HomeMy WebLinkAbout2022-11-21 I12B NW Douglas Pkwy Culvert, Pond Improvements_Pmt Est 7AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: November 21, 2022 AGENDA ITEM:Consideration of approval of Payment Estimate No. 7 to Elder Corporation for the NW Douglas Parkway Culvert and Pond Improvements Project, in the amount of $209,828.16. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Elder Corporation requested Payment Estimate No. 7 for the work completed on the NW Douglas Parkway Culvert Improvements Project, in the amount of $209,828.16. Veenstra & Kimm, Inc. has reviewed the payment estimate and recommends payment. The partial payment is for the pay period from October 1, 2022 to October 31, 2022. This pay estimate is for grading and pond dredging. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: $209,828.16 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve Payment Estimate No. 7 ATTACHMENTS: I. Payment Estimate No. 7 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I12B November 16, 2022 Rudy Koester Public Works Director City of Waukee 805 University Avenue Waukee, Iowa 50263 WAUKEE, IOWA NW DOUGLAS PARKWAY CULVERT AND POND IMPROVEMENTS CHANGE ORDER NO. 3 AND PARTIAL PAYMENT ESTIMATE NO. 7 Enclosed are three copies of Change Order No. 3 for the above-mentioned project under the contract between the City of Waukee and Elder Corporation. Change Order No. 3 is for additional dredging of the pond to maximize depth and reduce the likelihood of future dredging. Change Order No. 3 increases the contract price by a total of $144,850.00. Veenstra & Kimm, Inc. recommends approval of Change Order No. 3. Also enclosed are three copies of Partial Payment Estimate No. 7 for the period between October 1, 2022 and October 31, 2022. Partial Payment Estimate No. 7 is for grading and pond dredging. We have checked the estimate and recommend payment to Elder Corporation in the amount of $209,828.16 Please sign all three copies of Change Order No. 3 and Partial Payment Estimate No. 7 in the spaces provided. Return one signed copy of each to our office and one signed copy of each with payment to Elder Corporation. The remaining copy of each should be kept for your files. Rudy Koester November 16, 2022 Page 2 If you have any questions or comments, please contact us at 515-225-8000. VEENSTRA & KIMM, INC. Jordan Kappos JDK 292292 Enclosures cc: Becky Schuett, City of Waukee (via e-mail) Sara Kappos, City of Waukee (via e-mail) Beth Richardson, City of Waukee (via e-mail) Tracy Lovetinsky, City of Waukee (via e-mail) Elder Corporation (via e-mail) QUANTITY VALUE ESTIMATED AUTHORIZED COMPLETED COMPLETED ITEM NO.DESCRIPTION UNIT (ORIG. CONT.)