Loading...
HomeMy WebLinkAbout2022-10-17 I01F_12 NW 2nd St, NW Venture Dr to NW Douglas Pkwy_Change Order 4AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: October 17, 2022 AGENDA ITEM:Consideration of approval of Change Order No. 4 to Elder Corporation for the NW 2nd Street Construction – NW Venture Drive to NW Douglas Parkway project decreasing the contract price in the amount of $143,228.40 FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 4 is for the adjustments to final bid values to match actual as-built quantities installed in the field. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order decreases the contract price in the amount of $143,228.40. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 4 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1F12 8191 Birchwood Court, Suite L Johnston, IA 50131 Phone: (515) 254-1393 September 26, 2022 Sara Kappos, P.E. Assistant Public Works Director 805 University Avenue Waukee, IA 50263 RE: Change Order #4 NW 2nd Street Construction - NW Venture Drive to NW Douglas Parkway Dear Ms. Kappos: Attached please find a detailed Change Order for City Council appr oval on October 17, 2022. Change Description: • Adjustments to final bid values to match actual as-built quantities installed in the field. We have reviewed the submitted quotes from Elder Corporation and they appear to be in order with current industry pricing. If City Staff concurs with this pricing, we recommend the City of Waukee Decrease the contract price in the amount of $143,228.40 to complete the additional work associated with Change Order #4. If you have any questions, please contact me. Sincerely, Foth Infrastructure & Environment, LLC Andy Floy, P.E. Lead Civil Engineer Encl: Change Order #4 dated 9/26/2022 CHANGE ORDER 04 Distribution: Owner - Finance ____ Owner - Public Works ____ Engineer ____ Contractor ____ Contractor:Elder Corporation 5088 East University Ave. Des Moines, Iowa 50327 $4,940,000.00 December 7, 2020 2.2 CY $4.00 973.75 $3,895.00 2.5 CY $3.70 146.00 $540.20 2.7 SY $6.30 875.20 $5,513.76 CO 4.1 LF $76.00 -67.00 ($5,092.00) 4.8 LF $15.25 -12.00 ($183.00) 4.9 LF $34.00 -10.00 ($340.00) 4.11 EA $520.00 -1.00 ($520.00) 4.12 EA $1,500.00 -2.00 ($3,000.00) 4.15 LF $38.00 -92.00 ($3,496.00) 5.1 LF $35.00 268.60 $9,401.00 5.2 LF $40.00 1728.60 $69,144.00 5.3 LF $44.00 -378.60 ($16,658.40) 5.4 LF $61.50 -1874.70 ($115,294.05) 5.5 LBS $6.00 -401.00 ($2,406.00) 5.7 EA $2,300.00 -1.00 ($2,300.00) 6.13 EA $1,500.00 -3.00 ($4,500.00) 6.14 EA $1,300.00 1.00 $1,300.00 6.15 EA $1,500.00 -1.00 ($1,500.00) 7.7 TON $24.50 -139.79 ($3,424.86) 7.8 SY $74.00 -10.00 ($740.00) 8.3 EA $130.00 2.00 $260.00 8.5 EA $100.00 2.00 $200.00 8.9 CDAY $150.00 -9.00 ($1,350.00) 9.1 AC $730.00 1.15 $839.50 9.2 AC $600.00 -8.86 ($5,316.00) 9.3 AC $225.00 -30.00 ($6,750.00) THE CONTRACT IS CHANGED AS FOLLOWS: Final adjustment change order to match as-built quantities. Item Code NW 2nd Street Construction NW Venture Dr. to NW Douglas Parkway 4 19W020.01 Waukee Project File Number Description Value Adjustment September 26, 2022 Foth Project File Number Orig. Contract Amount & Date Date Change Order Number Project Title Department of Public Works 805 University Avenue Waukee, IA 50263 (515) 987-7920 Fax (515) 987-3979 Quantity AdjustmentUnit Price 2010-D-1000 UnitItem No. TOPSOIL, ON SITE 2010-E-1030 2010-I-1206 4010-A-1108 4040-A-1106 4040-A-1110 4040-C-1000 4040-C-1020 SPECIAL 5010-A-1008 5010-A-1012 5010-A-1108 5010-A-1112 