION DEBRIS AND SEDIMENT 4. THE CONTRACTOR SHALL TAKE CARE IN PROTECTING EXISTING TREES AND SHRUBS, LAWNS AND EXISTING STRUCTURES OUTSIDE OF THE PROPOSED CONSTRUCTION 5. CONTRACTOR SHALL SEED AREA WITHIN SANITARY SEWER EASEMENT. ALL OTHER AREAS TO BE SODDED. 6. PIPE LENGTHS ARE CENTER TO CENTER OF STRUCTURE.6" 22.5° BEND F/L 1049.30 EXISTING 8" SANITARY SEWER EXISTING 2" GAS LINE F/L OF STORM = 1053.10 TOP OF SANITARY = 1051.00 20F EXISTING 8" SANITARY SEWER EXISTING 12" WATERLINE EXISTING 3" GAS LINE EXISTING 8" WATERLINE UTILITY CROSSING BLOW UP SCALE:1"=10' 19D 59 20D 20B 510F/L 1053.50 510 F/L 1053.50 BOTTOM OF 6" SANITARY PIPE 1053.75 TOP OF 2" WATER SERVICE 1051.50 TOP OF 1" IRRIGATION LINE 1051.50 BOTTOM OF 6" SANITARY PIPE 1053.55 TOP OF 1" IRRIGATION LINE 1051.00 59 GI F/L OR STORM SEWER 1054.00 TOP OF WATERLINES 1051.00 EXISTING 30" STORM SEWER EXISTING 24" STORM SEWER EXISTING 15" STORM SEWER EXISTING 15" STORM SEWER 20D EXISTING 15" STORM SEWER EXISTING 15" STORM SEWER EXISTING 15" STORM SEWER EXISTING 24" STORM SEWER 20F EXISTING 18" STORM SEWER EXISTING 15" STORM SEWEREXISTING 8" SANITARY SEWER EXISTING 8" SANITARY SEWER EXISTING 24" STORM SEWER U G P U G P U G P U G P U G P U G P U G P U G P U G P 105 6 1 0 5 7 10 5 3 1056 105 3 105 1 1 0 5 0 105 3 105 5 1 0 5 4 105 1 10 5 4 10 5 5 1055 1 0 5 5 10 5 6 10 5 7 1 0 5 5 1 0 5 5 1056 10 5 6 10 5 6 1 0 5 6 10 5 5 10 5 5 10 5 3 1 0 5 5 1 0 5 6 105 5 1 0 5 6 TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG T U G TU G TU G TU G TU G TU G TU G TU G TU G TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG DEX STORM MHRIM=1048.84 EX INTAKET/C=1048.88 EX INTAKET/C=1051.74 DEX STORM MHRIM=1051.82 H Y D DEX STORM MHRIM=1053.43 EX INTAKET/C=1053.27 EX SAN MH RIM=1059.76 INV (E) 1041.47 INV (S) 1041.41 INV (W) 1041.37 DEX STORM MHRIM=1059.35 DEX STORM MHRIM=1058.04 DEX STORM MHRIM=1055.34 EX INTAKERIM=1056.52 DEX STORM MHRIM=1057.36 DIRT MOUND ST. ST. ST. ST. ST . ST . ST . ST . ST . ST . ST . ST . ST . ST. ST. ST. ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST. ST. S T . S T . ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST. S A N S A N S A N S A N S A N SA N SA N SA N SAN WAT E R W A T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R W A T E R W A T E R W A T E R WA T E R GAS GAS GAS G A S G A S TUG TUG TUG TUG T U G TUG EX LOCATION PER LUMEN (CENTURYLINK) WAUKEE MAP TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP UGP UGP UGP UG P OH P OH P U G P SE UNIVERSITY AVENUE SE W A C O P L A C E / 9 8 T H S T R E E T LO T 4 OW N E R : S P L A S H E X P R E S S , L L C ZO N E D : C - 1 / P D - 1 C O M M U N I T Y A N D H I G H W A Y SE R V I C E C O M M E R C I A L D I S T R I C T / P L A N N E D DE V E L O P M E N T O V E R L A Y (S 89°48'38"E 439.03') (S 44°44'26" E) (14.12') (S 0 ° 1 9 ' 4 7 " W 4 7 9 . 8 0 ' ) (δ= 2 9 ° 0 2 ' 4 9 L T R = 2 8 5 ' L=1 4 4 . 4 9 ' C H = 1 4 2 . 9 4 ' N 4 8 ° 3 4 ' 5 4 " W ) (S 0 ° 1 1 ' 2 0 " W 3 0 1 . 5 9 ' ) ( 3 0 ' B U I L D I N G S E T B A C K L I N E - P E R Z O N E ) EX INTAKET/C=1059.44EX 6" CMPFL=1056.90 EX INTAKERIM=1059.82 S T . T W 1 0 5 5 B W 1 0 5 4 T W 1 0 5 4 B W 1 0 5 3 MATCH TC 1057.59 MATCH TC 1057.62 FFE 1057.00 TC 1054.50 TC 1055.00 TC 1056.10 TC 1055.62 TC 1056.40 TC 1057.80 TC 1056.80 75 . 0 ' TC 1055.80 TC 1055.50 TC 1055.10 TC 1055.90 TC 1055.30 TC 1055.30 TC 1055.40 TC 1055.20 SW 1056.80 SW 1056.90 TC 1056.75 SW 1056.40 SW 1056.80 TC 1056.75 TP 1056.00 TP 1056.00 TC 1055.75 TC 1055.75 TC 1056.00 TC 1056.05 TC 1056.00 TC 1055.70 TC 1055.80 TC 1056.90 TC 1056.60 TC 1056.25TC 1055.88 TC 1055.80 TC 1055.85 TC 1056.02 SW 1056.07 SW 1056.45 SW 1056.55 SW 1056.95 SW 1056.90 TC/SW 1055.59 TC/SW 1055.54 TC 1056.90 TC 1056.80 TC 1056.45 TC 1056.74 TC/SW 1056.35 TC 1055.20 TC 1056.75 TP 1056.25 TP 1056.70 TC 1057.00 TP 1056.50 TC 1056.50 TC 1056.80 TC/SW 1049.30 TC/SW 1049.20 MATCH TC 1048.00 TC/SW 1048.48 TC/SW 1048.38 TC 1057.40 SW 1049.40 SW 1049.30 SW 1049.36 SW 1049.46 SW 1048.48 SW 1048.48 SW 1048.78 SW 1048.88 TC 1055.65 TC 1053.00 TC 1055.63 TC 1056.00 TC 1056.10 TC 1056.05 TC 1056.00 TC 1056.00TC 1056.00 TC 1055.80 TP 1056.20 TP 1056.00 TC/SW 1055.88 TC/SW 1055.89 SW 1055.76 SW 1055.77 SW 1054.60SW 1054.60 10 5 6 10 5 3 10 5 2 10 5 4 TC 1056.26 SW 1055.83 SW 1055.73 T T T T 6" CLEANOUT F/L 1054.50 6" CLEANOUT F/L 1053.50 6" RDC @ 0.93%6" RDC @ 2.2% TC 1056.40 TC 1056.10 TC 1056.60 TC 1056.70 TC 1056.85 TC 1056.70 TC 1056.50 TC/SW 1055.80 TC 1056.90TC 1056.75TP 1056.40 TC 1056.90 TC 1056.70 TC/SW 1056.12 TC 1056.65 TC 1054.80 TC 1055.15 TP 1049.50 TP 1057.20 GR 1055.90 GR 1054.10 GR 1053.65 1.0%1. 5 % 6. 6 ' 1. 5 % 1.0% 1.0% 0. 6 % 10 . 0 ' 0. 6 % 1.0% 0.0% 1.0% 6. 6 ' 0. 0 % 1. 5 % 3. 0 % 10 . 0 ' 4. 0 % 1.0% 1.0% 0. 0 % 0. 0 % 7. 7 ' 5.0' 10.0' 10.0' 8. 0 % 5. 0 ' 1.0% 1.0% 8. 0 % 8. 0 % 5. 0 ' 1.0% 6. 0 ' 5.0' 8. 0 % 1.0% 0.14% 2. 0 % 14 . 1 ' 8. 2 % 8. 3 % 0.0% 105 7 10 5 6 10 5 5 10 5 8 1057 1056 1055 1056 1057 10 5 6 10 5 7 10 5 5 10 5 3 10 5 2 10 5 1 10 5 0 10 5 1 10 5 2 1054 1055 1056 10 5 9 1 0 5 8 10 5 9 7.0' TP 1055.15 SW 1056.30 SW 1056.90 GR 1052.00 TP 1053.89 TC 1056.60 2.0 % 1 . 3 % GAS GA S GA S GA S GA S GA S GA S GA S GA S GA S GA S GA S GA S SW 1054.50 TC 1056.10 SW 1052.10 SW 1050.60 TC 1056.60 TC 1056.40 TC 1056.30 TC/SW 1056.06 TP 1056.34 TP 1056.30 10. 6 ' 8.7 ' 5 . 0 ' 2.7 % 1.0 % 1 . 3 % 1 0 . 0 ' 5.0 ' 5. 0 ' TC 1056.59 SW 1056.64 1.0 % TC/SW 1055.86 7 . 