Loading...
HomeMy WebLinkAbout2022-07-18 I01F_02 NW Meredith Dr Overlay, NW 10th St to N Warrior Ln_Pmt Est 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: July 18, 2022 AGENDA ITEM:Consideration of approval of Payment Estimate No. 1 to InRoads Paving for the NW Meredith Drive Overlay, NW 10th Street to N. Warrior Lane project, in the amount of $585,023.86. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: InRoads requested Payment Estimate No. 1 for the work completed on NW Meredith Drive Overlay, NW 10th Street to N. Warrior Lane project in the amount of $585,023.86. Foth Infrastructure and Environment, LLC has reviewed the payment estimate and recommends payment. The partial payment is for the pay period ending June 30, 2022. This pay estimate is for topsoil, subgrade prep, removal of culvert, pipe apron, HMA pavement, milling, granular shoulders and driveways, temporary traffic control, portable message signs, rip rap, and mobilization. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $585,023.86 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Payment Estimate No. 1 ATTACHMENTS: I. Payment Estimate No. 1 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1F2 8191 Birchwood Court, Suite L Johnston, IA 50131 Phone: (515) 254-1393 Fax: (515) 254-1642 July 11, 2022 Sara Kappos Assistant Public Works Director 805 University Avenue Waukee, IA 50263 RE: Pay Request #01 NW Meredith Drive Overlay NW 10th Street to N. Warrior Lane Dear Ms. Kappos: Attached please find a detailed Pay Request for City Council approval on July 18, 2022. Submitted Quantity Item No. Description Unit Quantity 2.1 TOPSOIL, OFF-SITE CY 126.00 2.2 SUBGRADE PREPARATION, 8 IN. SY 16029.00 2.3 SUBGRADE TREATMENT, 6% CEMENT TON 285.88 2.4 REMOVAL OF KNOWN PIPE CULVERT, CMP 36" LF 31.00 2.5 REMOVAL OF KNOWN PIPE CULVERT, RCP 36" LF 31.00 4.1 PIPE CULVERT, TRENCHED, RCP ARCH PIPE, 48" DIA. EQUIVALENT LF 66.00 4.2 PIPE APRON, RCP ARCH PIPE, 48" DIA. EQUIVALENT EA 4.00 7.1 HMA PAVEMENT, STANDARD TRAFFIC, BASE COURSE, 3/4" MIX TON 2225.11 7.2 HMA PAVEMENT, STANDARD TRAFFIC, INTERMEDIATE COURSE, 1/2" MIX TON 1046.17 7.3 HMA PAVEMENT, STANDARD TRAFFIC, SURFACE COURSE, 1/2" MIX TON 1264.07 7.4 HMA PAVEMENT SAMPLES AND TESTING LS 1.00 7.5 DRIVEWAY, GRANULAR, CLASS A CRUSHED STONE TON 17.52 7.6 MILLING SY 148.00 7.7 GRANULAR SHOULDERS, TYPE B TON 808.44 8.3 TEMPORARY TRAFFIC CONTROL LS 1.00 8.4 PORTABLE DYNAMIC MESSAGE SIGNS CDAY 24.00 9.2 RIP RAP TON 72.00 11.1 MOBILIZATION LS 1.00 Ltr-2022-0711-Waukee NW Meredith Dr Overlay-Recommend PayApp 01.docx 2 We have reviewed the submitted quantities and they appear to be in order with what has been constructed in the field. If City Staff concurs with this payment, we recommend the City of Waukee pay InRoads of Des Moines, Iowa in the amount of $585,023.86 for the work completed to date. Please let me know if you have any questions or need additional information. Sincerely, Foth Infrastructure and Environment, LLC Rob Kline, P.E. Lead Civil Engineer Encl: Pay Request #01 dated 07/11/2022 Owner: Engineer: $638,555.30 Contractor: Est.Unit Extended Quantity Value Qty.Price Price Completed Completed DIVISION 2 - EARTHWORK, SUBGRADE AND SUBBASE 2.1 2010-D-1003 TOPSOIL, OFF-SITE CY 126 83.00$ $10,458.00 126.00 $10,458.00 2.2 2010-G-1008 SUBGRADE PREPARATION, 8 IN.SY 16,029 2.10$ $33,660.90 16029.00 $33,660.90 2.3 2010-I-1008 SUBGRADE TREATMENT, 6% CEMENT TON 303 160.00$ $48,480.00 285.88 $45,740.80 2.4 2010-J-2336 REMOVAL OF KNOWN PIPE CULVERT, CMP 36"LF 31 41.00$ $1,271.00 31.00 $1,271.00 2.5 2010-J-2436 REMOVAL OF KNOWN PIPE CULVERT, RCP 36"LF 31 41.00$ $1,271.00 31.00 $1,271.00 DIVISION 4 - SEWERS AND DRAINS 4.1 4030-A-1048 PIPE CULVERT, TRENCHED, RCP ARCH PIPE, 48" DIA. EQUIVALENT LF 66 660.00$ $43,560.00 66.00 $43,560.00 4.2 4030-B-1048 PIPE APRON, RCP ARCH PIPE, 48" DIA. EQUIVALENT EA 4 6,500.00$ $26,000.00 4.00 $26,000.00 DIVISION 7 - STREETS AND RELATED WORK 7.1 7020-A-1000 HMA PAVEMENT, STANDARD TRAFFIC, BASE COURSE, 3/4" MIX TON 2,261 81.00$ $183,141.00 2225.11 $180,233.91 7.2 7020-A-1010 HMA PAVEMENT, STANDARD TRAFFIC, INTERMEDIATE COURSE, 1/2" MIX TON 1,158 85.00$ $98,430.00 1046.17 $88,924.45 7.3 7020-A-1020 HMA PAVEMENT, STANDARD TRAFFIC, SURFACE COURSE, 1/2" MIX TON 1,158 89.00$ $103,062.00 1264.07 $112,502.23 7.4 7020-I-1000 HMA PAVEMENT SAMPLES AND TESTING LS 1 1,250.00$ $1,250.00 1.00 $1,250.00 7.5 7030-H-1020 DRIVEWAY, GRANULAR, CLASS A CRUSHED STONE TON 16 50.00$ $800.00 17.52 $876.00 7.6 7040-G-1000 MILLING SY 148 $9.00 $1,332.00 148.00 $1,332.00 7.7 SPECIAL GRANULAR SHOULDERS, TYPE B TON 780 $32.50 $25,350.00 808.44 $26,274.30 DIVISION 8 - TRAFFIC SIGNALS AND TRAFFIC CONTROL 8.1 8020-C-1000 PAINTED PAVEMENT MARKINGS, DURABLE STA 211.8 60.00$ $12,708.00 $0.00 8.2 8020-M-1000 GROOVES CUT FOR PAVEMENT MARKINGS STA 211.8 23.00$ $4,871.40 $0.00 8.3 8030-A-1000 TEMPORARY TRAFFIC CONTROL LS 1 9,900.00$ $9,900.00 1.00 $9,900.00 8.4 SPECIAL PORTABLE DYNAMIC MESSAGE SIGNS CDAY 28 125.00$ $3,500.00 24.00 $3,000.00 DIVISION 9 - SITE WORK AND LANDSCAPING 9.1 9010-A-1100 CONVENTIONAL SEEDING & FERTILIZING, TYPE 2 (PERMANENT COOL-SEASON MIX)AC 0.10 15,500.00$ $1,550.00 0.00 $0.00 9.2 9040-J-1000 RIP RAP TON 42.00 100.00$ $4,200.00 72.00 $7,200.00 9.3 9040-N-1000 SILT FENCE OR SILT FENCE DITCH CHECK LF 200.00 4.00$ $800.00 0.00 $0.00 9.4 9040-N-2000 SILT FENCE OR SILT FENCE DITCH CHECK, REMOVAL OF SEDIMENT LF 200 1.00$ $200.00 0.00 $0.00 9.5 9040-N-3000 SILT FENCE OR SILT FENCE DITCH CHECK, REMOVAL OF DEVICE LF 200 2.00$ $400.00 0.00 $0.00 DIVISION 11 - MISCELLANEOUS 11.1 11020-A-1000 MOBILIZATION LS 1 22,360.00$ $22,360.00 1.00 $22,360.00 PAY ESTIMATE 1 Waukee Public Works Department 805 University Avenue Waukee, IA 50263 Phone (515) 978-7920 Fax (515) 987-3979 Project Title NW Meredith Drive Overlay Foth Infrastructure & Environment 8191 Birchwood Court, Ste L Johnston, IA 50131 Phone (515) 254-1393 Fax (515) 254-1642 Project No.0021W028.01 Purchase Order Orig. Contract Amount and Date 5/19/2022 Estimated Completion Date 7/29/2022 InRoads Paving 4224 Hubbell Avenue Des Moines, Iowa 50317 Pay Period End Date 6/30/2022 Pay Estimate Number 1 Date 7/1/2022 BID ITEMS Item No.Item Code Description Unit TOTAL $638,555.30 $615,814.59 Page 1 # of Units Unit Price Extended Cost $0.00 MATERIALS STORED SUMMARY Description TOTAL PAY REQUEST SUMMARY Total Approved Total Completed Revised Contract Price $638,555.30 $615,814.59 Contract Price $638,555.30 $615,814.59 Approved Change Order 1 $0.00 Approved Change Order 2 $0.00 Approved Change Order 3 $0.00 Pay Request 3 Materials Stored $0.00 Retainage (5%)$30,790.73 Total Earned Less Retainage $585,023.86 Pay Request 4 Pay Request 5 Pay Request 6 Pay Request 7 Pay Request 8 Pay Request 9 Contractor Engineer Owner Pay Request 10 Percent Complete 96.4% Percent of Contract Period Utilized 59.2% Total Previously Approved (list each) Pay Request 1 Pay Request 2 Total Previously Approved $0.00 Amount Due This Request $585,023.86 The amount $585,023.86 is recommended for approval for payment in accordance with the terms of the contract InRoads Paving Foth Infrastructure City of Waukee Signature: Signature: Signature: Date:Date:Date: Name: Bill Rosener Name: Rob Kline Name: Brad Deets Title: Project Manager Title: Project Engineer Title: City Administrator Page 2