HomeMy WebLinkAbout2022-09-19 I01F_07 Douglas Pkwy Extension_Pmt Est 10AGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: September 19, 2022
AGENDA ITEM:Consideration of approval of Payment Estimate No. 10 to Absolute
Concrete for the Douglas Parkway Extension project in the amount of
$109,584.40
FORMAT:Consent Agenda
SYNOPSIS INCLUDING PRO & CON: Absolute Concrete requested Payment Estimate No.
10 for the work completed on the NE Douglas Parkway Extension project in the amount of
$109,584.40. Bolton & Menk has reviewed the payment estimate and recommends payment.
The partial payment is for the pay period ending August 31, 2022. Work completed for this pay
estimate includes subdrain, sanitary sewer drop connections, 9” PCC pavement, sidewalk,
pavement markings and signs.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $109,584.40
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve Payment Estimate No. 10
ATTACHMENTS: I. Payment Estimate No. 10
II. Letter of Recommendation
PREPARED BY:Beth Richardson
REVIEWED BY:Sara Kappos SKK
PUBLIC NOTICE INFORMATION –
NAME OF PUBLICATION:
DATE OF PUBLICATION:
I1F7
H:\WAUKEE_CI_IA\0A1124531\7_Construction\D_Pay Applications
September 13, 2022
Mr. Rudy Koester
Public Works Director
City of Waukee, Iowa
RE: Douglas Parkway Extension Pay Request 10
Dear Mr. Koester:
Submitted for your approval is Pay Request 10 for the above-mentioned project. Pay Request 10 is for a
total payment of $109,584.40. The total value completed to date is $954,468.35 minus 5% retainage of
$47,723.42. Please see Pay Request 10 for a full summary of the items completed that are included in
this payment.
Bolton & Menk, Inc. recommends the approval of Pay Request 10. Please let me know if you have any
questions.
Sincerely,
Bolton & Menk, Inc.
Justin Ernst, P.E.
Project Manager
$919,069.00
Owner:City of Waukee Contractor:Absolute Concrete
805 University Ave 1000 W. 6th Avenue
Waukee, IA 50263 Slater, IA 50244
Item Est. Unit Extended Quantity Value
No.Unit Qty Price Price Completed Completed
1 LS 1.00 2,500.00$ 2,500.00$ 1.00 2,500.00$
2 CY 8,990.00 4.00$ 35,960.00$ 8,990.00 35,960.00$
3 SY 5,271.00 2.00$ 10,542.00$ 5,271.00 10,542.00$
4 SY 5,271.00 7.00$ 36,897.00$ 0.00 -$
5 SY 5,271.00 8.50$ 44,803.50$ 5,271.00 44,803.50$
6 LF 150.00 45.00$ 6,750.00$ 150.00 6,750.00$
7 LF 119.00 50.00$ 5,950.00$ 119.00 5,950.00$
8 LF 190.00 68.00$ 12,920.00$ 190.00 12,920.00$
9 LF 311.00 100.00$ 31,100.00$ 311.00 31,100.00$
10 EA 2.00 2,250.00$ 4,500.00$ 2.00 4,500.00$
11 LF 1,204.00 15.00$ 18,060.00$ 1,204.00 18,060.00$
12 EA 11.00 250.00$ 2,750.00$ 11.00 2,750.00$
13 EA 8.00 302.00$ 2,416.00$ 8.00 2,416.00$
14 LF 162.00 45.00$ 7,290.00$ 162.00 7,290.00$
15 LF 481.00 55.00$ 26,455.00$ 481.00 26,455.00$
16 EA 2.00 2,500.00$ 5,000.00$ 2.00 5,000.00$
17 EA 2.00 2,000.00$ 4,000.00$ 2.00 4,000.00$
18 EA 4.00 5,000.00$ 20,000.00$ 4.00 20,000.00$