3 % SW 1055.96 SW 1055.90 1. 3 % 1.0 % 2.0 % TOP OF INFILTRATION TRENCH 1052.50 MATCH TC 1048.80 1 . 5 % 1. 5 % 1.0% TOP OF INFILTRATION TRENCH 1052.50 F/L OUT 1053.10 F/L OUT 1053.10 6" RDC @ 1.0% TC 1054.50 TC 1054.50 TC 1054.50 TC 1054.50 RR RR TC 1054.50 RR SW 6.75 1. 0 % 1.0% SW 6.60 2.0%0. 0 % SW 6.75 2. 0 % 2.0% SW 6.60 2. 0 % SW 6.50 2.0% 2.0% SW 6.80 SW 6.82 TC 1056.72 TC 1056.70 2.0% 2.0% 0. 3 % 0. 3 % 1. 9 %TC 1056.20 TC 1056.30 1. 2 % 2.0% SW 6.75 1.0 % 2.0% 2.0 % SW 1056.16 1 . 5 % 0.14% 6. 0 ' 1. 0 % 1. 0 % 0.0% TC 1054.50 TC 1054.50 F/L 1055.00 F/L 1055.00 F/L 1055.00 6" RDC @ 2.2% 6" RDC @ 2.8% 6" RDC @ 3.4% 6" RDC @ 4.0% EXISTING FES F/L 1050.98 RR RR RR 0 20'10' 1"=20' s h e e t C5.0 Civil p e r m i t GRADING PLAN Revisions ST A R B U C K S 15 0 0 S E U N I V E R S I T Y A V E WA U K E E , I O W A 17 DECEMBER 2021 2-15-22 CITY COMMENTS 3-29-22 CITY COMMENTS 4-20-22 CITY COMMENTS 5-12-22 CITY COMMENTS 6-2-22 CITY COMMENTS 6-21-22 CITY COMMENTS GRADING NOTES: 1. EARTHWORK UNDER THE BUILDING SHALL COMPLY WITH THE PROJECT ARCHITECTURAL PLANS. OTHER FILL MATERIAL SHALL BE MADE IN LIFTS NOT TO EXCEED EIGHT INCHES DEPTH COMPACTED TO 95% STANDARD PROCTOR DENSITY. FILL MATERIAL MAY INCLUDE ROCK FROM ON-SITE EXCAVATION IF CAREFULLY PLACED SO THAT LARGE STONES ARE WELL DISTRIBUTED AND VOIDS ARE COMPLETELY FILLED WITH SMALLER STONES, EARTH, SAND OR GRAVEL TO FURNISH A SOLID EMBANKMENT. NO ROCK LARGER THAN THREE INCHES IN ANY DIMENSION NOR ANY SHALE SHALL BE PLACED IN THE TOP 12 INCHES OF EMBANKMENT. 2. AREAS THAT ARE TO BE CUT TO SUBGRADE LEVELS SHALL BE PROOF ROLLED WITH A MODERATELY HEAVY LOADED DUMP TRUCK OR SIMILAR APPROVED CONSTRUCTION EQUIPMENT TO DETECT UNSUITABLE SOIL CONDITIONS. 3. IN ALL AREAS OF EXCAVATION, IF UNSUITABLE SOIL CONDITIONS ARE ENCOUNTERED. A QUALIFIED GEOTECHNICAL ENGINEER SHALL RECOMMEND TO THE OWNER THE METHODS OF UNDERCUTTING AND REPLACEMENT OF PROPERLY COMPACTED, APPROVED FILL MATERIAL. ALL PROOF ROLLING AND UNDERCUTTING SHOULD BE PERFORMED DURING A PERIOD OF DRY WEATHER. 4. CONTRACTOR SHALL USE SILT FENCE OR OTHER MEANS OF CONTROLLING EROSION ALONG THE EDGE OF THE PROPERTY OR OTHER BOTTOM OF SLOPE LOCATIONS. 5.CONTRACTOR IS TO REMOVE AND DISPOSE OF ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM PREVIOUS AND CURRENT DEMOLITION OPERATIONS. 6. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. THE CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT. 7. IT IS NOT THE DUTY OF THE ENGINEER OR THE OWNER TO REVIEW THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES, IN, ON OR NEAR THE CONSTRUCTION SITE AT ANY TIME DURING CONSTRUCTION. 8. THE SITEWORK FOR THIS PROJECT SHALL MEET OR EXCEED STANDARD SITEWORK SPECIFICATIONS. 9. PIPE LENGTHS ARE CENTER TO CENTER OF STRUCTURE OR TO END OF END SECTIONS. 10. HANDICAP STALLS SHALL MEET ADA REQUIREMENTS AND SHALL NOT EXCEED 2% SLOPE IN ANY DIRECTION AT THE BUILDING ENTRY AND ACCESSIBLE PARKING STALLS. SLOPES EXCEEDING 2.0% WILL BE REPLACED AT THE CONTRACTOR'S EXPENSE. 11. CONTRACTOR TO ADJUST DEPTHS OF EXISTING SERVICE LINES AS NECESSARY 12. ALL CONSTRUCTION TRAFFIC, TEMPORARY TRAFFIC CONTROL DEVICES AND PAVEMENT MARKINGS SHALL CONFORM TO REQUIREMENTS OF THE LATEST MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. SM Engineering 5507 High Meadow Circle Manhattan Kansas, 66503 smcivilengr@gmail.com 785.341.9747 Drawings and/or Specifications are original proprietary work and property of the Engineer and intended specifically for this project. Use of items contained herein without consent of the Engineeris prohibited. Drawings illustrate best information available to the Engineer. Field verification of actual elements, conditions, and dimensions is required. PROPOSED MODULAR BLOCK RETAINING WALL INFILTRATION TRENCH (SEE DETAIL) NOTE INFILTRATION TRENCHES SHALL NOT BE INSTALLED UNTIL UPSTREAM AREAS ARE STABILIZED MAXIMUM 100yr WSE 1054.56 ALL 100yr STORM WATER IS CONTAINED WITHIN THE POND. NO WATER WILL OVERFLOW THROUGH THE PARKING OR DRIVE AREAS. F/L 1052.00 3:1 3:1 3:1 3:1 3:1 3:1 3: 1 4.0' 6.0' 3. 0 ' RIP RAP PLAN STORM WATER FLOW ROUTE IN THE EVENT OF A CATASTROPHIC RAIN EVENT OR CLOGGING ELEV 1055.50 STORM WATER FLOW ROUTE IN THE EVENT OF A CATASTROPHIC RAIN EVENT OR CLOGGING ELEV 1055.12 RR: 2.75sy OF RIP RAP D50 = 7" DEPTH = 20" ROC: ROOF DRAIN COLLECTOR OVERFLOW ROUTE ELEVATION = 1055.6 T W 1 0 5 5 T W 1 0 5 4 TC 1056.80 75 . 0 ' TC 1056.75 TP 1056.25 TP 1056.70 TC 1057.00 TP 1056.50 TC 1056.50 TC 1056.80 TC 1055.65 TC 1055.63 TC 1056.00 TC 1055.80 TP 1056.20 TP 1056.00 TC 1056.40 TC 1056.10 TC 1056.60 TC 1056.70 TC 1056.85 TC 1056.70 TC 1056.50 TC/SW 1055.80 TC 1056.90TC 1056.75TP 1056.40 TC 1056.90 TC 1056.70 TC/SW 1056.12 TC 1056.65 TC 1055.15TC 1056.60 2.0 % 1 . 3 % TC 1056.60 TC/SW 1056.06 TP 1056.34 TP 1056.30 10. 6 ' 8.7 ' 5 . 0 ' 2.7 % 1.0 % 1 . 3 % 1 0 . 0 ' 5.0 ' 5 . 0 ' TC 1056.59 SW 1056.64 1.0 % TC/SW 1055.86 7 . 3 % SW 1055.96 SW 1055.90 1. 3 % 1.0 % 2.0 % 1.0% TOP OF INFILTRATION TRENCH 1052.50 SW 6.75 1. 0 % 1.0% SW 6.60 2.0%0. 0 % SW 6.75 2. 0 % 2.0% SW 6.60 2. 0 % SW 6.75 1.0 % TU G TU G TU G TU G TU G D EX STORM MH RIM=1048.84 EX INTAKE T/C=1048.88 ST . ST . ST . ST . ST . ST . ST . ST . ST . ST.ST. WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P T W 1 0 5 4 B W 1 0 5 3 TC/SW 1049.30 TC/SW 1049.20 MATCH TC 1048.00 TC/SW 1048.48 TC/SW 1048.38 SW 1049.40 SW 1049.30 SW 1049.36 SW 1049.46 SW 1048.48 SW 1048.48 SW 1048.78 SW 1048.88 TC 1055.65 TC 1055.15 TP 1049.50 1.0%1. 