HomeMy WebLinkAbout2023-02-06 Resolution 2023-072_Set Public Hearing Date, Stratford Crossing ParkRESOLUTION 2023-072
RESOLUTION ORDERING CONSTRUCTION OF THE
S"IRATFORD CROSSING PARK, AND FIXING A DATE FOR
I IEARING TIIEREON AND TAKING OF BIDS T111 REFOR
WHEREAS, it is deemed advisable and necessary to construct certain public improvements
described in general as the Stratford Crossing Park; and
WHEREAS, the City has caused to be prepared plans, specifications and form of contract,
together with estimate of cost, which are now on file in the office of the City Clerk for public
inspection, for the construction of the public improvements; and
WHEREAS, the plans, specifications and form of contract are deemed suitable for the
making of the public improvements; and
WHEREAS, before the plans, specifications, form of contract and estimate of cost may be
adopted, and a contract for the construction of the public improvements is entered into, it is
necessary, pursuant to Chapter 26, Code of lowa, to hold a public hearing and to advertise for bids:
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
WAUKEE, STATE OF IOWA:
Section 1. That it is hereby determined that it is necessary and advisable to construct certain
public improvements described in general as the Stratford Crossing Park, in the manner set forth
in the plans and specifications and form of contract, above referred to, the cost thereof to be paid
in accordance with the provisions as set out in the posted Notice to Bidders and published Notice
of Public Hearing, the public improvements being more generally described as follows:
Construction of a premanufactured kit -built restroom building, including but not
limited to: full restroom, mechanical room, electrical, water, and sanitary
connections, final electrical and plumbing trim out, and all associatedfinish work
(sealing, caulking, signage, etc).
Site work includes: PCC sidewalk/trail w/ detectable warning plates where shown,
PCC drive and parking with integral curbs, pavement striping, PCC subbase and
integral curbs, PCC beam curbs, PCC basketball court w/ striping, PCC footings,
foundations and stoops as indicated on plans, along with associated earthwork and
aggregate subbase work, parking signs and posts; installation of open-air shelters,
and column wraps on all shade structure and restroom building posts; complete
basketball hoop system; timber bench; landscaping includes evergreen trees,
deciduous overstory and understory trees, shrubs, sod, seeded lawn, and native
seed areas and planting soils; bioretention basin with engineered soil and
aggregates, sediment and erosion control measures shall be installed and
maintained as shown on plans; site utilities include storm sewer, sanitary sewer,
water, and electrical, including connection to existing transformer; electrical work
also includes drive/parking lot light poles and luminaires, and restroom and shade
structure lighting.
Playground equipment, poured in place rubber and playground mulch surfacing
procurement and install is by Owner's contractor — not in contract. Site
furnishings, with the exception of the timber bench, are by owner.
Section 2. That the amount of the bid security to accompany each bid shall be in an amount
which shall conform to the provisions of the notice to bidders approved as a part of the
specifications.
BE IT FURTHER RESOLVED, that the City Clerk be and is hereby directed to post a
notice to bidders once in a relevant contractor plan room service with statewide circulation and a
relevant construction lead generating service with statewide circulation and on an internet site
sponsored by either the City or a statewide association that represents the City. Posting shall be
not less than thirteen clear days nor more than forty-five days prior to March 2, 2023, which is
hereby fixed as the date for receiving bids. The bids are to be filed prior to 2:00 P.M., on such
date.
The City Council hereby delegates to the City Administrator or his designee the duty of
receiving, opening and tabulating bids for construction of the Project. Bids shall be received and
opened as provided in the public notice and the results of the bids shall be considered at the meeting
of this Council on March 20, 2023, at 5:30 P.M.
BE IT FURTHER RESOLVED, that the City Clerk be and is hereby directed to publish
notice of hearing once in a legal newspaper, printed wholly in the English language, published at
least once weekly and having general circulation in this City. Publication shall be not less than
four clear days nor more than twenty days prior to the date hereinafter fixed as the date for a public
hearing on the plans, specifications, form of contract and estimate of costs for the project, the
hearing to be at 5:30 P.M. on March 20, 2023.
PASSED AND APPROVED this 6th day of February, 2023.
ATTEST:[411A" /-
City Clerk
RESULTS OF VOTE:
AYE
Anna Bergman Pierce
X
R. Charles Bottenberg
X
Chris Crone
X
Larry R. Lyon
X
Ben Sinclair
0
Mayor
NAY ABSENT
KI
ABSTAIN