HomeMy WebLinkAbout2023-01-16 H02B NW Sunrise Dr Culvert_Award ContractAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: January 16, 2023 AGENDA ITEM:Consideration of approval of resolution awarding contract [NW Sunrise Drive Culvert Project] FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: Bids were received on January 4, 2023, with eight contractors submitting bids. The bid package included alternatives for cast-in-place (CIP) or Precast culvert structure types. The engineer’s estimate for the project was $383,883.60 and $377,771.85 for the CIP and precast alternatives respectively. The apparent low bid was submitted by Progressive Structures, LLC of Luxemburg, Iowa for $363,898.48 (precast alternate was selected). The low bid is approximately 4% below the engineer’s estimate. Staff recommend awarding the project to Progressive Structures, LLC of Luxemburg, Iowa for the amount of $363,898.48. This project is part of the draft FY 2024-28 CIP with a total project budget of $450K. Project has a completion date of September 30, 2023. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Staff recommends awarding the project to Progressive Structures, LLC of Luxemburg, Iowa for the amount of $363,898.48. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Letter of Recommendation II. Bid Summary PREPARED BY:Rudy Koester REVIEWED BY:Rudy Koester RK H2B RESOLUTION 2023- RESOLUTION MAKING AWARD OF CONSTRUCTION CONTRACT FOR THE NW SUNRISE DRIVE CULVERT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1.That the following bid for the construction of certain public improvements described in general as the NW Sunrise Drive Culvert, described in the plans and specifications heretofore adopted by this Council on January 16, 2023, be and is hereby accepted, the same being the lowest responsive, responsible bid received for such work, as follows: Contractor:Progressive Structures, LLC,of Luxemburg, IA Amount of bid:$363,898.48 Portion of project:All construction work Section 2.That the Mayor and Clerk are hereby directed to execute the contract with the contractor for the construction of the public improvements, such contract not to be binding on the City until approved by this Council. PASSED AND APPROVED this 16th day of January, 2023. Mayor ATTEST: City Clerk 3737 Woodland Avenue, Suite 111 West Des Moines, IA 50266 Phone: 515.226.8859 Email: desmoines@whks.com Website: www.whks.com January 4, 2023 Honorable Mayor and City Council Members City of Waukee 230 West Hickman Road Waukee, Iowa 50263 RE: City of Waukee NW Sunrise Drive Culvert (STORM 24-01) Bid Tabulation and Recommendation of Award of Contract Dear Mayor and Council Members: The bid letting for the NW Sunrise Drive Culvert project was held on January 4, 2023. Bids were received from eight (8) bidders. The bid package included alternates for cast-in-place or precast culvert structure types. The low bidder selected the precast culvert structure type. A summary of the bids is as follows: Bidder Alternate Total Bid Amount Progressive Structures, LLC, Luxemburg, IA Precast $363,898.48 Nagel Construction, LLC, Allerton, IA Cast-in-Place $389,943.00 Gus Construction Co., Inc., Casey, IA Cast-in-Place $393,704.60 RW Excavating Solutions, LC, Prairie City, IA Precast $409,842.11 On Track Construction, LLC, Nevada, IA Precast $437,700.00 Shekar Engineering, PLC, Des Moines, IA Precast $453,700.49 Peterson Contractors, Inc., Reinbeck, IA Precast $475,301.43 Jenco Construction Inc., Des Moines, IA Cast-in-Place $481,138.80 The low bid was less than the Engineer’s Opinion of Probable Construction Cost of $377,771.85. Please find a detailed Bid Tabulation attached for your information. No errors were found compared to the apparent bids that change the low bid as read. We have reviewed the low bid and bid attachments and everything appears to be in order, including the experience of the low bidder. We recommend awarding the contract for this work to Progressive Structures, LLC, from Luxemburg, IA in the amount of $363,898.48. Appropriate contract documents will be prepared for signatures upon award of the contract by the City. Please let us know if you have any questions or need any additional information. We appreciate the opportunity to work with you and City staff on this project. City of Waukee January 4, 2023 Page 2 of 2 Sincerely, WHKS & CO. Casey V. Faber, P.E. Project Manager cc (w/enclosures): Becky Schuett, City of Waukee Rudy Koester, City of Waukee BID TABULATION (1 of 2) PROJECT: NW Sunrise Drive Culvert (STORM 24-01) LOCATION OF PROJECT: Waukee, IA WHKS PROJECT #: 9551 LETTING DATE-TIME-LOCATION: January 4, 2023 - 2:00 PM - City Hall - Waukee PREPARED BY: WHKS & Co. Unit Quantity Unit Price Ext. Price Unit Price Ext. Price Unit Price Ext. Price Unit Price Ext. Price Unit Price Ext. Price 1 EMBANKMENT-IN-PLACE CY 805 $12.00 $9,660.00 $0.00 $20.00 $16,100.00 $16.00 $12,880.00 $0.00 2 EXCAVATION, CLASS 10, CHANNEL CY 367 $10.00 $3,670.00 $0.00 $15.00 $5,505.00 $14.00 $5,138.00 $0.00 3 FLOODED BACKFILL CY 144 $40.00 $5,760.00 $0.00 $80.00 $11,520.00 $85.00 $12,240.00 $0.00 4 EXCAVATION, CLASS 20 CY 447 $22.50 $10,057.50 $0.00 $20.00 $8,940.00 $14.00 $6,258.00 $0.00 5 GRANULAR MATERIAL FOR BLANKET CY 122 $75.00 $9,150.00 $0.00 $60.00 $7,320.00 $90.00 $10,980.00 $0.00 6 STRUCTURAL CONCRETE (RCB CULVERT)CY 265 $700.00 $185,570.00 $0.00 $625.00 $165,687.50 $650.00 $172,315.00 $0.00 7 REINFORCING STEEL LB 36,662 $1.75 $64,158.50 $0.00 $1.85 $67,824.70 $1.90 $69,657.80 $0.00 8 ORNAMENTAL METAL RAILING LF 111 $200.00 $22,200.00 $0.00 $250.00 $27,750.00 $213.00 $23,643.00 $0.00 9 TEMPORARY STREAM DIVERSION EACH 1 $10,000.00 $10,000.00 $0.00 $10,000.00 $10,000.00 $14,500.00 $14,500.00 $0.00 10 ENGINEERING FABRIC SY 399 $3.50 $1,395.10 $0.00 $3.00 $1,195.80 $3.00 $1,195.80 $0.00 11 REVETMENT, CLASS E TON 340 $55.00 $18,700.00 $0.00 $65.00 $22,100.00 $78.00 $26,520.00 $0.00 12 MOBILIZATION LS 1 $35,000.00 $35,000.00 $0.00 $30,000.00 $30,000.00 $32,000.00 $32,000.00 $0.00 13 CONSTRUCTION SURVEY LS 1 $4,000.00 $4,000.00 $0.00 $7,000.00 $7,000.00 $2.00 $2.00 $0.00 14 SAFETY CLOSURE EACH 1.0 $1,000.00 $1,000.00 $0.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $0.00 15 STABILIZED CONSTRUCTION ENTRANCE, EC-303 LF 30.0 $75.00 $2,250.00 $0.00 $200.00 $6,000.00 $100.00 $3,000.00 $0.00 16 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF 375.00 $3.50 $1,312.50 $0.00 $4.00 $1,500.00 $5.00 $1,875.00 $0.00 Total Cast-in-Place Alternate $383,883.60 $0.00 $389,943.00 $393,704.60 $0.00 1 EMBANKMENT-IN-PLACE CY 515.0 $12.00 $6,180.00 $16.00 $8,240.00 $0.00 $0.00 $15.00 $7,725.00 2 EXCAVATION, CLASS 10, CHANNEL