5 % 6. 6 ' 1. 5 % 1.0% 1.0% 0. 6 % 10 . 0 ' 0. 6 % 1.0% 0.0% 1.0% 6. 6 ' 0. 0 % 1. 5 % 3. 0 % 10 . 0 ' 4. 0 % 10.0' 10.0' GA S GA S GA S GA S GA S GA S GA S GA S GA S GA S GA S GA S MATCH TC 1048.80 TC 1054.50 U G P U G P U G P U G P U G P U G P U G P U G P U G P UG P FFE 1057.00 SW 1056.80 SW 1056.90 TC 1056.75 SW 1056.40 SW 1056.80 TC 1056.75 TP 1056.00 TP 1056.00 TC 1055.75 TC 1055.75 TC 1056.00 TC/SW 1056.35 TC 1056.26 T T T 6" RDC @ 2.2% 1.0% 1.0% 0. 0 % 0. 0 % 7. 7 ' 5.0' 8. 0 % 5. 0 ' 1.0% 1.0% 8. 0 % 8. 0 % 5. 0 ' SW 1056.30 SW 1056.90 GA S GAS GAS TC 1056.40 1 . 5 % 1.5 % F/L OUT 1053.10 TC 1054.50 TC 1054.50 RR RR SW 6.80 SW 6.82 TC 1056.72 TC 1056.70 2.0% 2.0% 0. 3 % 0. 3 % F/L 1055.00 F/L 1055.00 F/L 1055.00 U G P U G P U G P TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST. W A T E R W A T E R W A T E R TUG TUG TUG TUG TUG TUG OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP TC 1055.75 TC 1056.00 TC 1056.05 TC 1056.00 TC 1055.70 TC 1056.60 TC 1056.25TC 1055.88 TC 1055.80 TC 1055.85 TC 1056.02 SW 1056.07 SW 1056.45 SW 1056.55 SW 1056.95 SW 1056.90 TC/SW 1055.59 TC/SW 1055.54 TC 1056.45 TC 1056.74 TC/SW 1055.88 TC/SW 1055.89 SW 1055.76 SW 1055.77 SW 1054.60SW 1054.60 GR 1054.10 GR 1053.65 1.0% 6. 0 ' 5.0' 8. 0 % 1.0% 0.14% 2. 0 % 14 . 1 ' 8. 2 % 8. 3 % 0.0% 7.0' SW 1056.30 SW 1054.50 1. 9 %TC 1056.20 TC 1056.30 1. 2 % 2.0% 2.0% 2. 0 % SW 1056.16 1 . 5 % 0.14% 6. 0 ' 1. 0 % 1. 0 % 0.0% TC 1054.50 F/L 1055.00 0 10'5' 1"=10' s h e e t C5.1 Civil p e r m i t ADA RAMPS Revisions ST A R B U C K S 15 0 0 S E U N I V E R S I T Y A V E WA U K E E , I O W A 17 DECEMBER 2021 2-15-22 CITY COMMENTS 3-29-22 CITY COMMENTS 4-20-22 CITY COMMENTS 5-12-22 CITY COMMENTS 6-2-22 CITY COMMENTS 6-21-22 CITY COMMENTS SE W A C O S T SM Engineering 5507 High Meadow Circle Manhattan Kansas, 66503 smcivilengr@gmail.com 785.341.9747 Drawings and/or Specifications are original proprietary work and property of the Engineer and intended specifically for this project. Use of items contained herein without consent of the Engineeris prohibited. Drawings illustrate best information available to the Engineer. Field verification of actual elements, conditions, and dimensions is required. U G P TU G TU G TU G TU G DEX STORM MH RIM=1048.84EX INTAKET/C=1048.88EX INTAKET/C=1048.81 ST . ST . ST . ST . ST . ST . ST . ST . ST. WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P SE W A C O P L A C E / 9 8 T H S T R E E T T TTT GAS GA S GA S GA S GA S GA S GA S GA S GA S GA S 1035 1040 1045 1050 1055 1060 1065 1070 1035 1040 1045 1050 1055 1060 1065 1070 -0+20 0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 St a . 0 + 0 0 . 0 0 , S T O R M L I N E A 4' D i a . M H , A - 1 To p E l e v . = 1 0 5 0 . 6 4 ST A 0 + 5 2 . 3 4 , S T O R M L I N E A 5' x 4 ' C U R B I N L E T , A - 2 WI T H F I L T E R I N S E R T To p : 1 0 5 0 . 9 8 55.70 LF 18" HDPE PIPE @ 6.20% Slope F/ L I N ( N ) : 1 0 4 8 . 8 5 F/ L I N ( S ) : 1 0 4 7 . 1 0 F/ L O U T ( E ) : 1 0 4 6 . 6 0 F/ L I N ( W ) : 1 0 4 6 . 1 0 ST A 1 + 0 8 . 5 7 , S T O R M L I N E A 3' x 3 ' G R A T E I N L E T , A - 3 To p : 1 0 5 4 . 5 1 F/ L I N ( W ) : 1 0 5 2 . 3 8 F/ L O U T ( S ) : 1 0 5 2 . 3 0 F/ L I N 1 0 5 3 . 0 0 9.01 LF 18" HDPE PIPE @ 6.88% Slope CO N C R E T E E N D S E C T I O N , A - 4 WI T H 3 " O R I F I C E P L A T E ST A 1 + 1 4 . 2 3 , L I N E A STORM LINE A EXISTING GRADE PROPOSED GRADE 52.34 LF 18" RCP @ 0.96% Slope TOP OF WATERLINE 1044.30 INV OF STORM 1046.20 EX I S T I N G F / L I N ( N ) 1 0 4 3 . 9 9 EX I S T I N G F / L O U T ( S ) 1 0 4 3 . 8 4 1035 1040 1045 1050 1055 1060 1065 1035 1040 1045 1050 1055 1060 1065 -0+20 0+00 0+20 0+40 0+60 ST A 0 + 5 2 . 3 4 , S T O R M L I N E A 5' x 4 ' C U R B I N L E T , A - 2 WI T H F I L T E R I N S E R T To p : 1 0 5 0 . 9 8 ST A 0 + 3 2 . 0 0 , S T O R M L I N E B 5' x 3 ' C U R B I N L E T , B - 1 WI T H F I L T E R I N S E R T To p : 1 0 5 0 . 9 8 32.00 LF 15" HDPE PIPE @ 1.25% Slope F/ L O U T ( N ) : 1 0 4 7 . 5 0 F/ L I N ( N ) : 1 0 4 8 . 8 5 F/ L I N ( S ) : 1 0 4 7 . 1 0 F/ L O U T ( E ) : 1 0 4 6 . 6 0 PROPOSED GRADE EXISTING GRADE STORM LINE B 0 20'10' 1"=20' s h e e t C6.0 Civil p e r m i t Revisions ST A R B U C K S 15 0 0 S E U N I V E R S I T Y A V E WA U K E E , I O W A 17 DECEMBER 2021 2-15-22 CITY COMMENTS 3-29-22 CITY COMMENTS 4-20-22 CITY COMMENTS 5-12-22 CITY COMMENTS 6-2-22 CITY COMMENTS 6-21-22 CITY COMMENTS SM Engineering 5507 High Meadow Circle Manhattan Kansas, 66503 smcivilengr@gmail.com 785.341.9747 Drawings and/or Specifications are original proprietary work and property of the Engineer and intended specifically for this project. Use of items contained herein without consent of the Engineeris prohibited. Drawings illustrate best information available to the Engineer. Field verification of actual elements, conditions, and dimensions is required. EXISTING STORM MH, STA 0+00 A-1 CORE DRILL MANHOLE AND PROVIDE SOIL TIGHT CONNECTION STORM LINE A & B PLAN & PROFILE 0 20'10' 1"=20' 5'X4' CURB INLET, A-2 WITH FILTER INSERT STA 0+52.34, LINE A N582963.26 E1546418.18 0 5' 2. 