HomeMy WebLinkAbout2022-08-01 J07C The Pitch_Site PlanAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: August 1, 2022 AGENDA ITEM:Consideration of approval of a resolution approving a site plan for The Pitch FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: Pitch, LLC requests approval of a site plan to authorize the construction of a multi-family residential apartment complex located at the southeast corner of NW 2nd Street and NW Douglas Parkway. The project involves the construction of three (3) apartment buildings and a clubhouse. The total number of units proposed is 162-units. Building #1 will be 74-units, Building #2 will be 36-units and Building #3 will be 52-units. Each building will be three-stories in height and 38-feet tall overall. The footprints for the buildings will range from 12,140-square feet to 25,090- square feet. The clubhouse is shown to be 2,680-square feet and is located in the southeast corner of the site. A pool will be included with the clubhouse. Additional amenities for the residents are shown on the north side of the site including a dog park and playground area. Access to the property is shown to be provided via NW 2nd Street and NW Douglas Parkway. The access points for Buildings #1 and #2 will be from NW 2nd Street and the access points for Building #3 will be from NW Douglas Parkway. The access to Building #3 will be restricted to a right-in / right-out access point with NW Douglas Parkway is widened in the future. The applicant has provided elevations for the proposed building on the site. The design and materials are consistent with the Site Plan Ordinance. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this project at the July 12, 2022, Commission Meeting and recommended approval subject to remaining staff comments: Approval of a Site Plan for The Pitch (705 NW 2nd Street) City Planner, Bill Mettee, introduced the request for approval of a preliminary plat, final plat, and site plan related to a multi-family residential development as submitted by the applicant, Lloyd Companies. The subject property is generally located south of NE Douglas Parkway and east of NW 2nd Street, containing approximately 9.22 acres. Mr. Mettee advised that the project involves the construction of three apartment buildings and one clubhouse. A total of 162 units will be spread between the three buildings. The buildings range in J7C size from 12,140 square feet to 25,090 square feet and the clubhouse is proposed to be 2,680 square feet. A pool will also be provided with the clubhouse along with a dog park and playground area. Access to the site is provided from NW 2nd Street and NW Douglas Parkway. A 10-foot trail will be provided along NW Douglas Parkway and a five foot wide sidewalk is provided along NW 2nd street. Parking, open space, landscape, and parkland dedication (or fee in lieu of) requirements have all been met at this time. Staff recommends approval of a preliminary plat, final plat, and site plan for The Pitch (705 NW 2nd Street) subject to remaining staff comments and review of the legal documents. Commissioner Broderick questioned about the Parkland dedication, Mr. Mettee advised, the applicant has submitted a fee in lieu of dedication above what has been dedicated with a bordering property also owned by the applicant. Commissioner Hoifeldt clarified that this was not the location of the new “affordable housing” project. Mr. Mettee advised that was correct. Commissioner Broderick questioned what the units per acre was with this development. Mr. Mettee advised it is approximately 18. Commissioner Broderick questioned what the detention looked like. Erin Ollendike, a representative of the applicant, advised they are reshaping the drainage ditch that exists naturally and there are three additional basins on the property. Commissioner Gerlitz moved to approve the Preliminary Plat for The Pitch (705 NW 2nd Street) subject to any remaining staff comments and review of the legal documents. Commissioner Hoifeldt seconded the motion. Ayes: Gerlitz, Hoifeldt, Inman, Broderick., and Tessau. Nays: none. Motion Carried. Commissioner Tessau moved to approve the Final Plat for The Pitch (705 NW 2nd Street) subject to any remaining staff comments and review of the legal documents. Commissioner Gerlitz seconded the motion. Ayes: Gerlitz, Hoifeldt, Inman, Broderick., and Tessau. Nays: none. Motion Carried. Commissioner Broderick moved to approve the Site Plan for The Pitch (705 NW 2nd Street) subject to any remaining staff comments and review of the legal documents. Commissioner Gerlitz seconded the motion. Ayes: Gerlitz, Hoifeldt, Inman, Broderick., and Tessau. Nays: none. Motion Carried. STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan subject to remaining staff comments. RECOMMENDATION: Approve the resolution subject to remaining staff comments. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan & Elevations PREPARED BY:Bill Mettee, Planner REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 2022- APPROVING THE SITE PLAN FOR THE PITCH IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for The Pitch, subject to remaining staff comments on July 12, 2022; AND, WHEREAS, the Site Plan for The Pitch is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for The Pitch is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 1st day of August, 2022 that the Site Plan for The Pitch is approved. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman Pierce R. Charles Bottenberg Chris Crone Larry R. Lyon Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: The Pitch Plat 1 – Preliminary Plat, Final Plat, & Site Plan PREPARED BY: Andy Kass, Community Development Director REPORT DATE: July 8, 2022 MEETING DATE: July 12, 2022 GENERAL INFORMATION Applicant: Lloyd Companies Owner: Pitch, LLC Owner’s Representative: Erin Ollendike, P.E. – CDA Request: The applicant is requesting approval of a preliminary plat, final plat, and site plan for a multi- family residential development. Location and Size: Property is generally located south of NE Douglas Parkway and east of NW 2nd Street, containing approximately 9.22-acres. AREA MAP ABOVE: Aerial of subject property (outlined in BLUE) in relation to the surrounding area. July 8, 2022 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant - Undeveloped Single Family Residential R-3 (Multi-Family Residential District) North Prairie Rose Plat 3 Single Family Residential R-2 (One & Two Family Residential District) / PD-1 (Planned Development Overlay) South Vacant - Undeveloped Single Family Residential R-4 (Row Dwelling & Townhome District) East Future Prairie Rose Phases Single Family Residential R-2 (One & Two Family Residential District) / PD-1 (Planned Development Overlay) West Triumph Park Institutional A-1 (Agricultural District) HISTORY The subject property is located south of NW Douglas Parkway and east of NW 2nd Street. The property was included in the Prairie Rose Phase II rezoning and preliminary plat that were both approved in 2021. The subject property as platted as Outlot Y of Prairie Rose Plat 3. PROJECT DESCRIPTION The project involves the construction of three (3) apartment buildings and one (1) clubhouse. The total number of units proposed is 162 units. Building #1 will include 72 units, Building #2 will include 36 units, and Building #3 will include 52-units. Each apartment building is three stories in height and 38-feet tall overall. The footprints of each building will range from 12,140 square feet to 25,090 square feet. The clubhouse is shown to be 2,680 square feet and is in the southeast corner of the site. A pool will be included with the clubhouse. Additional amenities for the residents are shown on the north side of the site including a dog park and a playground area. The preliminary plat and final plat identify the creation of one (1), 9.22-acre lot that is to be created. The proposed Lot 1 meets the requirements of the R-3 zoning district. ACCESS AND PARKING Access to the property is shown to be provided NW 2nd Street and NW Douglas Parkway. The access point for Buildings #1 and #2 will be from NW 2nd Street. The access point or Building #3 will be from NW Douglas Parkway. The access to Building #3 will be restricted to a right-in/right-out access point when NW Douglas Parkway is widened in the future. A five-foot sidewalk will be provided along NW 2nd Street and a 10-foot trail will be provided along NW Douglas Parkway. A total of 341 parking spaces are required for the overall development. The site plan indicates 390 parking spaces. July 8, 2022 3 of 3 UTILITIES Sanitary sewer and water services were extended to the property as part of the Prairie Rose Plat 3 improvements. Sanitary sewer and water exist to the site and stormwater management is accommodated in the center of the site. The owner of the property will be responsible for the ownership and maintenance of the detention areas and the private utilities within the site. LANDSCAPING & OPEN SPACE A 25-foot landscape buffer will be provided along all side of the development. A minimum amount of 20% of open space is required and the site plan identifies that a total of 45% of open space is being provided. PARKLAND DEDICATION A total of 1.84-acres of parkland dedication is required. Parkland dedication will be satisfied with future dedication as part of the single-family residential development to the east. ELEVATIONS Elevations of the available units have been provided by the applicant. Proposed materials include hardboard siding, asphalt shingles, and stone. STAFF RECOMMENDATION The site plan is in general conformance with the Zoning Ordinance, Subdivision Ordinance, Site Plan Ordinance, and Comprehensive Plan. Staff recommends approval of the preliminary plat, final plat, and site plan subject to remaining staff comments and review of the legal