HomeMy WebLinkAbout2023-02-06 J01E_08 MEC Overhead to Underground Proposal_N Warrior Ln, Douglas Pkwy Traffic SignalsAGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: February 6, 2023
AGENDA ITEM:Consideration of approval of a resolution approving Overhead to
Underground Proposal from MidAmerican Energy Company [Douglas
Parkway & N Warrior Lane Traffic Signal Improvements, WMIS 2966124]
FORMAT:Resolution
SYNOPSIS INCLUDING PRO & CON: MidAmerican Energy Co. (MEC) proposes to relocate
their overhead electrical facilities to underground facilities along N Warrior Lane to accommodate the
Douglas Parkway and N Warrior Lane Traffic Signal Improvements project currently underway.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: MEC’s relocation expense is
estimated to be $74,867.53. Staff have indicated to MEC staff the City’s intent to utilize the local
government compliance clause to compel MEC to recover the actual costs for this relocation effort
from their customers within the corporate boundaries of Waukee. MEC will assign a monthly per
kilowatt-hour (kWh) fee applied to their customer’s electric utility bill for a one-year duration. The
estimated fee is $0.00037/kWh. For the average residential customer, the monthly fee is estimated to
be $0.31/month and for the average commercial customer, this fee is estimated to be $2.15/month.
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve the resolution.
ATTACHMENTS: I. Proposed Resolution
II. MidAmerican Proposal and Design
PREPARED BY: Rudy Koester
REVIEWED BY: Rudy Koester RK
PUBLIC NOTICE INFORMATION –
NAME OF PUBLICATION:
DATE OF PUBLICATION:
J1E8
THE CITY OF WAUKEE, IOWA
RESOLUTION 2023-
APPROVING MIDAMERICAN ENERGY COMPANY PROPOSAL FOR OVERHEAD
TO UNDERGROUND PROPOSAL [DOUGLAS PARKWAY AND N WARRIOR LANE
TRAFFIC SIGNAL IMPROVEMENTS, WMIS 2966124]
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA
WHEREAS, the City of Waukee is a duly organized municipality within Dallas County; AND,
WHEREAS, the City of Waukee requested a proposal from MidAmerican Energy Company to
relocate the overhead electric system along N Warrior Lane at its intersection with Douglas
Parkway; AND,
WHEREAS the removal and/or relocation of overhead electric facilities would improve safety,
image, economic development and the construction of the traffic signal poles; AND,
NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council that the City of
Waukee hereby approves the MidAmerican Energy Company Overhead to Underground
Proposal [Douglas Parkway and N Warrior Lane Traffic Signal Improvements, WMIS 2966124].
Passed by the City Council of the City of Waukee, Iowa, and approved the 6th day of February,
2023.
____________________________
Courtney Clarke, Mayor
Attest:
___________________________________
Rebecca D. Schuett, City Clerk
RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN
Anna Bergman Pierce
R. Charles Bottenberg
Chris Crone
Larry R. Lyon
Ben Sinclair
1/20/2023
City of Waukee
Attention: Rudy Koester, P.E.
rkoester@waukee.org
Reference: Overhead to underground request and new source for traffic signal at N.
Warrior Lane and Douglas Parkway in Waukee, IA. WMIS: 2966124
Dear City of Waukee:
The enclosed drawing shows MidAmerican Energy Company’s proposal to convert the
existing three-phase overhead to underground and add a source for a new traffic signal
cabinet at the intersection of N. Warrior Ln. and Douglas Pkwy. in Waukee, IA. The
applicant charge for this work is $74,867.53 and the credit for a similarly situated cabinet
located at 15 E. Hickman Rd. in Waukee for $2,047.15 has been deducted from the total
cost of construction. This proposal is valid for 90 days and if MidAmerican Energy
Company construction has not commenced within 12 months it may be voided.
It is MidAmerican Energy Company’s responsibility to see that the various utility
companies’ facilities are located before our construction. This includes electric, natural
gas, telephone, cable television, and generally water. It is the owner’s responsibility to
see that any privately owned systems such as water systems, irrigation systems, drain
pipes, septic lines and underground wiring are located before MidAmerican Energy
Company’s construction. MidAmerican Energy Company assumes no liability for private
facilities that are not located.