CY 378.0 $10.00 $3,780.00 $4.25 $1,606.50 $0.00 $0.00 $20.00 $7,560.00 3 FLOODED BACKFILL CY 133.0 $40.00 $5,320.00 $50.00 $6,650.00 $0.00 $0.00 $40.00 $5,320.00 4 EXCAVATION, CLASS 20 CY 570 $22.50 $12,825.00 $9.00 $5,130.00 $0.00 $0.00 $15.00 $8,550.00 5 GRANULAR MATERIAL FOR BLANKET CY 127 $75.00 $9,525.00 $74.50 $9,461.50 $0.00 $0.00 $60.00 $7,620.00 6 ORNAMENTAL METAL RAILING LF 93.2 $200.00 $18,640.00 $200.00 $18,640.00 $0.00 $0.00 $295.55 $27,545.26 7 PRECAST CONCRETE BOX CULVERT, 12 FT. X 5 FT.LF 162.0 $1,100.00 $178,200.00 $1,150.00 $186,300.00 $0.00 $0.00 $1,155.00 $187,110.00 8 PRECAST CONCRETE BOX CULVERT STRAIGHT END SECTION, 12 FT. X 5 FT. EACH 4.0 $17,500.00 $70,000.00 $19,250.00 $77,000.00 $0.00 $0.00 $15,596.00 $62,384.00 9 TEMPORARY STREAM DIVERSION EACH 1.0 $10,000.00 $10,000.00 $1,650.00 $1,650.00 $0.00 $0.00 $10,000.00 $10,000.00 10 ENGINEERING FABRIC SY 390.1 $3.50 $1,365.35 $4.75 $1,852.98 $0.00 $0.00 $3.50 $1,365.35 11 REVETMENT, CLASS E TON 336.3 $55.00 $18,496.50 $75.00 $25,222.50 $0.00 $0.00 $75.00 $25,222.50 12 MOBILIZATION LS 1.0 $35,000.00 $35,000.00 $17,000.00 $17,000.00 $0.00 $0.00 $50,000.00 $50,000.00 13 CONSTRUCTION SURVEY LS 1.0 $4,000.00 $4,000.00 $3,000.00 $3,000.00 $0.00 $0.00 $5,000.00 $5,000.00 14 SAFETY CLOSURE EACH 1.0 $1,000.00 $1,000.00 $500.00 $500.00 $0.00 $0.00 $1,000.00 $1,000.00 15 STABILIZED CONSTRUCTION ENTRANCE, EC-303 LF 30.00 $75.00 $2,250.00 $9.50 $285.00 $0.00 $0.00 $75.00 $2,250.00 16 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF 340 $3.50 $1,190.00 $4.00 $1,360.00 $0.00 $0.00 $3.50 $1,190.00 Total Precast Alternate $377,771.85 $363,898.48 $0.00 $0.00 $409,842.11 Total Project Construction Cost $377,771.85 $363,898.48 $389,943.00 $393,704.60 $409,842.11 I hereby certify that this is a true and correct tabulation of the bids received on January 4th, 2023 for the NW Sunrise Drive Culvert in Waukee, Iowa, and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. Casey V. Faber License Number: 22283 My license renewal date is December 31, 2023 Pages covered by this seal: All Pages RW Excavating Solutions, LCEngineer's Opinion Gus Construction Co., Inc. Note the total on the proposal form was incorrectly shown as $395,702.60. Precast Alternate Item Item No. Cast-in-Place Alternate Nagel Construction, LLCProgressive Structures, LLC L I CENSED PROFESSION A L E N G I N EER IOW A 22283 Faber Casey V. BID TABULATION (2 of 2) PROJECT: NW Sunrise Drive Culvert (STORM 24-01) LOCATION OF PROJECT: Waukee, IA WHKS PROJECT #: 9551 LETTING DATE-TIME-LOCATION: January 4, 2023 - 2:00 PM - City Hall - Waukee PREPARED BY: WHKS & Co. Unit Quantity Unit Price Ext. Price Unit Price Ext. Price Unit Price Ext. Price Unit Price Ext. Price Unit Price Ext. Price 1 EMBANKMENT-IN-PLACE CY 805 $12.00 $9,660.00 $0.00 $0.00 $0.00 $12.00 $9,660.00 2 EXCAVATION, CLASS 10, CHANNEL CY 367 $10.00 $3,670.00 $0.00 $0.00 $0.00 $12.00 $4,404.00 3 FLOODED BACKFILL CY 144 $40.00 $5,760.00 $0.00 $0.00 $0.00 $60.00 $8,640.00 4 EXCAVATION, CLASS 20 CY 447 $22.50 $10,057.50 $0.00 $0.00 $0.00 $20.00 $8,940.00 5 GRANULAR MATERIAL FOR BLANKET CY 122 $75.00 $9,150.00 $0.00 $0.00 $0.00 $60.00 $7,320.00 6 STRUCTURAL CONCRETE (RCB CULVERT)CY 265 $700.00 $185,570.00 $0.00 $0.00 $0.00 $800.00 $212,080.00 7 REINFORCING STEEL LB 36,662 $1.75 $64,158.50 $0.00 $0.00 $0.00 $2.00 $73,324.00 8 ORNAMENTAL METAL RAILING LF 111 $200.00 $22,200.00 $0.00 $0.00 $0.00 $100.00 $11,100.00 9 TEMPORARY STREAM DIVERSION EACH 1 $10,000.00 $10,000.00 $0.00 $0.00 $0.00 $5,000.00 $5,000.00 10 ENGINEERING FABRIC SY 399 $3.50 $1,395.10 $0.00 $0.00 $0.00 $3.00 $1,195.80 11 REVETMENT, CLASS E TON 340 $55.00 $18,700.00 $0.00 $0.00 $0.00 $80.00 $27,200.00 12 MOBILIZATION LS 1 $35,000.00 $35,000.00 $0.00 $0.00 $0.00 $100,000.00 $100,000.00 13 CONSTRUCTION SURVEY LS 1 $4,000.00 $4,000.00 $0.00 $0.00 $0.00 $7,000.00 $7,000.00 14 SAFETY CLOSURE EACH 1.0 $1,000.00 $1,000.00 $0.00 $0.00 $0.00 $400.00 $400.00 15 STABILIZED CONSTRUCTION ENTRANCE, EC-303 LF 30.0 $75.00 $2,250.00 $0.00 $0.00 $0.00 $100.00 $3,000.00 16 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF 375.00 $3.50 $1,312.50 $0.00 $0.00 $0.00 $5.00 $1,875.00 Total Cast-in-Place Alternate $383,883.60 $0.00 $0.00 $0.00 $481,138.80 1 EMBANKMENT-IN-PLACE CY 515.0 $12.00 $6,180.00 $20.00 $10,300.00 $15.00 $7,725.00 $14.00 $7,210.00 $0.00 2 EXCAVATION, CLASS 10, CHANNEL CY 378.0 $10.00 $3,780.00 $22.00 $8,316.00 $25.00 $9,450.00 $9.25 $3,496.50 $0.00 3 FLOODED BACKFILL CY 133.0 $40.00 $5,320.00 $86.00 $11,438.00 $44.84 $5,963.72 $53.25 $7,082.25 $0.00 4 EXCAVATION, CLASS 20 CY 570 $22.50 $12,825.00 $15.00 $8,550.00 $17.50 $9,975.00 $24.00 $13,680.00 $0.00 5 GRANULAR MATERIAL FOR BLANKET CY 127 $75.00 $9,525.00 $107.00 $13,589.00 $78.60 $9,982.20 $81.00 $10,287.00 $0.00 6 ORNAMENTAL METAL RAILING LF 93.2 $200.00 $18,640.00 $215.00 $20,038.00 $244.95 $22,829.34 $213.00 $19,851.60 $0.00 7 PRECAST CONCRETE BOX CULVERT, 12 FT. X 5 FT.LF 162.0 $1,100.00 $178,200.00 $1,318.00 $213,516.00 $1,329.93 $215,448.66 $1,615.00 $261,630.00 $0.00 8 PRECAST CONCRETE BOX CULVERT STRAIGHT END SECTION, 12 FT. X 5 FT. EACH 4.0 $17,500.00 $70,000.00 $19,730.00 $78,920.00 $18,611.78 $74,447.12 $17,250.00 $69,000.00 $0.00 9 TEMPORARY STREAM DIVERSION EACH 1.0 $10,000.00 $10,000.00 $4,870.00 $4,870.00 $25,426.50 $25,426.50 $6,000.00 $6,000.00 $0.00 10 ENGINEERING FABRIC SY 390.1 $3.50 $1,365.35 $1.30 $507.13 $4.50 $1,755.45 $4.75 $1,852.98 $0.00 11 REVETMENT, CLASS E TON 336.3 $55.00 $18,496.50 $79.00 $26,567.70 $85.00 $28,585.50 $65.00 $21,859.50 $0.00 12 MOBILIZATION LS 1.0 $35,000.00 $35,000.00 $31,931.17 $31,931.17 $32,550.00 $32,550.00 $40,350.00 $40,350.00 $0.00 13 CONSTRUCTION SURVEY LS 1.0 $4,000.00 $4,000.00 $3,030.00 $3,030.00 $5,175.00 $5,175.00 $3,500.00 $3,500.00 $0.00 14 SAFETY CLOSURE EACH 1.0 $1,000.00 $1,000.00 $707.00 $707.00 $805.00 $805.00 $1,500.00 $1,500.00 $0.00 15 STABILIZED CONSTRUCTION ENTRANCE, EC-303 LF 30.00 $75.00 $2,250.00 $124.00 $3,720.00 $65.00 $1,950.00 $60.00 $1,800.00 $0.00 16 PERIMETER AND SLOPE SEDIMENT CONTROL DEVICE, 12 IN. DIA. LF 340 $3.50 $1,190.00 $5.00 $1,700.00 $4.80 $1,632.00 $18.24 $6,201.60 $0.00 Total Precast Alternate $377,771.85 $437,700.00 $453,700.49 $475,301.43 $0.00 Total Project Construction Cost $377,771.85 $437,700.00 $453,700.49 $475,301.43 $481,138.80 Jenco Construction Inc. Cast-in-Place Alternate Precast Alternate Note incorrect extended price of $215,448.70 for item 7 and total of $453,700.53. Note incorrect extended price of $111,000.00 for item 8 but the correct total. Item No.Item Engineer's Opinion On Track Construction, LLC Shekar Engineering, PLC Peterson Contractors, Inc.