documents. l l l l l l 4121 NW URBANDALE DRIVE URBANDALE, IOWA 50322 PH: (515) 369-4400 Fax: (515) 369-4410 CIVIL DESIGN ADVANTAGE UTILITY WARNING www.iowaonecall.com 1-800-292-8989 ONE CALL IOWA ONE CALL Know what's before you dig. below. Call CONSTRUCTION SCHEDULE SUBMITTAL DATES PROJECT SITE ADDRESS SURVEYOR ZONING INDEX OF SHEETSVICINITY MAP GENERAL LEGEND ENGINEER LEGAL DESCRIPTION DATE OF SURVEY BENCHMARKS THE PITCHTHE PITCH PRELIMINARY PLAT & SITE PLAN FOR: WAUKEE, IOWA OWNER / DEVELOPER WAUKEE NOTES BULK REGULATIONS TH E P I T C H T DEVELOPMENT SUMMARY CITY OF WAUKEE CORPORATE LIMITS HICKMAN ROAD WA R R I O R L A N E U A V E DOUGLA S P A R K W A Y PROJECT EXISTING / PROPOSED USE NW 2 N D S T PRELIMI N A R Y NOT FOR C O N S T R U C T I O N CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 PREPARATION CURB RAMPS OUTSIDE OF INTERSECTION RADIUS PERPENDICULAR CURB RAMP @ CLASS 'A' INTEGRAL CURB 6" INTEGRAL CURB AND SIDEWALK SW-203 SANITARY CLEANOUT DUMPSTER ENCLOSURE DETAIL DETECTABLE WARNING DETAIL DE T A I L S TYPICAL SIGN POST TYPICAL SECTION - 26' P.C.C. ROADWAY 2 PCC FLUME DETAIL HYDRANT ASSEMBLY DETAIL MAILBOX CLUSTER PAD DETAIL 12" SUBGRADE CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 DOWNSPOUT CONNECTION WITH WYE ° SANITARY SEWER SERVICE RISER DE T A I L S ROCK APRON FOR PIPE OUTLET 3 RCP APRON FOOTING DETAILREFERENCE DETAIL STANDARD CURB INTEGRAL 6" SPOT ELEVATION MODIFIED SW-513 INTAKE (POND 1A)MODIFIED SW-513 INTAKE (POND 1B)MODIFIED SW-513 INTAKE (POND 1C) FE FE REF.DW S D D NW 2 N D S T R E E T N W D O U G L A S P A R K W A Y N W R O S E M O N T C I R C L E LOT 1 S74°32' 4 6 " W 1 2 7 . 0 7 ' S47 ° 0 7 ' 4 4 " W 1 1 6 . 3 5 ' N62°03'33"W 5.29' S47 ° 0 7 ' 4 4 " W 1 6 0 . 3 5 ' S0 0 ° 1 0 ' 3 8 " W 2 4 8 . 1 1 ' N89°49'22"W 567.03' N0 0 ° 0 4 ' 0 9 " W 1 2 7 . 6 8 ' Δ=27°17'47" L=219.15' R=460.00' CH=217.08' CHB=N13°34'43"E N2 7 ° 1 3 ' 3 9 " E 4 3 3 . 4 7 ' N72°13 ' 3 9 " E 7 5 . 0 0 ' N27°13'39"E 15.05' S6 2 ° 4 6 ' 0 8 " E 5 9 8 . 2 6 ' Δ=2°11'21" L=43.56' R=1140.00' CH=43.55' CHB=S61°40'28"E PR E L I M I N A R Y P L A T 4 CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 WAUKEE, IOWA THE PITCHTHE PITCH PRELIMINARY PLAT FOR: FE FE N W D O U G L A S P A R K W A Y N W R O S E M O N T C I R C L E CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 GENERAL NOTES TRAFFIC CONTROL NOTES DI M E N S I O N P L A N 5 FIRE SAFETY CONSTRUCTION NOTE APPROVED FIRE APPARATUS ACCESS ROADS SHALL BE PROVIDED FOR ALL BUILDINGS AS SOON AS VERTICAL CONSTRUCTION OF THE BUILDING COMMENCES. IF PAVING IS NOT INSTALLED PRIOR TO BUILDING CONSTRUCTION COMMENCING AFTER FOOTINGS ARE INSTALLED, AN APPROVED TEMPORARY ROUTE AROUND THE EXTERIOR OF THE BUILDING TO EXTEND WITHIN 100-FEET OF ALL PORTIONS OF THE EXTERIOR WALLS SHALL BE PROVIDED AND COMPLY WITH THE REQUIREMENTS OF SECTION 503.2 OF THE IFC. FE FE REF.DW NW 2 N D S T R E E T CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 DI M E N S I O N P L A N 6 NW 2 N D S T R E E T N W D O U G L A S P A R K W A Y CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 GRADING NOTES GR A D I N G P L A N 7 N W R O S E M O N T C I R C L E CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 GR A D I N G P L A N 8 FE FE NW 2 N D S T R E E T CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 GR A D I N G P L A N 9 FE FE REF.DW CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 GR A D I N G P L A N 10 CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 GR A D I N G P L A N SIDEWALK RAMP DETAIL 'A' 11 SIDEWALK RAMP DETAIL 'B' SIDEWALK RAMP DETAIL 'C'SIDEWALK RAMP DETAIL 'D' CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 GR A D I N G P L A N SIDEWALK RAMP DETAIL 'E' 12 SIDEWALK RAMP DETAIL 'F' SIDEWALK RAMP DETAIL 'G' SIDEWALK RAMP DETAIL 'J'SIDEWALK RAMP DETAIL 'K' SIDEWALK RAMP DETAIL 'H'SIDEWALK RAMP DETAIL 'I' FE FE l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l lllllllllll l ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l NW 2 N D S T R E E T N W D O U G L A S P A R K W A Y DA #1 9.93 AC l l l l l l l l l l l l l l l l l l ll l l l l l l l l l l l l l l l l CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 l l l l ER O S I O N A N D S E D I M E N T C O N T R O L P L A N EROSION AND SEDIMENT CONTROL PLAN R SWPPP LEGEND THE PITCH VICINITY MAP WAUKEE, IOWA THE PITCH DISCHARGE POINT SUMMARYSTABILIZATION QUANTITIES NOTES: CITY OF WAUKEE CORPORATE LIMITS HICKMAN ROAD WA R R I O R L A N E U A V E DOUGLA S P A R K W A Y PROJECT 13 MAINTENANCE PLANS FOR HYDRODYNAMIC SEPARATORS: FE FE REF.DW l l ll l l ll l ll l l ll l ll l l l l l ll l l l l l ll l l l R l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l lllllllllll l ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll l l l l l l l l l l l l l l l DA #1 9.93 AC NW 2 N D S T R E E T l l l l l l l ll l l l l l l l l l l l l l l CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 ER O S I O N A N D S E D I