5 ' 1" = 5 ' 3'X3' GRATE INLET, A-3 , STA 1+08.57, LINE A N583015.03 E1546396.24 CONCRETE END SECTION WITH 3" ORIFICE PLATE STA 1+14.23, LINE A N583014.95 E1546387.23 106' OF 24" HDPE PIPE WITH FES INV 1053.00, C-1 INV 1053.20, C-2 ELEV 1054.50 F/L 1052.50 F/L 1052.30 PRIVATE STRUCTURE A-3 5'X3' CURB INLET, B-1 WITH FILTER INSERT STA 0+32.00, LINE B N582931.27 E1546418.08 STORM LINE A STORM LINE B STRUCTURE A-3 MAINTENANCE ON A MONTHLY BASIS OWNER TO INSPECT STRUCTURE, REMOVE ANY DEBRIS FROM ORIFICE OPENING AND REMOVE EXCESS SEDIMENT 2.71 ORIFICE PLATE DETAIL TU G TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TU G TU G TU G TU G EX I N T A K E T/C= 1 0 4 5 . 7 2 EX I N T A K E T/C = 1 0 4 5 . 7 0 DEX S T O R M M H RIM = 1 0 4 5 . 7 0 DEX S T O R M M H RIM = 1 0 4 6 . 1 5 EX I N T A K E T/C= 1 0 4 6 . 1 6 D EX S T O R M M H RIM = 1 0 4 8 . 8 4 EX I N T A K E T/C = 1 0 4 8 . 8 8 EX I N T A K E T/C = 1 0 5 1 . 7 4 DEX S T O R M M H RIM = 1 0 5 1 . 8 2 H Y D DEX S T O R M M H RIM = 1 0 5 3 . 4 3 EX I N T A K E T/C= 1 0 5 3 . 2 7 EX 1 2 " R C P F E S FL=1 0 4 1 . 3 9 EX I N T A K E T/C = 1 0 4 5 . 7 3 EX I N T A K E T/C = 1 0 4 5 . 7 1 EX I N T A K E T/C = 1 0 4 6 . 0 4 EX I N T A K E T/C= 1 0 4 6 . 0 1 EX 4 " P V C FL= 1 0 4 7 . 3 7 EX I N T A K E T/C = 1 0 4 8 . 8 1 EX I N T A K E T/C = 1 0 5 1 . 7 3 ST . ST . ST.ST. ST.ST.ST.ST. ST . ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST. ST . ST . ST. ST. ST . ST . ST . ST . ST . ST . ST . WA T E R WA T E R WA T E R WA T E R WATERWATERWATERWATERWATERWATERWATERWATERWATERWATERWATERWATERWATERWATERWATERWATERWATERWATERWATERWATERWATER WAT E R WAT E R WAT E R WATER GA S GA S GA S GA S GAS GASGAS TU G TUG TU G TU G TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG T U G TU G TU G TU G TU G TU G UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P OH P UGP UGP UGP UGP UGP UG P UG P UG P UG P UG P UG P UG P UG P SE WACO PLACE / 98TH STREET T T T T GA S GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS 0 20'10' 1"=20' s h e e t C7.0 Civil p e r m i t STRIPING PLAN Revisions ST A R B U C K S 15 0 0 S E U N I V E R S I T Y A V E WA U K E E , I O W A 17 DECEMBER 2021 2-15-22 CITY COMMENTS 3-29-22 CITY COMMENTS 4-20-22 CITY COMMENTS 5-12-22 CITY COMMENTS 6-2-22 CITY COMMENTS 6-21-22 CITY COMMENTS SM Engineering 5507 High Meadow Circle Manhattan Kansas, 66503 smcivilengr@gmail.com 785.341.9747 Drawings and/or Specifications are original proprietary work and property of the Engineer and intended specifically for this project. Use of items contained herein without consent of the Engineeris prohibited. Drawings illustrate best information available to the Engineer. Field verification of actual elements, conditions, and dimensions is required. NOTE CONTRACTOR RESPONSIBLE FOR PREPARING TRAFFIC CONTROL PLAN FOR APPROVAL BY THE CITY PRIOR TO CONSTRUCTION. ALL PAVEMENT MARKINGS TO BE DURABLE PAINT PER CITY OF WAUKEE CRITERIA. BEGIN REMOVAL OF DOUBLE YELLOW END REMOVAL OF DOUBLE YELLOW SOLID 4" YELLOW WITH DASHED 4" YELLOW REMOVE 50' OF WHITE LANE LINE REMOVE TURN LANE ARROW WHITE TURN ARROW 1 2 3 4 5 100' 200' EXISTING STOP BAR 5 5 2 1 3 46 6 6 4 U G P U G P U G P U G P U G P U G P U G P U G P U G P 105 6 1 0 5 7 10 5 3 1056 105 3 105 1 1 0 5 0 105 3 105 5 1 0 5 4 105 1 10 5 4 10 5 5 1055 1 0 5 5 10 5 6 10 5 7 1 0 5 5 1 0 5 5 1056 10 5 6 10 5 6 1 0 5 6 10 5 5 10 5 5 10 5 3 1 0 5 5 1 0 5 6 105 5 1 0 5 6 TUG TUG TUG TUG TUG TUG TUG TUG TUG T U G TU G TU G TU G TU G TU G TU G TU G TU G TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG DEX STORM MHRIM=1048.84 EX INTAKET/C=1048.88 EX INTAKET/C=1051.74 DEX STORM MHRIM=1051.82 H Y D DEX STORM MHRIM=1053.43 EX INTAKET/C=1053.27 EX SAN MH RIM=1059.76 INV (E) 1041.47 INV (S) 1041.41 INV (W) 1041.37 DEX STORM MHRIM=1059.35 DEX STORM MHRIM=1058.04 DEX STORM MHRIM=1055.34 EX INTAKERIM=1056.52 DEX STORM MHRIM=1057.36 DIRT MOUND ST. ST. ST. ST . ST . ST . ST . ST . ST . ST . ST . ST . ST. ST. ST. S T . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST. ST. S T . S T . ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST. S A N S A N S A N S A N S A N S A N S A N S A N SA N W A T E R W A T E R W A T E R W A T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R W A T E R W A T E R W A T E R WA T E R GAS GA S G A S G A S G A S G A S TUG TUG TUG TUG T U G TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG TUG UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP UGP UGP UGP UG P OH P OH P U G P U G P U G P U G P SE UNIVERSITY AVENUE SE W A C O P L A C E / 9 8 T H S T R E E T OW N E R : S P L A S H E X P R E S S , L L C ZO N E D : C - 1 / P D - 1 C O M M U N I T Y A N D H I G H W A Y SE R V I C E C O M M E R C I A L D I S T R I C T / P L A N N E D DE V E L O P M E N T O V E R L A Y EX INTAKET/C=1059.44EX 6" CMPFL=1056.90 10 5 6 10 5 3 10 5 2 10 5 4 T T T T S E B I S H O P D R I V E 105 7 10 5 6 10 5 5 10 5 8 1057 1056 1055 1056 1057 10 5 6 10 5 7 10 5 5 10 5 3 10 5 2 10 5 1 10 5 0 10 5 1 10 5 2 1054 1055 1056 10 5 9 1 0 5 8 10 5 9 GAS GA S GA S GA S GA S GA S GA S GA S GA S GA S GA S GA S GA S GA S GA S 0 20'10' 1"=20' s h e e t C8.0 Civil p e r m i t Revisions ST A R B U C K S 15 0 0 S E U N I V E R S I T Y A V E WA U K E E , I O W A 17 DECEMBER 2021 2-15-22 CITY COMMENTS 3-29-22 CITY COMMENTS 4-20-22 CITY COMMENTS 5-12-22 CITY COMMENTS 6-2-22 CITY COMMENTS 6-21-22 CITY COMMENTS TEMPORARY CONSTRUCTION ENTRANCE 20' X 50' LEGEND SILT FENCE INLET PROTECTION TEMPORARY CONSTRUCTION ENTRANCE INSTALL INLET PROTECTION GENERAL NOTES: 1. PROPERTY LINE IS LIMITS OF CONSTRUCTION EXCEPT AS SHOWN. 