Loading...
HomeMy WebLinkAbout2022-08-01 I03B Hickman Rd and Berkshire Pkwy-SE Waco Pl Intersection_Consent to Awarding ContractAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: August 1, 2022 AGENDA ITEM:Consideration of approval of resolution consenting to the City of Clive’s making award of construction contract [U.S. 6 (Hickman Road) & Berkshire Parkway/SE Waco Place Intersection Improvements Project] FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: The bids are for furnishing all materials, equipment, transportation and labor necessary to lengthen PCC left turn lanes, reconstruct trail and sidewalk ramps, and construct a traffic signal at the intersection. Project also includes lengthening/construction of PCC left turn lanes and construction of a restrictive median at the Hickman Road & SE Brick Dr intersection. Project items include subgrade preparation and treatment, PCC turn lane extension and sidewalk/trail ramp paving, pavement markings, traffic signalization, and traffic control. Bids were received on July 20, 2022, with two general contractors submitting bids. The engineer’s estimate for the project was $1,133,125.60, The apparent low bid was submitted by Minturn, Inc. of Brooklyn, Iowa for $1,398,084.95. Snyder and Associates recommends award of the contract to Minturn, Inc. of Brooklyn, Iowa for $1,398,084.95. This bid is approximately 23% over the engineer’s estimate. This project received a $400K USTEP grant from the Iowa DOT. Considering this reimbursement, Waukee’s total project cost is estimated to be $915K. The budget in the approved CIP is $750K. The approximately $165K overage is anticipated to be covered without issue in the overall FY 2023 CIP project budget. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $1,057,731.60 City of Clive $ 340,353.35 City of Waukee $1,057,731.60 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Staff recommend approval of the resolution consenting to the City of Clive’s making award of construction contract to Minturn, Inc. of Brooklyn, Iowa for $1,398,084.95 RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Bid Summary II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Rudy Koester RK I3B RESOLUTION 2022- RESOLUTION CONSENTING TO THE CITY OF CLIVE’S MAKING AWARD OF CONSTRUCTION CONTRACT FOR THE HICKMAN ROAD (US 6) & BERKSHIRE PKWY/SE WACO PL INTERSECTION PROJECT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1.That the City of Waukee consents to the following bid for the construction of certain public improvements described in general as the Hickman Road (US 6) & Berkshire Pkwy/SE Waco Pl Intersection Project, described in the plans and specifications heretofore adopted by this Council on August 1, 2022, being accepted by the City of Clive, the same being the lowest responsive, responsible bid received for such work, as follows: Contractor:Minturn, Inc.,of Brooklyn, IA Amount of bid:$1,398,084.95 Portion of project:All construction work Section 2.That the City Clerk is hereby directed to notify