Loading...
HomeMy WebLinkAbout2023-03-06 J03 Waukee HS Baseball Softball_Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: March 6, 2023 AGENDA ITEM: Consideration of approval of a resolution approving a site plan for Waukee High School Baseball & Softball (975 S Warrior Lane) FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: The Waukee Community School District requests approval of a site plan to authorize the improvements proposed to the existing Waukee High School baseball and softball fields. The improvements include removal of two existing buildings to the north of the fields and constructing a new concession/batting facility building in their place. The size of the proposed building is 7,500 square feet in area. The project also includes the construction of a small storage building at the east side of the site that measures 642 square feet in area. Other improvements include resurfacing the fields with turf, replacing portions of sidewalks, constructing ADA parking stalls, and replacing portions of fencing. The elevations of the buildings are proposed to be constructed mainly of brick and metal wall panel. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this project at the February 28, 2023, Commission Meeting and recommended approval subject to remaining staff comments: Approval of a Site Plan for Waukee High School Baseball and Softball (975 S Warrior Lane) Community Development Director, Andy Kass, introduced the request for approval of a site plan related to improvements to the existing Waukee High School Baseball & Softball Stadium as submitted by the applicant, Waukee Community School District. The subject property is generally located north of Park Road and east of Warrior Lane, containing approximately 8.32 acres. Mr. Kass advised that the project would include the removal of the two buildings to the north of the fields and constructing a new concession/batting facility approximately 7,500 square feet in size which will be served with public utilities. A storage shed approximately 642 square feet in size is proposed on the east side of the site. Other improvements include resurfacing the fields with turf, sidewalk replacement, ADA parking stall additions, and updating portions of the fencing. Staff recommends approval subject to any remaining staff comments. • Commissioner Tessau questioned if the fence will be replaced at the same height. Mr. Kass advised that the updates would replace the current 6 foot fence with an 8 foot fence along Warrior Lane similar to Triumph Park. • Commissioner Broderick questioned if there were any concerns with the visibility in the event Warrior Lane is widened. Mr. Kass advised that the fencing portions do not interfere with the vision triangle at the corner or entry points even in the event of widening the road. J3 Commissioner Tessau moved to approve the site plan for Waukee High School baseball and Softball (975 S Warrior Lane), subject to any remaining comments. The motion was seconded by Commissioner Beenken. Ayes: Koelker, Beenken, Broderick, Tessau, and Lohse. Nays: none. Motion Carried. STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan subject to remaining staff comments. RECOMMENDATION: Approve the resolution subject to remaining staff comments. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan & Elevations PREPARED BY: Melissa DeBoer, Planning Coordinator REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 2023- APPROVING THE SITE PLAN FOR WAUKEE HIGH SCHOOL BASEBALL & SOFTBALL (975 S WARRIOR LANE) IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Waukee High School Baseball & Softball, subject to remaining staff comments on February 28, 2023; AND, WHEREAS, the Site Plan for Waukee High School Baseball & Softball is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Waukee High School Baseball & Softball is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 6th day of March, 2023 that the Site Plan for Waukee High School Baseball & Softball is approved subject to remaining staff comments. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman Pierce R. Charles Bottenberg Chris Crone Larry R. Lyon Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Waukee High School Baseball & Softball – Site Plan PREPARED BY: Melissa DeBoer, AICP – Planning Coordinator REPORT DATE: February 24, 2023 MEETING DATE: February 28, 2023 GENERAL INFORMATION Owner / Applicant: Waukee Community School District Engineer: Joel Jackson, P.E., Bishop Engineering Request: The applicant is requesting approval of a site plan for improvements to the existing Waukee High School Baseball & Softball Stadium. Location and Size: Property is generally located north of Park Road and east of Warrior Lane, containing approximately 8.32 acres. Property Address: 975 S Warrior Lane AREA MAP ABOVE: Aerial of subject property (outlined in RED) in relation to the surrounding area. February 24, 2023 2 of 2 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Existing Waukee High School Baseball and Softball Fields Institutional A-1 (Agricultural) North Waukee Middle School Institutional A-1 (Agricultural) South City Park Park COS (Conservation and Open Space District) East Waukee High School Football Stadium Institutional A-1 (Agricultural) West Single-Family Residential Single Family Residential R-1 (Single-Family Residential District) HISTORY The Waukee Community School District owns the property. The school district is asking for site plan approval to make several improvements to their existing baseball and softball fields. PROJECT DESCRIPTION The project includes improvements to the existing baseball and softball fields, including removal of the two buildings to the north of the fields and constructing a new concession/batting facility building along the north side of the site that is about 7,500 sq ft in area. The project also includes the construction of a 642 sq ft storage building at the east side of the site. Other improvements include resurfacing the fields with turf, replacing portions of sidewalks, constructing ADA parking stalls, and replacing portions of fencing. ACCESS AND PARKING There are no proposed changes to access. The site plan includes the addition of 5 ADA parking stalls. All other parking will remain the same. UTILITIES All public utilities are provided to the site. Utilities will be brought in to serve the new concession building. ELEVATIONS Elevations of the proposed buildings will be constructed of brick and metal wall panel. STAFF RECOMMENDATION The proposed site plan is in general conformance with the Site Plan Ordinance and Comprehensive Plan. Staff recommends approval subject to remaining staff comments. SITE WAUKEE HIGH SCHOOL BASEBALL & SOFTBALL SITE PLAN IOWAONE CALL 1-800-292-8989 www.iowaonecall.com 811 Know what's below. Call before you dig. VICINITY MAP NOT TO SCALE COPYRIGHT 2023 BISHOP ENGINEERING. THIS DOCUMENT AND THE INFORMATION CONTAINED MAY NOT BE REPRODUCED OR EXCERPTED WITHOUT THE EXPRESS WRITTEN PERMISSION OF BISHOP ENGINEERING. UNAUTHORIZED COPYING OR DISCLOSURE OF CONSTRUCTION USE ARE PROHIBITED BY COPYRIGHT LAW. LEGEND: SAN SANITARY SEWER ST STORM SEWER W WATER LINE G GAS LINE U/E UNDERGROUND ELECTRIC O/E OVERHEAD ELECTRIC TELE TELEPHONE LINE F/O FIBER OPTIC CATV CABLE TV STORM MANHOLE CURB INTAKE SURFACE INTAKE FLARED END SECTION SANITARY MANHOLE CLEANOUT FIRE HYDRANT SPRINKLER IRRIGATION CONTROL VALVE WATER MANHOLE WELL WATER VALVE WATER SHUT OFF YARD HYDRANT ELECTRIC MANHOLE ELECTRIC METER ELECTRIC RISER ELECTRIC VAULT POWER POLE TRANSFORMER POLE LIGHT POLE ELECTRIC JUNCTION BOX ELECTRIC PANEL TRANSFORMER GROUND LIGHT GUY WIRE ELECTRIC HANDHOLE GAS METER GAS VALVE AIR CONDITIONING UNIT TELEPHONE RISER TELEPHONE VAULT TELEPHONE MANHOLE TRAFFIC SIGNAL MANHOLE FIBER OPTIC MANHOLE FIBER OPTIC RISER FIBER OPTIC VAULT CABLE TV RISER SIGN BOLLARD 7 DENOTES NUMBER OF PARKING STALLS PROPERTY CORNER - FOUND AS NOTED PROPERTY CORNER- PLACED AS NOTED SECTION CORNER - FOUND AS NOTED D S CO H Y D I CV W W SO YA DR E EM E ELEC EJ EP GM GV A/C T TEL T TS FO F/O TV W WV DRAWING TITLE: REVISIONS: DRAWING NO.: PROJECT NO.: DATE: 26 0 0 w e s t o w n p a r k w a y , s u i t e 3 4 0 , w e s t d e s m o i n e s , i o w a 5 0 2 6 6 p 5 1 5 . 2 2 3 . 5 1 0 0 f 5 1 5 . 2 2 3 . 7 2 2 6 w w w . f r k - a e . c o m fr k a r c h i t e c t s + e n g i n e e r s 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 WA U K E E H I G H S C H O O L BA S E B A L L / S O F T B A L L S T A D I U M WA U K E E C O M M U N I T Y S C H O O L D I S T R I C T WA U K E E , I O W A 1018D07 FEBRUARY 2023 12/27/22 - 1ST CITY SET 01/24/23 - 2ND CITY SET 02/07/23 - 3RD CITY SET L: \ L A N D P R O J E C T S 2 0 2 2 \ 2 2 0 4 1 6 W A U K E E H S B A S E B A L L - S O F T B A L L S Y N T H E T I C T U R F P R O J E C T \ D W G \ C 0 C O V E R . D W G 2/ 2 0 / 2 0 2 3 4 : 0 7 : 5 5 P M UTILITY NOTE: THE LOCATION OF THE UTILITIES INDICATED ON THE PLANS HAVE BEEN TAKEN FROM THE FIELD SURVEY, EXISTING PUBLIC RECORDS, AND PLANS PROVIDED BY OTHERS. SURFACE UTILITY LOCATIONS HAVE BEEN FIELD LOCATED BY BISHOP ENGINEERING, UNLESS OTHERWISE NOTED. ALL UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE LOCATIONS ONLY. BISHOP ENGINEERING DOES NOT GUARANTEE THE UNDERGROUND LOCATION OF ANY UTILITIES SHOWN. IT SHALL BE THE DUTY OF THE CONTRACTOR TO DETERMINE THE LOCATION AND DEPTH OF ANY UNDERGROUND UTILITIES SHOWN AND IF ANY ADDITIONAL UTILITIES, OTHER THAN THOSE SHOWN ON THE PLANS, MAY BE PRESENT. A REQUEST WAS MADE TO IOWA ONE CALL FOR UTILITY PROVIDERS TO VERIFY, LOCATE, AND MARK THEIR UTILITIES IN THE FIELD. ABBREVIATIONS: AC ACRES ASPH ASPHALT BK BOOK CONC CONCRETE D DEEDED DISTANCE EX EXISTING ENCL ENCLOSURE FF FINISHED FLOOR FL FLOW LINE FRAC FRACTIONAL M MEASURED DISTANCE MH MANHOLE OPC ORANGE PLASTIC CAP P PLATTED DISTANCE PG PAGE POB POINT OF BEGINNING POC POINT OF COMMENCEMENT PRA PREVIOUSLY RECORDED AS PUE PUBLIC UTILITY EASEMENT ROW RIGHT OF WAY RPC RED PLASTIC CAP SF SQUARE FEET SAN SANITARY TYP TYPICAL YPC YELLOW PLASTIC CAP N NORTH S SOUTH E EAST W WEST UTILITY MAPS PROVIDED BY: 1. ELECTRIC (PROVIDER / CONTACT INFO) 2. STORM AND SANITARY (PROVIDER / CONTACT INFO) 3. FIBER OPTIC (PROVIDER / CONTACT INFO) 4. CABLE (PROVIDER / CONTACT INFO) 5. GAS (PROVIDER / CONTACT INFO) 6. WATER (PROVIDER / CONTACT INFO) 7. OTHERS (PROVIDER / CONTACT INFO) F/O C0.1 - C7.1 C-001 COVER SHEET ADDRESS: 975 S. WARRIOR LN WAUKEE, IA 50263 OWNER/PREPARED FOR: WAUKEE COMMUNITY SCHOOL DISTRICT ATTN: KIRK JOHNSON 560 SE UNIVERSITY AVE WAUKEE, IA 50263 PH: 515-987-5161 ENGINEER/PROJECT MANAGER: JOEL JACKSON, PE BISHOP ENGINEERING 3501 104TH STREET URBANDALE, IA 50322 PH: 515-276-0467 ZONING: A-1: AGRICULTURAL DISTRICT BUILDING SETBACKS: FRONT YARD = 35 FEET REAR YARD = 35 FEET SIDE YARD = 35 FEET MAXIMUM BUILDING HEIGHT = 40 FEET PARKING REQUIREMENTS: NO CHANGE OPEN SPACE & IMPERVIOUS SURFACE: IMPERVIOUS SURFACE REMOVED= 54,000 SF (INCLUDING GRAVEL) IMPERVIOUS SURFACE ADDED = 171,000 SF (INCLUDING SYNTHETIC TURF) NET INCREASE IN IMPERVIOUS SURFACE = 117,000 SF BENCHMARK & SITE CONTROL: BASIS OF BEARING OBTAINED FROM GPS OBSERVATIONS DATUM = NAD 83, IOWA SOUTH BENCHMARK DATUM = NAVD88, GEOID 18 POINT #9000, 5/8" IRON ROD W/ RED PLASTIC CAP NORTHING = 584,667.99 EASTING = 1,539,484.39 ELEVATION = 1032.14 DESCRIPTION: NORTHEAST OF SOFTBALL FIELD BLEACHERS IN GRASS ISLAND POINT #9002, 5/8" IRON ROD W/ RED PLASTIC CAP NORTHING = 584,224.44 EASTING = 1,539,086.19 ELEVATION = 1023.76 DESCRIPTION: ~110 FEET SOUTHWEST OF BATTING CAGES SHEET INDEX: C-001 CIVIL COVER SHEET C-101 DEMO PLAN C-201 LAYOUT PLAN C-301 GRADING PLAN C-401 UTILITY PLAN C-501 LANDSCAPE PLAN C-601 DETAILS SHEET C-701 SWPPP STAKING NOTES: 1.CONTRACTOR IS REQUIRED TO HAVE ALL STAKING DONE UNDER THE SUPERVISION OF A LICENSED LAND SURVEYOR AND IN COORDINATION WITH THE PROJECT ENGINEER. 