HomeMy WebLinkAbout2023-02-06 J01G_01 City Hall Security Project_Change Order 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: February 6, 2023 AGENDA ITEM:Consideration of approval of Change Order No. 1 to Bergstrom Construction, Inc., for the Waukee City Hall Security Upgrades Project, increasing the contract in the amount of $3,871.00 FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 1 relates to additional costs associated with adding electrical for two screen locations within the lobby area as well as repurpose and reinstallation of existing LED light fixtures throughout the building that were removed in the lobby area. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $3,871.00 COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 1 PREPARED BY:Brad Deets, City Administrator REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: J1G1 Bergstrom Construction Inc. *Estimate* 1719 Hull Ave, Des Moines, IA 50313, Ph:(515)266-5146, Fx:(515)266-7072 Project:WAUKEE CITY HALL SECURITY UPGRADES Est. #:1 Location:230 HICKMAN ROAD, WAUKEE Date:12/17/22 Contact:OPN Schedule:5/31/23 Summary By:Tom Gorgas Print Date:12/17/22 CR#1 TV power and data Material Labor Description Qunty Unit Unit/P Mat/Cst Unit/P Lab/cst A:GENERAL CONDITIONS 1.TRUCK TIME 0.5 HRS 25 $13 58.9 $29 2.CLEANUP 0.5 HRS 3 $2 58.9 $29 3.DUMP FEE NONE 4.LAYOUT 0.5 HRS 3 $2 58.9 $29 5.SMALL TOOLS/LADDERS 1 JOB 16 $16 6.SUPERVISION 1 HRS 3 $3 58.9 $59 7.NAILS, SCREWS AND MISC 1 JOB 12 $12 B: DEMOLITION/FINISHES 1. REMOVE GYP BOARD 32 SF 0.1 $3 1 $32 2. FIRE TREATED PLYWOOD 32 SF 2.5 $80 2.5 $80 4. PATCH GYP BOARD 32 SF 1 $32 1 $32 5. TAPE 32 SF 0.2 $6 1 $32 material cost $168 tax 7%EXEMPT material cost w/tax $168 $168 labor cost $323 labor burden $129 $453 material cost with tax $168 total project cost $621 contractors fee 10%$62 total with contractors fee $683 Performance sub costs $1,638 $1,638 Bond 1.5% $36 contractors fee 5%$82 total with contractors fee $1,720 Total With ___________________________________________________ Bond $2,439 Total Estimate $2,403 ___________________________________________________ # Of Man Hours @ $58.9 5.49 # Of Days For 1 Man 0.69 # Of Weeks For 1 Man 0.14 # Of Months For 1 Man 0.03 Subcontractors/Major Suppliers Description Total Cost ELECTRICAL BRETON $1,638 Bergstrom Construction Inc. *Estimate* 1719 Hull Ave, Des Moines, IA 50313, Ph:(515)266-5146, Fx:(515)266-7072 Project:WAUKEE CITY HALL SECURITY UPGRADES Est. #:1 Location:230 HICKMAN ROAD, WAUKEE Date:1/15/23 Contact:OPN Schedule:5/31/23 Summary By:Tom Gorgas Print Date:01/15/23 CR#3 RELOCATE SALVAGED LIGHTS Material Labor Description Qunty Unit Unit/P Mat/Cst Unit/P Lab/cst A:GENERAL CONDITIONS 1.TRUCK TIME NONE 2.CLEANUP 0.25 HRS 3 $1 58.9 $15 3.DUMP FEE NONE 4.LAYOUT 0.25 HRS 3 $1 58.9 $15 5.SMALL TOOLS/LADDERS 1 JOB 5 $5 6.SUPERVISION 0.5 HRS 3 $2 58.9 $29 7.NAILS, SCREWS AND MISC 1 JOB 5 $5 material cost $13 tax 7%EXEMPT material cost w/tax $13 $13 labor cost $59 labor burden $24 $82 material cost with tax $13 total project cost $95 contractors fee 10%$10 total with contractors fee $105 Performance sub costs $1,244 $1,244 Bond 1.5% $21 contractors fee 5%$62 total with contractors fee $1,306 Total With ___________________________________________________ Bond $1,432 Total Estimate $1,411 ___________________________________________________ # Of Man Hours @ $58.9 1.00 # Of Days For 1 Man 0.13 # Of Weeks For 1 Man 0.03 # Of Months For 1 Man 0.01 Subcontractors/Major Suppliers Description Total Cost ELECTRICAL BRETON $1,244 JOB NAME JOB DESCRIPTION LABOR HOURS HOURS Site Work Voice / Data Feeder C & W Fire Alarm Branch C & W Sound System Mechanical Connections Gen Set Distribution Equipment U.P.S. Fixtures Other 12.60 STRAIGHT 12.60 X 65.21 821.65 OVERTIME X 93.65 0.00 TOTAL 12.60 SUBSIDY NET LABOR 821.65 EQUIPMENT/MATERIAL Site 0.00 Feeder C & W Branch C & W Mechanical Connections Distribution Equipment Fixtures Voice / Data Fire Alarm Sound System Gen Set U.P.S. Other Other EQUIPMENT/MATERIAL SUBTOTAL 0.00 DIRECT JOB COSTS Temporary Electrical Expenses Trans. / Small Tool (%L) 0.02 16.43 Material Tax (7% M & E) 0.00 Permits & Fees 0.00 Equipment Rental (%L) 0.00 0.00 OSHA (%L) 0.01 8.22 Estimating 125.00 Interest Warranty (%L) 0.06 49.30 Other/Office 0.02 16.43 DIRECT JOB COSTS SUBTOTAL 215.38 SUBCONTRACTS Painting G.C. Work (including concrete) Digging Hoist & Rig Special Insurance Roofing Drafting Other SUBCONTRACTS SUBTOTAL 0.00 TOTAL JOB COSTS 1,037.03 QUOTED PRICE 1,244.00 MARKUP 20.00 %207.41 BOND 0.00 % 0.00 SELL 1,244.43 DATE ESTIMATED BY ELECTRICAL JOB ESTIMATE SUMMARY CR#003 1/13/2023 Joe Breton 255 S. Hickory Blvd, Pleasant Hill, Iowa 50327 Ph. 515-447-6336 Fax 515-262-5703 Breton Enterprises L.L.C dba: Breton Electrical Services 1/13/2023 Bergstrom Construction Inc. 1719 Hull Avenue. Des Moines, IA 50317 Attn: Tom Gorgas Subj: Waukee City Hall Security Upgrades Change Request #003 (Relocation of Previously Removed Fixtures) Dear Tom, Per the attached we propose to complete the following scope of work.  Reinstall the previously removed fixtures and install them at the locations specified by the owner.  Remove and dispose of the fixtures that are currently install at the location specified. Our price for this work is: One Thousand Two-Hundred Forty-Four and 00/100 ($1,244.00) Dollars. Respectfully, Russell Joe Breton Russell (Joe) Breton President/Managing Member