the City of Clive that the City of Waukee consents to the City of Clive’s execution of the contract with the contractor for the construction of the public improvements, such contract not to be binding on the City until approved by this Council. PASSED AND APPROVED this 1st day of August, 2022. Mayor ATTEST: City Clerk SNYDER & ASSOCIATES July 21, 2022 Mr. Jim Hagelie Engineering Services Administrator City of Clive 2123 NW 11 Ith Street Clive, IA 50325 10WA i MISSOURI i NEBRASKA i SOUTH DAKOTA i WISCONSIN k Mr. Rudy Koester Public Works Director City of Waukee 805 University Avenue Waukee, IA 50263 RE: RECEIPT OF BIDS AND RECOMMENDATION OF AWARD HICKMAN ROAD (US 6) & BERKSHIRE PKWY/SR WACO PL AND HICKMAN ROAD (US 6) & SE BRICK DR INTERSECTIONS IMPROVEMENTS Dear Jim and Rudy: Bids were received for the Hickman Road (US 6) & Berkshire Pkwy/SE Waco PI and Hickman Road (US 6) & SE Brick Dr Intersections Improvements project at 2:00 p.m. on Wednesday, July 20, 2022. Two bids were received and opened that were $1,398,084.95 to $1,590,442.81. Our opinion of probable construction cost was $1,135,000. The low bid was submitted by Mintui'n, Inc. of Brooklyn, Iowa. The low bidder is primarily a general contractor. They have experience with similar sized projects in the area. Most of the submitted unit prices were higher than the engineer's estimate with greatest differences being excavation, pavement, and mobilization. However, rebidding the project could result in higher construction costs. Therefore, we recommend award of the contract to the low bidder, Minturn, Inc. Due to the project being a joint venture between the Cities of Clive and Waukee, the following is the resulting share each agency has for the construction project: * City of Clive * City of Waukee $340,353.35 $1,057,731.60 Those do not factor in the U-STEP funding ($400,000) the agencies received for the project. Sincerely, SNYDER & ASSOCIATES. INC. Todd Knox. P.E.. PTOE Project Manager 2727 SW SNYDER BOULEVARD i p.o. BOX 115€) i ANKENY, 14 50023-0974 P: 515-€164-2020 i F: 515-964-7938 i SNYDER-ASSOCIATES.COM V:V'rojectsVO21l121.0371.OlVdvertisingLetting'iLTR2022-07-21AwardRecommendation.docx TABULATION OF BIDS Hickman Road (US 6) & Berkshire Pkwy/SE Waco Pl Intersecton City of Clive Project No.: 121.0371.01 Bid Date/Time: July 20, 2022 at 2:00 PM ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE EARTHWORK 1 Topsoil, On-site CY 936 25.00$ 23,400.00$ 45.00$ 42,120.00$ 24.00$ 22,464.00$ 2 Excavation, Class 10, Roadway and Borrow CY 1429 20.00$ 28,580.00$ 40.00$ 57,160.00$ 30.00$ 42,870.00$ 3 Subgrade Preparation SY 3836 7.00$ 26,852.00$ 6.00$ 23,016.00$ 5.00$ 19,180.00$ 4 Subbase, Special Backfill CY 95.5 30.00$ 2,865.00$ 78.00$ 7,449.00$ 102.00$ 9,741.00$ 5 Subbase, Granular SY 1170 15.00$ 17,550.00$ 13.50$ 15,795.00$ 35.50$ 41,535.00$ STORM SEWER 6 Storm Sewer, Trenched, Class III RCP, 15 in LF 24 120.00$ 2,880.00$ 275.00$ 6,600.00$ 300.00$ 7,200.00$ 7 Storm Sewer, Trenched, Class III RCP, 18 in LF 8 140.00$ 1,120.00$ 230.00$ 