2. THE CONTRACTOR SHALL INSTALL SEDIMENT CONTROL MEASURES AS SHOWN ON THE DRAWINGS PRIOR TO BEGINNING EARTHWORK OPERATIONS. 3. THE CONTRACTOR SHALL MAINTAIN ALL SILT CONTROL MEASURES DURING CONSTRUCTION. 4. ALL SILT SHALL REMAIN ON SITE AND SURROUNDING STREETS SHALL BE KEPT CLEAR OF ALL MUD AND DEBRIS. 5. A SEDIMENTATION BARRIER IS TO BE INSTALLED AS SHOWN. 6. ACCUMULATED SEDIMENT SHALL BE REMOVED AND THE SEDIMENTATION BARRIERS MAINTAINED PER 2022 SUDAS 7. SLOPES ARE TO BE LEFT IN A ROUGH CONDITION DURING GRADING. 8. CURB INLET SEDIMENTATION BARRIERS ARE TO BE INSTALLED AROUND INLETS AND WEIRS WHERE SEDIMENTATION IS A CONCERN. INLET BARRIERS SHALL BE EITHER BLOCK AND GRAVEL, PER 2022 SUDAS, OR SILT FENCE. 9. SEDIMENT IS TO BE REMOVED FROM STORM WATER DRAINAGE SYSTEMS. 10. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ANY ADDITIONAL EROSION AND SEDIMENT CONTROL AS HE/SHE DEEMS NECESSARY. 11. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT AND LABOR AS NECESSARY TO INSTALL AND MAINTAIN ADEQUATE EROSION AND SILTATION CONTROLS REQUIRED TO PREVENT SOIL EROSION FROM LEAVING THE PROJECT SITE. IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO ENSURE THAT METHODS UTILIZED ARE ADEQUATE AND COMPLY WITH REQUIREMENTS OF THE SPECIFICATIONS AND GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK. 12. TEMPORARY SEDIMENT FENCE TO REMAIN UNTIL ADEQUATE VEGETATION IS ESTABLISHED. 13. MUD AND DEBRIS SHALL BE CLEANED UP AT THE CONCLUSION OF EACH WORKING DAY AND PRIOR TO RAIN EVENT, OR AFTER EACH RAINFALL IF SILT IS PRESENT. 14. INSPECTION, MAINTENANCE AND REPAIR OF EROSION AND SEDIMENT CONTROL DEVICES SHALL BE ON GOING THROUGHOUT THE LIFE OF BUILDING CONSTRUCTION TO KEEP THE DEVICES IN OPERABLE CONDITION AT ALL TIMES. ADDITIONAL MEASURES SHALL BE INSTALLED AS REQUIRED BY ACTUAL FIELD CONDITIONS AND/OR GOVERNING INSPECTION AGENCIES. 15. INSTALL CONSTRUCTION ENTRANCE AT ANY POINT WHERE TRAFFIC WILL BE ENTERING OR LEAVING THE SITE AND AS SHOWN ON PLANS. 16. AT COMPLETION OF SITE GRADING AND OTHER RELATED CONSTRUCTION ACTIVITIES, ALL DISTURBED AREAS WITHIN THE PROJECT SITE SHALL BE SEEDED, SODDED, OR LANDSCAPED AS SHOWN ON THE LANDSCAPE PLAN IMMEDIATELY. 17. TOPSOIL TO BE RE-SPREAD TO MEET SUDAS SPECIFICATION 2010 18. THE CONTRACTOR SHALL HAVE THE RESPONSIBILITY FOR RESOLVING COMPLAINTS IN THE EVENT THAT COMPLAINTS OR DAMAGE CLAIMS ARE FILED DUE TO DAMAGES OCCURRING ADJACENT TO OR DOWNSTREAM FROM PROPERTY BY SEDIMENT RESULTING FROM EROSION ON THE PROJECT SITE. 19. GOOD HOUSEKEEPING PRACTICES SHALL BE MAINTAINED ON SITE TO KEEP SOLID WASTE FROM ENTRY INTO WATERS. 20. ALL FUELING FACILITIES PRESENT ON SITE SHALL ADHERE TO APPLICABLE FEDERAL AND STATE REQUIREMENTS CONCERNING UNDERGROUND STORAGE, ABOVE GROUND STORAGE AND DISPENSERS, INCLUDING SPILL PREVENTION, CONTROL AND COUNTER MEASURES. 21. EROSION CONTROL AND SEDIMENT IS TO BE PLACED IN PHASING AS CONSTRUCTION PROGRESSES. 22. CONCRETE WASHOUT SHALL BE PER SECTION 11,050 OF THE SUDAS STANDARD SPECIFICATIONS. CONCRETE WASHOUT OF THE DRUM IS NOT ALLOWED. ANY PIT/WASHOUT AREA NEEDS TO BE MAINTAINED IN A NON-DISCHARGING MANNER AND ANY WASTE RESIDUE WILL NEED TO BE CLEANED OUT AND REMOVED AT THE END OF PROJECT. 23. EROSION CONTROL SEDIMENT FENCE TO BE INSTALLED 1'-0" BEHIND CURB & GUTTER UPON COMPLETION OF BACKFILL OF CURB IN ALL AREAS WHERE SLOPES FROM LOT DRAIN TOWARDS CURB. UPON COMPLETION OF FINAL GRADING THE TOES OF ALL EMBANKMENTS IN EXCESS OF TWO FEET IN HEIGHT WILL HAVE EROSION CONTROL SEDIMENT FENCE INSTALLED. 24. ALL SLURRY AND SEDIMENT FROM SAWCUTTING OPERATIONS MUST BE CONFINED TO THE IMMEDIATE WORK AREA USING SAND BAGS, TEMPORARY BERMS OR OTHER DIVERSION STRUCTURES. SM Engineering 5507 High Meadow Circle Manhattan Kansas, 66503 smcivilengr@gmail.com 785.341.9747 Drawings and/or Specifications are original proprietary work and property of the Engineer and intended specifically for this project. Use of items contained herein without consent of the Engineeris prohibited. Drawings illustrate best information available to the Engineer. Field verification of actual elements, conditions, and dimensions is required. INSTALL SILT FENCE AS SHOWN INSTALL INLET PROTECTION INSTALL INLET PROTECTION CONCRETE WASHOUT AREA MATERIAL STORAGE & STAGING AREA INFILTRATION TRENCHES SHALL NOT BE INSTALLED UNTIL UPSTREAM AREAS AREA STABILIZED LIMITS OF DISTURBANCE TOTAL AREA = 2.27ac INSTALL INLET PROTECTION TOPSOIL STORAGE AREA INSTALL SILT FENCE AS SHOWN EROSION & SEDIMENT CONTROL QUANTITIES SILT FENCE 1,033' INLET PROTECTION 5 CONSTRUCTION ENTRANCE 1 EROSION CONTROL DEVICES SUDAS SPECIFICATIONS REFERENCE INLET PROTECTION: SECTION 2.19 SILT FENCE: SECTION 2.13 CONSTRUCTION ENTRANCE: SECTION 2.14 TYPE 1 PERMANENT SEEDING = 0.90ac PERMANENT SOD = 0.41ac POST CONSTRUCTION EROSION CONTROL MEASURES: INFILTRATION TRENCHES RIP RAP ULTIMATE STORM WATER DISCHARGED POINT. NEAREST WATER BODY, WALNUT CREEK CONTRACTOR TO USE SUDAS TYPE 4 TEMPORARY SEEDING FOR ONSITE CONSTRUCTION AREAS AND ACCESS DRIVES SUDAS TYPE 4 TEMPORARY SEEDING FOR OFF SITE SANITARY SEWER AREA SUDAS TYPE 4 TEMPORARY SEEDING FOR STOCKPILE AREA s h e e t C9.0 Civil p e r m i t Revisions ST A R B U C K S 15 0 0 S E U N I V E R S I T Y A V E WA U K E E , I O W A 17 DECEMBER 2021 2-15-22 CITY COMMENTS 3-29-22 CITY COMMENTS 4-20-22 CITY COMMENTS 5-12-22 CITY COMMENTS 6-2-22 CITY COMMENTS 6-21-22 CITY COMMENTS EROSION AND SEDIMENT CONTROL DETAILS utilized comply with the requirements of the governmental agencies having abutting properties, streets, and all utilities. 