2.CONTRACTOR IS REQUIRED TO HAVE ALL STAKING DONE DIRECTLY UNDER THE GENERAL CONTRACTOR BY A SINGLE COMPANY. 3.STAKING DOES NOT RELIEVE CONTRACTOR OF ULTIMATE RESPONSIBILITY TO CONSTRUCT THE PROJECT PER PLAN. SOILS REPORT: 1.REFERENCE ALLENDER BUTZKE SOILS REPORT (PN TBD) FOR ADDITIONAL SOILS INFORMATION INCLUDING BUT NOT LIMITED TO SUBGRADE INFORMATION, FOOTING DESIGN, AND ANY POSSIBLE OVER EXCAVATION DUE TO POOR SOILS. PAVEMENT SECTIONS ON THE PLANS GOVERN OVER PAVEMENT THICKNESS IN THE SOILS REPORT. EARTHWORK BALANCE NOTES: 1.SOIL IMPORT OR EXPORT ON THIS PROJECT SHALL BE CONSIDERED INCIDENTAL AND WILL NOT BE MEASURED OR PAID FOR SEPARATELY. CONTRACTOR RESPONSIBLE FOR MAKING THE SITE EARTHWORK BALANCE. 2.THIS INCLUDES BUT IS NOT LIMITED TO TOPSOIL, POOR SOILS AND STRUCTURAL FILL NECESSARY TO MEET PROJECT PLANS AND SPECIFICATIONS. FARM TILE NOTES: 1.ACTIVE EXISTING FIELD TILES ENCOUNTERED DURING CONSTRUCTION SHALL BE REPAIRED, REROUTED, OR CONNECTED TO PUBLIC OR PRIVATE STORM SEWER TO REMAIN IN SERVICE. CONNECT TO STORM SEWER WITH AN INSERT-A-TEE OR DIRECTLY TO A STORM STRUCTURE. 2.IT IS ANTICIPATED THAT THE SITE CONTAINS FIELD TILES, HOWEVER, LIMITED INFORMATION IS AVAILABLE. 3.THIS WORK WILL BE ELIGIBLE FOR A CHANGE ORDER IF, AND ONLY IF, PROPOSED SITE STORM SEWER IS NOT WITHIN 50 FEET OF THE FIELD TILE. 4.CONTRACTOR SHALL PROVIDE AS-BUILTS OF FARM TILES TO BISHOP ENGINEERING WITH BOTH ELEVATIONS AND STATE PLANE COORDINATES. PAVEMENT PLACEMENT NOTES: 1.SEE PROJECT SPECIFICATION SECTION 32 13 13 FOR LASER SCREED REQUIREMENTS. STORM & SANITARY TELEVISING NOTES: 1.CONTRACTOR IS REQUIRED TO TELEVISE ALL SANITARY AND STORM SEWER SYSTEM PRIOR TO PAVING OPERATIONS. 2.CONTRACTOR SHALL SEND VIDEO INSPECTION TO THE ENGINEER FOR APPROVAL PRIOR TO PAVING. 3.CONTRACTOR SHALL PROVIDE COPIES OF THE REPORTS AND VIDEOS TO THE WAUKEE ENGINEERING DEPARTMENT FOR APPROVAL PRIOR TO PAVING. UTILITY CONFLICT NOTES: 1.UTILITY CONFLICTS MAY EXIST ACROSS THE SITE WITH NEW UTILITIES, GRADING, PAVING ETC. MOST UTILITY CONFLICTS HAVE BEEN CALLED OUT FOR CONTRACTOR CONVENIENCE. 2.CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY CONFLICTS THAT ARE EITHER CALLED OUT ON THE PLANS OR THAT CAN BE SEEN ON THE PLANS BETWEEN AN EXISTING UTILITY AND PROPOSED CONSTRUCTION. 3.CONTRACTOR SHALL USE O-RING GASKET JOINTS FOR STORM SEWER AND SANITARY SEWER AT CROSSINGS WITH WATER WHERE STORM OR SANITARY SEWER CROSSES OVER OR LESS THAN 18 INCHES BELOW WATER. O-RING GASKET JOINTS SHALL BE EXTENDED UNTIL WATER AND SEWER ARE AT LEAST 10 FEET APART. ALL O-RING GASKET JOINTS SHALL BE CONSIDERED INCIDENTAL TO BID. IF N-12 PIPE IS USED FOR STORM SEWER, CONTRACTOR SHALL USE WATER-TIGHT N-12 PIPE, CENTERED ON THE CROSSING. 4.FOR ALL CRITICAL CROSSINGS WITH EXISTING UTILITIES, THE ELEVATION OF THE EXISTING UTILITY SHALL BE FIELD VERIFIED PRIOR TO CONSTRUCTION. NOTIFY BISHOP ENGINEERING PRIOR TO CONSTRUCTION IF A CONFLICT EXISTS. GENERAL NOTES: 1.ALL WORK SHALL BE DONE IN ACCORDANCE WITH 2020 WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS AND SUDAS 2023 STANDARD SPECIFICATIONS. THE CITY OF WAUKEE COMMUNITY DEVELOPMENT DEPARTMENT MUST BE NOTIFIED BY ALL CONTRACTORS 48 HOURS PRIOR TO COMMENCING WORK AND PRIOR TO ANY WEEKEND OR HOLIDAY WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING WAUKEE COMMUNITY DEVELOPMENT DEPARTMENT 1 WEEK PRIOR TO ANY PLANNED WORK TO SCHEDULE A PRE-CONSTRUCTION MEETING. 2.IN EVENT OF A DISCREPANCY BETWEEN THE QUANTITY ESTIMATES AND THE DETAILED PLANS, THE DETAILED PLANS SHALL GOVERN. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION OF ALL UTILITIES. ANY DAMAGE TO SAID UTILITIES SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE. 4.ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT O.S.H.A. CODES AND STANDARDS. NOTHING INDICATED ON THESE PLANS SHALL RELIEVE THE CONTRACTOR FROM COMPLYING WITH THE APPROPRIATE SAFETY REGULATIONS. 5.ALL NECESSARY CONSTRUCTION SIGNS, BARRICADES AND OTHER TRAFFIC CONTROL DEVICES REQUIRED DURING CONSTRUCTION WILL BE FURNISHED BY THE CONTRACTOR. SIGNS, BARRICADES AND OTHER TRAFFIC CONTROL DEVICES MUST BE IN CONFORMANCE WITH THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS" AND CITY OF WAUKEE REQUIREMENTS. 6.BISHOP ENGINEERING SHALL NOT BE LIABLE FOR ANY INJURIES THAT HAPPEN ON SITE. THIS SHALL INCLUDE BUT NOT BE LIMITED TO TRENCH COLLAPSES FROM VARYING SOIL CONDITIONS OR INJURIES CAUSED BY UNDERGROUND UTILITIES INCLUDING UTILITIES THAT ARE NOT SHOWN ON PLAN. 7.THE CONTRACTOR IS LIABLE FOR ALL DAMAGES TO PUBLIC OR PRIVATE PROPERTY CAUSED BY THEIR ACTION OR INACTION IN PROVIDING FOR STORM WATER FLOW DURING CONSTRUCTION. DO NOT RESTRICT FLOWS IN EXISTING DRAINAGE CHANNELS, STORM SEWER, OR FACILITIES. 8.THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER A SCHEDULE FOR PERFORMANCE OF WORK ITEMS. THIS SCHEDULE SHALL BE PROVIDED BY THE CONTRACTOR AT THE PROJECT PRECONSTRUCTION CONFERENCE. NO WORK SHALL BEGIN UNTIL A SCHEDULE HAS BEEN SUBMITTED AND ACCEPTED. THE CONTRACTOR SHALL THEN PERFORM WORK TO CONFORM TO THE ACCEPTED SCHEDULE. 9.LABORATORY TESTS SHALL BE PERFORMED BY THE OWNER UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL PROVIDE SAMPLES OF MATERIAL REQUIRED FOR LABORATORY TESTS AND TESTING IN ACCORDANCE WITH THE URBAN STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS. 10.THE CONTRACTOR SHALL PROTECT ALL STRUCTURES NOT SHOWN AS REMOVALS ON THE PLANS. 11.THE CONTRACTOR SHALL OBTAIN ANY AND ALL NECESSARY PERMITS PRIOR TO ANY CONSTRUCTION. CONTRACTOR SHALL WORK WITH OWNER OR OWNERS REPRESENTATIVE ON ALL REQUIRED STORM WATER DISCHARGE PERMITS FROM THE IOWA DEPARTMENT OF NATURAL RESOURCES AND THE CITY OF WAUKEE. 12.GRADING AND EROSION CONTROL SHALL BE DONE IN ACCORDANCE WITH THE APPROVED GRADING PLAN, SWPPP, NPDES DOCUMENTS, AND IOWA DEPARTMENT OF NATURAL RESOURCES REQUIREMENTS. 13.THE CONTRACTOR SHALL PICK UP ANY DEBRIS SPILLED ONTO THE ADJACENT RIGHT OF WAY OR ABUTTING PROPERTIES AS THE RESULT OF CONSTRUCTION, AT THE END OF EACH WORK DAY AND PRIOR TO A RAIN EVENT. 14.THE CONTRACTOR IS RESPONSIBLE FOR THE PROMPT REMOVAL OF ALL MUD THAT HAS BEEN TRACKED OR WASHED UNTO ADJACENT PROPERTY OR RIGHT OF WAY UNTIL SUCH TIME THAT PERMANENT VEGETATION HAS BEEN ESTABLISHED. 15.DISPOSE OF ALL EXCESS MATERIALS AND TRASH IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REQUIREMENTS. PROVIDE WASTE AREAS OR DISPOSAL SITES FOR EXCESS MATERIALS NOT DESIRABLE FOR INCORPORATION INTO THE PROJECT. 16.ANY PROPOSED CHANGES TO THE APPROVED PLAN SET DURING CONSTRUCTION MUST RECEIVE WRITTEN APPROVAL FROM THE CITY OF WAUKEE COMMUNITY DEVELOPMENT DEPARTMENT AND DESIGN ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CHANGES MADE DURING CONSTRUCTION THAT HAVE NOT RECEIVED WRITTEN APPROVAL FROM THE CITY OF WAUKEE COMMUNITY DEVELOPMENT DEPARTMENT. 17.CONTRACTOR SHALL PROVIDE THE CITY OF WAUKEE ENGINEERING DEPARTMENT WITH A LIST OF QUANTITIES FOR SCHEDULING INSPECTION PURPOSES. PAVING NOTES: 1.THE PAVING/ GRADING CONTRACTOR SHALL BACKFILL THE PAVING SLAB AND FINE GRADE THE RIGHT OF WAY AS SOON AFTER THE PAVING AS POSSIBLE. ALL AREAS SHALL BE SEEDED IN ACCORDANCE WITH CITY OF WAUKEE STANDARD SPECIFICATIONS AND THE CURRENT VERSION OF SUDAS. 2.SUBGRADE PREPARATION AND PAVEMENTS WILL BE CONSTRUCTED FOLLOWING RECOMMENDATIONS IN THE SOILS REPORT. APPROVED SOILS ENGINEER MUST SIGN OFF ON SUBASE PRIOR TO ANY PAVEMENT BEING PLACED. 3.SEE DETAILS FOR ALL PAVEMENT THICKNESS. 4.DETECTABLE WARNING PANELS CALLED OUT ON PLANS SHALL BE PER A.D.A. REGULATIONS. PANEL TYPE & COLOR SHALL BE PER CITY STANDARD. 5.ALL WALKS, PARKING LOTS, HANDICAP PARKING, RAMPS, ETC. SHALL COMPLY WITH ALL A.D.A. AND CITY CODES. HANDICAP PARKING SIGNAGE IS REQUIRED FOR ALL HANDICAP STALLS AND SHALL BE CONSIDERED INCIDENTAL. IN EVENT OF A DISCREPANCY BETWEEN THE PLANS AND THE A.D.A./CITY CODES THE A.D.A./CITY CODES SHALL GOVERN. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING A.D.A. CODES ARE MET. 6.ALL PAVEMENT REPLACEMENT SHALL COMPLY WITH THE WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS. UTILITY NOTES: 1.QUANTITY CALLOUTS ON PIPE LENGTHS ARE APPROXIMATE AND SHOULD BE USED FOR REFERENCE ONLY. 2.THE CONTRACTOR SHALL COORDINATE THE ADJUSTMENT OF ANY AND ALL EXISTING AND PROPOSED UTILITIES TO PROPOSED GRADES. EXISTING UTILITIES SHALL BE RAISED OR LOWERED IN ACCORDANCE WITH THE UTILITY OWNER REQUIREMENTS. ANY NECESSARY ADJUSTMENTS SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. 3.ALL PROPOSED RCP STORM SEWER PIPE JOINTS SHALL BE FABRIC WRAPPED AND THE LAST 3 PIPE SECTIONS ON THE APRON SHALL BE TIED WITH RF-14 TYPE II CONNECTORS. ALL APRONS SHALL HAVE A STANDARD FOOTING AND TRASH GUARD. ALL FLARED END SECTIONS SHALL HAVE A 3' WIDE CLAY WATERSTOP (SUDAS SW-105). 4.ALL RIP RAP CALLED OUT ON PLANS SHALL BE UNDERLAIN WITH ENGINEERING FABRIC. 5.ALL STRUCTURE SIZES CALLED OUT ON PLANS ARE MINIMUM INSIDE WALL DIMENSIONS. 6.ALL STRUCTURES CALLED OUT AS "MODIFIED" OR "SPECIAL" SHALL BE ENGINEERED BY THE PRECASTER TO ENSURE STRUCTURE STABILITY. MODIFICATIONS INCLUDE ADDITIONAL WALL LENGTH TO ACCOUNT FOR LARGE PIPE DIAMETERS AND ADDITIONAL WALL WIDTH & BASE DEPTH TO ACCOUNT FOR DEEPER STRUCTURES. ANY AND ALL MODIFICATIONS TO STANDARD STRUCTURES SHALL BE CONSIDERED INCIDENTAL TO BID. 7.SANITARY SERVICES SHALL MAINTAIN 18" OF VERTICAL SEPARATION FROM THE WATERMAIN WITH 18" OF COMPACTED LOW PERMEABILITY SOIL BETWEEN THE UTILITIES WITHIN 10' OF THE CROSSING. 8.MANDREL AND PRESSURE TESTS SHALL BE REQUIRED FOR ALL PROPOSED SANITARY LINES, ALL SANITARY MANHOLES SHALL BE VACUUM TESTED. ALL SANITARY AND STORM LINES SHALL BE CLEANED AND TELEVISED PRIOR TO PAVING. THE CITY SHALL WITNESS ALL CLEANING AND TELEVISING, COPIES OF THE REPORTS AND VIDEOS SHALL BE PROVIDED TO THE CITY OF WAUKEE ENGINEERING DEPARTMENT. 9.ALL UTILITIES SHALL BE TESTED TO CITY OF WAUKEE STANDARDS AND THE CITY OF WAUKEE ENGINEERING DEPARTMENT SHALL WITNESS ALL TESTING. 10.ALL WATER LINE MATERIAL SHALL BE C-900 UNLESS NOTED OTHERWISE ON PLANS. SIZE OF WATERMAIN AS SHOWN ON PLANS. 11.THRUST BLOCKS SHALL BE INSTALLED AS REQUIRED AND SHALL BE CONSIDERED INCIDENTAL TO WATERMAIN CONSTRUCTION. 12.PROPOSED WATERMAIN SHALL BE PRESSURE TESTED, BACTERIA TESTED AND CHLORINATED. THE FILLING OF THE WATER MAIN SHALL BE DONE BY THE CITY OF WAUKEE. 