1,840.00$ 360.00$ 2,880.00$ 8 Storm Sewer, Trenched, Class III RCP, 30 in LF 36 180.00$ 6,480.00$ 235.00$ 8,460.00$ 420.00$ 15,120.00$ 9 Remove and Reinstall Storm Sewer, Class III RCP, 30"LF 16 125.00$ 2,000.00$ 275.00$ 4,400.00$ 480.00$ 7,680.00$ 10 Subdrain, Type 1, 6 inch LF 1210 15.00$ 18,150.00$ 26.00$ 31,460.00$ 46.00$ 55,660.00$ 11 Subdrain Cleanout, Type A2, 6 inch EACH 1 600.00$ 600.00$ 850.00$ 850.00$ 3,000.00$ 3,000.00$ 12 Subdrain Outlets and Connections, 6 Inch EACH 7 400.00$ 2,800.00$ 700.00$ 4,900.00$ 1,800.00$ 12,600.00$ STRUCTURES FOR SANITARY AND STORM 13 Manhole, SW-401, 48 Inch EACH 2 5,000.00$ 10,000.00$ 8,000.00$ 16,000.00$ 9,000.00$ 18,000.00$ 14 Intake, 508 EACH 1 7,500.00$ 7,500.00$ 9,000.00$ 9,000.00$ 16,200.00$ 16,200.00$ 15 Intake, 507 EACH 2 7,500.00$ 15,000.00$ 9,000.00$ 18,000.00$ 15,600.00$ 31,200.00$ 16 Remove Intake EACH 3 1,250.00$ 3,750.00$ 500.00$ 1,500.00$ 6,000.00$ 18,000.00$ STREETS AND RELATED WORK 17 Lighting SY 1 25,000.00$ 25,000.00$ 16,000.00$ 16,000.00$ 21,000.00$ 21,000.00$ 18 Pavement, PCC, 10.5 Inch SY 2898.3 90.00$ 260,847.00$ 112.50$ 326,058.75$ 105.00$ 304,321.50$ 19 Median, PCC, 6 Inch SY 397.2 70.00$ 27,804.00$ 90.00$ 35,748.00$ 180.00$ 71,496.00$ 20 PCC Pavement Samples and Testing LS 1 6,000.00$ 6,000.00$ 12,000.00$ 12,000.00$ 9,600.00$ 9,600.00$ 21 Removal of Sidewalk SY 44.5 20.00$ 890.00$ 15.00$ 667.50$ 24.00$ 1,068.00$ 22 Removal of Shared Use Path SY 219.5 20.00$ 4,390.00$ 15.00$ 3,292.50$ 18.00$ 3,951.00$ 23 Special Subgrade Preparation for Shared Use Path SY 339 10.00$ 3,390.00$ 5.50$ 1,864.50$ 14.40$ 4,881.60$ 24 Sidewalk, PCC, 6 In.SY 246.8 70.00$ 17,276.00$ 100.00$ 24,680.00$ 144.00$ 35,539.20$ 25 Sidewalk, Temporary Granular SY 61.7 25.00$ 1,542.50$ 70.00$ 4,319.00$ 36.00$ 2,221.20$ 26 Detectable Warnings, Cast Iron, Natural Finish SF 144 65.00$ 9,360.00$ 40.00$ 5,760.00$ 90.00$ 12,960.00$ 27 Pavement Removal SY 1993.8 15.00$ 29,907.00$ 30.00$ 59,814.00$ 32.00$ 63,801.60$ UNIT PRICE UNIT PRICE 1 2 Sternquist Construction Indianola, IA Minturn, Inc. Brooklyn, IAENGINEER'S ESTIMATE https://cityofwaukee-my.sharepoint.com/personal/bschuett_waukee_org/Documents/Desktop/Copy of Bid Tabulation.xlsxCopy of Bid Tabulation.xlsx TABULATION OF BIDS Hickman Road (US 6) & Berkshire Pkwy/SE Waco Pl Intersecton City of Clive Project No.: 121.0371.01 Bid Date/Time: July 20, 2022 at 2:00 PM ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICEUNIT PRICE UNIT PRICE 1 2 Sternquist Construction Indianola, IA Minturn, Inc. Brooklyn, IAENGINEER'S ESTIMATE TRAFFIC CONTROL 28 Traffic Signals LS 1 400,000.00$ 400,000.00$ 392,000.00$ 392,000.00$ 525,000.00$ 525,000.00$ 29 Painted Pavement Markings, Durable STA 232.05 250.00$ 58,012.50$ 100.00$ 23,205.00$ 120.00$ 27,846.00$ 30 Wet, Retroreflective Removable Tape Markings 82.11 125.00$ 10,263.75$ 130.00$ 10,674.30$ 156.00$ 12,809.16$ 31 Painted Symbols and Legends, Durable EACH 24 350.00$ 8,400.00$ 200.00$ 4,800.00$ 240.00$ 5,760.00$ 32 Pavement Markings Removed STA 101.39 90.00$ 9,125.10$ 