3. Erosion control devices shall remain in place for the duration of the project. 4. The contractor shall seed/mulch and or sod all areas disturbed during the by the use of Silt fence and other acceptable methods to protect the at all times and shall schedule the work to minimize the erosion of material 2. The contractor shall control the grading operation so that the site is well drained construction activities. jurisdiction over the work. angle toward the anticipated runoff source. that the downslope face of the trench is flat and perpendicular to the 2. Silt Fence shall be trenched in with a spade or mechanical trencher so 1. Steel posts which support the silt fence shall be installed on a slight to block or impede storm flow or drainage. the silt fence to be laid in the ground and backfilled. 6. Silt Fence shall be removed when it has served its usefulness so as not 5. Inspection shall be frequent and repair or replacement shall be made woven wire which is in turn attached to the steel fence posts. 4. Silt Fence should be securely fastened to each steel, support post or to 7. Sediment trapped by this practice shall be uniformly distributed on the 3. The trench should be a minimum of 6" deep and 3-4" wide to allow for EROSION CONTROL NOTES: 1. The contractor shall provide all materials, tools, equipment and labor as necessary to install and maintain adequate erosion control to prevent soil from leaving the project site. It shall be the contractor's responsibility to insure that the methods 8. The Erosion Control shown shall be Silt Fence. Or other approved methods source area prior to topsoiling. promptly as needed. line of flow. CONSTRUCTION SPECIFICATIONS GRAVEL FILTER BAG AFTER CONSTRUCTION OF INLETS, FILTER BAGS SHALL BE PLACED AROUND PROPOSED INLETS. NOTE: SILT FENCE LOCATED ALONG THE PROJECT BOUNDARIES CURB CONTACT WITH NO GAPS APPROXIMATELY 6-INCHES FROM INLET BAG IS TO HAVE A TIGHT SHALL BE INSTALLED PRIOR TO GRADING OPERATIONS NOTE: FRONT VIEW NOT BE ABOVE THE CONCRETE WALK HEIGHT OF GRAVEL FILTER BAGS SHOULD PAVEMENT GAPS ARE EVIDENT PLACE GRAVEL FILTER BAGS SUCH THAT NO TOP VIEW (1/8-INCH MESH) APPROXIMATELY 24 INCHES (Not to Scale) (Typical At Every Inlet) GRAVEL FILTER BAGS 3/4-INCH GRAVEL CONTAINED IN PERVIOUS BURLAP BAGS OR SYNTHETIC NET BAGS LONG, 12 INCHES WIDE, AND 6 INCHES (i.e. CURB HEIGHT) HIGH. CONCRETE SLAB BAGS SUCH THAT NO GAPS ARE EVIDENT PLACE GRAVEL FILTER BAGS AND INLET LEAVE APPROXIMATELY 4 TO 6 INCHES BETWEEN GRAVEL FILTER 2" x 4" BOARD SM Engineering 5507 High Meadow Circle Manhattan Kansas, 66503 smcivilengr@gmail.com 785.341.9747 Drawings and/or Specifications are original proprietary work and property of the Engineer and intended specifically for this project. Use of items contained herein without consent of the Engineeris prohibited. Drawings illustrate best information available to the Engineer. Field verification of actual elements, conditions, and dimensions is required. s h e e t C10.0 Civil p e r m i t DETAILS Revisions ST A R B U C K S 15 0 0 S E U N I V E R S I T Y A V E WA U K E E , I O W A 17 DECEMBER 2021 2-15-22 CITY COMMENTS 3-29-22 CITY COMMENTS 4-20-22 CITY COMMENTS 5-12-22 CITY COMMENTS 6-2-22 CITY COMMENTS 6-21-22 CITY COMMENTS 2.0' TYP. VARIES SEE DIMENSION PLAN VARIES SEE DIMENSION PLAN 90° SE E D I M E N S I O N P L A N 8.0'5.0'8.0' PER ADA VARIES 4' MIN. 2.0' TYP. 4' MIN. VARIES 4" TRAFFIC YELLOW TYP. ALWAYS PUT BUFFER ZONE ON THE RIGHT HAND SIDE OF VAN SPACE.4" TRAFFIC YELLOW TYP. MIN.MIN.MIN. STANDARD 90° SPACE SEE DIMENSION PLAN FOR DIMENSION ALL DIMENSIONS SHOWN ARE MINIMUM. SEE DIMENSION PLAN FOR WIDTH OF STALLS AND BUFFER ZONES. STANDARD 90° SPACE SEE DIMENSION PLAN FOR DIMENSION MIN. NOTE: PARKING SPACES AND ACCESS ISLES SHALL BE LEVEL WITH SURFACE SLOPES NOT EXCEEDING 1:50 IN ALL DIRECTIONS PER ADA 8.0'8.0' MIN. SE E D I M E N S I O N P L A N 90° 90° ACCESSIBLE & VAN ACCESSIBLE SPACE STRIPING PK1 4' - 0 " 3' - 6 " 1'-6" CONCRETE 10 " 6" 2' - 0 " 2'-0" GUARD POST BUILDING BASE 6" DIA. STANDARD STEEL PIPE FILL WITH CONCRETE PAVEMENT OR FINISHED GRADE ONE WRAP OF 30# ROOFING FELT NOTE: ALL PIPE SHALL BE PAINTED TRAFFIC YELLOW. BOLLARD DETAIL SG1 45° BEND 8" 45° WYE FRAME AND COVER "CLAY AND BAILEY" NO. 2238 OR "NEENAH" R-1974 WITH SOLID COVER. 18"x18" SQUARE CONCRETE COLLAR SEE UTILITY PLAN FOR SIZE OF MAIN CLEAN-OUT 510 TOOL JOINT 4" CONCRETE OVER 6" GRANULAR FILL TYPICAL PAVING SEE SITE PLANS 1'-6" #4 CONTINUOUS (2) 6" 1/4" R VAIRES 0"-6" 4" USE 1/2" FILLER IF PAVING IS TO BE CONCRETE RUBBED FACE BROOM FINISH WITH TOOLED JOINTS 3'-0" O.C. CURB WALK/CURB (AT BUILDING)CW1 SM Engineering 5507 High Meadow Circle Manhattan Kansas, 66503 smcivilengr@gmail.com 785.341.9747 Drawings and/or Specifications are original proprietary work and property of the Engineer and intended specifically for this project. Use of items contained herein without consent of the Engineeris prohibited. Drawings illustrate best information available to the Engineer. Field verification of actual elements, conditions, and dimensions is required. 6" 2. 0 ' 2. 0 ' 1. 