13.TRACER WIRE SHALL BE ADDED TO ALL WATER MAIN, AND BROUGHT TO THE SURFACE AT EVERY HYDRANT. 14.ALL HYDRANTS WILL IMMEDIATELY BE COVERED WITH A BLACK PLASTIC BAG (OR EQUIVALENT) ONCE THE HYDRANT IS INSTALLED. THE CITY OF WAUKEE WILL NOTIFY THE CONTRACTOR WHEN THE BAGS CAN BE REMOVED. 15.THE MINIMUM HYDRANT LEAD SHALL BE 3.5 FEET. 16.FIRE HYDRANT ASSEMBLY SHALL INCLUDE TEE, BRANCH, VALVE & HYDRANT AND A 5" STORZ CONNECTION. 17.ANY AND ALL HYDRANT AND VALVE EXTENSIONS, TOGETHER WITH VERTICAL BENDS, SHALL BE CONSIDERED INCIDENTAL TO WATER MAIN CONSTRUCTION. NO ADDITIONAL PAYMENT WILL BE PROVIDED FOR INCIDENTAL ITEMS. 18.ALL UTILITY CONNECTIONS TO EXISTING UTILITIES SHALL BE COORDINATED WITH THE CITY OF WAUKEE ENGINEERING DEPARTMENT. SWPPP NOTES: 1.STORM WATER POLLUTION PREVENTION PLAN HAS BEEN PREPARED BY BISHOP ENGINEERING. CONTACT JAMES RODEMYER (515-276-0467) FOR A COPY OF THE SWPPP. 2.NPDES PERMIT AUTHORIZATION NUMBER: TBD 3.THIS PROJECT INCLUDES SAWCUTTING OR CONCRETE GRINDING SO PROTECTION OF STORM SEWERS AND DRAINAGE WAYS WILL NEED TO BE PROVIDED FROM SLURRY FROM THE CONCRETE OPERATIONS. SEE SWPPP SHEET AND NARRATIVE FOR ADDITIONAL DETAILS. 4.CONTACTOR SHALL BE RESPONSIBLE FOR SUBMITTING THE NOTICE OF DISCONTINUATION TO THE DNR AFTER FINAL STABILIZATION AND THE CITY HAS AGGREED THAT PERMIT CAN BE DISCONTINUED. REQUIRED AS-BUILTS: THE OWNER SHALL BE RESPONSIBLE FOR COST OF AS-BUILT TOPO OF ALL DETENTION PONDS & DETENTION POND STORM SEWER, PUBLIC STORM SEWER, RAMPS, LANDINGS, CROSSWALKS AND PUBLIC IMPROVEMENTS. CONTRACTOR SHALL CONTACT BISHOP ENGINEERING (JOEL JACKSON AT 515-276-0467) TO PERFORM SAID AS-BUILT SURVEYS. IF ANYTHING HAS BEEN CONSTRUCTED INCORRECTLY, CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SUBSEQUENT AS-BUILT SURVEYS UNTIL ISSUES HAVE BEEN RECTIFIED. **CONTRACTOR SHALL CONTACT BISHOP ENGINEERING FOR POND AS-BUILTS AFTER TOPSOIL RESPREAD AND BEFORE SEEDING HAS TAKEN PLACE** AFTER DETENTION BASINS HAVE BEEN AS-BUILT AND APPROVED, BISHOP ENGINEERING SHALL PROVIDE A SIGNED CERTIFICATION STATEMENT TO THE CITY INDICATING THAT FACILITIES WERE CONSTRUCTED AS DESIGNED. MONUMENT AND BUILDING SIGNAGE: 1.ALL MONUMENT SIGNS ARE SUBJECT TO REVIEW BY THE CITY OF WAUKEE COMMUNITY DEVELOPMENT DEPARTMENT 2.CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL SIGN PERMITS PRIOR TO INSTALLATION OF ANY GROUND OR BUILDING SIGNAGE AND SHALL ENSURE COMPLIANCE WITH ALL CITY REGULATIONS. FENCE NOTES: 1.SEE PLANS, DETAILS AND SPECIFICATIONS ON ALL FENCES. 2.FENCES SHALL BE INSTALLED PRIOR TO SIDEWALKS IN MANY AREAS. THE CONCRETE SHALL BE AROUND THE FENCE POSTS AND THE FENCE IS NOT ALLOWED TO BE BOLTED TO OR ATTACHED TO THE WALKS. SEE DETAILS FOR FURTHER INFORMATION. SECURITY NOTES: 1.CONTRACTOR RESPONSIBLE FOR SECURITY OF THE SITE. 2.TEMPORARY FENCES OR ANY OTHER SECURITY MEASURES ARE THE RESPONSIBILITY OF THE CONTRACTOR. 3.NO SECURITY MEASURES WILL BE ELIGIBLE FOR A CHANGE ORDER AND MUST BE INCLUDED IN THE BASE BID. SPECIFICATIONS NOTES: 1.ALLWORK SHALL BE DONE IN ACCORDANCE WITH THE WAUKEE HIGH SCHOOL BASEBALL & SOFTBALL PROJECT SPECIFICATIONS, THE 2020 CITY OF WAUKEE STANDARD SPECIFICATIONS AND 2023 SUDAS SPECIFICATIONS. 2.FOR ANY DISCROPANCIES BETWEEN THE WAUKEE HIGH SCHOOL BASEBALL & SOFTBALL PROJECT SPECIFICATIONS AND THE CURRENT EDITION OF IOWA SUDAS, THE PROJECT SPECIFICATIONS SHALL GOVERN UNLESS DIRECTED OTHERWISE BY THE CITY OF WAUKEE OR THE PROJECT ENGINEER. 3.FOR ALL SPECIFICATION DISCREPANCIES, PROJECT ENGINEER SHALL BE CONTACTED PRIOR TO PROCEEDING WITH CONSTRUCTION. IF ENGINEER IS NOT CONTACTED, CONTRACTOR SHALL BE RESPONSIBLE FOR ANY PROBLEMS THAT RESULT FROM SAID DISCREPANCIES. 4.FOR ALL SPECIFICATION DISCREPANCIES, CONTRACTOR MUST OBTAIN WRITTEN APPROVAL FROM THE CITY OF WAUKEE ENGINEERING DEPARTMENT FOR ANY CHANGES TO PROPOSED SITE INFRASTRUCTURE OR GRADES PRIOR TO PROCEEDING WITH ANY CHANGES. FIRE DEPARTMENT ACCESS NOTES: 1.AN APPROVED FIRE APPARATUS ACCESS ROAD SHALL BE PROVIDED FOR ALL BUILDINGS, OR PORTIONS OF A BUILDING AS SOON AS VERTICAL CONSTRUCTION OF THE BUILDING COMMENCES. 2.FIRE APPARATUS ACCESS ROAD SHALL COMPLY WITH THE REQUIREMENTS OF 2015 IFC 503.2 AND SHALL EXTEND TO WITHIN 150 FEET OF ALL EXTERIOR PORTIONS OF THE BUILDING AS MEASURED BY AN APPROVED ROUTE AROUND THE EXTERIOR OF THE BUILDING. 3.FIRE APPARATUS TRAIL (AS SHOWN ON PLANS) SHALL BE INSTALLED PRIOR TO BUILDING GOING VERTICAL. IF PAVEMENT IS NOT PLANNED TO BE INSTALLED PRIOR TO THE BUILDING GOING VERTICAL, THAN TEMPORARY ROCK ACCESS SHALL BE PROVIDED AROUND THE BUILDING AND CONNECTED TO THE ROCK CONSTRUCTION ENTRANCE. 4.ANY TEMPORARY ROCK USED FOR THE FIRE DEPARTMENT ACCESS ROUTE SHALL BE REMOVED FROM THE SITE PRIOR TO TOPSOIL SPREADING AND SEEDING. SEE TOPSOIL NOTES ON COVER SHEET AND GRADING PLAN. 5.ANY AND ALL FIRE APPARATUS ACCESS ROAD WORK NECESSARY TO COMPLY WITH WAUKEE FIRE DEPARTMENT REQUIREMENTS SHALL BE CONSIDERED INCIDENTAL TO BID. TOPSOIL NOTES: 1.CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING GEOTECHNICAL ENGINEER WHEN TOPSOIL HAS BEEN PLACED / RE-SPREAD ON SITE. GEOTECHNICAL ENGINEER WILL THEN INVESTIGATE AND PROVIDE WRITTEN VERIFICATION TO THE OWNER THAT AT LEAST 8" OF TOPSOIL HAS BEEN PLACED IN ALL PERVIOUS AREAS OF THE SITE. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF HAULING IN ADDITIONAL TOPSOIL IN AREAS THAT ARE DEFICIENT. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ADDITIONAL COSTS FOR SUBSEQUENT TOPSOIL DEPTH TESTING PERFORMED BY GEOTECHNICAL ENGINEER IF SITE IS FOUND TO BE DEFICIENT. PAVEMENT SAWCUT NOTES: 1.CONTRACTOR SHALL FOLLOW JOINTING SHOWN ON PLANS. IF CONTRACTOR WANTS TO DEVIATE FROM JOINTING SHOWN, CONTRACTOR SHALL PROVIDE SAWCUT JOINTING PLAN TO JOEL JACKSON, BISHOP ENGINEERING (515-276-0467 OR JJACKSON@BISHOPENGR.COM) PRIOR TO ANY CONCRETE PAVEMENT INSTALLATION. 2.PAVEMENT MAY BE REQUIRED TO BE REMOVED AND REPLACED IF PLACED NOT IN COMPLIANCE WITH JOINTING PLAN. 3.LONGITUDINAL JOINTS IN DRIVE LANES & THE OUTER MOST JOINT OF ALL PARKING AREAS SHALL BE SUDAS TYPE 'L-1' OR 'L-2' JOINTS AND HAVE STEEL. INTERIOR PARKING LOT JOINTS, OTHER THAN THE OUTER MOST JOINT, DO NOT NEED STEEL AND SHALL BE SUDAS TYPE 'B' JOINTS. 4.TYPICAL LONGITUDINAL JOINTS SHALL BE PLACED IN THE CENTER OF ALL DRIVE AISLES AND AT THE END OF ALL PARKING STALLS. 5.ALL TRANSVERSE JOINTS SHALL BE SUDAS TYPE 'C' OR TYPE 'DW' JOINTS WITH STEEL IN THE CASE OF A DAY'S WORK JOINT. CP #9002 8" TREE 8" TREE 8" TREE 8" TREE 8" TREE 8" TREE 18" TREE H Y D WV FF = 1 0 2 8 . 6 0 FF = 1 0 2 8 . 6 1 H Y DWVWVHYD F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O FO FO D 6" TREE D 6" TREE6" TREE 6" TREE 6" PINE D D D 6" TREE 8" TREE EX 36" FES FL=1018.88 EX INTAKE RIM=1024.35 FL(N 12")=1022.13 FL(S 12")=1022.08 12" TREE 18" TREE 12" TREE 18" TREE 18" TREE 18" TREE F/O 18" TREE 12" TREE EJ GM FF = 1 0 2 8 . 6 4 FF = 1 0 2 8 . 7 6 YA DR FF = 1 0 2 8 . 6 9 FF = 1 0 2 8 . 7 1 FF = 1 0 2 8 . 8 0 EM EPEP FF = 1 0 2 8 . 7 7 EM EPEP 18" TREE 18" TREE 12" TREE 12" TREE P R E S S B O X F F = 1 0 4 2 . 3 3 12" TREE PRE S S B O X FF= 1 0 3 9 . 3 3 I CV FF=1028.11 X X X X X F/ O F/ O F/ O F/ O F/ O F/ O F/ O F / O F/ O X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X EX B R I C K D U G O U T EX BRICK DUGOUT EX BRICK & METAL FRAME BUILDING AREA=5,538 SF 38 . 0 ' 10.0' 80.7' 80.6' 68 . 7 ' 68 . 7 ' EX METAL FRAME BLDG EX BRICK DUGOUT 23.9' 24 . 1 ' 24.0' 23 . 9 ' 10 . 0 ' 46.0' 10 . 0 ' 38.0' EX B R I C K D U G O U T 10.0' 30 . 0 ' AR E A U N D E R C O N S T R U C T I O N A T T I M E O F S U R V E Y EX 6' CHAIN LINK FENCE EX SAND PITCHING PRACTICE MOUNDS EX C O N C R E T E S I D E W A L K EX TENNIS COURTS EX GATE EX GATE EX 12' CHAIN LINK FENCE EX FOUL POLE EX SAND EX SAND EX 6' CHAIN LINK FENCE EX B A T T I N G C A G E S W/ C O N C R E T E B A S E EX B A T T I N G C A G E S W/ C O N C R E T E B A S E EX METAL SUPPORT POLES (TYPICAL) EX SCORBOARD EX SCORBOARD EX S A N D EX SAND EX CONCRETE SIDEWALK EX FOUL POLE EX 6' CHAIN LINK FENCE EX CONCRETE LOW WALL EX SAND PITCHING PRACTICE MOUNDS EX 8' CHAIN LINK FENCE EX GATE EX B L E A C H E R S EX R A M P EX CONCRETE EX BRICK LOW WALL EX TABLE (TYP.) EX DOWNSPOUTS DRAIN INTO GROUND EX CONCRETE LOW WALLS EX BRICK PLANTER EX CONCRETE EX WIND TURBINE EX SAND PITCHING PRACTICE MOUNDS EX SAND PITCHING PRACTICE MOUNDS EX R A M P EX BRIC K EX BRICK LOW WALL E X B L E A C H E R S EX BRICK EX BRICK PLANTER EX FIRE LANE SIGN 15 15 15 15 ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15" ST 18" ST 18" ST 18"ST 18"ST 18"ST 18"ST 18"ST 18" ST 18 " ST 36 " ST 36" ST 36" ST 36" ST 24 " S T 1 8 " S T 1 8 " S T 1 8 " S T 1 5 " W 12 " W 12 " W 12 " W 12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W 8"W 8"W 8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8" W 8" W 8" EX SIZE / LOCATION PER CITY OF WAUKEE GIS ST 12" ST 12 " ST 12 " ST 12 " ASSUMED LOCATION ST 12 " TERMINUS UNKNOWN WA R R I O R L A N E (P U B L I C R O A D - A S P H A L T S U R F A C E ) PARK ROAD (PUBLIC ROAD - ASPHALT SURFACE) EX ASPHALT DRIVE SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " EX SIZE / LOCATION PER CITY OF WAUKEE GIS G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4"G4" G4" G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4" EX LOCATION PER CITY OF WAUKEE GIS G G G G G U/ E U/ E U/ E U/ E U/E U/E U/E U/E U/E U/E U/E U/E U/E EX LOCATIONS PER CITY OF WAUKEE GIS SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N 1024 1023 1022 1023 1023 1024 10 2 4 1025 1027 1 0 2 0 1022 10 2 5 10 2 7 1 0 2 5 1025 102 2 1028 1026 1026 1027 1027 1028 1 0 2 7 1028 1025 1027 1027 1026 1027 1029 1028 1030 1029 103 0 1031 1032 10 3 1 1030 1 0 2 9 1 0 2 7 10 2 9 F/ O U/E U/EU/E U/E U / E U / E U / E U / E U/ E U/E U/E U/E U/E U/E U/E U/E U/E U / E U / E U / E U/ E T E L E T E L E T E L E TE L E U/E U/E U/E U/E U/E U/E U/E U / E U/ E U/ E U/E U/E U/E U/ E U / E U / E U / E U / E U/E U/E U/E U/E U/E U/E U/ E U/ E EX 6' CHAIN LINK FENCE X X X X X X XXXXXXXX U/E U/E U/E U/E U/E U/E D D EX RETAINING WALL D D D D ST 18 " ST 30 " ST 24 " ST 24 " ST 24 " ST 24 " ST 24 " ST 15" ST 15" ST 15" ST 15" ST 15" D EX OPEN SIDED INTAKE FF = 1 0 3 5 . 9 5 FF = 1 0 3 5 . 9 7 EX INTAKE RIM=1034.82 FF = 1 0 3 5 . 9 7 FF = 1 0 3 5 . 9 5 FF = 1 0 3 6 . 0 3 FF = 1 0 3 6 . 0 0 18" TREE EX 12" FES FL=1029.78 FF = 1 0 3 6 . 