M E N T C O N T R O L P L A N 14 FE FE N W D O U G L A S P A R K W A Y N W R O S E M O N T C I R C L E CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 UT I L I T Y P L A N UTILITY NOTES 15 FE FE REF.DW NW 2 N D S T R E E T CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 UT I L I T Y P L A N 16 FE FE REF.DW NW 2 N D S T R E E T PLANT SCHEDULE OPEN SPACE PLANT SCHEDULE EAST BUFFER PLANT SCHEDULE SOUTH BUFFER CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 LA N D S C A P E P L A N LANDSCAPE NOTES OPEN SPACE REQUIREMENTS MINIMUM PLANTING REQUIREMENTS EAST 25' BUFFER REQUIREMENTS SOUTH 25' BUFFER REQUIREMENTS 17 FE FE NW 2 N D S T R E E T N W D O U G L A S P A R K W A Y PLANT SCHEDULE WEST BUFFER PLANT SCHEDULE NORTH BUFFER CI V I L D E S I G N A D V A N T A G E 2108.647 TH E P I T C H EN G I N E E R : E K O EI : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 12 / 2 1 / 2 0 2 1 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 18 SE C O N D S U B M I T T A L 05 / 2 4 / 2 0 2 2 TH I R D S U B M I T T A L 06 / 1 4 / 2 0 2 2 FO U R T H S U B M I T T A L 06 / 2 8 / 2 0 2 2 FI F T H S U B M I T T A L 07 / 1 2 / 2 0 2 2 FI N A L S U B M I T T A L 07 / 2 6 / 2 0 2 2 NORTH 25' BUFFER REQUIREMENTS 18 LA N D S C A P E P L A N WEST 25' BUFFER REQUIREMENTS MAIN FLOOR PLAN 0' -0" 2ND FLOOR FFE 10' -1 7/8" 3RD FLOOR FFE 20' -3 3/4" Roof Truss Bearing 28' -4 7/8" T.O. FOOTING -4' -0" E26 E1 E18 E32 E32 E18 E32 E11 E21 E22 E22 E22 E22 E22 E12 E14E14 W2 G23 W2 W2 W2 W2 W2 W1 W1 W1 W1 W1 W2 W2 W2 W2 W2 W2 W1 W1 W1 W1W1 W2W2 W2 W2 W2W2 W1 W1 W1W1 W2 W2 W2 W2 W2W2 W1 W1 W1 W2W2 W2 W2 W1 W1 W1 W1 W1 W2 W2 W2W2 W2 W2 W1 W1 W1 E32 E30 E18 E18 W2 W2 E30 19 ' - 1 0 " 9' - 4 3 / 4 " MAIN FLOOR PLAN 0' -0" 2ND FLOOR FFE 10' -1 7/8" 3RD FLOOR FFE 20' -3 3/4" Roof Truss Bearing 28' -4 7/8" E1 E11 E1 E18 E11 E22 E32 E30 E32 E30 E30 T.O. FOOTING -4' -0" 1 1A W1 W1 W1 W1 W2W2 W2 W2 W2 W2 W1 W1 W2 W2 G1 W2 W2 W2 W1 W1 W1 W1 W1 W2 W2 G60 W2 W1 W1 W1 W2 W2 W2 W1 W1 W1 W2 W2 W2 W1 W1 W1 W2 W2 W2 W2 W2 W1 W1 W1 W1 W1 G2 E18 E18 E32 W1 E32 19 ' - 1 0 " 9' - 4 3 / 4 " 19 ' - 1 0 " MAIN FLOOR PLAN 0' -0" 2ND FLOOR FFE 10' -1 7/8" 3RD FLOOR FFE 20' -3 3/4" Roof Truss Bearing 28' -4 7/8" T.O. FOOTING -4' -0" E11 E30 E32 E18 E22 E22 E14 E32 W1 W1 W1 W1 W1 W1 19 ' - 1 0 " 19 ' - 1 0 " MAIN FLOOR PLAN 0' -0" 2ND FLOOR FFE 10' -1 7/8" 3RD FLOOR FFE 20' -3 3/4" Roof Truss Bearing 28' -4 7/8" T.O. FOOTING -4' -0" E18 E32 E18 E30 E32 W1 W1 W1 19 ' - 1 0 " Project No. Date: Drawn by: Checked by: COPYRIGHT 2021 524 N Main Ave, Suite 201 Sioux Falls, SD 57104 605.305.4035 4609 S Techlink Cir Sioux Falls, SD 57106 605.362.3753 Electrical Project Manager: Harlan Osterloo harlan.osterloo@westplainsengineering.com Mechanical Engineer: Connor Swiontek, P.E. connor.swiontek@westplainsengineering.com Project Manager: Jerad Hoffman JHoffman@rakerrhodes.com 4121 NW Urbandale Drive Urbandale,IA 50322 515.369.4429 Project Manager: Erin Ollendike ErinO@cda-eng.com Project Architect: Laura Devine Email: laura.devine@lloydcompanies.com 101 S. Reid Street, Suite 201 Sioux Falls, SD 57103 Aspen: 605.695.1899 Laura: 605.929.6221 ARCHITECT CONSULTANTS CIVIL MEP STRUCTURAL 6/ 2 8 / 2 0 2 2 1 0 : 1 0 : 5 4 A M A3.11 BLDG 1(36) Exterior Elevations 21051 THE PITCH 12.10.2021 RJF LED 1/8" = 1'-0"2 Back Elevation 1/8" = 1'-0"1 Front Elevation 3/32" = 1'-0"3 Left Elevation 3/32" = 1'-0"4 Right Elevation EXTERIOR MATERIALS PALETTE- LP SMARTSIDE- -6" LAP SIDING -BOARD AND BATTEN 23.86% LP SMARTSIDE- -6" LAP SIDING -BOARD AND BATTEN 36.44% VERSETTA STONE- -LEDGESTONE STYLE STONE SIDING 38.12% Northern Ash EXTERIOR MATERIALS PALETTE- MALARKEY SHINGLES- -Vista AR Midnight Black KEYNOTES E1 Roof system consists of: 30 year laminated fiberglass shingles, #15 ashpalt felt underlayment (self adhered ice & water shield rubberized membrane 60" up from eave & 30" ea. side of all valleys), plywood roof sheathing (see struct.) w/ edge clips, & roof trusses @ 24" o.c. (verify w/ struct. & roof truss mfr.) E11 8" prefinished cement board facia trim. Color-White E12 8" prefinished cement board trim. Color-White E14 Poured concrete footing. See structural. E18 Prefinished LP Smartside Siding, Lap Siding. Color: SNOWSCAPE WHITE. E21 Prefinished aluminum gutter. E22 Prefinished aluminium downspout. Add drain tile for gutter. E26 42" tall railing. Top and bottom rail to be wood, balusters to be metal. Typical. E30 Prefinished LP Smartside Siding, board and batten. Color: ABYSS BLACK. E32 Versetta Stone Northern Ash Ledge Stone. 