0 ' 4.0' 5" CONCRETE FLUME 6" 12 " CONSTRUCT 6"X6"X7" FLOW DISSIPATOR IN ALTERNATING PATTERN PLAN VIEW SECTION INFILTRATION TRENCH 2" PEA GRAVEL (#8+3/8") 1-3 CONSTRUCT 1'X6"X7" FLOW DISSIPATOR IN ALTERNATING PATTERN CONTRACTOR TO POUR DISSIPATOR BLOCKS SEPARATELY AND IN GREEN CONCRETE 1" DEEP. ALTERNATE METHODS MAY BE USED WITH ENGINEERS APPROVAL 4. 0 ' VARIES' 6" 4' ELEV 1053.00 ELEV 1049.00 s h e e t C11.0 Civil p e r m i t DETAILS Revisions ST A R B U C K S 15 0 0 S E U N I V E R S I T Y A V E WA U K E E , I O W A 17 DECEMBER 2021 2-15-22 CITY COMMENTS 3-29-22 CITY COMMENTS 4-20-22 CITY COMMENTS 5-12-22 CITY COMMENTS 6-2-22 CITY COMMENTS 6-21-22 CITY COMMENTS SM Engineering 5507 High Meadow Circle Manhattan Kansas, 66503 smcivilengr@gmail.com 785.341.9747 Drawings and/or Specifications are original proprietary work and property of the Engineer and intended specifically for this project. Use of items contained herein without consent of the Engineeris prohibited. Drawings illustrate best information available to the Engineer. Field verification of actual elements, conditions, and dimensions is required. MATERIAL VA R I E S UNDISTURBED EARTH PIPE BEDDING BACKFILL AS SPECIFIED NOTE EXCAVATED MATERIAL FOR BACKFILL, WHEN SPECIFIED: FINELY DIVIDED MATERIAL FREE FROM DEBRIS, STONES, ORGANIC MATTER OR FROZEN LUMPS. 1. STD.DWG.NO.2 CITY OF WAUKEE GRANULAR ENCASEMENT STANDARD PVC PIPE BEDDING 6" MIN. 12" MIN. PVC, PVC TRUSS, OR PROFILE WALL PIPE STD.DWG.NO.15 CITY OF WAUKEE RISER 12" MIN. 6" MIN. 6" MIN. S U R F A C E STOPPER AT END OF PIPE (TYP.) RISER PIPE TRENCH WALL GRANULAR BEDDING WYE BRANCH (SIZE AS SPECIFIED) STAKE TO WALL 1' - 0 " MI N . 1' - 0 " MI N . OF TRENCH PLAN INSTALL RISER PIPE TO BEAR FIRMLY AGAINST UNDISTURBED WALL OF TRENCH. STAKE RISER PIPE IN PLACE PRIOR TO BACK- FILLING TO PREVENT MOVEMENT OF PIPE NOTCH WALL OF TRENCH TO RECEIVE PIPE WHERE POSSIBLE. 2. 1. NOTES SECTION 45° 8' ± T O G R O U N D s h e e t C12.0 Civil p e r m i t DETAILS Revisions ST A R B U C K S 15 0 0 S E U N I V E R S I T Y A V E WA U K E E , I O W A 17 DECEMBER 2021 2-15-22 CITY COMMENTS 3-29-22 CITY COMMENTS 4-20-22 CITY COMMENTS 5-12-22 CITY COMMENTS 6-2-22 CITY COMMENTS 6-21-22 CITY COMMENTS 7" 8" 4" 13 " 5" 12 " PORTLAND CEMENT CONCRETE PAVEMENT PORTLAND CEMENT CONCRETE PAVEMENT 1. FLEXIBLE PAVEMENT SHALL BE IN ACCORDANCE WITH THE 2020 WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS AND 2022 SUDAS ASPHALT SURFACE COURSE - APWA TYPE 3-01 ASPHALT BASE COURSE - APWA TYPE 1-01 AGG BASE-MODOT TYPE 5 2. PORTLAND CEMENT CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4000 PSI AT 28 DAYS WITH 6% ENTRAINED AIR ±2% AND SHALL MEET OR EXCEED THE 2020 WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS AND 2022 SUDAS 3. HEAVY DUTY CONCRETE IS AN OPTIONAL PAVEMENT FOR DETAIL 041 HEAVY DUTY ASPHALT. WHEN PLANS SPECIFY DETAIL 042 NO ALTERNATES ARE ALLOWED. GRANULAR BASE COURSE GRANULAR BASE COURSE COMPACTED SUBGRADE8" COMPACTED SUBGRADE 4" REGULAR DUTY CONCRETE PAVING HEAVY DUTY CONCRETE CONCRETE ALTERNATE PV1 PV3 CORRUGATED POLYETHYLENE PIPE AND/OR POLYVINYL CHLORIDE PIPE. INCLUDES CORRUGATED METAL PIPE. HAUNCHING 4"6"BEDDING D 6" MIN. 6" MIN. D BEDDING INCLUDES REINFORCED CONCRETE, DUCTILE IRON, & CAST IRON D/2+6" D/2 8" MI N . 1. BEDDING SHALL BE COMPACTED SAND AND SHALL BE SHAPED TO THE BOTTOM OF THE PIPE. 2. SELECT FILL SHALL BE NATIVE MATERIAL FREE OF LARGE ROCKS, DEBRIS, AND ORGANICS (3"+) AND SHALL BE PLACED IN 8" MAX. LOOSE LIFTS AND COMPACTED IN ACCORDANCE WITH SPECIFICATIONS. 1. BEDDING AND HAUNCHING MATERIAL SHALL BE COMPACTED SAND, UNLESS NOTED OTHERWISE ON PLANS AND SHALL BE SHAPED TO THE BOTTOM OF THE PIPE. 2. INITIAL BACKFILL MATERIAL SHALL BE GRANULAR MATERIAL OR SELECT MATERIAL (INCLUDING SAND) COMPACTED IN ACCORDANCE TO SPECIFICATIONS. 3. SELECT FILL PLACEMENT AND COMPACTION SAME AS FOR RIGID PIPE. SLOPE TRENCH SIDES PER OSHA REQUIREMENTS SLOPE TRENCH SIDES PER OSHA REQUIREMENTS SELECT FILL SELECT FILL INITIAL BACKFILL RIGID PIPE:FLEXIBLE PIPE: TRENCH AND BEDDING DETAILS MS1 2. 1. A MINIMUM OF 3" ASPHALT. REBAR IS NOT REQUIRED FOR CURB CONSTRUCTION ON SAME AS NOTED ON TYPE "A" CURB AND GUTTER DETAIL. 3" EXPANSION, CONTRACTION, OR CONSTRUCTION JOINTS ARE TO BENOTE: CG-1 CURB AND GUTTER 12" 24" 6" 6" 2" 12 " 5 1 / 2 " 6" 7" R=2" R=2" #4 BARS R=1/4" R=1/4" SM Engineering 5507 High Meadow Circle Manhattan Kansas, 66503 smcivilengr@gmail.com 785.341.9747 Drawings and/or Specifications are original proprietary work and property of the Engineer and intended specifically for this project. Use of items contained herein without consent of the Engineeris prohibited. Drawings illustrate best information available to the Engineer. Field verification of actual elements, conditions, and dimensions is required. 1' - 6 " 1'-0" 5' - 0 " M I N . 1'-6" 2' - 0 " 3" WHEN VAN-ACCESSIBLE SPACE IS ADJACENT TO BUILDING, SIGN TO BE MOUNTED TO BUILDING. FACE PER SAME DIMENSIONS AS SHOWN AND PER FEDERAL CODE. "U"-CHANNEL POST (3-LBS/FT) 6" PIPE BOLLARD PAINTED TRAFFIC YELLOW, FILLED WITH CONCRETE. THIS SIGN TYPICAL AT ALL ACCESSIBLE PARKING SPACES THIS SIGN TYPICAL AT ALL VAN-ACCESSIBLE PARKING SPACES 3500 P.S.I. P.C. CONCRETE (SEE SPECIFICATIONS) ACCESSIBLE PARKING SIGN PK2 CONCRETE TRAIL TWNOTE: CONCRETE SHALL BE 4,000 PSI CONCRETE PER SUDAS 4,000 PSI 10' 6" DOWNSPOUT COLLECTOR CONNECTION 0. 