2 7 EX CMP" 18 FES FL=1026.41 EX 12" FES FL=1026.66 12" TREE EX 12" FES FL=1027.68 12" TREE 12" TREE EX 12" FES FL=1028.30 6" TREE ST 12" 1030 1030 10 2 8 1029 1035 103 5 1 0 2 7 1031 1035 1033 1034 1035 ST 18 " 18" CMP OUTLET FL=1025.72 EX NO PARKING SIGN EX NO PARKING SIGN10 3 0 10 3 1 10 3 2 10 2 9 1 0 2 9 APPROXIMATE SERVICE LINE LOCATION PER CITY OF WAUKEE GIS APPROXIMATE ELEVATION PER OWNER = 1016.33± REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE REMOVE EX TREES SAWCUT & REMOVE EX SIDEWALK TO NEAREST JOINTREMOVE EX TREES REMOVE EX TRANSFORMER & STUMP REMOVE EX FLAGPOLE SAWCUT & REMOVE EX PAVEMENT SAWCUT & REMOVE EX PAVEMENT PROTECT EX TREE W/ ORANGE CONSTRUCTION FENCE PROTECT EX TREE W/ ORANGE CONSTRUCTION FENCE PROTECT EX TREE W/ ORANGE CONSTRUCTION FENCE SAWCUT & REMOVE EX SIDEWALK TO NEAREST JOINT PROTECT EX DUGOUT PROTECT EX DUGOUT PROTECT EX TREE & SCOREBAORD W/ ORANGE CONSTRUCTION FENCE REMOVE EX STORM SEWER REMOVE EX STORM SEWER & PATCH EX INTAKE REMOVE EX STORM SEWER & PATCH EX MANHOLE PROTECT EX SCOREBOARD REMOVE EX WALL & BACKSTOP, PROTECT EX BLEACHERS PROTECT EX DUGOUT PROTECT EX DUGOUT SAWCUT & REMOVE EX PAVEMENT PROTECT EX BATTING CAGES REMOVE EX WALL & BACKSTOP, PROTECT EX BLEACHERS REMOVE EX CHAIN LINK FENCE PROTECT ALL EX FIELD LIGHTING, TYP PROTECT ALL EX FIELD LIGHTING, TYP PROTECT ALL EX FIELD LIGHTING, TYP REMOVE EX FLAGPOLE FIELD VERIFY TERMINUS & REMOVE. CONTRACT BISHOP ENGINEERING IF ADDITIONAL FLOW IS LOCATED UPSTREAM REMOVE EX SOLAR PANEL REMOVE EX INFIELD MATERIAL & WARNING TRACK REMOVE EX INFIELD MATERIAL & WARNING TRACK REMOVE EX BULLPENS REMOVE EX BULLPENS REMOVE EX INFIELD MATERIAL & WARNING TRACK FIELD VERIFY LOCATION & REMOVE ALL EXISTING IRRIGATION FOR BOTH FIELDS RELOCATERELOCATE EX FIRE LANE SIGN RELOCATE EX HYDRANT SAWCUT & REMOVE EX SIDEWALK REMOVE EX CULVERT BID ALT: REMOVE EX SIDEWALK TO NEAREST JOINT BID ALT: GRIND EX CURB FLUSH WITH GUTTER REMOVE EX TREE REMOVEREMOVE SAWCUT & REMOVE EX CURB & GUTTER REMOVE EX BUILDINGS (REF ARCH) SAWCUT & REMOVE EX PAVEMENT TO NEAREST JOINTREMOVE EX 18" CMP TO NEW CONNECTION (SEE UTILITY PLAN) FIELD VERIFY LOCATION & REMOVE EX SANITARY SERVICE AS NECESSARY TO LOWER (SEE UTILITY PLAN) DEMO NOTES: 1.SAWCUT & REMOVE ALL PAVEMENT TO FULL DEPTH OF SLAB. 2.PROTECT ALL TREES NOT CALLED OUT FOR REMOVAL WITH ORANGE CONSTRUCTION FENCE AT THE DRIP LINE. 3.PAVEMENT STRIPING CALLED OUT FOR REMOVAL SHALL BE SANDBLASTED. NO GRINDING WILL BE ALLOWED. 4.EXISTING BASEBALL & SOFTBALL FIELDS ARE IRRIGATED. EXACT LOCATION OF IRRIGATION LINES AND HEADS IS UNKNOWN. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL EXISTING IRRIGATION LINES AND HEADS FROM BOTH FIELDS. DRAWING TITLE: REVISIONS: DRAWING NO.: PROJECT NO.: DATE: 26 0 0 w e s t o w n p a r k w a y , s u i t e 3 4 0 , w e s t d e s m o i n e s , i o w a 5 0 2 6 6 p 5 1 5 . 2 2 3 . 5 1 0 0 f 5 1 5 . 2 2 3 . 7 2 2 6 w w w . f r k - a e . c o m fr k a r c h i t e c t s + e n g i n e e r s 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 WA U K E E H I G H S C H O O L BA S E B A L L / S O F T B A L L S T A D I U M WA U K E E C O M M U N I T Y S C H O O L D I S T R I C T WA U K E E , I O W A 1018D07 FEBRUARY 2023 12/27/22 - 1ST CITY SET 01/24/23 - 2ND CITY SET 02/07/23 - 3RD CITY SET L: \ L A N D P R O J E C T S 2 0 2 2 \ 2 2 0 4 1 6 W A U K E E H S B A S E B A L L - S O F T B A L L S Y N T H E T I C T U R F P R O J E C T \ D W G \ C 1 D E M O . D W G 2/ 2 0 / 2 0 2 3 4 : 0 9 : 5 0 P M GRAPHIC SCALE 030 15 30 60 C-101 DEMO PLAN PROPOSED BUILDING FOOTPRINT = 7,513 SF FF = 1029.00 D D CO HY D BID ALT STORAGE BUILDING FOOTPRINT = 642 SF FF = 1029.00 WV D SA N 4" SA N 4" D R25' R30' R 1 0 0 ' R 1 0 0 ' 6' 10' 11 ' 0. 5 ' 15' 15 ' 5' 5' 5 ' 5" PCC WALK 5" PCC WALK 5" PCC WALK 5" PCC WALK 5" PCC WALK 5" P C C W A L K BULLPEN BU L L P E N BU L L P E N B U L L P E N R1 5 0 ' R1 5 6 ' 5 ' 5' 5'5" PCC WALK 5" PCC WALKR2' R5 0 ' R1 0 0 ' 5" PCC WALK SYNTHETIC TURF FIELD (REF ARCH FOR ALL MARKINGS & LOGOS) SYNTHETIC TURF FIELD (REF ARCH FOR ALL MARKINGS & LOGOS) STEPS W/ HANDRAILS (SEE DETAIL 16/C-601) 7" PCC CURB & GUTTER SECTION 7" PCC CURB & GUTTER SECTION GRIND EX CURB FLUSH WITH GUTTER 7" PCC CURB & GUTTER SECTION REF ARCH FOR KNEE WALL & NETTING REF ARCH FOR KNEE WALL & NETTING 8' TALL BLACK VINYL CHAIN LINK FENCE IN MOW STRIP (SEE DETAIL 4/C-601) 10' FOUL POLE (SEE DETAIL 15/C-601) 12' WIDE GATE W/ TOP RAIL PROTECTION 5' WIDE GATE W/ TOP RAIL PROTECTION 8' TALL BLACK VINYL CHAIN LINK FENCE W/ TOP RAIL PROTECTION IN MOW STRIP(SEE DETAIL 14/C-601) 8' TALL BLACK VINYL CHAIN LINK FENCE W/ TOP RAIL PROTECTION IN MOW STRIP (SEE DETAIL 14/C-601) 5' WIDE GATE W/ TOP RAIL PROTECTION 12' WIDE GATE 5' WIDE GATE W/ TOP RAIL PROTECTION 5' WIDE GATE W/ TOP RAIL PROTECTION 5' WIDE GATE W/ TOP RAIL PROTECTION 5' WIDE GATE 8' TALL BLACK VINYL CHAIN LINK FENCE 12' WIDE GATE W/ TOP RAIL PROTECTION 12' WIDE GATE W/ TOP RAIL PROTECTION FOUL POLE (SEE DETAIL 15/C-601) FOUL POLE (SEE DETAIL 15/C-601) FOUL POLE (SEE DETAIL 15/C-601) 8' TALL BLACK VINYL CHAIN LINK FENCE (SEE DETAIL 14/C-601) 5' WIDE GATE W/ TOP RAIL PROTECTION 5' WIDE GATE INSTALL 8' TALL BLACK VINYL CHAIN LINK FENCE 6" INTO SIDEWALK (SEE DETAIL 3/C-601) 10' WIDE GATE 8' TALL BLACK VINYL CHAIN LINK FENCE W/ TOP RAIL PROTECTION IN MOW STRIP (SEE DETAIL 14/C-601) 10' TALL BLACK VINYL CHAIN LINK FENCE W/ TOP RAIL PROTECTION IN MOW STRIP (SEE DETAIL 14/C-601) 8' TALL BLACK VINYL CHAIN LINK FENCE W/ TOP RAIL PROTECTION IN MOW STRIP (SEE DETAIL 14/C-601) 8' TALL BLACK VINYL CHAIN LINK FENCE W/ TOP RAIL PROTECTION IN MOW STRIP (SEE DETAIL 14/C-601) 8' 10' 8' 10' 5' WIDE GATE 5' WIDE GATE 8' TALL BLACK VINYL CHAIN LINK FENCE W/ IN MOW STRIP (SEE DETAIL 4/C-601) 8' TALL BLACK VINYL CHAIN LINK FENCE W/ IN MOW STRIP (SEE DETAIL 4/C-601) 20' WIDE GATE 8' TALL BLACK VINYL CHAIN LINK FENCE W/ IN MOW STRIP (SEE DETAIL 4/C-601) 8' TALL BLACK VINYL CHAIN LINK FENCE W/ IN MOW STRIP (SEE DETAIL 4/C-601) 8' TALL BLACK VINYL CHAIN LINK FENCE IN MOW STRIP (SEE DETAIL 14/C-601) 8' 10' 8' 8' 8' 10' 8' TALL BLACK VINYL CHAIN LINK FENCE W/ IN MOW STRIP (SEE DETAIL 4/C-601) 8' TALL BLACK VINYL CHAIN LINK FENCE W/ IN MOW STRIP (SEE DETAIL 14/C-601) EXTEND MOW STRIP TO EX SIDEWALK 12' WIDE GATE HOME PLATE (SEE DETAIL 13/C-601) HOME PLATE (SEE DETAIL 13/C-601) PITCHER'S MOUND (SEE DETAIL 12/C-601) REINSTALL EX FIRE LANE SIGN REINSTALL EX FIRE LANE SIGN EXTEND MOW STRIP TO EX SIDEWALK STRUCTURAL STOOP TO SIDEWALK TRANSITION, TYP (SEE DETAIL 11/C-601) BID ALT GRIND EX CURB FLUSH WITH GUTTER BID ALT 6" PCC WALK 9' 5' 8'8'8'8' 5' 9' 18 ' 6' 6'5" PCC WALK R3' R 5 ' BOLLARD W/ VAN ACCESSIBLE HC SIGN (SEE DETAIL 24/C-601) BOLLARD W/ HC SIGN (SEE DETAIL 24/C-601) BOLLARD W/ HC SIGN (SEE DETAIL 24/C-601) 5" PCC WALK PAVEMENT TYPE 1 24" WIDE WHITE CROSSWALK BARS 5' PAVEMENT TYPE 1 115.33' 54 . 0 0 ' 6.33' 13 . 6 7 ' 35.00'0.67'44.67'8. 6 7 ' 29.33' 59 . 6 7 ' 25.33' 25 . 3 3 ' 25.33' 25 . 3 3 ' CP #9002 8" TREE 8" TREE 8" TREE 8" TREE 8" TREE 8" TREE 18" TREE H Y D WVWVWVHYD F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O FO FO D 6" TREE D 6" TREE6" TREE 6" TREE 6" PINE D D D 6" TREE 8" TREE 12" TREE 18" TREE 12" TREE 18" TREE 18" TREE 18" TREE F/O 18" TREE 12" TREE P R E S S B O X F F = 1 0 4 2 . 3 3 12" TREE PRE S S B O X FF= 1 0 3 9 . 3 3 FF=1028.11 X X X X X F/ O F/ O F/ O F/ O F/ O F/ O F/ O F / O F/ O EX B R I C K D U G O U T EX BRICK DUGOUT 38 . 0 ' 10.0' EX BRICK DUGOUT 10 . 0 ' 46.0' 10 . 0 ' 38.0' EX B R I C K D U G O U T 10.0' 30 . 0 ' AR E A U N D E R C O N S T R U C T I O N A T T I M E O F S U R V E Y EX C O N C R E T E S I D E W A L K EX TENNIS COURTS EX GATE EX GATE EX 12' CHAIN LINK FENCE EX B A T T I N G C A G E S W/ C O N C R E T E B A S E EX B A T T I N G C A G E S W/ C O N C R E T E B A S E EX METAL SUPPORT POLES (TYPICAL) EX SCORBOARD EX SCORBOARD EX CONCRETE SIDEWALK EX B L E A C H E R S EX R A M P EX CONCRETE EX TABLE (TYP.) EX R A M P EX BRIC K E X B L E A C H E R S EX BRICK 15 15 15 15 ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15" ST 18" ST 18" ST 18"ST 18"ST 18"ST 18"ST 18"ST 18" ST 18 " ST 36 " ST 36" ST 36" ST 36" ST 24 " S T 1 8 " S T 1 8 " S T 1 8 " S T 1 5 " W 12 " W 12 " W 12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W 8"W 8"W 8"W 8"W 8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8" W 8" W 8" WA R R I O R L A N E (P U B L I C R O A D - A S P H A L T S U R F A C E ) PARK ROAD (PUBLIC ROAD - ASPHALT SURFACE) EX ASPHALT DRIVE SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4"G4" G4" G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4" G G G G G U/ E U/ E U/ E U/ E U/E U/E U/E U/E U/E U/E U/E U/E U/E SA N SA N SA N SA N SA N SA N SA N F/ O U/E U/EU/E U/E U / E U / E U / E U / E U/ E U/E U/E U/E U/E U/E U/E U/E U/E U / E U / E U / E U/ E T E L E T E L E T E L E TE L E U/E U/E U/E U/E U/E U/E U/E U / E U/ E U/ E U/E U/E U/E U/ E U / E U / E U / E U / E U/E U/E U/E U/E U/E U/E U/ E U/ E U/E U/E U/E U/E U/E U/E D D EX RETAINING WALL D D D D ST 18 " ST 30 " ST 24 " ST 24 " ST 24 " ST 24 " ST 24 " ST 15" ST 15" ST 15" ST 15" ST 15" D FF = 1 0 3 5 . 9 5 FF = 1 0 3 5 . 9 7 FF = 1 0 3 5 . 9 7 FF = 1 0 3 5 . 9 5 FF = 1 0 3 6 . 0 3 FF = 1 0 3 6 . 0 0 FF = 1 0 3 6 . 2 7 12" TREE 12" TREE 12" TREE 6" TREE ST 12" ST 18 " DRAWING TITLE: REVISIONS: DRAWING NO.: PROJECT NO.: DATE: 26 0 0 w e s t o w n p a r k w a y , s u i t e 3 4 0 , w e s t d e s m o i n e s , i o w a 5 0 2 6 6 p 5 1 5 . 2 2 3 . 5 1 0 0 f 5 1 5 . 2 2 3 . 7 2 2 6 w w w . f r k - a e . c o m fr k a r c h i t e c t s + e n g i n e e r s 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 WA U K E E H I G H S C H O O L BA S E B A L L / S O F T B A L L S T A D I U M WA U K E E C O M M U N I T Y S C H O O L D I S T R I C T WA U K E E , I O W A 1018D07 FEBRUARY 2023 12/27/22 - 1ST CITY SET 01/24/23 - 2ND CITY SET 02/07/23 - 3RD CITY SET L: \ L A N D P R O J E C T S 2 0 2 2 \ 2 2 0 4 1 6 W A U K E E H S B A S E B A L L - S O F T B A L L S Y N T H E T I C T U R F P R O J E C T \ D W G \ C 2 L A Y O U T . D W G 2/ 2 0 / 2 0 2 3 4 : 1 1 : 2 0 P M GRAPHIC SCALE 030 15 30 60 C-201 LAYOUT PLAN 0. 5 % 0 . 6 % 0.9% 1.0% 1. 0 % 1. 0 % 1. 0 % 1.0% 1. 1 % 0.5% 0. 5 % 0.5% 0. 5 % 0. 9 % 1.4% 1.1% 1.5% 1.6 % 1. 5 % 6:1 6.8% 5: 1 3: 1 4:1 PROPOSED BUILDING FOOTPRINT = 7,513 SF FF = 1029.00 8 : 1 4: 1 D D 3.4% 5.3%2.5% 5: 1 2.0% 2.2% 3.0% 2.9 % 5 . 0 % 8:1 4: 1 6:1 5: 1 8:1 CO 250' DETENTION BASIN OVERTOPPING 3: 1 H Y D 2.0 % 1 0 2 5 1 0 2 3 1 0 2 4 10 2 6 10 2 7 10 2 8 1030 1031 10 3 0 10 2 9 1020 102 5 102 1 102 2 10 2 3 10 2 4 10 2 6 10 2 7 10 2 8 1025 1026 1027 1028 1 0 2 5 1 0 2 6 1 0 2 7 102 5 1 0 2 6 1 0 2 7 1 0 2 8 102 9 102 7 102 8 1026 1027 1028 1 0 2 2 1023 1 0 2 0 1 0 1 8 1 0 1 9 1 0 2 1 1 0 2 0 1 0 1 8 1 0 1 9 1 0 2 1 1 0 2 2 1 0 2 3 1 0 2 3 1 0 2 4 1 0 2 4 10311030 10291026 1027 1028 1029 BID ALT STORAGE BUILDING FOOTPRINT = 642 SF FF = 1029.00 1 0 2 9 1 0 2 8 10 2 9 8.0 % 103 0 1031 1032 103 2 2. 