19 EA 2.00 1,000.00$ 2,000.00$ 2.00 2,000.00$
20 EA 3.00 150.00$ 450.00$ 3.00 450.00$
21 EA 3.00 1,500.00$ 4,500.00$ 3.00 4,500.00$
22 EA 1.00 8,500.00$ 8,500.00$ 1.00 8,500.00$
23 EA 1.00 2,800.00$ 2,800.00$ 1.00 2,800.00$
24 EA 2.00 3,000.00$ 6,000.00$ 2.00 6,000.00$
25 EA 2.00 3,500.00$ 7,000.00$ 2.00 7,000.00$
26 EA 2.00 3,800.00$ 7,600.00$ 2.00 7,600.00$
27 EA 1.00 6,500.00$ 6,500.00$ 1.00 6,500.00$
28 EA 2.00 1,500.00$ 3,000.00$ 2.00 3,000.00$
29 EA 2.00 400.00$ 800.00$ 2.00 800.00$
30 EA 1.00 1,500.00$ 1,500.00$ 1.00 1,500.00$
31 EA 2.00 1,500.00$ 3,000.00$ 2.00 3,000.00$
32 SY 4,304.00 69.50$ 299,128.00$ 4,606.70 320,165.65$
33 SY 184.00 125.00$ 23,000.00$ 259.15 32,393.75$
34 SY 170.00 12.50$ 2,125.00$ 193.89 2,423.63$
35 SY 332.00 45.00$ 14,940.00$ 332.00 14,940.00$
36 SY 755.00 45.00$ 33,975.00$ 755.00 33,975.00$
37 SF 252.00 50.00$ 12,600.00$ 252.00 12,600.00$
38 SY 70.00 175.00$ 12,250.00$ 85.73 15,002.75$
39 SY 543.00 31.00$ 16,833.00$ 543.00 16,833.00$
40 STA 88.70 185.00$ 16,409.50$ 88.70 16,409.50$
41 EA 15.00 280.00$ 4,200.00$ 15.00 4,200.00$
42 STA 7.80 200.00$ 1,560.00$ 7.80 1,560.00$
43 EA 2.00 150.00$ 300.00$ 2.00 300.00$
44 SF 64.00 75.00$ 4,800.00$ 112.00 8,400.00$
45 LS 1.00 10,000.00$ 10,000.00$ 1.00 10,000.00$
STORM SEWER, TRENCHED, 36", RCP
SYMBOLS AND LEGENDS REMOVED
TYPE A SIGN, SHEET ALUMINUM
TEMPORARY TRAFFIC CONTROL
INTAKE, SW-503
SUBGRADE TREATMENT, FLY ASH OR CEMENT
SUBBASE, 6", MODIFIED
SANITARY SEWER SERVICE STUB, PVC, 8"
STORM SEWER, TRENCHED, 15", RCP
PIPE APRON, RCP, 36"
SUBDRAIN, CASE E,TYPE 2, 6"
SUBDRAIN CLEANOUT, TYPE 1-A, 6"
SUBDRAIN OUTLETS AND CONNECTIONS
WATER MAIN, TRENCHED, PVC, 8"
WATER MAIN, TRENCHED, PVC, 12"
WATER MAIN LOWERING/HORIZONTAL ADJUSTMENT, TRENCHED, DIP, 12"
VALVE, GATE, 8"
FIRE HYDRANT ASSEMBLY
FLUSHING DEVICE (BLOWOFF), 8"
VALVE BOX ADJUSTMENT
FIRE HYDRANT ASSEMBLY REMOVAL
STORM MANHOLE, SW-401, 96 IN.
SANITARY MANHOLE, SW-303, 48 INCH
INTAKE, SW-501
Description
CLEARING AND GRUBBING
EXCAVATION, CLASS 10
BID ITEMS
08/12/22
8/31/22
10
Project Title
Date
Orig. Contract Amount & Date
Period End Date:
Pay Request Number
Estimated Completion Date
PAY REQUEST
Douglas Parkway Extension
06/21/21
SUBGRADE PREPARATION, 12"
STORM SEWER, TRENCHED, 24", RCP
09/09/22
INTAKE, SW-505
INTAKE, SW-506
INTERNAL DROP CONNECTION
MANHOLE ADJUSTMENT, MINOR
CONNECTION TO EXISTING INTAKE
REMOVE INTAKE STRUCTURE
PAVEMENT, PCC, 9"
FULL DEPTH CONCRETE MEDIAN
REMOVAL OF SIDEWALK
SIDEWALK, PCC, 4"
SIDEWALK, PCC, 6"
DETECTABLE WARNING
FULL DEPTH PATCHES
PAVEMENT REMOVAL
PAINTED PAVEMENT MARKINGS, DURABLE
PAINTED SYMBOLS AND LEGENDS
PAVEMENT MARKINGS REMOVED
H:\WAUKEE_CI_IA\A13122515_Douglas Parkway Extension\7_Construction\D_Pay Applications\Douglas Parkway Pay Req 10.xlsx
Pay Request 10
1 of 3
DocuSign Envelope ID: C91E8585-D54F-465E-B20A-708A4B2F69F3
46 AC 1.50 4,000.00$ 6,000.00$ 0.51 2,040.00$