5 " 6" PVC DOWNSPOUT FINISH GRADE U G P U G P U G P U G P U G P U G P U G P U G P U G P 105 6 1 0 5 7 10 5 3 1056 105 3 105 1 1 0 5 0 105 3 105 5 1 0 5 4 105 1 10 5 4 10 5 5 1055 1 0 5 5 1 0 5 5 1056 10 5 6 10 5 6 1 0 5 6 10 5 5 10 5 5 10 5 3 1 0 5 5 1 0 5 6 105 5 1 0 5 6 TUG TUG TUG TUG TUG T U G TU G TU G TU G TU G TU G TU G TU G TUG TUG TUG TUG TUG TUG TUG TUG DEX STORM MHRIM=1048.84 EX INTAKET/C=1048.88 EX INTAKET/C=1051.74 DEX STORM MHRIM=1051.82 H Y D DEX STORM MHRIM=1053.43 EX INTAKET/C=1053.27 ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST . ST. ST. S T . S T . ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST.ST. SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R WA T E R W A T E R W A T E R W A T E R WA T E R WA T E R TUG TU G TUG GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS TUG TUG TUG TUG TUG TUG TUG TUG UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P UG P OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP UGP UGP UGP UG P UG P SE UNIVERSITY AVENUE SE W A C O P L A C E / 9 8 T H S T R E E T (S 89°48'38"E 439.03') (S 44°44'26" E) (14.12') (S 0 ° 1 9 ' 4 7 " W 4 7 9 . 8 0 ' ) 10 5 6 10 5 3 10 5 2 10 5 4 T T T T 105 7 10 5 6 10 5 5 10 5 6 10 5 7 10 5 5 10 5 3 10 5 2 10 5 1 10 5 0 10 5 1 10 5 2 1054 1055 1056 GAS GA S GA S GA S GA S GA S GA S GA S GA S GA S GA S 0 20'10' 1"=20' s h e e t C13.0 Civil p e r m i t LANDSCAPE PLAN Revisions ST A R B U C K S 15 0 0 S E U N I V E R S I T Y A V E WA U K E E , I O W A 17 DECEMBER 2021 2-15-22 CITY COMMENTS 3-29-22 CITY COMMENTS 4-20-22 CITY COMMENTS 5-12-22 CITY COMMENTS 6-2-22 CITY COMMENTS 6-21-22 CITY COMMENTS LANDSCAPE DATA WACO PLACE 260' REQUIRED SHADE TREE / 40'7 PROVIDED PROPOSED SHADE TREES 7 UNIVERSITY AVE 185' REQUIRED SHADE TREE / 40'5 PROVIDED SHADE TREES 5 WACO PLACE R/W SETBACK 260' REQUIRED 2 TREES / 50'10 8 SHRUBS / 50'42 PROVIDED TREES 9 SHRUBS 45 UNIVERSITY AVE R/W SETBACK 185' REQUIRED 2 TREES / 50'7 8 SHRUBS / 50'30 PROVIDED TREES 7 SHRUBS 30 OPEN SPACE 18,109sf 1.5 TREE /1000sf 27 .5 ORNAMENTAL TREES / 1000sf 9 2 SHRUB / 1000sf 36 PROVIDED TREES 23 ORNAMENTAL 9 SHRUBS 34 Tree List Acer Rubrum 'October Glory'BB As ShownOctober Glory Maple20 15 Skyline Honeylocust As ShownBBGleditsia Triacanthos 'Skyline'2" cal 2" cal Symbol Quantity Common Name Botanical Name Size Condition Spacing LANDSCAPE NOTES CONTRACTOR REQUIRED TO LOCATE ALL UTILITIES BEFORE INSTALLATION TO BEGIN. Contractor shall verify all landscape material quantities and shall report any discrepancies to the Landscape Architect prior to installation. No plant material substitutions are allowed without City of Waukee approval. Contractor shall guarantee all landscape work and plant material for a period of one year from date of acceptance of the work by the Owner. Any plant material which dies during the one year guarantee period shall be replaced by the contractor during normal planting seasons. Contractor shall be responsible for maintenance of the plants until completion of the job and acceptance by the Owner. Successful landscape contractor shall be responsible for design that complies with minimum irrigation requirements, and installation of an irrigation system. Irrigation system to be approved by the owner before starting any installation. All plant material shall be specimen quality stock as determined in the "American Standards For Nursery Stock" published by The American Association of Nurseryman, free of plant diseases and pest, of typical growth of the species and having a healthy, normal root system. Sizes indicated on the plant list are the minimum, acceptable size. In no case will sizes less than specified be accepted. All shrub beds within lawn areas to receive a manicured edge. All shrub beds shall be mulched with 3" of peagravel color to be selected by owner. All disturbed areas including public right of way shall be sodded and fertilized with a Turf-Type-Tall Fescue seed blend, unless otherwise noted. Shrub Bed & Parking No Scale 6" Min.bottom of pit Scarify soil in Manicured Edge 6" M i n . 1/2 topsoil 1/2 existing soil, 4' Min. Ba c k o f Cu r b Setback Detail Tree Planting Detail No Scale #12 gauge wire Tree Guard bottom of pit Scarify soil in around saucer Finished Grade 4" Berm 6" M i n . Rubber hose Steel fence posts 3 per tree 1/2 topsoil Top 1/3 of root ball Fold back burlap from 1/2 Existing soil, flush w/finished grade Plant w/top of ball 6" Min. Treated crepe tree wrap 6ft. Diameter Mulched Area In Lawn Areas Ce n t e r o f Sh r u b Weed Mat 25' 150' SIGHT TRIANGLE Shrub List Juniperus Chinensis 'Seagreen'Cont.4'Seagreen Juniper40 18"-24"sp. Symbol Quantity Common Name Botanical Name Size Condition Spacing Calamagrostis Acutiflora 'Karl Foerster'Cont.2'Feather Reed Grass34 18"-24"sp. 14 Prairiefire Crabapple As ShownBBMalus Sp. 'Priariefire'1 1/2"cal Euonymus Alatus 'Compactus'Cont.4'Dwarf Winged Euonymus35 18"-24"sp. (Thornless) SM Engineering 5507 High Meadow Circle Manhattan Kansas, 66503 smcivilengr@gmail.com 785.341.9747 Drawings and/or Specifications are original proprietary work and property of the Engineer and intended specifically for this project. Use of items contained herein without consent of the Engineeris prohibited. Drawings illustrate best information available to the Engineer. Field verification of actual elements, conditions, and dimensions is required. 2" Peagravel mulch over 2" deep well-rotted manure 2" Peagravel mulch over 2" deep well-rotted manure RIVER ROCK SIZE AND COLOR TO BE SELECTED BY OWNER 11 Amur Maple As ShownBBAcer Ginnala 'Flame'1 1/2"cal