0 % 1.5% WV D SA N 4" SA N 4" D 100-YR PONDING ELEV = 1029.29 100-YR PONDING ELEV = 1029.09 100-YR PONDING ELEV = 1028.56 100-YR PONDING ELEV = 1028.73 100-YR PONDING ELEV = 1024.43 100-YR PONDING ELEV = 1025.44 100-YR PONDING ELEV = 1026.06 100-YR PONDING ELEV = 1026.84 100-YR PONDING ELEV = 1023.00 REF ARCH FOR PROTECTION ABOVE FINISHED FLOOR 100-YR PONDING ELEV = 1028.06 100-YR PONDING ELEV = 1028.79 TAPER OUT CURB HEIGHT 1026.28± EX 1026.32± EX SEE DETAIL 12/C-601 FOR MOUND GRADING 4" BASE COURSE AGGREGATE DEPTH AT EDGE OF MOUND 6" STANDARD BASE COURSE AGGREGATE DEPTH AT BASE LINE 6" STANDARD BASE COURSE AGGREGATE DEPTH AT BASE LINE VARYING BASE COURSE DEPTH INSIDE BASE LINES FROM 4" AT MOUNT TO 6" AT BASE LINE CONTRACTOR SHALL INCORPORATE 5% CEMENT OR 15% FLY ASH INTO THE TOP 12" OF COMPACTED SUBGRADE BELOW THE SYNTHETIC TURF, EXTENDING TO 24" BEYOND THE OUTSIDE FENCE/MOW STRIP CONTRACTOR SHALL INCORPORATE 5% CEMENT OR 15% FLY ASH INTO THE TOP 12" OF COMPACTED SUBGRADE BELOW THE SYNTHETIC TURF, EXTENDING TO 24" BEYOND THE OUTSIDE FENCE/MOW STRIP 1028.03 1028.03 1028.03 1028.03 1027.77 1027.771027.661027.66 1027.66 1027.66 1027.66 1027.44 1026.69 1026.49 1025.97 1025.77 1025.79 1025.82 1025.84 1025.77 1025.71 1025.71 1025.50 1025.50 1025.70 1025.70 1025.75 1031.06 1030.91 1030.91 1030.91 1030.91 1030.781030.781030.56 OVERTOPPPING 1030.35 1029.27 1029.47 1028.90 1029.03 1029.03 1029.03 1029.03 1029.03 1028.90 1028.80 1029.69 1029.79 1030.55 1030.55 1030.55 1030.59 1030.61 1017.00 1028.50 1026.00 OVERTOPPING 1026.46 1026.06 1025.40 OVERTOPPING 1025.80 1024.25 OVERTOPPING 1025.27 1029.00 1029.00 1029.00 1029.001029.00 1028.92E/W 1028.87 1028.79E/W 1029.00 1028.79E/W 1028.92 1028.88E/W 1028.92E/W1028.92E/W 1028.90E/W 1028.83E/W 1029.001029.001029.00 1029.00 1029.00 1029.001029.00 1029.001028.50 1028.00 1027.681026.75 1028.73E/W 1028.66E/W 1028.77E/W 1028.68E/W 1028.77E/W 1028.77E/W1028.77E/W 1028.77E/W 1028.77E/W 1028.81E/W 1028.35E/W 1028.28E/W 1029.19E/W1029.15E/W 1029.10E/W 1031.40E/W 1031.57E/W 1031.67E/W 1031.50E/W 1030.28E/W 1029.25 OVERTOPPING 1029.23 1028.50 OVERTOPPING 1028.99 OVERTOPPING 1027.80 1032.19E/W 1032.28E/W 1032.09E/W 1032.18E/W 1032.51E/W1032.41E/W 1032.31E/W 1032.60E/W1032.50E/W 1032.40E/W 1030.21E/W 1030.30E/W 1029.25B/S 1031.46T/S1031.36T/S 1029.20B/S 1028.31E/W 1028.39E/W 1027.96E/W 1027.91E/W 1027.57E/W 1027.50E/W 1027.79E/W 1027.86E/W 1029.00 1024.30 1024.30 OVERTOPPING 1030.10 1019.00 1028.04E/W 1027.96E/W 1027.88E/W 1027.86E/W 1027.83± EX 1027.95± EX 1029.32± EX 1029.28± EX 1032.61± EX 1032.47± EX 1031.96± EX 1031.78± EX 1029.20 1029.501029.50 1029.50 1027.85± EX 1024.30 1024.30 1024.30 1031.97E/W 1032.04E/W 1031.83E/W 1031.90T/C EX 1030.60T/C EX1030.06T/C EX 1029.33T/C EX1029.18T/C 1028.68G 1030.52E/W1029.98E/W1029.25E/W1029.09E/W 1029.04E/W 1028.96E/W 1027.37E/W 1027.29E/W 1028.92 1029.00 1029.00 1028.77E/W 1028.92 1028.95 1028.31 1029.00OVERTOPPING 1028.80 1029.00 1029.00 1029.00 1028.64 1028.55 1028.46 1028.55 1027.78± EX 1028.92± EX 1028.91± EX 1027.55± EX 1028.52± EX 1028.55± EX 1027.75 1025.59 1031.59± EX 1031.78± EX 1032.85E/W 1032.77E/W 1032.73E/W1032.66E/W 1032.58E/W 1032.49E/W 1032.40E/W 1032.34E/W 1032.22E/W 1032.24E/W 1032.22E/W 1032.50E/W 1033.26T/C 1032.76G 1032.91T/C 1032.41G1032.17T/C 1031.67G 1032.40T/C 1031.90G 1032.681032.64 1032.57 1032.49 1032.40 1032.31 1032.25 1032.13 1032.98T/C 1032.48G 1032.37 1032.33 1032.26 1032.18 1032.09 1032.00 1031.94 1029.78± EX 1028.921028.92 1029.45T/C 1028.95G 1029.10T/C 1028.60G 1029.26T/C 1028.76G 1029.10± EX 1029.02E/W 1029.08E/W 2.6 % 1.5% 2.0% 2.5% 2.2% 2.0%7. 0 % 2. 1 % 2. 0 % 2.0% 2.3% 4.0% 2.1% 2. 5 % 2. 2 % 2. 0 % 3. 4 % 2.0% 1.4% 5. 9 % 1.0% 6. 7 % 1. 5 % 1.0% 1. 5 % 5. 0 % 5. 0 % 1.0% 1. 5 % 1.0% 1. 5 % 1. 0 % 1. 0 % 4.7% 4.9%0.9% 0. 5 % 1.5% 0. 0 % 0. 0 % 0. 0 % 1.5% 1.5%0. 0 % 0. 0 % 1. 5 % 1. 0 % 1.5% 1. 5 % 0.4%1. 5 % 1. 1 % 1.0% 0.5% 1.8% 1.8% 1. 5 % 0.1% 0.1%1. 7 % 0. 0 % 0. 0 % 1.5% 0. 0 % 1.5% 1.3% 0.0% 0. 0 % 1.5% 1.3% 1. 5 % 1.0% 1.3% 1.2% 2.5 % 0.0% 1.5% 0.0% 1. 5 % 0.0% 0.0% 0.5% 1.3% 1. 5 % 1.3% 1. 5 % 1. 5 %1.3% 1.5% 1.0% 3.1%1.6% 1. 5 % 1. 5 % 1.5 % 1.5 % 0.3% 1.0% 1.0 % 1.5% 1.5 % 0.6% 1. 5 % 1 . 5 % 1. 5 % 0.3% 0 . 9 % 0 . 7 % 3.2 % 3.0 % 1. 5 % 1. 5 % 1. 5 % 1. 5 % 1. 5 % 1.5 % 1.5% 1.5 % 0.9 % 3.5 % 3.5 % 3. 5 % 2. 9 % 1. 5 % 1. 5 % 1.0% 1. 5 % 1. 5 % 1. 5 % 1. 5 % 0.0% 2.7% 2. 1 % 2.0% 1.5% 1. 0 % 1. 0 % 1.5% 1 . 5 % 1.5 %1. 5 % 1. 5 % 1. 5 % 1. 5 % 1. 5 % 1. 5 % 1. 5 % 1. 5 % 1.5 % 1.5 % 1.5 %1.5 %1.5 % 1.5 % 1.5 % 0.8%0.8%0.8%0.8%1.0%1.0%1.0%0.8% 0.8% 1. 5 % 0.8%0.8% 0.8%0.8% 0.8%0.8% 0.8%1.0% 1.0%1.0% 1.0%1.0% 1.0%1.1% 1.1% 2.3 % 1.7 % 1.5 % 2.2% 2.2% 1.5 % 0. 6 %0.6% 0. 5 % 1.5% 1. 5 % 1. 5 % 0.5% CP #9002 H Y D WVWVWVHYD F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O FO FO D D D D D F/O P R E S S B O X F F = 1 0 4 2 . 3 3 PRE S S B O X FF= 1 0 3 9 . 3 3 FF=1028.11 X X X X X F/ O F/ O F/ O F/ O F/ O F/ O F/ O F / O F/ O EX B R I C K D U G O U T EX BRICK DUGOUT 38 . 0 ' 10.0' EX BRICK DUGOUT 10 . 0 ' 46.0' 10 . 0 ' 38.0' EX B R I C K D U G O U T 10.0' 30 . 0 ' AR E A U N D E R C O N S T R U C T I O N A T T I M E O F S U R V E Y EX C O N C R E T E S I D E W A L K EX TENNIS COURTS EX GATE EX GATE EX 12' CHAIN LINK FENCE EX B A T T I N G C A G E S W/ C O N C R E T E B A S E EX B A T T I N G C A G E S W/ C O N C R E T E B A S E EX METAL SUPPORT POLES (TYPICAL) EX SCORBOARD EX SCORBOARD EX CONCRETE SIDEWALK EX B L E A C H E R S EX R A M P EX CONCRETE EX TABLE (TYP.) EX R A M P EX BRIC K E X B L E A C H E R S EX BRICK 15 15 15 15 ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15" ST 18" ST 18" ST 18"ST 18"ST 18"ST 18"ST 18"ST 18" ST 18 " ST 36 " ST 36" ST 36" ST 36" S T 1 8 " S T 1 8 " S T 1 8 " S T 1 5 " W 12 " W 12 " W 12 " W 12 " W 12 " W 12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W 8"W 8"W 8"W 8"W 8"W 8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8" W 8" W 8" WA R R I O R L A N E (P U B L I C R O A D - A S P H A L T S U R F A C E ) PARK ROAD (PUBLIC ROAD - ASPHALT SURFACE) EX ASPHALT DRIVE SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4"G4" G4" G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4" G G G G G U/ E U/ E U/ E U/ E U/E U/E U/E U/E U/E U/E U/E U/E U/E SA N SA N SA N SA N SA N SA N SA N 1024 1023 1022 1023 1023 1024 10 2 4 1025 1027 1 0 2 0 1022 10 2 5 10 2 7 1 0 2 5 1025 102 2 1028 1026 1026 1027 1027 1028 1 0 2 7 1028 1025 1027 1027 1026 1027 1029 1028 1030 1029 103 0 1031 1032 10 3 1 1030 1 0 2 9 1 0 2 7 10 2 9 F/ O U/E U/EU/E U/E U / E U / E U / E U / E U/ E U/E U/E U/E U/E U/E U/E U/E U/E U / E U / E U / E U/ E T E L E T E L E T E L E TE L E U/E U/E U/E U/E U/E U/E U/E U / E U/ E U/ E U/E U/E U/E U/ E U / E U / E U / E U / E U/E U/E U/E U/E U/E U/E U/ E U/ E U/E U/E U/E U/E U/E U/E D D EX RETAINING WALL D D D D ST 18 " ST 30 " ST 24 " ST 24 " ST 24 " ST 24 " ST 24 " ST 15" ST 15" ST 15" ST 15" ST 15" D FF = 1 0 3 5 . 9 5 FF = 1 0 3 5 . 9 7 FF = 1 0 3 5 . 9 7 FF = 1 0 3 5 . 9 5 FF = 1 0 3 6 . 0 3 FF = 1 0 3 6 . 0 0 FF = 1 0 3 6 . 2 7 ST 12" 1030 1030 10 2 8 1029 1035 103 5 1 0 2 7 1031 1035 1033 1034 1035 ST 18 " 10 3 0 10 3 1 10 3 2 10 2 9 1 0 2 9 TOPSOIL NOTES: 1.STRIP AND STOCKPILE THE TOP 8" OF SOIL ON ALL DISTURBED AREAS. 2.RESPREAD TOPSOIL TO A MINIMUM DEPTH OF 8" ON ALL GREEN (NON PAVED) AREAS. IMPORT TOPSOIL AS NECESSARY TO ACHIEVE A MINIMUM DEPTH OF 6". 3.TOPSOIL SHALL BE FREE OF ALL ROCK AND DEBRIS LARGER THAN 3/4" IN SIZE. 4.TOPSOIL IS DEFINED AS: FERTILE, FRIABLE LOAM, CAPABLE OF SUSTAINING VIGOROUS PLANT GROWTH, FROM WELL DRAINED SITE FREE FROM FLOODING, NOT IN FROZEN OR MUDDY CONDITIONS; REASONABLE FREE FROM SUBSOIL, CLAY LUMPS, ROOTS, GRASS, WEEDS, STONES LARGER THAN 3/4 INCH IN DIAMETER, AND FOREIGN MATTER; ACIDITY RANGE (PH) OF 5.5 TO 7.5; CONTAINING MINIMUM 4 PERCENT AND MAXIMUM 20 PERCENT ORGANIC MATTER. 5.CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL TOPSOIL REQUIREMENTS OF NPDES GENERAL PERMIT NO. 2 ARE MET. DRAWING TITLE: REVISIONS: DRAWING NO.: PROJECT NO.: DATE: 26 0 0 w e s t o w n p a r k w a y , s u i t e 3 4 0 , w e s t d e s m o i n e s , i o w a 5 0 2 6 6 p 5 1 5 . 2 2 3 . 5 1 0 0 f 5 1 5 . 2 2 3 . 7 2 2 6 w w w . f r k - a e . c o m fr k a r c h i t e c t s + e n g i n e e r s 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 WA U K E E H I G H S C H O O L BA S E B A L L / S O F T B A L L S T A D I U M WA U K E E C O M M U N I T Y S C H O O L D I S T R I C T WA U K E E , I O W A 1018D07 FEBRUARY 2023 12/27/22 - 1ST CITY SET 01/24/23 - 2ND CITY SET 02/07/23 - 3RD CITY SET GRADING LEGEND: EXISTING CONTOUR PROPOSED CONTOUR FINISHED GROUND ELEVATION TOP OF CURB ELEVATION GUTTER ELEVATION TOP OF WALL ELEVATION BOTTOM OF WALL ELEVATION EDGE OF WALK ELEVATION TOP OF STAIR ELEVATION BOTTOM OF STAIR ELEVATION NOTE: WALL ELEVATIONS SHOWN ON PLAN ARE FINISHED GROUND GRADES AT THE TOP AND BOTTOM OF THE WALL. 150.50E/W 150.50B/W 150.50T/W 150.50G 150.50T/C 150.50 150 150 150.50T/S 150.50B/S L: \ L A N D P R O J E C T S 2 0 2 2 \ 2 2 0 4 1 6 W A U K E E H S B A S E B A L L - S O F T B A L L S Y N T H E T I C T U R F P R O J E C T \ D W G \ C 3 G R A D I N G . D W G 2/ 2 0 / 2 0 2 3 4 : 1 2 : 5 5 P M GRAPHIC SCALE 030 15 30 60 C-301 GRADING PLAN PROPOSED BUILDING FOOTPRINT = 7,513 SF FF = 1029.00 D D 5,200LF TOTAL LENGTH 12" WIDE FLAT HYDRAWAY PIPE SPACED 20' O/C, TYP CO REPAIR EX STRUCTURE FOR REMOVED PIPE 1,780LF TOTAL LENGTH 12" WIDE FLAT HYDRAWAY PIPE SPACED 20' O/C, TYP H Y D R150' HYDRANT RA D I U S R150' H Y D R A N T R A D I U S BID ALT STORAGE BUILDING FOOTPRINT = 642 SF FF = 1029.00 18" CMP FES FL=1025.59 WV D SA N 4" SA N 4" D INV=1020.00 (REF PLUMB) CONNECT TO EX WATER MAIN W/ 8"x6" T.S.&V. STRUCTURE #1 48"x48" SW-402 MANHOLE W/ RESTRICTION PLATE (SEE DETAIL 10/C-601) RIM=1024.49 FL(N)=1016.33 FL(E)=1014.86 FL(W)=1014.86 STRUCTURE #2 24" FES FL(S)=1017.00 PIPE #2 34LF 24" RCP @ S=2.00% PIPE #5A 66LF 24" N-12 @ S=2.67% STRUCTURE #7 FL(W)=1021.48 FL(E)=1021.48 STRUCTURE #7.2 24"x15" REDUCER & 15" 90° BEND FL(N)=1021.80 FL(E)=1021.80 PIPE #7.2 79LF 24" SLOTTED N-12 @ S=0.40% STRUCTURE #8 FL(N)=1023.62 FL(S)=1023.62 PIPE #8 227LF 15" SLOTTED N-12 @ S=0.80% 15" 45° BEND FL(NE)=1024.54 FL(S)=1024.54 PIPE #8.2 115LF 15" SLOTTED N-12 @ S=0.80% STRUCTURE #6.3 15" 45° BEND FL(SW)=1024.33 FL(E)=1024.33 PIPE #6.4 18LF 15" SLOTTED N-12 @ S=1.17% STRUCTURE #5 FL(N)=1020.69 FL(S)=1020.22 STRUCTURE #5.2 18"x15" REDUCER & 15" 45° BEND FL(NW)=1021.25 FL(S)=1021.25 PIPE #5.2 67LF 18" SLOTTED N-12 @ S=0.84% STRUCTURE #6 15" 45° BEND FL(W)=1021.35 FL(SE)=1021.35 PIPE #6 12LF 15" SLOTTED N-12 @ S=0.82% STRUCTURE #6.2 FL(W)=1023.17 FL(E)=1023.17 PIPE #6.2 228LF 15" SLOTTED N-12 @ S=0.80% PIPE #6.3 116LF 15" SLOTTED N-12 @ S=1.00% STRUCTURE #5X 24" FES FL(N)=1019.00 STRUCTURE #5B 48" SW-401 MANHOLE RIM=1025.52 FL(NE)=1020.37 FL(N)=1019.80 FL(W)=1019.80 FL(S)=1019.70 PIPE #5B 86LF 24" RCP @ S=0.82% STRUCTURE #10A 15" TEE FL(SE)=1023.49 FL(NW)=1023.49 FL(SW)=1023.40 PIPE #10A 56LF 15" N-12 @ S=5.39% STRUCTURE #10 FL(N)=1024.24 FL(S)=1024.24 STRUCTURE #10.2 15" 90° BEND FL(E)=1024.88 FL(S)=1024.88 PIPE #10.2 80LF 15" SLOTTED N-12 @ S=0.80% STRUCTURE #10.3 15"x8" TEE & 15"x12" REDUCER FL(E)=1025.63 FL(N)=1025.63 FL(W)=1025.63 PIPE #10.3 94LF 15" SLOTTED N-12 @ S=0.80% STRUCTURE #11 12" 45° BEND FL(SE)=1026.38 FL(W)=1026.38 PIPE #11 94LF 12" SLOTTED N-12 @ S=0.80%STRUCTURE #13 12" 45° BEND FL(NW)=1026.69 FL(S)=1026.69 PIPE #11.2 17LF 12" SLOTTED N-12 @ S=1.87% STRUCTURE #14 24" NYLOPLAST BASIN RIM=1029.25 FL(N)=1025.92 FL(S)=1025.82 PIPE #14 19LF 8" N-12 @ S=1.00% STRUCTURE #12 FL(E)=1023.87 FL(W)=1023.87 STRUCTURE #12.2 15" 90° BEND FL(N)=1024.19 FL(W)=1024.19 PIPE #12.2 80LF 15" SLOTTED N-12 @ S=0.40% STRUCTURE #12.3 15"x12" TEE & 15"x12" REDUCER FL(N)=1024.51 FL(E)=1024.51 FL(S)=1024.51 PIPE #12.3 79LF 15" SLOTTED N-12 @ S=0.40% PIPE #13 109LF 12" SLOTTED N-12 @ S=2.00% STRUCTURE #16 24" NYLOPLAST BASIN RIM=1028.50 FL(N)=1024.75 FL(S)=1024.75 FL(W)=1024.65 PIPE #16 35LF 12" N-12 @ S=0.40% STRUCTURE #20 