47 AC 0.75 3,500.00$ 2,625.00$ 0.00 -$
48 LS 1.00 1,500.00$ 1,500.00$ 1.00 1,500.00$
49 LS 1.00 3,800.00$ 3,800.00$ 0.55 2,090.00$
50 TON 15.00 100.00$ 1,500.00$ 15.00 1,500.00$
51 TON 60.00 95.00$ 5,700.00$ 60.00 5,700.00$
52 LF 2,600.00 1.70$ 4,420.00$ 2,589.00 4,401.30$
53 AC 2.30 1,600.00$ 3,680.00$ 4.18 6,688.00$
54 EA 23.00 160.00$ 3,680.00$ 2.00 320.00$
55 LS 1.00 100,000.00$ 100,000.00$ 1.00 100,000.00$
56 LS 1.00 2,500.00$ 2,500.00$ 1.00 2,500.00$
C01.1 LF 920.00 43.57$ 40,084.40$ 721.00 31,413.97$
CO1.2 EA 1.00 1,492.95$ 1,492.95$ 1.00 1,492.95$
CO1.3 EA 5.00 1,548.45$ 7,742.25$ 3.00 4,645.35$
CO1.4 EA 1.00 3,163.50$ 3,163.50$ 2.00 6,327.00$
$954,468.35
HYDROSEEDING, TYPE 1 URBAN, FERTILIZING, AND MULCHING
MATERIALS STORED SUMMARY
# of Units Unit Price
$0.00
$0.00
Extended Cost
$0.00TOTAL
TOTAL $919,069.00
6-inch DRAIN TILE CLEANOUTS
EXISTING STORM SEWER ROCK CHIMNEY
None
Description
HYDROSEEDING, TYPE 2 URBAN, FERTILIZING, AND MULCHING
SWPPP PREPARATION
SWPPP MANAGEMENT
CHECK DAM, ROCK
RIP RAP, CLASS 'E'
SILT FENCE, INSTALL, MAINTAIN, AND REMOVAL
TEMPORARY EROSION CONTROL MULCHING, HYDROMULCHING
INLET PROTECTION DEVICE, INSTALL, MAINTAIN, AND REMOVE
MOBILIZATION
CONCRETE WASHOUT
6-inch PERFORATED TILE
CONNECTION TO EXISTING MANHOLE
H:\WAUKEE_CI_IA\A13122515_Douglas Parkway Extension\7_Construction\D_Pay Applications\Douglas Parkway Pay Req 10.xlsx
Pay Request 10
2 of 3
DocuSign Envelope ID: C91E8585-D54F-465E-B20A-708A4B2F69F3
$109,584.40 is recommended for approval for payment in accordance with the terms of the Contract
Absolute Concrete
Name: Eli Hartog
Title: Project Manager
Pay Request 9
Pay Request 6
Pay Request 7
26,290.89$
24,290.46$
104,269.14$
265,346.45$
971,552.10$
Materials Stored
919,069.00$
52,483.10$
PAY REQUEST SUMMARY
Total Approved
City of Waukee
Contractor:
Pay Request 8
-$
47,723.42$
Approved Change Order 2
Pay Request 1
Pay Request 2
The amount
Pay Request 10
Percent Complete
Total Previously Approved
Amount Due This Request
Percent of Contract Period Utilized
109,584.40$
98%
107%
Name: Daniel Laughridge
Title: City Inspector
Date:
Reviewed By:
Total Earned Less Retainage
Date:
Recommended By:
Bolton & Menk, Inc.
Name: Brad Deets
City of Waukee
Approved By:
Signature:Signature:
Name: Justin Ernst, P.E.
Title: Project Manager
Date:
Title: City Adimistrator
797,160.53$
954,468.35$
Pay Request 3
Pay Request 4
Total Completed
906,744.93$
Retainage (5%)
2,857.60$
9,608.49$
120,375.03$
Liquidated Damages
Contract Price
Revised Contract Price
Approved Change Order 1
Pay Request 5
Total Previously Approved (list each)69,680.84$
174,441.63$
Signature:
Date:
Signature:
H:\WAUKEE_CI_IA\A13122515_Douglas Parkway Extension\7_Construction\D_Pay Applications\Douglas Parkway Pay Req 10.xlsx
Pay Request 10
3 of 3
DocuSign Envelope ID: C91E8585-D54F-465E-B20A-708A4B2F69F3
September 12, 2022 September 12, 2022September 13, 2022