(INCL. C.O.'S)TO DATE UNIT PRICE TO DATE 1 Mobilization LS 1.00 1.00 0.95 $179,341.71 $170,374.62 2 Traffic Control LS 1.00 1.00 0.95 $1,950.00 $1,852.50 3 Testing LS 1.00 1.00 0.95 $12,875.00 $12,231.25 4 Construction Staking LS 1.00 1.00 0.95 $12,000.00 $11,400.00 5 Construction Entrance EA 2.00 2.00 1.00 $3,900.00 $3,900.00 6 Clearing and Grubbing LS 1.00 1.00 1.00 $13,500.00 $13,500.00 7 Topsoil, Strip, Salvage and Respread CY 21,000.00 21,000.00 13,752.00 $5.00 $68,760.00 8 Special Backfill TONS 550.00 550.00 774.08 $60.75 $47,025.36 9 Compacting Backfill Adjacent to Bridges, Culverts or Structures CY 285.00 285.00 285.00 $16.00 $4,560.00 10 Flooded Backfill CY 295.00 295.00 295.00 $84.00 $24,780.00 11 Compaction with Moisture Control (Structures)CY 8,850.00 8,850.00 8,850.00 $2.50 $22,125.00 12 Excavation, Class 20 CY 8,400.00 8,400.00 8,400.00 $11.00 $92,400.00 13 Pond Dredging CY 16,879.00 16,879.00 16,879.00 $9.25 $156,130.75 14 Trail Grading CY 5,723.00 5,723.00 4,873.00 $3.00 $14,619.00 15 Forebay Grading CY 7,683.00 7,683.00 7,683.00 $6.75 $51,860.25 16 Roadway Grading CY 1,335.00 1,335.00 1,335.00 $3.00 $4,005.00 17 Dam Grading CY 3,039.00 3,039.00 3,039.00 $4.25 $12,915.75 18 Dam Drainage System LF 200.00 200.00 200.00 $60.50 $12,100.00 19 Dam Outlet for Pond LS 1.00 1.00 1.00 $146,900.00 $146,900.00 20 15" RCP Storm Sewer LF 180.00 180.00 180.00 $87.00 $15,660.00 21 18" RCP Storm Sewer LF 69.00 69.00 69.00 $90.50 $6,244.50 22 72" RCP Storm Sewer LF 145.00 145.00 145.00 $570.00 $82,650.00 23 15" Headwall and Flapgate EA 1.00 1.00 1.00 $12,900.00 $12,900.00 24 18" Headwall and Flapgate EA 1.00 1.00 1.00 $13,900.00 $13,900.00 25 18" Culvert Flared End Section EA 1.00 1.00 1.00 $2,800.00 $2,800.00 26 72" Culvert Flared End Section EA 1.00 1.00 1.00 $28,000.00 $28,000.00 27 SW-512 Intake EA 1.00 1.00 1.00 $2,600.00 $2,600.00 28 Structural Concrete (RCB Culvert)CY 932.60 932.60 932.60 $618.00 $576,346.80 29 Reinforcing Steel LB 131,036.00 131,036.00 131,036.00 $2.16 $283,037.76 30 Rip-Rap, Class E Revetment TONS 662.00 662.00 662.13 $63.50 $42,045.26 31 Gabion Baskets CY 120.00 120.00 120.00 $380.00 $45,600.00 32 Rolled Erosion Control Products, Type 3 SY 3,000.00 3,000.00 0.00 $1.70 $0.00 33 Filter Socks, 8"LF 4,000.00 4,000.00 2,734.00 $2.32 $6,342.88 34 Curtain Wall LF 200.00 200.00 200.00 $41.20 $8,240.00 35 Stormwater Pollution Prevention Plan (SWPPP) Preparation LS 1.00 1.00 1.00 $1,550.00 $1,550.00 36 Stormwater Pollution Prevention Plan (SWPPP) Management LS 1.00 1.00 0.95 $3,400.00 $3,230.00 37 Hydro-Seeding, Fertilize and Mulch, Type 1 AC 6.50 6.50 0.00 $4,789.50 $0.00 38 Hydro-Seeding, Fertilize and Mulch, Type 2 AC 15.00 15.00 0.00 $3,811.00 $0.00 39 City Borrow, Douglas Pkwy Site CY 17,000.00 17,000.00 16,886.00 $4.50 $75,987.00 40 Prairie Rose Plat 2 Borrow CY 22,000.00 22,000.00 19,092.00 $3.25 $62,049.00 41 Native Seed Preparation AC 7.50 7.50 0.00 $309.00 $0.00 42 Native Seeding AC 7.50 7.50 0.00 $1,854.00 $0.00 43 Ornamental Metal Railing on Culvert LF 178.50 178.50 0.00 $216.30 $0.00 44 Ornamental Metal Gate, 14' Wide LS 1.00 1.00 0.00 $1,905.50 $0.00 45 Ornamental Metal Railing on Footing LF 201.00 201.00 0.00 $227.63 $0.00 BID ITEMS PROJECT TITLE: NW Douglas Parkway Culvert and Pond Improvements Contractor: Elder Corportation Original Contract Amount: Pay Period: October 1, 2022 to October 31, 2022 ESTIMATE OF CONSTRUCTION COMPLETED PARTIAL PAYMENT NO. 7 $2,514,850.00 Date: November 16, 2022 292292 Page 1 of 3 QUANTITY VALUE ESTIMATED AUTHORIZED COMPLETED COMPLETED ITEM NO.DESCRIPTION UNIT (ORIG. CONT.)