It will be the responsibility of the City to provide the necessary staking of ROW and the
signal footing locations to help avoid installation within conflict of the traffic signals and
equipment.
If this proposal is satisfactory please sign and return one (1) copy to me. MidAmerican
Energy Company will release the work upon receipt of the signed proposal and site
readiness. An invoice will be sent to the City after install. Please call me at (515) 252-
6742 if you have any questions.
Sincerely,
MidAmerican Energy Company
Scot Enger
Customer Project Coordinator
Accepted By:
Date: Date Service Required: 02/06/2023 05/01/2023
NE BADGER LN
DOUGLAS PKWY
61
0
62
0
175 185 205
705
700
66
0
65
0
64
0
63
0
635
645
655
665
710
720
730
740
735
725
715
UG COC
EJ202
EJ202
EJ202
EJ202
EJ202
EJ
2
0
2
C
B
B
B
750 AL PARA
750 AL PARA
1/0 AL JACKETED
1/0 AL JACKETED
336 ACSR 26/7 (4/0 ACSR 6/1)
33
6
A
C
S
R
1
8
/
1
(
4
/
0
A
C
S
R
6
/
1
)
CA
T
V
0015843557
0015843558
0015843578
00164067180016406721
00164067470016406752
0016406910
0016407166
0016475552
0017453960
0017454014
0017811764
01PE1598
0020436207
0016233351
0016233359
0017153326
0015844567
0016406790
0017153330
0017364405
0017455508
45-3 WOOD
0017364403
01G00515
01G00648
01G00798
01S04944
900
900
900
900
<
<
235355
277422
277423
311960
333185
50
50
50 50
50
50
50
A PHS 25KVA
120/240
1 - 6.00 - CONTINUOUS POLYETHELYNE
1 - 4.00 - PVC
NE BADGER LN
DOUGLAS PKWY
61
0
62
0
185
705
700
66
0
65
0
64
0
63
0
635
645
655
665
710
720
730
740
735
725
715
UG COC
EJ202
EJ202
EJ202
EJ202
EJ
2
0
2
C
B
B
B
1/0 AL JACKETED
1/0 AL JACKETED
336 ACSR 26/7 (4/0 ACSR 6/1)
33
6
A
C
S
R
1
8
/
1
(
4
/
0
A
C
S
R
6
/
1
)
CA
T
V
0015843557
0015843558
0015843578
00164067180016406721
00164067470016406752
0016406910
0016407166
0016475552
0017453960
0017454014
0017811764
0016233351
0016233359
0017153326
0015844567
0016406790
0017153330
0017364405
0017455508
0017364403
<
<
235355
277422
277423
311960
333185
50
50
50 50
50
50
50
1 - 6.00 - CONTINUOUS POLYETHELYNE
1 - 4.00 - PVC
NE BADGER LN
DOUGLAS PKWY
61
0
62
0
185
705
700
66
0
65
0
64
0
63
0
635
645
655
665
710
720
730
740
735
725
715
UG COC
EJ202
EJ202
EJ202
EJ202
EJ202
EJ202
EJ
2
0
2
C
B
B
B
750 AL PARA
750 AL PARA
1/0 AL JACKETED
1/0 AL JACKETED
336 ACSR 26/7 (4/0 ACSR 6/1)
33
6
A
C
S
R
1
8
/
1
(
4
/
0
A
C
S
R
6
/
1
)
CA
T
V
0015843557
0015843558
0015843578
00164067180016406721
00164067470016406752
0016406910
0016407166
0016475552
0017453960
0017454014
0017811764
01PE1598
0020436207
0016233351
0016233359
0017153326
34.5-NULL STEEL
34-NULL STEEL
34-NULL STEEL
34-NULL STEEL
34-NULL STEEL
34-NULL STEEL
34-NULL STEEL
0015844567
0016406790
0017153330
0017364405
0017455508
45-3 WOOD
0017364403
R9987
01G00515
01G00648
01G00798
01S04944
600
900
900
900
900
<
<
<
ST155
50
50
50 50
50
50
50
A PHS 25KVA
120/240
140T
1 - 6.00 - CONTINUOUS POLYETHELYNE
1 - 4.00 - PVC
<
<
1
2
3
4
5 6
7
8
9