2 No. Description Date 1 Addendum 1 2.4.2022 2 Revision 2 2.17.2022 2 A2.23 W1 W1 W1 W1 W1 W2 W2 E1 E1 W1 1 A4.20 3' - 0 " 3' - 0 " 1 A2.23 W1 W1 W1 W1 W1 W1 W2 W2 E5 Project No. Date: Drawn by: Checked by: COPYRIGHT 2021 609 S. Lyncrest Place Suite 110 Sioux Falls SD, 57108 (605)743-2510 4609 S Techlink Cir Sioux Falls SD, 57106 (605)362-3753 Electrical Project Manager: Harlan Osterloo harlan.osterloo@westplainsengineering.com Mechanical Engineer: Connor Swiontek, P.E. connor.swiontek@westplainsengineering.com Project Manager: Justin Christensen jjchristensen@riseincorp.com 3800 W 53rd St Sioux Falls, SD 57106 Project Manager: Aaron Norman aaron@normanengineeringinc.com Project Architect: Laura Devine Email: laura.devine@lloydcompanies.com 101 S. Reid Street, Suite 201 Sioux Falls, SD 57103 Aspen: 605.695.1899 Laura: 605.929.6221 ARCHITECT CONSULTANTS CIVIL MEP STRUCTURAL 6/ 2 8 / 2 0 2 2 1 1 : 3 0 : 2 6 A M A3.20 BLDG 4 (52 CL) Exterior Elevations 22--- THE PITCH PHASE 2 02.15.2022 MLM LED 1/16" = 1'-0"1 Front Elevation- 52 Unit 1/16" = 1'-0"2 Back Elevation- 52 Unit 1/8" = 1'-0"3 Side Elevation 1 - 52 Unit 1/8" = 1'-0"4 Side Elevation 2 - 52 Unit LP SMARTSIDE- -6" LAP SIDING -BOARD AND BATTEN 17.40% LP SMARTSIDE- -6" LAP SIDING = 38.08% -BOARD AND BATTEN = 8.57% VERSETTA STONE- -LEDGESTONE STYLE STONE SIDING 35.31% Northern Ash EXTERIOR MATERIALS PALETTE- MALARKEY SHINGLES- -Vista AR Midnight Black FOR REFERENCE ONLY FOR REFERENCE ONLY FOR REFERENCE ONLYFOR REFERENCE ONLY No. Description Date TOTAL PERCENTAGE OF BRICK ON ALL BUILDINGS: 35.33% 1 2 2.1 2.2 63.1 3.2 4.1 5.1 E3 E3 E3 E5 E4 E4 E11 E11E11 E11 E11 W1 W2 W2 W2 W2 W2W2 W1 W1 W2 W2 W2W2 W2 W2 W1 W1 W2 W2 W2W2 W2 W2 W4 W4 W4 W4 W4127AW4125B E9 E1 E1 E6E6 E6 E18 W2 W2 W1 W2 W2 W1 W1 W2W2 W1 W1 E11E11 E3E3 E4 E5 E22 E4 5.2 6.11 A4.21 Sim 2 A4.20 W1 W1 W1 W1 W1 3 A4.20 4 A4.20 6.2 7.17 11.110.18.28.1 E5 E3 E3 E3 E4 E11 E11 E11 W1 W2 W2 W2W2 W2 W2 W1 W1 W2 W2 W2 W2 W2W2 W1 W1 W2 W2 W2W2 E9E9 E1 E6 W2 W2 W1 W1 xW2 xW2 W1 E3 E11 E11 E11 E11 E4 E5 E4 W1 6.1 W1 W1 W1 W1 W1 W1 W1 xW2xW2 W2 W2 W1 E3 Project No. Date: Drawn by: Checked by: COPYRIGHT 2021 524 N Main Ave, Suite 201 Sioux Falls, SD 57104 605.305.4035 4609 S Techlink Cir Sioux Falls, SD 57106 605.362.3753 Electrical Project Manager: Harlan Osterloo harlan.osterloo@westplainsengineering.com Mechanical Engineer: Connor Swiontek, P.E. connor.swiontek@westplainsengineering.com Project Manager: Jerad Hoffman JHoffman@rakerrhodes.com 3405 SE Crossroads Drive, Suite G Grimes,IA 50111 515.369.4429 Project Manager: Erin Ollendike ErinO@cda-eng.com Project Architect: Laura Devine Email: laura.devine@lloydcompanies.com 101 S. Reid Street, Suite 201 Sioux Falls, SD 57103 Aspen: 605.695.1899 Laura: 605.929.6221 ARCHITECT CONSULTANTS CIVIL MEP STRUCTURAL 6/ 2 8 / 2 0 2 2 1 1 : 3 0 : 3 0 A M A3.21 BLDG 4 (52 CL) Exterior Elevations 22--- THE PITCH PHASE 2 02.15.2022 ROBI Checker 1/8" = 1'-0"1 Front Elevation- 48 Unit Side A 1/8" = 1'-0"2 Front Elevation- 48 Unit Side B KEYNOTES E1 Prefinished cement board, 1x6 Trim. LP SMARTSIDE. Color: Snowscape White. E3 Prefinished cement board, 8" lap siding. LP SMARTSIDE. Color: Snowscape White. E4 Prefinished cement board, board and batten. LP SMARTSIDE. Color: Abyss Black. E5 Prefinished cement board, board and batten. LP SMARTSIDE. Color: Snowscape White. E6 Roof system consists of: Class III Impact-Resistant 30-year laminated fiberglass shingles, #15 ashpalt felt underlayment (self-adhered ice & water shield rubberized membrane 60" up from eave & 30" ea. side of all valleys), plywood roof sheathing (see struct.) w/ edge clips, & roof trusses @ 24" o.c. (verify w/ struct. & roof truss mfr.). E9 Prefinished aluminum gutter. Color: White. E11 Versetta Stone Mortarless screw-applied stone. Color: Northern Ash Style: Ledgestone. E18 18" tall metal building signage on 3" standoffs. Backlight. Finish: Weathered metal, Color: Copper/Rust. See Detail 8/A1.02. E22 Prefinished aluminum overhead door. Provide opener & light. No. Description Date 123456 E3 E11 E3 E11 E11 W1 W1W1 W1W1 W1 W1 W1 W1 W2W2 W2 W2 W2W2 W1 W1 W1W1 W2W2 W2W2 W2 W2 W2W2 W2 W2 E11 E5 E9 E1 E4 E3E3 E11 E11 E11 E11 E1 E3 E6 E6 xW2 xW2 xW2xW2 xW2 xW2 W1W1 W1 W1 W2W2 W1 W1 W1 W1 W1 5.2 W1 W1 3 A4.20 4 A4.20 89 67121110 E3 E3 E11 E11 E11 W1 W1 W1 W2W2 W2 W2 W2W2 W1W1 W1 W1 W1W1 W2W2 W2 W2 W2W2 W1 W1 W1 E9 E1 E11 E4E5 E3 E3 E1 E11 E11 E11 E11 E3 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 xW2 xW2 xW2xW2 E6 E6 E3 E1 W2 W2 W2 W2 W2 W2 6.1 W1 xW2 xW2 W1 E3 E11 E9 E1 E9 E25 E1 E11 E3 E4 E4 3' - 0 " 3' - 0 " 1 A2.23 W1 W1 W1 W1 W1 W1 W2 W2 E5 E5 E3 E3 E11E11 E4E4 E25 E25 2 A2.23 W1 W1 W1 W1 W1 W2 W2 E1 E1 W1 Project No. Drawn by: Checked by: COPYRIGHT 2021 524 N Main Ave, Suite 201 Sioux Falls, SD 57104 605.305.4035 4609 S Techlink Cir Sioux Falls, SD 57106 605.362.3753 Electrical Project Manager: Harlan Osterloo harlan.osterloo@westplainsengineering.com Mechanical Engineer: Connor Swiontek, P.E. connor.swiontek@westplainsengineering.com Project Manager: Jerad Hoffman JHoffman@rakerrhodes.com 4121 NW Urbandale Drive Urbandale,IA 50322 515.369.4429 Project Manager: Erin Ollendike ErinO@cda-eng.com Project Architect: Laura Devine Email: laura.devine@lloydcompanies.com 101 S. Reid Street, Suite 201 Sioux Falls, SD 57103 Laura: 605.929.6221 ARCHITECT CONSULTANTS