24" NYLOPLAST BASIN RIM=1024.25 FL(W)=1020.47 FL(N)=1020.47 FL(S)=1020.37 PIPE #20 143LF 15" N-12 @ S=0.40% STRUCTURE #21 24" NYLOPLAST BASIN RIM=1025.40 FL(W)=1021.40 FL(E)=1021.30 PIPE #21 92LF 15" N-12 @ S=0.90% STRUCTURE #22 24" NYLOPLAST BASIN RIM=1026.00 FL(N)=1022.10 FL(W)=1023.00 FL(E)=1022.00 PIPE #22 66LF 12" N-12 @ S=0.90% STRUCTURE #23 24" NYLOPLAST BASIN RIM=1026.75 FL(E)=1023.00 FL(S)=1022.48 PIPE #23 77LF 8" N-12 @ S=0.50% PIPE #7 316LF 24" SLOTTED N-12 @ S=0.40% PIPE #12 94LF 15" SLOTTED N-12 @ S=0.40% PIPE #10 94LF 15" SLOTTED N-12 @ S=0.80% STRUCTURE #17 24" NYLOPLAST BASIN RIM=1028.50 FL(S)=1025.00 PIPE #17 64LF 12" N-12 @ S=0.40% STRUCTURE #5A 24"x24" TEE & 24"x18" REDUCER FL(N)=1020.69 FL(S)=1020.22 FL(E)=1021.57 PIPE #5 56LF 18" SLOTTED N-12 @ S=0.84% PIPE #24 19LF 6" N-12 @ S=10.00% ADJUST EX VALVE TO PROPOSED GRADE STRUCTURE #15 24" NYLOPLAST BASIN RIM=1029.00 FL(S)=1026.09 PIPE #15 17LF 8" N-12 @ S=1.00% CLEANOUT RIM=1027.68 FL(E)=1024.68 110LF 6 SUBDRAIN @ S=1.53% STRUCTURE #25 24" NYLOPLAST BASIN RIM=1028.00 FL(S)=1023.92 PIPE #25A 75LF 8" N-12 @ S=3.00% FL=1025.25 (SEE DETAIL 17/C-601) REF ELEC/TECHNOLOGY PLANS FOR RELOCATION AROUND BULLPEN **CRITICAL CROSSING** BOTTOM STORM = 1021.35 TOP SAN = 1012± CONTACT BISHOP ENGINEERING IF IN CONFLICT 6"x3" TEE, 3" VALVE, 3" 90° BEND & 5LF 3" DOMESTIC SERVICE RELOCATED HYDRANT ASSEMBLY **CRITICAL CROSSING** BOTTOM STORM (N) = 1021.75± BOTTOM STORM (S) = 1022.05± TOP SANITARY = 1020.25± GREASE INTERCEPTOR (REF PLUMB) STRUCTURE #18 24" NYLOPLAST BASIN RIM=1027.75 FL(N)=1025.36 PIPE #18 61LF 12" N-12 @ S=1.00% 7LF 6" FIRE SERVICE FIRE DEPARTMENT CONNECTION & FIRE RISER ROOM STRUCTURE #30X 18" FES FL(NE)=1025.59 STRUCTURE #30A 48" SW-401 MANHOLE RIM=1028.79 FL(N)=1025.88±EX FL(SE)=1026.03 FL(SW)=1025.78PIPE #30A 38LF 18" RCP @ S=0.50% STRUCTURE #30 SW-505 INTAKE T/C=1029.10 FL(NW)=1026.16 PIPE #30 13LF 15" RCP @ S=1.00% **CRITICAL CROSSING** BOTTOM STORM = 1025.40± TOP WATER = 1020.00± EX CONNECT TO EX SEWER INV=1018.55± 145LF 4" SAN SWR @ S=1.00% PIPE #23A 21LF 6" N-12 @ S=2.00% STRUCTURE #25A 24" NYLOPLAST BASIN W/ SOLID LID RIM=1028.51 FL(N)=1022.80 FL(W)=1023.37 FL(S)=1022.70 PIPE #25 37LF 8" N-12 @ S=3.00% 84LF 6" SUBDRAIN 79LF 6" SUBDRAIN 99LF 6" SUBDRAIN 99LF 6" SUBDRAIN 32LF 6" SUBDRAIN 24LF 6" SUBDRAIN 40LF 6" SUBDRAIN 14LF 6" SUBDRAIN DOWNSPOUT CONNECTION (SEE DETAIL 22/C-601)TRANSFORMER PAD W/ MOAT (SEE DETAIL 20/C-601) (REF ELECTRICAL FOR SERVICE) LIGHT POLE (REF ELEC) LIGHT POLE (REF ELEC) CP #9002 H Y D WVWVWVHYD F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O FO FO D D D D D F/O P R E S S B O X F F = 1 0 4 2 . 3 3 PRE S S B O X FF= 1 0 3 9 . 3 3 FF=1028.11 X X X X X F/ O F/ O F/ O F/ O F/ O F/ O F/ O F / O F/ O EX B R I C K D U G O U T EX BRICK DUGOUT 38 . 0 ' 10.0' EX BRICK DUGOUT 10 . 0 ' 46.0' 10 . 0 ' 38.0' EX B R I C K D U G O U T 10.0' 30 . 0 ' AR E A U N D E R C O N S T R U C T I O N A T T I M E O F S U R V E Y EX C O N C R E T E S I D E W A L K EX TENNIS COURTS EX GATE EX GATE EX 12' CHAIN LINK FENCE EX B A T T I N G C A G E S W/ C O N C R E T E B A S E EX B A T T I N G C A G E S W/ C O N C R E T E B A S E EX METAL SUPPORT POLES (TYPICAL) EX SCORBOARD EX SCORBOARD EX CONCRETE SIDEWALK EX B L E A C H E R S EX R A M P EX CONCRETE EX TABLE (TYP.) EX R A M P EX BRIC K E X B L E A C H E R S EX BRICK 15 15 15 15 ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15" ST 18" ST 18" ST 18"ST 18"ST 18"ST 18"ST 18"ST 18" ST 18 " ST 36 " ST 36" ST 36" ST 36" ST 24 " ST 24 " ST S T 1 8 " S T 1 8 " S T 1 8 " S T 1 8 " S T 1 5 " W 12 " W 12 " W 12 " W 12 " W 12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W 8"W 8"W 8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8" W 8" W 8" W EX SIZE / LOCATION PER CITY OF WAUKEE GIS WA R R I O R L A N E (P U B L I C R O A D - A S P H A L T S U R F A C E ) PARK ROAD (PUBLIC ROAD - ASPHALT SURFACE) EX ASPHALT DRIVE SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " EX SIZE / LOCATION PER CITY OF WAUKEE GIS G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4"G4" G4" G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4" EX LOCATION PER CITY OF WAUKEE GIS G G G G G U/ E U/ E U/ E U/ E U/E U/E U/E U/E U/E U/E U/E U/E U/E EX LOCATIONS PER CITY OF WAUKEE GIS SA N SA N SA N SA N SA N SA N SA N F/ O U/E U/EU/E U/E U / E U / E U / E U / E U/ E U/E U/E U/E U/E U/E U/E U/E U/E U / E U / E U / E U/ E T E L E T E L E T E L E TE L E U/E U/E U/E U/E U/E U/E U/E U / E U/ E U/ E U/E U/E U/E U/ E U / E U / E U / E U / E U/E U/E U/E U/E U/E U/E U/ E U/ E U/E U/E U/E U/E U/E U/E D D EX RETAINING WALL D D D D ST 18 " ST 30 " ST 24 " ST 24 " ST 24 " ST 24 " ST 24 " ST 15" ST 15" ST 15" ST 15" ST 15" D EX OPEN SIDED INTAKE FF = 1 0 3 5 . 9 5 FF = 1 0 3 5 . 9 7 EX INTAKE RIM=1034.82 FF = 1 0 3 5 . 9 7 FF = 1 0 3 5 . 9 5 FF = 1 0 3 6 . 0 3 FF = 1 0 3 6 . 0 0 EX 12" FES FL=1029.78 FF = 1 0 3 6 . 2 7 EX CMP" 18 FES FL=1026.41 EX 12" FES FL=1026.66 EX 12" FES FL=1027.68 EX 12" FES FL=1028.30 ST 12" ST 18 " APPROXIMATE SERVICE LINE LOCATION PER CITY OF WAUKEE GIS APPROXIMATE ELEVATION PER OWNER = 1016.33± UTILITY NOTES: 1.ALL PROPOSED UTILTIES SHALL BE PRIVATE, UNLESS NOTED OTHERWISE. 2.ALL WATER LINES SHALL HAVE A MINIMUM OF 5.5' OF COVER UNLESS NOTED OTHERWISE. 3.FIRE HYDRANT ASSEMBLY SHALL INCLUDE THE TEE, BRANCH, VALVE AND HYDRANT. 4.PIPE LENGTHS CALLED OUT ON PLANS INCLUDE FLARED END SECTION, WHERE APPLICABLE. 5.STORM SEWER CALLED OUT AS RCP MUST BE CLASS III RCP. 6.STORM SEWER CALLED OUT AS N-12 MAY BE EITHER N-12 OR CLASS III RCP. 7.FOR RCP PIPE, ASSOCIATED F.E.S. MUST BE RCP. FOR N-12 PIPE, ASSOCIATED F.E.S. SHALL BE CMP. 8.ALL NYLOPLAST BASINS SHALL HAVE CASTINGS SECURELY FASTENED TO THE BASIN BODY, AND ALL GRATES/LIDS SHALL BE BOLTED DOWN TO THE CASTINGS. 9.TRANSFORMER PAD IS SHOWN FOR REFERENCE ONLY AND MAY NOT BE DRAWN TO ACTUAL SIZE. PAD SHALL CONFORM TO ALL UTILITY COMPANY DESIGN STANDARDS AND SPECIFICATIONS. 10.GREASE INTERCEPTOR AND ANY VENT LINES ARE SHOWN FOR REFERENCE ONLY AND MAY NOT BE DRAWN TO ACTUAL SIZE. REFER TO PLUMBING PLANS FOR DETAILED DRAWINGS AND SPECIFICATIONS. PLUMBING PLANS SHALL TIE INTO SANITARY SERVICE AT LOCATION AND ELEVATION SHOWN ON PLANS. DRAWING TITLE: REVISIONS: DRAWING NO.: PROJECT NO.: DATE: 26 0 0 w e s t o w n p a r k w a y , s u i t e 3 4 0 , w e s t d e s m o i n e s , i o w a 5 0 2 6 6 p 5 1 5 . 2 2 3 . 5 1 0 0 f 5 1 5 . 2 2 3 . 7 2 2 6 w w w . f r k - a e . c o m fr k a r c h i t e c t s + e n g i n e e r s 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 WA U K E E H I G H S C H O O L BA S E B A L L / S O F T B A L L S T A D I U M WA U K E E C O M M U N I T Y S C H O O L D I S T R I C T WA U K E E , I O W A 1018D07 FEBRUARY 2023 12/27/22 - 1ST CITY SET 01/24/23 - 2ND CITY SET 02/07/23 - 3RD CITY SET L: \ L A N D P R O J E C T S 2 0 2 2 \ 2 2 0 4 1 6 W A U K E E H S B A S E B A L L - S O F T B A L L S Y N T H E T I C T U R F P R O J E C T \ D W G \ C 4 U T I L I T Y . D W G 2/ 2 0 / 2 0 2 3 4 : 1 4 : 2 1 P M GRAPHIC SCALE 030 15 30 60 C-401 UTILITY PLAN PROPOSED BUILDING FOOTPRINT = 7,513 SF FF = 1029.00 D D CO HY D 1 0 2 5 1 0 2 3 1 0 2 4 10 2 6 10 2 7 10 2 8 1030 1031 10 3 0 10 2 9 1020 102 5 102 1 102 2 10 2 3 10 2 4 10 2 6 10 2 7 10 2 8 1025 1026 1027 1028 1 0 2 5 1 0 2 6 1 0 2 7 102 5 1 0 2 6 1 0 2 7 1 0 2 8 102 9 102 7 102 8 1026 1027 1028 1 0 2 2 1023 1 0 2 0 1 0 1 8 1 0 1 9 1 0 2 1 1 0 2 0 1 0 1 8 1 0 1 9 1 0 2 1 1 0 2 2 1 0 2 3 1 0 2 3 1 0 2 4 1 0 2 4 10311030 10291026 1027 1028 1029 BID ALT STORAGE BUILDING FOOTPRINT = 642 SF FF = 1029.00 1 0 2 9 1 0 2 8 10 2 9 103 0 1031 1032 103 2 WV D SA N 4" SA N 4" D CP #9002 8" TREE 8" TREE 8" TREE 8" TREE 8" TREE 8" TREE 18" TREE H Y D WVWVWVHYD F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O FO FO D 6" TREE D 6" TREE6" TREE 6" TREE 6" PINE D D D 6" TREE 8" TREE 12" TREE 18" TREE 12" TREE 18" TREE 18" TREE 18" TREE F/O 18" TREE 12" TREE P R E S S B O X F F = 1 0 4 2 . 3 3 12" TREE PRE S S B O X FF= 1 0 3 9 . 3 3 FF=1028.11 X X X X X F/ O F/ O F/ O F/ O F/ O F/ O F/ O F / O F/ O EX B R I C K D U G O U T EX BRICK DUGOUT 38 . 0 ' 10.0' EX BRICK DUGOUT 10 . 0 ' 46.0' 10 . 0 ' 38.0' EX B R I C K D U G O U T 10.0' 30 . 0 ' ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15" ST 18" ST 18" ST 18"ST 18"ST 18"ST 18"ST 18"ST 18" ST 18 " ST 36 " ST 36" ST 36" ST 36" S T 1 8 " S T 1 8 " S T 1 8 " S T 1 5 " W 12 " W 12 " W 12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8" W 8" W 8" WA R R I O R L A N E (P U B L I C R O A D - A S P H A L T S U R F A C E ) PARK ROAD (PUBLIC ROAD - ASPHALT SURFACE) EX ASPHALT DRIVE SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4"G4" G4" G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4" G G G G G U/ E U/ E U/ E U/ E U/E U/E U/E U/E U/E U/E U/E U/E U/E SA N SA N SA N SA N SA N SA N SA N 1024 1023 1022 1023 1023 1024 10 2 4 1025 1027 1 0 2 0 1022 10 2 5 10 2 7 1 0 2 5 1025 102 2 1028 1026 1026 1027 1027 1028 1 0 2 7 1028 1025 1027 1027 1026 1027 1029 1028 1030 1029 103 0 1031 1032 10 3 1 1030 1 0 2 9 1 0 2 7 10 2 9 F/ O U/E U/EU/E U/E U / E U / E U / E U / E U/ E U/E U/E U/E U/E U/E U/E U/E U/E U / E U / E U / E U/ E T E L E T E L E T E L E TE L E U/E U/E U/E U/E U/E U/E U/E U / E U/ E U/ E U/E U/E U/E U/ E U / E U / E U / E U / E U/E U/E U/E U/E U/E U/E U/ E U / E U/E U/E U/E U/E U/E U/E D D D D D D ST 18 " ST 30 " ST 24 " ST 24 " ST 24 " ST 24 " ST 24 " ST 15" ST 15" ST 15" ST 15" ST 15" D FF = 1 0 3 5 . 9 5 FF = 1 0 3 5 . 9 7 FF = 1 0 3 5 . 9 7 FF = 1 0 3 5 . 9 5 FF = 1 0 3 6 . 0 3 FF = 1 0 3 6 . 0 0 FF = 1 0 3 6 . 2 7 12" TREE 12" TREE 12" TREE 6" TREE ST 12" 1030 1030 10 2 8 1029 1035 103 5 1 0 2 7 1031 1035 1033 1034 1035 ST 18 " 10 3 0 10 3 1 10 3 2 10 2 9 1 0 2 9 SOD SOD SOD SEED SOD SOD SOD SOD SOD SOD SOD SOD SEED SEED SEED SEED SEED SEED SEED LIMITS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL SEED/SOD ALL DISTURBED AREAS, TYP SOD/SEED LIMITS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL SOD/SEED ALL DISTURBED AREAS, TYP SEED LIMITS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL SEED/SOD ALL DISTURBED AREAS, TYP SEED LIMITS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL SEED/SOD ALL DISTURBED AREAS, TYP PROJECT SITE LIMITS PROJECT SITE LIMITS KF 17 STEEL EDGING RIVER ROCK SOD SOD SOD SEED SEED SEED LIMITS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL SEED/SOD ALL DISTURBED AREAS, TYP DRAWING TITLE: REVISIONS: DRAWING NO.: PROJECT NO.: DATE: 26 0 0 w e s t o w n p a r k w a y , s u i t e 3 4 0 , w e s t d e s m o i n e s , i o w a 5 0 2 6 6 p 5 1 5 . 2 2 3 . 5 1 0 0 f 5 1 5 . 2 2 3 . 