60.00$ 6,083.40$ 72.00$ 7,300.08$ 33 Symbols and Legends Removed 4 100.00$ 400.00$ 110.00$ 440.00$ 132.00$ 528.00$ 34 Grooves Cut for Pavement Markings STA 232.05 15.00$ 3,480.75$ 60.00$ 13,923.00$ 72.00$ 16,707.60$ 35 Grooves Cut for Symbols and Legends EACH 24 75.00$ 1,800.00$ 110.00$ 2,640.00$ 132.00$ 3,168.00$ 36 Temporary Traffic Control LS 1 25,000.00$ 25,000.00$ 32,000.00$ 32,000.00$ 34,000.00$ 34,000.00$ 37 Permanent Signing Modifications LS 1 4,000.00$ 4,000.00$ 8,500.00$ 8,500.00$ 9,600.00$ 9,600.00$ 38 Portable Dynamic Message Signs CDAY 12 150.00$ 1,800.00$ 200.00$ 2,400.00$ 240.00$ 2,880.00$ SITE WORK AND LANDSCAPING 39 Hydro Seeding, Fertilizing, and Mulching, Type 1 ACRE 0.4 7,000.00$ 2,800.00$ 8,500.00$ 3,400.00$ 10,200.00$ 4,080.00$ 40 Filter Sock, 12 Inch LF 270 5.00$ 1,350.00$ 3.50$ 945.00$ 4.20$ 1,134.00$ 41 Filter Sock, Removal LF 270 1.00$ 270.00$ 1.00$ 270.00$ 1.20$ 324.00$ 42 Inlet Protection Device, Drop-in EACH 6 250.00$ 1,500.00$ 185.00$ 1,110.00$ 222.00$ 1,332.00$ 43 Inlet Protection Device, Maintenance and Removal EACH 6 75.00$ 450.00$ 25.00$ 150.00$ 30.00$ 180.00$ 44 Inlet Protection Device, Drop-in, Open-Throat EACH 9 50.00$ 450.00$ 185.00$ 1,665.00$ 222.00$ 1,998.00$ 45 Inlet Protection Device, Maintenance and Removal, Open-Throat EACH 9 10.00$ 90.00$ 25.00$ 225.00$ 30.00$ 270.00$ MISCELLANEOUS 46 Construction Survey LS 1 11,000.00$ 11,000.00$ 15,000.00$ 15,000.00$ 28,800.00$ 28,800.00$ 47 Mobilization LS 1 36,000.00$ 36,000.00$ 139,800.00$ 139,800.00$ 31,200.00$ 31,200.00$ 48 Concrete Washout LS 1 1,000.00$ 1,000.00$ 100.00$ 100.00$ 21,355.87$ 21,355.87$ TOTAL BID:1,133,125.60$ 1,398,084.95$ 1,590,442.81$ BID SECURITY:X 10%X 10% X Acknowledged X Acknowledged Notes - - ADDENDUM: https://cityofwaukee-my.sharepoint.com/personal/bschuett_waukee_org/Documents/Desktop/Copy of Bid Tabulation.xlsxCopy of Bid Tabulation.xlsx -4.00% -2.00% 0.00% 2.00% 4.00% 6.00% 8.00% 10.00% 12.00% To p s o i l , O n - s i t e Ex c a v a t i o n , C l a s s 1 0 , R o a d w a y a n d B o r r o w Su b g r a d e P r e p a r a t i o n Su b b a s e , S p e c i a l B a c k f i l l Su b b a s e , G r a n u l a r St o r m S e w e r , T r e n c h e d , C l a s s I I I R C P , 1 5 i n St o r m S e w e r , T r e n c h e d , C l a s s I I I R C P , 1 8 i n St o r m S e w e r , T r e n c h e d , C l a s s I I I R C P , 3 0 i n Re m o v e a n d R e i n s t a l l S t o r m S e w e r , C l a s s I I I R C P , 3 0 " Su b d r a i n , T y p e 1 , 6 i n c h Su b d r a i n C l e a n o u t , T y p e A 2 , 6 i n c h Su b d r a i n O u t l e t s a n d C o n n e c t i o n s , 6 I n c h Ma n h o l e , S W - 4 0 1 , 4 8 I n c h In t a k e , 5 0 8 In t a k e , 5 0 7 Re m o v e I n t a k e Li g h t i n g Pa v e m e n t , P C C , 1 0 . 