5010-C-2000 5020-A-1012 6010-B-1512 6010-E-1000 6010-F-1000 7010-J-1000 7030-A-1020 8020-G-1000 8020-N-1000 SPECIAL 9010-A-1100 9010-A-1200 9010-A-1400 EXCAVATION, CLASS 10, WASTE SUBBASE, MODIFIED, 6 IN. SANITARY SEWER GRAVITY MAIN, TRENCHED, PVC, 8 IN. SUBDRAIN, PVC, 6 IN. SUBDRAIN, PVC, 10 IN. SUBDRAIN CLEANOUT, TYPE A-1 SUBDRAIN CLEANOUT, TYPE B FIELD TILE AND FITTINGS, PVC, UNSPECIFIED DIA. WATER MAIN, TRENCHED, PVC C900, DR18, 8 IN. WATER MAIN, TRENCHED, PVC C900, DR18, 12 IN. WATER MAIN, TRENCHED, RESTRAINED JOINT, PVC C900, DR18, 8 IN. WATER MAIN, TRENCHED, RESTRAINED JOINT, PVC C900, DR18, 12 IN. WATER MAIN FITTINGS VALVE, GATE, 12 IN. INTAKE, CIRCULAR AREA, SW-512, 24 IN. MANHOLE ADJUSTMENT, MINOR MANHOLE ADJUSTMENT, MAJOR GRANULAR SURFACING, CLASS-A CRUSHED STONE, 6 IN. REMOVAL OF SIDEWALK, SHARED USE PATH OR DRIVEWAY PAINTED SYMBOLS AND LEGENDS, DURABLE GROOVES CUT FOR SYMBOLS AND LEGENDS PORTABLE DYNAMIC MESSAGE SIGNS CONVENTIONAL SEEDING & FERTILIZING, TYPE 1 (PERMANENT LAWN MIXTURE) CONVENTIONAL SEEDING & FERTILIZING, TYPE 2 (PERMANENT COOL-SEASON MIX) CONVENTIONAL SEEDING, TYPE 4 (URBAN TEMPORARY EROSION CONTROL MIXTURE) CO#04-2022-0926-NW 2nd Street Construction.xls Change Order 1 Page 1 of 2 9.5 LF $2.20 -15689.00 ($34,515.80) 9.6 LF $0.10 -15689.00 ($1,568.90) 9.7 SY $1.30 -327.00 ($425.10) 9.8 TON $56.00 -8.73 ($488.88) 9.9 TON $50.00 -5.04 ($252.00) 9.10 LF $1.40 -8251.00 ($11,551.40) 9.11 LF $0.10 -1521.00 ($152.10) 9.12 LF $0.10 -8251.00 ($825.10) 9.13 AC $400.00 -30.00 ($12,000.00) 9.14 AC $2,300.00 -3.76 ($8,648.00) 9.15 EA $95.00 -1.00 ($95.00) 9.16 EA $15.00 42.00 $630.00 12.1 CY $87.50 80.00 $7,000.00 12.6 TON $71.50 20.15 $1,440.73 $0.00 ($143,228.40) $4,940,000.00 $177,280.08 $5,117,280.08 ($143,228.40) $4,974,051.68 0 Days Recommended By: Elder Corporation Signature: Name: Nick Tometich Title: Project Manager Date: Owner:City of Waukee □ ≤$500 Department Director X_______________________________________Date___________________ □ $501 to $2,500 City Administrator X_______________________________________Date___________________ □ Date___________________ □ >$2,501 City Council approved or ratified at Council meeting on Date___________________ Date: Name: Brad Deets Checked By: Prepared By: Date: The Contract Time will be increased by CHANGE ORDER SUMMARY Title: Lead Civil Engineer NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER Title: City Administrator The new Contract Sum including this Change Order will be Signature: Foth Infrastructure & Environment, LLC The Contract Sum prior to This Change Order was Name: Andy Floy, P.E. The Original Contract Sum was Signature: The Contract Sum will be decreased by this Change Order in the amount of Net Change by previously authorized Change Orders City of Waukee 9040-D-1012 9040-D-2000 9040-E-1000 9040-J-1400 9040-T-1000 9040-T-2000 2402-0425040 2507-8029000 9040-J-1500 9040-N-1000 9040-N-2000 9040-N-3000 9040-Q-1000 9040-Q-2000 FILTER SOCKS, 12 IN. FILTER SOCKS, REMOVAL TEMPORARY ROLLED EROSION CONTROL PRODUCTS (RECP), TYPE 3B RIP RAP, CLASS E EROSION STONE INLET PROTECTION DEVICE, MAINTENANCE FLOODED BACKFILL EROSION STONE SILT FENCE OR SILT FENCE DITCH CHECK SILT FENCE OR SILT FENCE DITCH CHECK, REMOVAL OF SEDIMENT SILT FENCE OR SILT FENCE DITCH CHECK, REMOVAL OF DEVICE EROSION CONTROL MULCHING, CONVENTIONAL EROSION CONTROL MULCHING, HYDROMULCHING INLET PROTECTION DEVICE, DROP-IN TYPE CO#04-2022-0926-NW 2nd Street Construction.xls Change Order 1 Page 2 of 2