Loading...
HomeMy WebLinkAbout2022-09-19 I01F_13 Library Stormwater Improvements_Change Order 9AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: September 19, 2022 AGENDA ITEM:Consideration of approval of Change Order No. 9 to Elder Corporation for the Waukee Public Library Stormwater Improvements decreasing the contract amount by $42,127.50. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 9 is for adjustments to final contract quantities to reflect actual item quantities used during construction. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order decreases the contract price in the amount of $42,127.50. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 9 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1F13 Project# 4185870 September 13, 2022 TO: Rudy Koester City of Waukee 805 University Ave Waukee IA, 50263 RE: Change Order #9 Waukee Public Library Stormwater Improvements SH Project Number 4185870 Mr. Koester, Please find attached Change Order #8 for the Waukee Public Library Stormwater Improvements. The change order includes adjustments to final contract quantities to reflect actual item quantities used during construction. We have reviewed the change order items and unit prices, both are line with anticipated amounts. If City staff concurs with this change, we recommend the City of Waukee approve this change order deduct in the amount of $42,127.50 to the construction contract for the Waukee Public Library Stormwater Improvements with Elder Corporation of Pleasant Hill, IA. Sincerely, Shive-Hattery, Inc. Nathan Hardisty, PE Project Manager Enc. Change Order #9 City of Waukee 230 W Hickman Road Waukee, IA 50263 Distribution: Owner __X__ Engineer __X__ Contractor __X__ Contractor: 5088 East University Ave Pleasant Hill, IA 50327 $2,162,580.00 May 4, 2020 CO-9.6A LF $63.00 (97.00) ($6,111.00) CO-9.8A LF $25.00 (44.50) ($1,112.50) CO-9.16A LF $123.00 (2.00) ($246.00) CO-9.18A LF $52.00 18.00 $936.00 CO-9.19A LF $134.00 (5.00) ($670.00) CO-9.21A LF $135.00 14.00 $1,890.00 CO-9.22A LF $22.00 18.00 $396.00 CO-9.27A EA $4,100.00 (1.00) ($4,100.00) CO-9.43A EA $800.00 (17.00) ($13,600.00) CO-9.59A AC $3,700.00 0.40 $1,480.00 CO-9.62A AC $1,600.00 (2.90) ($4,640.00) CO-9.74A LF $3.00 (1,865.00) ($5,595.00) CO-9.75A LF $0.50 (5,100.00) ($2,550.00) CO-9.77A TON $68.00 (11.25) ($765.00) CO-9.78A TON $68.00 (32.50) ($2,210.00) CO-9.79A LF $1.50 (2,100.00) ($3,150.00) CO-9.80A LF $0.05 (3,300.00) ($165.00) CO-9.81A LF $0.50 (3,300.00) ($1,650.00) CO-9.85A EA $53.00 (5.00) ($265.00) ($42,127.50) $2,162,580.00 $62,657.40 $2,225,237.40 $42,127.50 $2,183,109.90 0.95% 0 Days June 1, 2021 CHANGE ORDER Aggregate Change Order as a percent of Original Contract The date of Final Completion as of the date of this Change Order therefore is NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER Project Title S-H Project File Number Orig. Contract Amount & Date Change Order Number Date 9 The Contract Time will be changed by TOTAL The Original Contract Sum was Unit August 31, 2022 Filter Sock, 9 in. Contractor: Elder Corporation Elder Corporation Signature: Name: Sanitary Sewer Gravity Main, Trenched, PVC, 8 in. Removal of Sanitary Sewer, Any Size Storm Sewer, Trenched, PP, 36 in. Storm Sewer, Trenched, RCP, 15 in. Storm Sewer, Trenched, RCP, 18 in. Storm Sewer, Trenched, RCP, 42 in. Removal of Storm Sewer, Any Size Manhole, SW-301, 48 in. Remove Manhole or Intake Hydraulic Seeding, Turfgrass Hydraulic Seeding, Fertilizing - Type 4 Title: Date: Waukee Public Library Stormwater Improvements 4185870 Net Change by previously authorized Change Orders The Contract Sum prior to This Change Order was The Contract Sum will be decreased by this Change Order in the amount of The new Contract Sum including this Change Order will be Description THE CONTRACT IS CHANGED AS FOLLOWS: Change Order 9 adjusts final contract quantities to reflect actual item quantities used during construction. Item Value Adjustment CHANGE ORDER SUMMARY Quantity AdjustmentUnit Price Date: Approved By: City of Waukee Signature: Name: Title: Date: Recommended By: Shive-Hattery Signature: Name: Nathan T. Hardisty, PE Title: Project Manager Silt Fence, Removal of Device Inlet Protection Device, Removal Filter Sock, Removal Riprap, Class 'B' Riprap, Class 'E' Silt Fence, Removal of Sediment Silt Fence P:\Projects\DM\4185870\Construction\Library\CASupport\Change Orders\CO #9\Waukee Public Library Stormwater Improvements Change Order #9.xlsx 1 of 1