5 I n c h Me d i a n , P C C , 6 I n c h PC C P a v e m e n t S a m p l e s a n d T e s t i n g Re m o v a l o f S i d e w a l k Re m o v a l o f S h a r e d U s e P a t h Sp e c i a l S u b g r a d e P r e p a r a t i o n f o r S h a r e d U s e P a t h Si d e w a l k , P C C , 6 I n . Si d e w a l k , T e m p o r a r y G r a n u l a r De t e c t a b l e W a r n i n g s , C a s t I r o n , N a t u r a l F i n i s h Pa v e m e n t R e m o v a l Tr a f f i c S i g n a l s Pa i n t e d P a v e m e n t M a r k i n g s , D u r a b l e We t , R e t r o r e f l e c t i v e R e m o v a b l e T a p e M a r k i n g s Pa i n t e d S y m b o l s a n d L e g e n d s , D u r a b l e Pa v e m e n t M a r k i n g s R e m o v e d Sy m b o l s a n d L e g e n d s R e m o v e d Gr o o v e s C u t f o r P a v e m e n t M a r k i n g s Gr o o v e s C u t f o r S y m b o l s a n d L e g e n d s Te m p o r a r y T r a f f i c C o n t r o l Pe r m a n e n t S i g n i n g M o d i f i c a t i o n s Po r t a b l e D y n a m i c M e s s a g e S i g n s Hy d r o S e e d i n g , F e r t i l i z i n g , a n d M u l c h i n g , T y p e 1 Fi l t e r S o c k , 1 2 I n c h Fi l t e r S o c k , R e m o v a l In l e t P r o t e c t i o n D e v i c e , D r o p - i n In l e t P r o t e c t i o n D e v i c e , M a i n t e n a n c e a n d R e m o v a l In l e t P r o t e c t i o n D e v i c e , D r o p - i n , O p e n - T h r o a t In l e t P r o t e c t i o n D e v i c e , M a i n t e n a n c e a n d R e m o v a l , O pe n - T h r o a t Co n s t r u c t i o n S u r v e y Mo b i l i z a t i o n Co n c r e t e W a s h o u t Ab s o l u t e P e r c e n t a g e Hickman Road (US 6) & Berkshire Pareway / SE Waco Palce / SE Brick Drive Intersection Project MINTURN INC. BROOKLYN, IA STERNQUIST CONSTRUCTION INDIANOLA, IA OPINION OF PROBABLE PROJECT COSTS ITEM CODE DESCRIPTION DIV. 1 QUANTITY DIV. 2 QUANTITY UNIT UNIT PRICE DIV. 1 EXTENDED PRICE DIV. 2 EXTENDED PRICE EARTHWORK 1 2010-D-1 Topsoil, On-site 778.7 157.3 CY 45.00$ 35,041.50$ 7,078.50$ 2 2010-E Excavation, Class 10, Roadway and Borrow 1,344 85 CY 40.00$ 53,760.00$ 3,400.00$ 3 2010-G Subgrade Preparation 3,064 772 SY 6.00$ 18,384.00$ 4,632.00$ 4 2010-I Subbase, Special Backfill 51.6 43.9 SY 78.00$ 4,024.80$ 3,424.20$ 5 2010-J Subbase, Granular 1,170 SY 13.50$ 15,795.00$ -$ STORM SEWER 6 4020-A-1 Storm Sewer, Trenched, Class III RCP, 15 In 24 LF 275.00$ 6,600.00$ -$ 7 4020-A-1 Storm Sewer, Trenched, Class III RCP, 18 In 8 LF 230.00$ 1,840.00$ -$ 8 4020-A-1 Storm Sewer, Trenched, Class III RCP, 30 In 36 LF 235.00$ 8,460.00$ -$ 9 ---Remove and Reinstall Storm Sewer, Class III RCP, 30 In 16 LF 275.00$ 4,400.00$ -$ 10 4040-A Subdrain, Type 1, 6 Inch 1,210 LF 26.00$ 31,460.00$ -$ 11 4040-C Subdrain Cleanout, Type A2, 6 Inch 1 EACH 850.00$ 850.00$ -$ 12 4040-D Subdrain Outlets and Connections, Outlet into Structure, 6 Inch 7 EACH 700.00$ 4,900.00$ -$ STRUCTURES FOR SANITARY AND STORM 13 6010-A Manhole, SW-401, 48 In.2 EACH 8,000.00$ 16,000.00$ -$ 14 6010-B Intake, 508 1 EACH 9,000.00$ 9,000.00$ -$ 15 6010-B Intake, 507 2 EACH 9,000.00$ 18,000.00$ -$ 16 6010-H Remove Intake 3 EACH 500.00$ 1,500.00$ -$ STREETS AND RELATED WORK 17 --- Lighting 1 LS 16,000.00$ 16,000.00$ -$ 18 7010-A Pavement, PCC, 10.5 Inch 2,295.1 603.2 SY 112.50$ 258,198.75$ 67,860.00$ 