7 2 2 6 w w w . f r k - a e . c o m fr k a r c h i t e c t s + e n g i n e e r s 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 WA U K E E H I G H S C H O O L BA S E B A L L / S O F T B A L L S T A D I U M WA U K E E C O M M U N I T Y S C H O O L D I S T R I C T WA U K E E , I O W A 1018D07 FEBRUARY 2023 12/27/22 - 1ST CITY SET 01/24/23 - 2ND CITY SET 02/07/23 - 3RD CITY SET PLANTING SCHEDULE L: \ L A N D P R O J E C T S 2 0 2 2 \ 2 2 0 4 1 6 W A U K E E H S B A S E B A L L - S O F T B A L L S Y N T H E T I C T U R F P R O J E C T \ D W G \ C 5 L A N D S C A P E . D W G 2/ 2 0 / 2 0 2 3 4 : 1 6 : 0 2 P M GRAPHIC SCALE 030 15 30 60 C-501 LANDSCAPE PLAN DO NOT CUT CENTRAL LEADER WRAP TRUNK WITH APPROVED TREE WRAP TO FIRST BRANCH 4" DEEP HARDWOOD MULCH CUT SYNTHETIC CORDS AROUND ROOTBALL AND TRUNK -ENTIRELY REMOVE WIRE BASKETS FROM BALL SET ROOTBALL ON UNDISTURBED SUBGRADE DECIDUOUS TREE PLANTING (TYP.) NOT TO SCALESCALE: SCARIFY SIDES & BOTTOM OF PLANTING PIT STAKING ORIENTATION NORTH NORTH 2 STAKES - 3" CAL. & LESS 3 STAKES - GREATER THAN 3" CAL. 3'-0"SET ROOTBALL FLUSH WITH FINISHED GRADE DO NOT PLACE MULCH IN CONTACT WITH BASE OF TREE PRUNE ANY DEAD/DAMAGED BRANCHING FROM TREE. MAINTAIN OVERALL APPEARANCE. USE HOSE GUARDS AROUND TRUNK ON STAKING WIRE. TIE WIRE TO STEEL POSTS PLACED OUTSIDE PLANT PIT.. LEAVE STAKES IN PLACE NO MORE THAN 1 YEAR FROM INSTALLATION. CONTRACTOR RESPONSIBLE FOR REMOVAL. 4" DEPTH SHREDDED HARDWOOD MULCH SCARIFY SIDES & BOTTOM OF PLANTING PIT EVERGREEN TREE PLANTING (B&B) NOT TO SCALESCALE: CUT SYNTHETIC CORDS AROUND ROOTBALL AND TRUNK -ENTIRELY REMOVE WIRE BASKETS FROM BALL SET ROOTBALL ON UNDISTURBED SUBGRADE 3'-0" DO NOT PLACE MULCH IN CONTACT WITH BASE OF TREE DECIDUOUS SHRUB DETAIL EVERGREEN SHRUB DETAIL PLANTING ON SLOPES FIRMLY COMPACT SAUCER (USE TOPSOIL) ORIGINAL GROUND LINE SUB-SOIL 4" MULCH PLANTING PIT TWICE THE WIDTH OF ROOTBALL 1 2 SHRUB PLANTING (TYP) NOT TO SCALESCALE: 3" ROCK LANDSCAPE NOTES: 1.ALL SODDING, SEEDING & LANDSCAPE PLANTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, UNLESS SPECIFIED OTHERWISE. 2.SOD AND/OR SEED ALL DISTURBED AREAS WITHIN THE CONTRACT LIMITS, UNLESS NOTED OTHERWISE. SEED LIMITS SHOWN ON PLAN ARE FOR REFERENCE ONLY. FINAL LIMITS MAY CHANGE BASED ON CONSTRUCTION ACTIVITIES. 3.STAKE SOD ON ALL SLOPES 4 : 1 OR GREATER. 4.PLANT QUANTITIES ARE FOR CONTRACTORS CONVENIENCE, THE DRAWING SHALL PREVAIL IF A CONFLICT OCCURS. 5.ALL PLANT MATERIAL SHALL CONFORM TO THE LATEST EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1). 6.CONTRACTOR SHALL GUARANTEE ALL PLANT MATERIAL FOR A PERIOD OF ONE YEAR FROM THE DATE OF ACCEPTANCE. 7.IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE IDENTIFICATION TAGS AND CORDS ON ALL PLANT MATERIAL PRIOR TO THE COMPLETION OF THE CONTRACT. IDENTIFICATION TAGS MUST BE LEFT ON UNTIL AFTER ACCEPTANCE BY OWNER OR OWNER'S REPRESENTATIVE. 8.CONTRACTOR SHALL PLACE SHREDDED HARDWOOD MULCH AROUND ALL TREES, SHRUBS AND GROUND COVER BEDS TO A DEPTH OF 4 INCHES, UNLESS NOTED. 9.STAKE AND WRAP ALL DECIDUOUS TREES IMMEDIATELY AFTER PLANTING. STAKE ALL TREES ACCORDING TO THE STAKING DETAILS. CONTRACTOR SHALL ADJUST AND MAINTAIN GUYING TENSION THROUGHOUT THE PLANT ESTABLISHMENT PERIOD. 10.THE LANDSCAPING CONTRACTOR SHALL HAVE ALL UTILITIES LOCATED BEFORE STARTING ANY SITE WORK OR PLANTING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING UTILITIES. 11.NO LANDSCAPE MATERIAL SHALL BE SUBSTITUTED WITHOUT THE AUTHORIZATION OF THE LANDSCAPE ARCHITECT. ANY SUBSTITUTIONS SHALL BE APPROVED IN WRITING BY THE CITY OF WAUKEE DEVELOPMENT SERVICES DEPARTMENT. 12.ALL GENERAL SITE EDGING SHALL BE NATURAL LIMESTONE EDGING - 6" WIDE X 4" THICK X 36" LENGTHS AS PROVIDED BY WEBER STONE COMPANY, OR APPROVED EQUAL. SAW CUT ALL ENDS FOR TIGHT FIT TO ADJACENT EDGING STONE AND CONCRETE. 13.EDGING AROUND MONUMENT SIGN SHALL INCORPORATE 6" WIDE, NATURAL LIMESTONE EDGING. LAYOUT DIMENSIONS AS SHOWN ON DETAIL (SHEET C-501). SAW CUT ENDS AND SET STONE FLUSH AND TIGHT TO ADJACENT STONE. 14.CONTRACTOR SHALL BE RESPONSIBLE MAINTAINING APPROPRIATE LEVEL OF WATERING FOR ALL NEW PLANTS UNTIL ACCEPTED BY OWNER. 15.BED AROUND TRANSFORMER SHALL INCORPORATE TYPAR 3301 NONWOVEN LANDSCAPE FABRIC (OR SIMILAR) AND 4" THICK LAYER OF WASHED RIVER ROCK (1.5" NOMINAL SIZE). 16.ALL BEDS TO RECEIVE GRANULAR PRE-EMERGENT WEED CONTROL BEFORE AND AFTER MULCH/ROCK IS INSTALLED. 17.LANDSCAPING INCLUDING SOD MUST BE WATERED UNTIL ACCEPTED BY OWNER. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. LEGEND SOD: PROVIDE AND INSTALL SOD FROM LOCAL SUPPLIERS. AREAS TO BE SODDED MUST BE FREE OF ALL CONSTRUCTION DEBRIS AND ANY DIRT CLUMPS OVER 1" IN DIAMETER. THOROUGHLY WATER SOD UPON INSTALLATION. CONTRACTOR TO MAINTAIN WATERING UNTIL SOD IS ESTABLISHED (ROOTS KNITTED INTO SUBSURFACE) SEED: MIX TO BE "SUPER TURF II" BY UNITED SEEDS (OR APPROVED EQUAL). SEED AT A RATE OF 440 LBS PER ACRE. SEEDING DATES, SITE PREPARATION, SEEDING INSTALLATION, WATER REQUIREMENTS, FERTILIZING, AND MOWING PER UNITED SEEDS TECH BULLETIN FOR SEED TYPE. OVERSEEDING (IF REQUIRED) TO BE INSTALLED AT 220 LBS PER ACRE. HYDRO MULCH: HYDRO MULCH ALL SEEDED AREAS: WOOD CELLULOSE HYDRAULIC MULCH WITH TACKIFIER SHALL BE APPLIED AT A RATE OF 2,500 LBS PER ACRE. GENERAL LANDSCAPE REQUIREMENTS TOTAL PROJECT SITE AREA 340,800 SF REQUIRED OPEN SPACE (20%)68,160 SF PROVIDED OPEN SPACE (EXCLUDING SYNTHETIC TURF)147,400 SF DRAWING TITLE: REVISIONS: DRAWING NO.: PROJECT NO.: DATE: 26 0 0 w e s t o w n p a r k w a y , s u i t e 3 4 0 , w e s t d e s m o i n e s , i o w a 5 0 2 6 6 p 5 1 5 . 2 2 3 . 5 1 0 0 f 5 1 5 . 2 2 3 . 7 2 2 6 w w w . f r k - a e . c o m fr k a r c h i t e c t s + e n g i n e e r s 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 WA U K E E H I G H S C H O O L BA S E B A L L / S O F T B A L L S T A D I U M WA U K E E C O M M U N I T Y S C H O O L D I S T R I C T WA U K E E , I O W A 1018D07 FEBRUARY 2023 12/27/22 - 1ST CITY SET 01/24/23 - 2ND CITY SET 02/07/23 - 3RD CITY SET L: \ L A N D P R O J E C T S 2 0 2 2 \ 2 2 0 4 1 6 W A U K E E H S B A S E B A L L - S O F T B A L L S Y N T H E T I C T U R F P R O J E C T \ D W G \ C 6 D E T A I L S . D W G 2/ 2 0 / 2 0 2 3 4 : 1 6 : 4 3 P M C-601 DETAILS SHEET 1'-3" PCC ANCHOR GROUND ANCHOR AS SPECIFIED 1'-0" 6" 2" 1" 8" IMPACT BASE INSTALL PER MANUFACTURERS RECOMMENDATION BASE DETAIL SCALE NONE 8 C-601 COMPACTED SUBGRADE BASE COURSE AGGREGATE SYNTHETIC TURF WITH INFILL MATERIAL 2" 6" SYNTHETIC TURF TYPICAL SECTION SCALE NONE 7 C-601 FINISH COARSE AGGREGATE ENGINEERING FABRIC - MIRIFI 600X, US 315 OR APPROVED EQUAL12 " UNDISTURBED SUBGRADE 8' 3'-7" 4' 4' 3' 3' 6" 6" 10'-5" 5'- 8 1 / 2 " NOTES: 1.COVER WITH SYNTHETIC TURF SYSTEM AND REPLACEABLE PANEL SYSTEM. 2.USE BBFSB BASEBALL BATTERS BOX FORMING SYSTEM IN MAIN BASEBALL FIELD. 3.USE BBFSS SOFTBALL BATTERS BOX FORMING SYSTEM IN MAIN SOFTBALL FIELD. 4.USE STANDARD TURF ROCK SECTION IN BULLPENS. HOME PLATE DETAIL NOT TO SCALE 13 C-601 1"x12" HYDRAWAY FLAT PIPE OR APPROVED EQUAL LAID FLAT ON FABRIC OVER SUBGRADE, INSTALL PIPES SPACED 20' O/C COMPACTED SUBGRADE BASE COURSE AGGREGATE SYNTHETIC TURF WITH INFILL MATERIAL FINISH COARSE AGGREGATE UNDISTURBED SUBGRADE PCC ANCHOR GROUND ANCHOR AS SPECIFIED 1'-11" 6" 1" 8" IMPACT BASE INSTALL PER MANUFACTURERS RECOMMENDATION DOUBLE FIRST BASE DETAIL SCALE NONE 9 C-601 COMPACTED SUBGRADE BASE COURSE AGGREGATE SYNTHETIC TURF WITH INFILL MATERIAL FINISH COARSE AGGREGATE UNDISTURBED SUBGRADE 2'-0" 2'-2 7 8" MOW STRIP DETAIL SCALE NONE 4 C-601 PER FENCE MANUFACTURER 6" 5" PCC 6" TROWEL JOINT AT EVERY POST FENCE IN SIDEWALK DETAIL SCALE NONE 3 C-601 1" FOAM BETWEEN POLE & CONCRETE, SEAL FOAM W/ GRAY MASTIC POINT SEALANT GRASS FLUSH WITH EDGE OF CONCRETE SIDEWALK DETAIL SCALE NONE 2 C-601 FINISHED GROUND GRADE (INCLUDING SOD) SHALL BE 1/4" BELOW FINISHED PAVEMENT GRADE ON DOWNHILL SIDEWIDTH PER PLAN 5" PCC NOTE: SLOPE SIDEWALK IN ACCORDANCE WITH GRADING PLAN, 1.5% CROSS SLOPE 6" SUBGRADE PREPARATION 12" FOUL POLE DETAIL SCALE NONE 15 C-601 FOUL POLE INSTALL PER MANUFACTURERS RECOMMENDATION FENCE, SEE OTHER DETAILS 3'Ø x 5' DEEP FOOTING SIZE SHOWN INCREASE SIZE AS REQUIRED ACCORDING TO LOCAL SOIL CONDITIONS AND TO MEET LOCAL BUILDING CODES REGARDING WIND SPEEDS SLOPE TOP TO SHED WATER OUTSIDE OF FOUL POLE TO BE FLUSH WITH OUTSIDE OF FOUL LINE HOLES FOR JOINTING UPPER AND LOWER POLE SECTIONS TOGETHER MUST BE ORIENTED PARALLEL TO FOUL LINE POLE SECTIONS MUST BE ORIENTED SO WING PANELS ALIGN WITH OUTFIELD FENCE FAIR TERRITORY FOUL TERRITORY ATTACHED FENCE FABRIC DIRECTLY TO FOUL POLE 4" 12"12"12"12"12"12" 1" 2" 3" 5" 6" 6"6" 34" 22" 18" CENTER OF 9' RADIUS 9'9' PITCHER MOUND GRADING DETAIL NOT TO SCALE 12 C-601 PITCHING RUBBER INSTALL PER MANUFACTURER'S RECOMMENDATION GRADUAL SLOPE TO MATCH GRADUAL SLOPE TO MATCH 10 " A B O V E HO M E P L A T E LEVEL AREA: 5'x34" 60'-6" HOME PLATE INSTALL PER MANUFACTURER'S RECOMMENDATION 2x4 TREATED WOOD NAILER, TYP LOCATED AS RECOMMENDED BY TURF MANUFACTURER TO ACCOMMODATE REPLACEMENT PANEL SYSTEM SYNTHETIC TURF FIELD WITH INFILL 18 " M I N STORM OR SANITARY SEWER WATER MAIN LOCATED ONE FULL LENGTH OF PIPE SO BOTH JOINTS ARE AS FAR AS POSSIBLE FROM THE WATER MAIN WATER MAIN & STORM OR SANITARY SEWER CROSSING DETAIL SCALE NONE 23 C-601 NOTES: 1.THIS DETAIL SHALL APPLY ANY TIME A STORM SEWER OR SANITARY SEWER CROSSES OVER OR LESS THAN 18 INCHES BELOW A WATER MAIN. 2.WHEN WATER MAIN CROSSES UNDER STORM OR SANITARY SEWER THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF 18" OF SEPARATION. 3.STORM OR SANITARY SEWER MAY NOT BE PLACED CLOSER THAN 6" BELOW A WATER MAIN. 4.MAINTAIN THE MAXIMUM FEASIBLE SEPARATION IN ALL CASES. 5.SEWER AND WATER PIPES MUST BE ADEQUATELY SUPPORTED & HAVE WATERTIGHT JOINTS. 6.CONTRACTOR SHALL INSTALL LOW PERMEABILITY SOIL FOR BACKFILL MATERIAL WITHIN 10 FEET OF THE CROSSING. 7.IN SANITARY SEWER CROSSINGS, CONTRACTOR SHALL INSTALL ONE FULL LENGTH OF SANITARY SEWER OF WATER MAIN PIPE MATERIAL WITH WATERTIGHT JOINTS LOCATED AS FAR AS POSSIBLE FROM THE CROSSING. 8.IN STORM SEWER CROSSINGS, THE CONTRACTOR SHALL INSTALL ON FULL LENGTH OF STORM SEWER PIPE OF WATER MAIN MATERIAL OR RCP WITH GASKETED JOINTS LOCATED AS FAR AS POSSIBLE FROM THE CROSSING. 9.GASKETED JOINTS SHALL COMPLY WITH ASTM C443. 6" - 1 8 " WATER MAIN 4000 PSI CONCRETE NOTE: RESTRICTOR PLATE SHALL BE INSTALLED SUCH THAT NO PIPES, OTHER THAN THE OUTLET PIPE, ARE OBSTRUCTED DETENTION RESTRICTION PLATE DETAIL SCALE NONE 10 C-601 WEST WALL STRUCTURE #1 INSTALL 1/4" STAINLESS STEEL PLATE TO COVER PORTION OF OUTLET PIPE ATTACH RESTRICTOR PLATE TO WALL OF MANHOLE WITH 1/2" STAINLESS STEEL EXPANSION BOLTS OUTLET PIPE (BEHIND PLATE) TENSION BAR DOME POST CAP WITH SET SCREW OR POST WELDED WIRE TIES. 12" O.C. TIES ALONG TOP, INTERMEDIATE, AND BOTTOM RAILS 4-6' HIGH FENCE: NO INTERMEDIATE RAIL 8'-12' HIGH FENCE: INTERMEDIATE RAIL COMPACTED SUBGRADE BLACK VINYL COATED CHAIN LINK FABRIC (SEE SPECIFICATIONS) TENSION OR FABRIC BAND SE E P L A N BOTTOM RAIL MAX 10'-0" TOP BRACE RAIL LINE POST END, CORNER, OR GATE POST. VARIES, SEE PLAN 8' & 10' TALL CHAIN LINK FENCE DETAIL SCALE NONE 5 C-601 NOTES: 1.FENCE FABRIC SHALL BE SECURED TO GATE FRAMES WITH KNUCKLED SELVAGE ALONG ALL EDGES FOR ALL TYPES CHAIN LINK FENCE INSTALLATIONS. 2.REFER TO SPECIFICATION - SECTION 31 31 13 FOR ALL PIPE SIZING, WIRE FABRIC GAUGES, FOOTING SIZES & OTHER APPLICABLE INFORMATION. 3.ALL CONCRETE FOOTINGS AROUND POSTS AT GROUND LINE SHALL BE MOUNDED & SLOPED FOR POSITIVE DRAINAGE. 4.ALL FENCE AND FABRIC SHALL BE BLACK VINYL COATED PVC. SEE SPECIFICATIONS. 