CIVIL MEP STRUCTURAL PRELIMINARY NOT FOR CONSTRUCTION BI M 3 6 0 : / / P I T C H P 2 / 2 1 0 7 7 _ T h e P i t c h _ 4 8 D U - C L . r v t 6/ 2 8 / 2 0 2 2 1 1 : 3 0 : 3 4 A M A3.22 BLDG 4 (52 CL) Exterior Elevations 22--- THE PITCH PHASE 2 02.15.2022 ROBI Checker 1/8" = 1'-0"1 Back Elevation Side A 1/8" = 1'-0"2 Back Elevation Side B KEYNOTES E1 Prefinished cement board, 1x6 Trim. LP SMARTSIDE. Color: Snowscape White. E3 Prefinished cement board, 8" lap siding. LP SMARTSIDE. Color: Snowscape White. E4 Prefinished cement board, board and batten. LP SMARTSIDE. Color: Abyss Black. E5 Prefinished cement board, board and batten. LP SMARTSIDE. Color: Snowscape White. E6 Roof system consists of: Class III Impact-Resistant 30-year laminated fiberglass shingles, #15 ashpalt felt underlayment (self-adhered ice & water shield rubberized membrane 60" up from eave & 30" ea. side of all valleys), plywood roof sheathing (see struct.) w/ edge clips, & roof trusses @ 24" o.c. (verify w/ struct. & roof truss mfr.). E9 Prefinished aluminum gutter. Color: White. E11 Versetta Stone Mortarless screw-applied stone. Color: Northern Ash Style: Ledgestone. E25 8" prefinished fascia trim. Color White. 1/8" = 1'-0"3 Side Elevation. 1/8" = 1'-0"4 Side Elevation- 48 Unit. No. Description Date T.O. Grill 4' - 3 1 / 4 " 3' - 3 " 1' - 1 0 1 / 2 " FRONT 3' - 4" Fuel Type: Natural Gas NOTE: Provide Electrical and Gas Hookups. See Site Plan for location. 40" Sizzler Grill Model #ALSIZ40NG Concrete Countertop Corner Trim Wood Tounge and Groove FInish. Verify final color with owner. 1 G0.4 T. O . G R IL L - V e r i f y M a n u fa c t u r e r R e q u i r e me n t s 4' - 4 1 / 4 " 1' - 1 1 / 4 " 1' - 10" 9 1 / 4 " 2' - 5 3 / 4 " Tongue and Groove Wood Finish. Verify final selection with owner. 2x4 Wood framing. Grill Plywood Sheathing on interior of grill cutout. Concrete Countertop Product-Cove 30" Natural Gas Fire Pit Color-Black Note: Provide Gas hook up at this location. See Site Plan. Fill with Lava Rock or Fire Glass per Manufacturers Requirements. 2' - 6" 2' - 6" 1' - 3 1 / 4 " 1' - 2" 4" 15 " M I N . Ignition Switch at 15" AFF MIN. to meet ADA Reach requirments. Provide an automatic shutoff and timer for firepit. Contractor to provide a 4" high concrete pedestal for the firepit to rest on. Bring Gas line in through bottom of pit. 1' - 0 " 1' - 9 " 96" +/- 1/2 Center to Center 2" 7 1 / 4 " 4' - 1 1 3 / 4 " 5" 3 3/4" Mounting Bracket 2" Square X 18 GA. Posts Typ. 5/8" Square X 18 GA. Pickets Typ. Ribbed Channel Horizontal Rails 15/16" x 1 1/4" x 16 GA. Double Wall Leg 6' - 0 " NOTE: PROVIDE POWER TO THIS LOCATION. SEE ELECTRICAL SITE PLAN FOR MORE INFORMATION. 2' - 2 " Wood Cladding. Verify Material with owner. 4' - 1 0 " 7' - 0 " Stone Base. Verify Material with owner. Metal Logo/Signage. Verify final design with Owner. 6"5' - 0"6" SLOPE 14 ' - 0 " 5' - 0 " 4' - 0 " 5' - 0 " 7 5/8"12' - 8 3/4"7 5/8" 14' - 0" 3' - 0 " 8' - 0 " 3' - 0 " 2 A1.02 Sim 4' - 3 " 6' - 0 " 4' Vinyl Coated Chainlink Fence Project No. Drawn by: Checked by: COPYRIGHT 2021 524 N Main Ave, Suite 201 Sioux Falls, SD 57104 605.305.4035 4609 S Techlink Cir Sioux Falls, SD 57106 605.362.3753 Electrical Project Manager: Harlan Osterloo harlan.osterloo@westplainsengineering.com Mechanical Engineer: Connor Swiontek, P.E. connor.swiontek@westplainsengineering.com Project Manager: Jerad Hoffman JHoffman@rakerrhodes.com 4121 NW Urbandale Drive Urbandale,IA 50322 515.369.4429 Project Manager: Erin Ollendike ErinO@cda-eng.com Project Architect: Laura Devine Email: laura.devine@lloydcompanies.com 101 S. Reid Street, Suite 201 Sioux Falls, SD 57103 Laura: 605.929.6221 ARCHITECT CONSULTANTS CIVIL MEP STRUCTURAL PRELIMINARY NOT FOR CONSTRUCTION BI M 3 6 0 : / / T h e P i t c h W a u k e e I A / 2 1 0 7 7 _ T h e P i t c h _ 7 2 D U - CL . r v t 6/ 2 8 / 2 0 2 2 9 : 5 5 : 2 9 A M A1.02 Site Details 21077 THE PITCH 12.03.2021 ROBI Checker 1" = 1'-0"3 Island/Grill Detail1" = 1'-0"5 Firepit Detail 3/4" = 1'-0"6 Pool Fencing 1" = 1'-0"8 Monument Sign DOG PARK BLACK VINYL CHAIN LINK FENCE 4 4 No. Description Date 4 City Submittal #2 6.8.2022 1/4" = 1'-0"1 TRASH ENCLOSURE PLAN 1" = 1'-0"2 TRASH ENCLOSURE SECTION (NOT ACCURATE COLOR) 3/4" = 1'-0"7 Dog Park Fence (ACCURATE COLOR) 4' - 0 MAIN FLOOR PLAN 0' -0" 2nd Floor FFE 10' -1 7/8" 3rd Floor FFE 20' -3 3/4" Roof Truss Bearing 28' -4 7/8" 19 ' - 1 0 " 9' - 4 3 / 4 " 4' - 0 " 19 ' - 1 0 " 9' - 4 3 / 4 " MAIN FLOOR PLAN 0' -0" 2nd Floor FFE 10' -1 7/8" 3rd Floor FFE 20' -3 3/4" Roof Truss Bearing 28' -4 7/8" 19 ' - 1 0 " 9' - 4 3 / 4 " MAIN FLOOR PLAN 0' -0" 2nd Floor FFE 10' -1 7/8" 3rd Floor FFE 20' -3 3/4" Roof Truss Bearing 28' -4 7/8" 19 ' - 1 0 " MAIN FLOOR PLAN 0' -0" 2nd Floor FFE 10' -1 7/8" 3rd Floor FFE 20' -3 3/4" Roof Truss Bearing 28' -4 7/8" 19 ' - 1 0 " Project No. Date: Drawn by: Checked by: COPYRIGHT 2021 524 N Main Ave, Suite 201 Sioux Falls, SD 57104 605.305.4035 4609 