19 7010-G Median, PCC, 6 Inch 246.9 150.3 SY 90.00$ 22,221.00$ 13,527.00$ 20 7010-I PCC Pavement Samples and Testing 0.5 0.5 LS 12,000.00$ 6,000.00$ 6,000.00$ 21 7030-A Removal of Sidewalk 44.5 SY 15.00$ -$ 667.50$ 22 7030-A Removal of Shared Use Path 135.2 84.3 SY 15.00$ 2,028.00$ 1,264.50$ 23 7030-D Special Subgrade Prep. for Shared Use Path 139.0 200.0 SY 5.50$ 764.50$ 1,100.00$ 24 7030-E Sidewalk, PCC, 6 In.89.3 157.5 SY 100.00$ 8,930.00$ 15,750.00$ 25 7030-E Sidewalk, Temporary Granular 61.7 SY 70.00$ -$ 4,319.00$ 26 7030-G Detectable Warnings, Cast Iron, Natural Finish 48 96 SF 40.00$ 1,920.00$ 3,840.00$ 27 7040-H Pavement Removal 1,550.9 442.9 SY 30.00$ 46,527.00$ 13,287.00$ TRAFFIC CONTROL 28 8010-A Traffic Signals 1 LS 392,000.00$ -$ 392,000.00$ 29 8020-C Painted Pavement Markings, Durable 61.91 170.14 STA 100.00$ 6,191.00$ 17,014.00$ 30 8020-F Wet, Retroflective Removable Tape Markings 42.99 39.12 STA 130.00$ 5,588.70$ 5,085.60$ 31 8020-G Painted Symbols and Legends, Durable 12 12 EACH 200.00$ 2,400.00$ 2,400.00$ 32 8020-K Pavement Markings Removed 59.49 41.90 STA 60.00$ 3,569.40$ 2,514.00$ 33 8020-L Symbols and Legends Removed 4 EACH 110.00$ -$ 440.00$ 34 8020-M Grooves Cut for Pavement Markings 61.91 170.14 STA 60.00$ 3,714.60$ 10,208.40$ 35 8020-N Grooves Cut for Symbols and Legends 12 12 EACH 110.00$ 1,320.00$ 1,320.00$ 36 8030-A Temporary Traffic Control 0.5 0.5 LS 32,000.00$ 16,000.00$ 16,000.00$ 37 --- Permanent Signing Modifications 0.5 0.5 LS 8,500.00$ 4,250.00$ 4,250.00$ 38 --- Portable Dynamic Message Signs 12 CDAY 200.00$ -$ 2,400.00$ SITE WORK AND LANDSCAPING 39 9010-B Hydro. Seed, Fertilizing, and Mulching, Type 1 0.3 0.1 ACRE 8,500.00$ 2,550.00$ 850.00$ 40 9040-D-1 Filter Sock, 12 Inch 60 210 LF 3.50$ 210.00$ 735.00$ 41 9040-D-2 Filter Sock, Removal 60 210 LF 1.00$ 60.00$ 210.00$ 42 9040-T-1 Inlet Protection Device, Drop-in 2 4 EACH 185.00$ 370.00$ 740.00$ 43 9040-T-2 Inlet Protection Device, Maint. and Removal 2 4 EACH 25.00$ 50.00$ 100.00$ 44 9040-T-3 Inlet Protection Device, Drop-in, Open-Throat Intake 5 4 EACH 185.00$ 925.00$ 740.00$ 45 9040-T-4 Inlet Protection Device, Maint. and Removal, Open- Throat Intake 5 4 EACH 25.00$ 125.00$ 100.00$ MISCELLANEOUS 46 11010-A Construction Survey 0.5 0.5 LS 15,000.00$ 7,500.00$ 7,500.00$ 47 11020-A Mobilization 0.5 0.5 LS 139,800.00$ 69,900.00$ 69,900.00$ 48 11050-A Concrete Washout 0.5 0.5 LS 100.00$ 50.00$ 50.00$ CONSTRUCTION TOTAL: 717,378.25$ 680,706.70$ Other Project Costs Engineering: 39,000.00$ 64,900.00$ Traffic Impact Study: 11,000.00$ -$ Construction Administration: 9,800.00$ 11,600.00$ Construction Observation (4%) 29,000.00$ 28,000.00$ Construction Testing Services: 3,000.00$ 3,000.00$ Legal and Administration (1%) 8,312.00$ 7,262.40$ TOTAL PROJECT COST: 817,490.25$ 795,469.10$ Notes Hickman & Berkshire/Waco & SE Brick Intersection Bid Results Cost Opinion City of Clive and City of Waukee, Iowa V:\Projects\2022\122.0107.01\Design\CostOpinion_2022-07-20_HickmanImprovements.xls July 20, 2022 Page 1 of 1