Loading...
HomeMy WebLinkAbout2022-08-15 I01H_09 NW Douglas Pkwy Culvert and Pond_Change Order 2AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: August 15, 2022 AGENDA ITEM:Consideration of approval of Change Order No. 2 to Elder Corporation for NW Douglas Parkway Culvert and Pond Improvements project increasing the contract amount by $38,000.00. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 2 is for the addition of a drain pipe and gate valve to the pond outlet structure. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $38,000.00. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve change order no. 2. ATTACHMENTS: I. Change Order No. 2 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Rudy Koester RK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1H9 August 9, 2022 Rudy Koester Public Works Director City of Waukee 805 University Avenue Waukee, Iowa 50263 WAUKEE, IOWA NW DOUGLAS PARKWAY CULVERT AND POND IMPROVEMENTS CHANGE ORDER NO. 2 AND PARTIAL PAYMENT ESTIMATE NO. 4 Enclosed are three copies of Change Order No. 2 for the above-mentioned project under the contract between the City of Waukee and Elder Corporation. Change Order No. 2 is for the addition of a drain pipe and gate valve to the pond outlet structure. Change Order No. 2 increases the contract price by a total of $38,000.00. Veenstra & Kimm, Inc. recommends approval of Change Order No. 2. Also enclosed are three copies of Partial Payment Estimate No. 4 for the period between July 1, 2022 and July 27, 2022. Partial Payment Estimate No. 4 is for storm sewer, rip-rap, and backfill. We have checked the estimate and recommend payment to Elder Corporation in the amount of $145,891.27. Please sign all three copies of Change Order No. 2 and Partial Payment Estimate No. 4 in the spaces provided. Return one signed copy of each to our office and one signed copy of each with payment to Elder Corporation. The remaining copy of each should be kept for your files. Rudy Koester August 9, 2022 Page 2 If you have any questions or comments, please contact us at 515-225-8000. VEENSTRA & KIMM, INC. Jordan Kappos JDK 292292 Enclosures cc: Becky Schuett, City of Waukee (via e-mail) Sara Kappos, City of Waukee (via e-mail) Beth Richardson, City of Waukee (via e-mail) Tracy Lovetinsky, City of Waukee (via e-mail) Elder Corporation (via e-mail) 12 6 + 0 0 12 7 + 0 0 9+75 10+00 11+00 12+00 12+35 BP: 9+75.00 N=593214.91 E=1538111.37 EP: 12+35.04 N=593425.74 E=1538263.60 ST-20 SW-513 OPEN-SIDED AREA INTAKE STA=10+37.94 N=593265.91 E=1538148.25 ST-19 HEADWALL STA=11+83.00 N=593383.55 E=1538233.13 P-20 970 975 980 967 968 969 971 972 973 974 976 977 978 979 981 982 965 970 975 980 985 98 5 98 2 98 3 98 4 98 6 98 7 98 8 97 5 98 0 98 5 99 0 97 4 97 6 97 7 97 8 97 9 98 1 98 2 98 3 98 4 98 6 98 7 98 8 98 9 99 1 REMOVE EXISTING OUTLET STRUCTURE AND PIPES (INCIDENTAL TO NEW POND OUTLET CONSTRUCTION) RIP RAP 1-1/2'x20'x40' OVER ENGINEERING FABRIC RIP RAP #4 RIP RAP #5 9 7 0 9 7 5 9 8 0 9 8 5 99 0 96 8 9 6 9 9 7 1 9 7 2 9 7 3 9 7 4 9 7 6 9 7 7 9 7 8 9 7 9 9 8 1 9 8 2 9 8 3 9 8 4 9 8 6 9 8 7 98 8 98 9 99 1 970 97 5 9 8 0 969 971 972 973 974 97 6 97 7 97 8 9 7 9 9 8 1 9 8 2 9 8 3 P-24 ST-24 INLET STA=10+00.94 0.00' N=593235.94 E=1538126.56 ST-20 SW-513 OPEN-SIDED AREA INTAKE STA. 10+37.94, 0.04 RT RIM=993.98 P-20 ST - 1 9 HE A D W A L L ST A . 1 1 + 8 3 . 0 0 , 0 . 0 0 R T 145.06 LF O F 7 2 " R C P @ 3 . 2 1 % INV=965.00(72" SW) INV=969.66(72" NE) INV=972.17(12" SW) NEW PERMANENT POOL ELEV 983.0 100 YEAR FLOOD ELEVATION 3.5:1 SLOPE RIP RAP 12" C M P ELEV 989.66 INV=972.50(12" NE) 33.00 LF OF 12" C900 PVC @ 1.00% P-24 ST-24 INLET STA. 10+00.94 12" STAINLESS STEEL GATE VALVE 72" RCP HEADWALL RIP RAP 0'20'40' DWG. NO. PROJECT PL O T T E D : FI L E P A T H : X- R E F S : T O P O & D E S I G N & W e t l a n d _ E x p o r t C A D 1 & P r a i r i e R o s e 2 0 2 1 - 0 8 - 1 2 SCALE DRAWN CHECKED APPROVED DATE ISSUED FOR DATE REVISIONS NW DOUGLAS PARKWAY CULVERT AND POND IMPROVEMENTS CITY OF WAUKEE, IOWA 292276 POND OUTLET PIPING M.3 AS NOTED BJL GJR GJR REV. 1 CONST 11-4-21 7-13-22 ADDED 10" DI DRAIN AND GATE VALVE P: \ 2 9 2 2 7 6 \ 2 9 2 2 7 6 _ C I V I L \ P R O D U C T I O N D R A W I N G S \ M . S T O R M S E W E R \ 2 9 2 2 7 6 - P P - S T O R M Sa t u r d a y , J u l y 1 6 , 2 0 2 2 3 : 3 5 : 2 1 P M B A C D DWG. NO. PROJECT PL O T T E D : FI L E P A T H : X- R E F S : T O P O & D E S I G N & W e t l a n d _ E x p o r t C A D 1 & P r a i r i e R o s e 2 0 2 1 - 0 8 - 1 2 SCALE DRAWN CHECKED APPROVED DATE ISSUED FOR DATE REVISIONS NW DOUGLAS PARKWAY CULVERT AND POND IMPROVEMENTS CITY OF WAUKEE, IOWA 292276 POND OUTLET DETAILS M.3A AS NOTED BJL GJR GJR CONST 11-4-21 P: \ 2 9 2 2 7 6 \ 2 9 2 2 7 6 _ C I V I L \ P R O D U C T I O N D R A W I N G S \ M . S T O R M S E W E R \ 2 9 2 2 7 6 - P P - S T O R M Sa t u r d a y , J u l y 1 6 , 2 0 2 2 3 : 3 6 : 0 9 P M