S Techlink Cir Sioux Falls, SD 57106 605.362.3753 Electrical Project Manager: Harlan Osterloo harlan.osterloo@westplainsengineering.com Mechanical Engineer: Connor Swiontek, P.E. connor.swiontek@westplainsengineering.com Project Manager: Jerad Hoffman JHoffman@rakerrhodes.com 4121 NW Urbandale Drive Urbandale,IA 50322 515.369.4429 Project Manager: Erin Ollendike ErinO@cda-eng.com Project Architect: Laura Devine Email: laura.devine@lloydcompanies.com 101 S. Reid Street, Suite 201 Sioux Falls, SD 57103 Aspen: 605.695.1899 Laura: 605.929.6221 ARCHITECT CONSULTANTS CIVIL MEP STRUCTURAL 6/ 2 8 / 2 0 2 2 1 0 : 5 3 : 5 8 A M A3.20 BLDG 2 (74 CL) Exterior Elevations 21077 THE PITCH 12.03.2021 MLM LED 1/16" = 1'-0"1 Front Elevation- 72 Unit 1/16" = 1'-0"2 Back Elevation- 72 Unit 1/8" = 1'-0"3 Side Elevation- 72 Unit 1/8" = 1'-0"4 Side Elevation LP SMARTSIDE- -6" LAP SIDING -BOARD AND BATTEN 22.07% LP SMARTSIDE- -6" LAP SIDING = 37.74% -BOARD AND BATTEN = 2.53% VERSETTA STONE- -LEDGESTONE STYLE STONE SIDING 35.90% Northern Ash EXTERIOR MATERIALS PALETTE- MALARKEY SHINGLES- -Vista AR Midnight Black 2 No. Description Date 2 Revision 2 2.17.2022 1 2 8.1 8.2 9.1 3.1 3.2 4.1 5.1 6.1 7.1 E3 E3E3 E3 E3 E3E3 E5 E5 E4 E4 E4 E4 E4 E11 E11 E11 E11 E11 E11 E11 E11 E11 E11 xW1 xW2 xW2 xW1 xW2 xW2 137A xW2 xW2 xW1 xW1 xW1 xW2 xW2 518 333xW2xW2 xW2 xW2 158 xW1 xW1 W1 xW2 W2 1B.5 679xW2xW2 xW2 xW2 572 xW1 xW1 7 xW2 xW2 680 681xW2xW2 686xW2xW2 xW1 xW1 xW1 xW2 xW2 656 666xW2xW2 xW2 xW2 706 xW1 xW1 xW1 xW2 xW2 641 667xW2xW2 xW2 xW2 657 xW2xW2 xW2xW2 W4 W4 W4 W4 W4124AW4 xW2xW2 xW2 xW2 xW1 xW1 128A E9 E9 E9 E9 E9 E1 E1 E1 E1 E9 E1 E6E6E6E6E6 E6 E18 W2W2 W2 W2 xW1 xW1 xW1 xW1 168.2 9.1 9.2 14.1 14.213.112.111.110.1 15 E5 E4 E5 E3 E3 E3 E3 E3 E3 E3 E4 E4 E4 E4 E11 E11 E11 E11 E11 E11 E11 E11 xW2 xW2 xW2xW2 128A W4 W4 W4 W4 xW2 xW2 xW2xW2 W4 124A W4 xW1 xW1 622 xW2 xW2 xW2xW2617 1A.5 xW2 xW2 xW1 xW1 xW1 698 xW2 xW2 577 xW2 xW2 xW2xW2607 xW1 xW1 xW1 563 xW2 xW2 xW2xW2378 203 xW2 xW2 xW1 xW1 xW1 xW2 xW2 xW2xW2601 213 xW2 xW2 xW1 xW1 xW1 578 xW2 xW2 xW1 xW1 xW2xW2393 218 xW2 xW2 xW1 xW2 xW2 138A xW2 xW2 xW1 xW1 xW1 xW2 xW2 455 270xW2xW2 xW2 xW2 3B.13 xW1 xW1 xW1 E9 E9 E9 E9 E9E9E9E9 E1 E1 E1 E1 E1 E6 E6 E6 E6 E6 E6 Project No. Date: Drawn by: Checked by: COPYRIGHT 2021 524 N Main Ave, Suite 201 Sioux Falls, SD 57104 605.305.4035 4609 S Techlink Cir Sioux Falls, SD 57106 605.362.3753 Electrical Project Manager: Harlan Osterloo harlan.osterloo@westplainsengineering.com Mechanical Engineer: Connor Swiontek, P.E. connor.swiontek@westplainsengineering.com Project Manager: Jerad Hoffman JHoffman@rakerrhodes.com 4121 NW Urbandale Drive Urbandale,IA 50322 515.369.4429 Project Manager: Erin Ollendike ErinO@cda-eng.com Project Architect: Laura Devine Email: laura.devine@lloydcompanies.com 101 S. Reid Street, Suite 201 Sioux Falls, SD 57103 Aspen: 605.695.1899 Laura: 605.929.6221 ARCHITECT CONSULTANTS CIVIL MEP STRUCTURAL 6/ 2 8 / 2 0 2 2 1 0 : 5 4 : 0 5 A M A3.21 BLDG 2 (74 CL) Exterior Elevations 21077 THE PITCH 12.03.2021 MORGAN Checker 1/8" = 1'-0"1 Front Elevation- 72 Unit Side A 1/8" = 1'-0"2 Front Elevation- 72 Unit Side B KEYNOTES E1 Prefinished cement board, 1x6 Trim. LP SMARTSIDE. Color: Snowscape White. E3 Prefinished cement board, 8" lap siding. LP SMARTSIDE. Color: Snowscape White. E4 Prefinished cement board, board and batten. LP SMARTSIDE. Color: Abyss Black. E5 Prefinished cement board, borad and Batten. LP SMARTSIDE. Color: Snowscape White. E6 Roof system consists of: Class III- Impact Resistant 30 year laminated fiberglass shingles, #15 ashpalt felt underlayment (self adhered ice & water shield rubberized membrane 60" up from eave & 30" ea. side of all valleys), plywood roof sheathing (see struct.) w/ edge clips, & roof trusses @ 24" o.c. (verify w/ struct. & roof truss mfr.) E9 Prefinished aluminum gutter. Color: White. E11 Versetta Stone Mortarless screw applied stone. Color: Northern Ash Style: Ledgestone. E18 18" High metal building signage on 3" standoffs. Backlight. Finish: Weathered metal, Color: Copper/Rust. See Detail 8/A1.02. 2 No. Description Date 2 Revision 2 2.17.2022 MAIN FLOOR PLAN 0' -0" 2nd Floor FFE 10' -1 7/8" 3rd Floor FFE 20' -3 3/4" Roof Truss Bearing 28' -4 7/8" 128934567 E11 E3 E3 E11 E4 E4 E3 E11 E3 E11 xW1 xW1 xW1xW1xW1 xW1xW1 xW1 xW1 xW1 xW1 xW1 xW2xW293 295 xW2 xW2 xW2xW2480 470 xW2 xW2 xW2xW2285 2B.9 xW2 xW2 xW1 xW1 xW1 523 xW2 xW2 xW1 xW1 xW1 xW2xW2 xW2 xW2338 163 xW1 xW1 xW1 W2W2 W2 W2 W2W2 37 244 429 xW1 xW1 xW1 xW1xW1 xW1 xW1 xW1xW1 xW2xW2 xW2xW2 2C.9 490 xW2 xW2 xW2xW2305 2A.9 xW2 xW2 E4 E4 E3 E3 E11 E11 E11 E11 E5 E5 E9 E9 E9 E9 E9 E1 E1 E1 E1 MAIN FLOOR PLAN 0' -0" 2nd Floor FFE 10' -1 7/8" 3rd Floor FFE 20' -3 3/4" Roof Truss Bearing 28' -4 7/8" 8916141312111015 E4 E5 E11 E11 E5 E3 E3 E3 E3 E3 E3 E11 E11 E11 E11 E4 E4 xW1xW1 733xW2xW2 xW1 xW1 xW1 xW1 190xW2xW2 xW2 xW2 365 550xW2xW2 xW1xW1 xW1 xW1 xW1xW1 180xW2xW2 xW2 xW2 355 540xW2xW2 xW1 xW1 xW1xW1 