(INCL. C.O.'S)TO DATE UNIT PRICE TO DATE BID ITEMS 46 Temporary Stream Diversion EA 1.00 1.00 1.00 $65,600.00 $65,600.00 47 Underpass Lighting LS 1.00 1.00 1.00 $18,421.55 $18,421.55 48 Anti-Graffiti Coating SY 750.00 750.00 750.00 $23.69 $17,767.50 49 Form Liner Mockup LS 1.00 1.00 1.00 $4,635.00 $4,635.00 50 Form Liner SY 105.00 105.00 105.00 $185.40 $19,467.00 $2,266,513.73 CO1 Debris Removal Northside of Dam (per Load)EA 0.00 64.00 64.00 $1,075.00 $68,800.00 $68,800.00 CO2 Pond Drain Pipe and Gate Valve LS 0.00 1.00 0.10 $38,000.00 $3,800.00 $3,800.00 CO3 Additional Pond Dredging CY 0.00 14,485.00 14,485.00 $10.00 $144,850.00 $144,850.00 $2,483,963.73Total Value Completed - Bid Items Original Contract Value Completed Change Order No. 1 Value Completed Change Order No. 2 Value Completed Change Order No. 3 Value Completed 292292 Page 2 of 3 Total Completed $2,266,513.73 Total Completed $68,800.00 $3,800.00 $144,850.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $217,450.00 Total Completed $2,483,963.73 Total Completed $0.00 $2,483,963.73 $124,198.19 $2,359,765.54 $2,149,937.38 $209,828.16 $209,828.16 is recommended for approval for payment in accordance with the terms of the Contract. $2,514,850.00 $2,766,500.00 $209,828.16 $2,359,765.54 $406,734.46 89.8% Elder Corporation Signature Signature Signature Name Jordan Kappos Name Name Title Project Engineer Title Title Date Date Date $0.00 SUMMARY Bid Item Subtotal $2,514,850.00 Original Contract 1 Description/Notes Debris Removal Northside of Dam (per Load) Pond Drain Pipe and Gate Valve Additional Pond Dredging 2 3 6 7 $0.00 Total Approved Veenstra & Kimm, Inc. 9 10 Total Previously Approved City of Waukee Approved: CONTRACT SUMMARY $0.00 BALANCE ORIGINAL CONTRACT AMOUNT TOTAL PARTIAL PAYMENTS INCL THIS PAYMENT PERCENT COMPLETE TOTAL CONTRACT AMOUNT PLUS CHANGE ORDERS THIS PARTIAL PAYMENT $0.00 Amount Due This Request September 1, 2022 to September 30, 2022 $145,891.27 $413,697.68 $200,105.95 $0.00 $289,968.07 Recommended By:Contractor: Note: The amount 6 7 4 5 8 2 3 $490,372.76 $609,901.65 December 20, 2021 to April 30, 2022 Period $0.00 Total Completed Plus Materials Stored Total Change Orders APPROVED CHANGE ORDERS $0.00 $38,000.00 $144,850.00 $0.00 $0.00 4 5 Change Order No. 1 Total Approved $68,800.00 July 1, 2022 to July 27, 2022 July 28, 2022 to August 31, 2022 May 1, 2022 to May 31, 2022 June 1, 2022 to June 30, 2022 9 10 Partial Payment No. APPROVED PARTIAL PAYMENTS Revised Contract Price $251,650.00 8 $0.00 $0.00 Total Approved $2,766,500.00 Total Materials Stored Retainage (5%) Total Earned Less Retainage 292292 Page 3 of 3