xW1 xW1 530xW2xW2 xW2 xW2 345 170xW2xW2 xW1 xW1 xW1 xW1 xW2 xW2 223 398xW2xW2 xW2 xW2 583 xW1 xW1xW1 xW1 xW1 W2W2 W2W2 W2W2442 257 58 xW1 xW1 xW1 E9 E9 E9 E9 E1 E1 E1 E1 Project No. Drawn by: Checked by: COPYRIGHT 2021 524 N Main Ave, Suite 201 Sioux Falls, SD 57104 605.305.4035 4609 S Techlink Cir Sioux Falls, SD 57106 605.362.3753 Electrical Project Manager: Harlan Osterloo harlan.osterloo@westplainsengineering.com Mechanical Engineer: Connor Swiontek, P.E. connor.swiontek@westplainsengineering.com Project Manager: Jerad Hoffman JHoffman@rakerrhodes.com 4121 NW Urbandale Drive Urbandale,IA 50322 515.369.4429 Project Manager: Erin Ollendike ErinO@cda-eng.com Project Architect: Laura Devine Email: laura.devine@lloydcompanies.com 101 S. Reid Street, Suite 201 Sioux Falls, SD 57103 Laura: 605.929.6221 ARCHITECT CONSULTANTS CIVIL MEP STRUCTURAL PRELIMINARY NOT FOR CONSTRUCTION BI M 3 6 0 : / / T h e P i t c h W a u k e e I A / 2 1 0 7 7 _ T h e P i t c h _ 7 2 D U - CL . r v t 6/ 2 8 / 2 0 2 2 1 0 : 5 4 : 1 1 A M A3.22 BLDG 2 (74 CL) Exterior Elevations 21077 THE PITCH 12.03.2021 MORGAN Checker 1/8" = 1'-0"1 Back Elevation Side A 1/8" = 1'-0"2 Back Elevation Side B KEYNOTES E1 Prefinished cement board, 1x6 Trim. LP SMARTSIDE. Color: Snowscape White. E3 Prefinished cement board, 8" lap siding. LP SMARTSIDE. Color: Snowscape White. E4 Prefinished cement board, board and batten. LP SMARTSIDE. Color: Abyss Black. E5 Prefinished cement board, borad and Batten. LP SMARTSIDE. Color: Snowscape White. E9 Prefinished aluminum gutter. Color: White. E11 Versetta Stone Mortarless screw applied stone. Color: Northern Ash Style: Ledgestone. 2 No. Description Date 2 Revision 2 2.17.2022 First Floor FFE 0' -0" Roof Truss Bearing 2 10' -1 1/8" T.O. Footing -4' -0" W1 W1 W2 W1 E24 E20 E5 E15 E15E16 E20 E25 E25 E10 E27 E10 E7 E7 E7 E7 E8E8 W2W2 W3 W2 W6W6 W1W5 W5 W2 1 4' - 0 " E25 E25 First Floor FFE 0' -0" Roof Truss Bearing 2 10' -1 1/8" T.O. Footing -4' -0" E27 E25 E10 E10 12 10 13 E24 E5 E15 E12 E5 E5 E5 E15 E16 E16 E22 E7E7 E7 E8E8 E4 W6 W2 W6 W5W1W5 W7 W7 First Floor FFE 0' -0" Roof Truss Bearing 2 10' -1 1/8" T.O. Footing -4' -0" E27 E10E10 E27 E25 E10 E25 E24 E20 E20 E5 E16 E7 E7 E7 E7 E7 E15 E15 E12 E14E14 E15E15 E4 W2W2 W1W1 W2W6 W9W10W9 W6 W2 W1 W5W5 E20 E25 First Floor FFE 0' -0" Roof Truss Bearing 2 10' -1 1/8" T.O. Footing -4' -0" 76 E24 E5 E27 E4 E25 E10 E15 E5 E15 E5 E5E5 E7 E7 E8E8 W9 W6W2 W1 W5W1 W2 W9 W6 W5 E25 Project No. Date: Drawn by: Checked by: COPYRIGHT 2021 524 N Main Ave, Suite 201 Sioux Falls, SD 57104 605.305.4035 4609 S Techlink Cir Sioux Falls, SD 57106 605.362.3753 Electrical Project Manager: Harlan Osterloo harlan.osterloo@westplainsengineering.com Mechanical Engineer: Connor Swiontek, P.E. connor.swiontek@westplainsengineering.com Project Manager: Jerad Hoffman JHoffman@rakerrhodes.com 3405 SE Crossroads Drive, Suite G Grimes,IA 50111 515.369.4429 Project Manager: Erin Ollendike ErinO@cda-eng.com Project Architect: Laura Devine Email: laura.devine@lloydcompanies.com 101 S. Reid Street, Suite 201 Sioux Falls, SD 57103 Aspen: 605.695.1899 Laura: 605.929.6221 ARCHITECT CONSULTANTS CIVIL MEP STRUCTURAL 6/ 2 8 / 2 0 2 2 1 1 : 0 2 : 1 9 A M A3.31 BLDG 3(CH) Exterior Elevations 21007 THE PITCH 06.3.2021 LED LED 3/16" = 1'-0"1 Front Elevation-Clubhouse 3/16" = 1'-0"2 Back Elevation-Clubhouse 3/16" = 1'-0"3 Side A Elevation-Clubhouse 3/16" = 1'-0"4 Side B Elevation-Clubhouse LP SMARTSIDE- -6" LAP SIDING -BOARD AND BATTEN 42.42% LP SMARTSIDE- -6" LAP SIDING -BOARD AND BATTEN 21.31% VERSETTA STONE- -LEDGESTONE STYLE STONE SIDING 31.99% Northern Ash EXTERIOR MATERIALS PALETTE- MALARKEY SHINGLES- -Vista AR Midnight Black KEYNOTES E4 4" prefinished cement board corner trim. Color White. E5 8" prefinished cement board facia trim. Color White. E7 Poured concrete foundation wall. See struct. E8 Poured concrete footing. See struct. E10 LP Smartside cement board lap siding. Color: Abyss Black. E12 Insulated fiberglass door. E14 42" tall railing. Top and Bottom Rail to be wood, Balusters to be metal. Typical. E15 Prefinished aluminum gutter. E16 Prefinished aluminum downspout. Add drain tile for gutter. E20 8" prefinished cement board trim. Color White. E22 Water spicket. E24 Roof system consists of: 30 year laminated fiberglass shingles, #15 asphalt felt underlayment (self adhered ice & water shield rubberized membrane 60" up from eave & 30" ea. side of all valleys), plywood roof sheathing (see struct.) w/ edge clips, & roof trusses @ 24" o.c. (verify w/ struct. & roof truss mfr.) E25 Versetta Stone. Ledgestone stone siding. Color: Northern Ash. E27 LP Smartside board and batten siding. Color: Snowscape White. No. Description Date 2 Revision 2 2.17.2022 2 139'-4" 1' - 6 " 2' - 0 " 2' - 0 " 2' - 0 " 1' - 6 " 4' X2' Block wall Guardrail 101 S. Reid Street, Suite 201 Sioux Falls, SD 57103 1" = 10'-0"1 Retaining Wall SAMPLE IMAGE OF RETAINING BLOCK COLOR TO MATCH