5.ALL FENCES SHALL SWING IN BOTH DIRECTIONS UNLESS OTHERWISE NOTED ON PLANS. 12" DIAMETER, 4' DEEP PCC FOOTING FOR ALL END, CORNER AND GATE POSTS CHAIN LINK FENCE GATE DETAIL SCALE NONE 6 C-601 TOP RAIL PROTECTION (WHERE NOTED ON PLANS) SEE SPECIFICATION SECTION 11 68 33.33 TOP HINGE (90° SWING) TOP RAIL 8'-12' HIGH FENCE: INTERMEDIATE RAIL 4'-6' HIGH FENCE: NO INTERMEDIATE RAIL BOTTOM RAIL BOTTOM HINGE (90° SWING) HEAVY-DUTY & LOCKABLE FORK LATCH 12" DIAMETER, 4' DEEP PCC FOOTING FOR ALL GATE POSTS 10" DIAMETER, 42" DEEP PCC FOOTING FOR ALL INTERMEDIATE POSTS 10 . 1 " PVC & N-12 PIPE BEDDING SCALE NONE 21 C-601 PE R F E N C E MA N U F A C T U R E R 6" SIDEWALK NOTES: 1. CONTRACTOR MUST PLACE FENCE POST PRIOR TO SIDEWALK INSTALLATION 2. LINE UP SIDEWALK SAWCUTS WITH FENCE POSTS. SEE LAYOUT PLAN FOR WIDTH 1" FOAM BETWEEN POLE & CONCRETE SEAL FOAM W/ GRAY MASTIC JOINT SEALANT TROWEL JOINT AT EVERY POST MIN 2" DIRT OR ROCK BETWEEN FOOTING AND WALK PMFSB BASEBALL PITCHING MOUND FORMING SYSTEM IN MAIN FIELD ONLY. FORM USING SLOPES FOR BULLPENS 4,000 PSI CONCRETE SEE DETAIL 13/C-601 FOR CONCRETE EXTENTS BBFSB BASEBALL BATTER'S BOX OR BBFSS SOFTBALL BATTER'S BOX FORMING SYSTEM IN MAIN FIELD ONLY. BBFSB BASEBALL BATTER'S BOX OR BBFSS SOFTBALL BATTER'S BOX FORMING SYSTEM FILLED WITH 4000 PSI CONCRETE XXX 36" 2" 5'-0" 12"12" STRUCTURAL STOOP / SIDEWALK TRANSITION DETAIL SCALE NONE 11 C-601 5" 6" PCC #4 @ 12" O.C. STRUCTURAL STOOP SEE STRUCTURAL 1/4" EXPANSION JOINT FILLED W/ GRAY MASTIC JOINT SEALANTKEYED JOINT SIDEWWALK SEE PLANS FOR THICKNESS 4" VOID FORMS X WIDTH OF SIDEWALK #4 @ 12" O.C. THUS: 60" ROCK BASE IOWA DOT SPEC 4123 OR EQUAL POROUS BACKFILL (IOWA DOT SPEC 4131 OR EQUAL) 6" SUBDRAIN STORM CLEANOUT DETAIL SCALE NONE 18 C-601 SCH. 40 PVC ROOF DRAIN LINE (REF MECH) HDPE STORM SEWER (SEE SITE PLAN) ROOF DRAIN CONNECTION DETAIL SCALE NONE 17 C-601 CITY OF WAUKEE FLARED END SECTION DETAIL SCALE NONE 19 C-601 TRANSFORMER PAD MOAT DETAIL NOT TO SCALE 20 C-601 CONTRACTOR TO INSTALL REINFORCED CONCRETE TRANSFORMER PAD (PER MID-AMERICAN STANDARDS) REFERENCE ELECTRICAL PLANS TRANSFORMER 3' 3' 3' 3' SEE LANDSCAPE PLAN FOR MATERIAL EDGING WHERE SHOWN ON LANDSCAPE PLAN REINFORCED CONCRETE TRANSFORMER PAD (PER MID-AMERICAN STANDARDS) 3' 2'2' 3'LINE TRENCH WITH SILT FENCE FABRIC (OR OTHER SOIL FABRIC WITH EQUAL OR LOWER POROSITY) EDGING WHERE SHOWN ON LANDSCAPE PLAN MATERIAL TO MATCH LANDSCAPE PLAN METAL STRUT FOR METER (SEE ELEC) 24" TYPE 1 PAVEMENT SECTION SCALE NONE 1 C-601 COMPACTED BACKFILL 6" M A X 7" 4.5"3" R 1" R 2" 12" SUBGRAGE PREPARATION IN TWO 6" LIFTS 7" PCC C4 MIX NOTES: 1.SLOPE GUTTER IN ACCORDANCE WITH GRADING PLAN. 2.PCC PAVEMENT SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 4,000 PSI. STEPS W/ HANDRAIL DETAIL SCALE NONE 16 C-601 A A PLAN SECTION A-A Possible Sidewalk Possible Sidewalk x 1 Sidewalk ISOMETRIC 1 2 Minimum riser height is 4 inches. Maximum riser height is 7 inches. Minimum tread depth is 11 inches. Match existing sidewalk width. Construct cross slope of landing to match adjacent sidewalk. 1"foam between pole & concrete. Seal foam with gray mastic joint sealant. 1 2 1.5% Provide a minimum of 2 inches of cover for all reinforcing. Ensure all risers are an equal height and all treads are an equal depth within a flight of stairs. 3 3 4 #4 @ 18" C-C #4 @ 12" C-C POST HANDRAIL LENGTH (AS SPECIFIED) WI D T H ( A S S P E C I F I E D ) 4 12" MIN BEYOND RISER z 5'-0" MAX #4 8" 2' - 0 " 8 " M I N #4 @ 12" C-C #4 @ 18" C-C 1" PREFORMED EXPANSION JOINT 1' - 5 " T O 1' - 7 " 12" MIN BEYOND RISER 2' - 1 0 " T O 3 ' - 2 " 12" 6" 1" 1/2" MAX RADIUS 36 " M I N 2" OUTSIDE DIA GALVANIZED STEEL HANDRAIL Sidewalk 5 5 3' M I N , T Y P SET POST IN HOLE & ENCASE IN CONCRETE PLAN VIEW 24" INLET PIPE FL=1016.33 18" OUTLET PIPE 1014.86± EX 4' 18" INLET PIPE FL=1014.86± EX 4' INSTALL 1/4" STAINLESS STEEL PLATE TO COVER PORTION OF OUTLET PIPE PROFILE VIEW 1014.86± EX 48" 20" 6" DIA GALVANIZED STEEL PIPE EMBEDDED IN CONC (DO NOT PAINT BOLLARD) FILL PIPE W/ CONCRETE INSTALL BOLLARD 6" INTO SIDEWALK MEASURED FROM EDGE OF PARKING STALL TO CENTER OF BOLLARD CLASS "A" CONC FOUNDATION CENTERED ON BOLLARD EDGE OF PARKING STALL CONC WALK. SEE OTHER DETAILS MUTCD R7-8 (RESERVED PARKING) SIGN 2"x2" SQUARE BLACK POWDER COATED STEEL POLE MUTCD R7-8a OR R7-8b (VAN ACCESSIBLE) SIGN AS CALLED OUT ON PLANS STEEL POLE CEMENTED INTO BOLLARD CENTER NOTE: FOR HANDICAP STALLS IN FRONT OF CURB, INSTALL POLE 2' FROM BACK OF CURB. DIRECT BURY POLE 4' MIN INTO GROUND WITHOUT INSTALLING BOLLARD 24"36"60" 1/2" FOAM AROUND BOLLARD SEAL FOAM W/ GRAY MASTIC JOINT SEALANT 6" BOLLARD W/ PARKING SIGN DETAIL SCALE NONE 24 C-601 INSTALL CAP ON TOP OF POLE GREASE INTERCEPTOR INSTALLATION DETAILS SCALE NONE 26 C-601 STRUCTURE #1 BASEBALL DIMENSIONS SHOWN. SOFTBALL DIMENSIONS VARY. MATCH MANUFACTURER'S RECOMMENDATIONS FLOOR SLAB DOWNSPOUT CONNECTION DETAIL SCALE NONE 22 C6.2 FOOTING EXTERIOR WALL DOWNSPOUT (REF ARCH) FIELD VERIFY ANY OFFSET IN FIELD DUE TO FOOTINGS WITH ENGINEERS & ARCHITECT INSTALL CAP ON STORM PIPE AND EXTEND DOWNSPOUT INTO CAP COVER PROPOSED GROUND 6" RISER PIPE 6" N-12 PIPE 90° BEND NYLOPLAST COUPLING (ADS CODE 1579 AG) SCH. 40 PVC TO N-12 (REDUCING COUPLING AS NECESSARY) FIELD EDGE AT MOW STRIP SCALE NONE 14 C-601 SLOTTED N-12 PIPE SIZE & SLOPE PER PLAN SYNTHETIC TURF FIELD WITH INFILL 2x4 TREATED WOOD NAILER FASTENED TO CONCRETE WALL, LOCATED AS RECOMMENDED PER TURF MANUFACTURER SLOPE TO DRAIN BACK TO COLLECTOR PIPE FINISH COARSE AGGREGATE 1"x12" HYDRAWAY FLAT PIPE OR APPROVED EQUAL BASE COURSE AGGREGATE BASE COURSE AGGREGATE ENGINEERING FABRIC - MIRIFI 600X, US 315 OR APPROVED EQUAL ENGINEERING FABRIC - MIRIFI 140N, US 160NW OR APPROVED EQUAL LINING PIPE TRENCH COMPACTED SUBGRADE UNDISTURBED SUBGRADE 5' 2" M I N PIPE DIA PLUS 4" DEPTH PER FENCE MANUFACTURER 1" FOAM BETWEEN POLE & CONC, SEAL FOAM W/ GRAY MASTIC POINT SEALANT 6"6" TROWEL JOINT AT EVERY POSTS 2'6" SLOTTED N-12 PIPE IN 9" TRENCH 6"6" GRASS FLUSH WITH EDGE OF CONCRETE PROPOSED BUILDING FOOTPRINT = 7,513 SF FF = 1029.00 D D CO H Y D 1 0 2 5 1 0 2 3 1 0 2 4 10 2 6 10 2 7 10 2 8 1030 1031 10 3 0 10 2 9 1020 102 5 102 1 102 2 10 2 3 10 2 4 10 2 6 10 2 7 10 2 8 1025 1026 1027 1028 1 0 2 5 1 0 2 6 1 0 2 7 102 5 1 0 2 6 1 0 2 7 1 0 2 8 102 9 102 7 102 8 1026 1027 1028 1 0 2 2 1023 1 0 2 0 1 0 1 8 1 0 1 9 1 0 2 1 1 0 2 0 1 0 1 8 1 0 1 9 1 0 2 1 1 0 2 2 1 0 2 3 1 0 2 3 1 0 2 4 1 0 2 4 10311030 10291026 1027 1028 1029 BID ALT STORAGE BUILDING FOOTPRINT = 642 SF FF = 1029.00 1 0 2 9 1 0 2 8 10 2 9 103 0 1031 1032 103 2 WV D SA N 4" SA N 4" D H Y D WVWVWVHYD F/O F/O F/O F/O F/O F/O F/O F/O F/O F/O FO FO D D D D D F/O P R E S S B O X F F = 1 0 4 2 . 3 3 PRE S S B O X FF= 1 0 3 9 . 3 3 FF=1028.11 X X X X X F/ O F/ O F/ O F/ O F/ O F/ O F/ O F / O F/ O EX B R I C K D U G O U T EX BRICK DUGOUT 38 . 0 ' 10.0' EX BRICK DUGOUT 10 . 0 ' 46.0' 10 . 0 ' 38.0' EX B R I C K D U G O U T 10.0' 30 . 0 ' ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15"ST 15" ST 18" ST 18" ST 18"ST 18"ST 18"ST 18"ST 18"ST 18" ST 18 " ST 36 " ST 36" ST 36" ST 36" S T 1 8 " S T 1 8 " S T 1 8 " S T 1 5 " W 12 " W 12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W12 " W 8"W 8"W 8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8"W8" W 8" W 8" WA R R I O R L A N E (P U B L I C R O A D - A S P H A L T S U R F A C E ) PARK ROAD (PUBLIC ROAD - ASPHALT SURFACE) EX ASPHALT DRIVE SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " SA N 16 " G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4"G4" G4" G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4" G G G G G U/ E U/ E U/ E U/ E U/E U/E U/E U/E U/E U/E U/E U/E U/E SA N SA N SA N SA N SA N SA N SA N 1024 1023 1022 1023 1023 1024 10 2 4 1025 1027 1 0 2 0 1022 10 2 5 10 2 7 1 0 2 5 1025 102 2 1028 1026 1026 1027 1027 1028 1 0 2 7 1028 1025 1027 1027 1026 1027 1029 1028 1030 1029 103 0 1031 1032 10 3 1 1030 1 0 2 9 1 0 2 7 10 2 9 F/ O U/E U/EU/E U/E U / E U / E U / E U / E U/ E U/E U/E U/E U/E U/ E U/E U/E U/E U / E U / E U / E U/ E T E L E T E L E T E L E TE L E U/E U/E U/E U/E U/E U/E U/E U / E U/ E U/ E U/E U/E U/E U/ E U / E U / E U / E U / E U/E U/E U/E U/E U/E U/E U/ E U / E U/E U/E U/E U/E U/E U/E D D D D D D ST 18 " ST 30 " ST 24 " ST 24 " ST 24 " ST 24 " ST 24 " ST 15" ST 15" ST 15" ST 15" ST 15" D FF = 1 0 3 5 . 9 5 FF = 1 0 3 5 . 9 7 FF = 1 0 3 5 . 9 7 FF = 1 0 3 5 . 9 5 FF = 1 0 3 6 . 0 3 FF = 1 0 3 6 . 2 7 ST 12" 1030 1030 10 2 8 1029 1035 103 5 1 0 2 7 1031 1035 1033 1034 1035 ST 18 " 10 3 0 10 3 1 10 3 2 10 2 9 1 0 2 9 SF SF SF SF SF SF SF SF SF SF SF SF SF SF INLET PROTECTION, TYP SF SF SF SF SF SF SF SF SF SF SF SF S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF S F S F S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSILT FENCE, TYP SILT FENCE, TYP SILT FENCE, TYP SILT FENCE, TYP INLET PROTECTION, TYP 8'x105' SUDAS TYPE 2 TRM 4,100 SY SUDAS TYPE 2.D RECP POSSIBLE ROCK STAGING & PARKING AREA W/ TEMPORARY RESTROOM FACILITIES & DUMPSTER SITE DISCHARGE POINT TO UNNAMED TRIBUTARY OF SUGAR CREEK POSSIBLE LOCATION OF TOPSOIL STOCKPILE. CONTRACTOR TO INSTALL SILT FENCE ON ALL DOWNHILL SIDES SF S F SF SF SF SF INSTALL FILTER SOCK ALONG EXISTING DRIVE 4 FLOW TRANSITION MATS OVER TYPE 2 TRM 4 FLOW TRANSITION MATS OVER TYPE 2 TRM SF SF SF SF SF SF SILT FENCE DITCH CHECK SF SF DRAWING TITLE: REVISIONS: DRAWING NO.: PROJECT NO.: DATE: 26 0 0 w e s t o w n p a r k w a y , s u i t e 3 4 0 , w e s t d e s m o i n e s , i o w a 5 0 2 6 6 p 5 1 5 . 2 2 3 . 5 1 0 0 f 5 1 5 . 2 2 3 . 7 2 2 6 w w w . f r k - a e . c o m fr k a r c h i t e c t s + e n g i n e e r s 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 WA U K E E H I G H S C H O O L BA S E B A L L / S O F T B A L L S T A D I U M WA U K E E C O M M U N I T Y S C H O O L D I S T R I C T WA U K E E , I O W A 1018D07 FEBRUARY 2023 12/27/22 - 1ST CITY SET 01/24/23 - 2ND CITY SET 02/07/23 - 3RD CITY SET IOWAONE CALL 1-800-292-8989 www.iowaonecall.com 811 Know what's below. Call before you dig. UTILITY NOTE: THE LOCATION OF THE UTILITIES INDICATED ON THE PLANS ARE TAKEN FROM EXISTING PUBLIC RECORDS AND ARE APPROXIMATE LOCATIONS. THE EXACT LOCATIONS OF ALL UTILITIES MUST BE ASCERTAINED IN THE FIELD. IT SHALL BE THE DUTY OF THE CONTRACTOR TO DETERMINE WHETHER ANY ADDITIONAL FACILITIES OTHER THAN THOSE SHOWN ON THE PLANS MAY BE PRESENT. NOT TO SCALE SITE ENTRANCE DETAIL TEMP. ROCK ENTRANCE (PLAN VIEW) (PROFILE VIEW) TEMP. ROCK ENTRANCE 3" CLEAN LIMESTONE PLACE ROCK ON FABRIC STABILIZED ENTRANCE SHALL BE AT LEAST 50' LONG AND EXTEND TO THE PUBLIC ROADWAY. 5' - 0 " M I N . GROUND LINE ENGINEERING FABRIC FLOW 2 1' ABOVE GROUND LINE VARIABLE 10' MAX.5' MAX.5' MAX.10' MAX. 1' ABOVE GROUND LINE SECURE TOP OF ENGINEERING FABRIC ENGINEERING FABRIC TO BE PLACED TO BOTTOM OF TRENCH. 1 2 ENGINEERING FABRIC GROUND LINE TRENCH BOTTOM TRENCH BOTTOM 1 1 1 LINE GROUND 1 MIN. 4" EXCESS FABRIC COMPACTED BACKFILL 12 " MI N . DETAIL OF SILT FENCE AT DITCH OR SWALE DETAIL OF SILT FENCE 8' SPACING TO TOP OF STEEL POST. SEE DETAIL OF ATTACHMENT TO POST. VERTICAL CUT WIRE CORD CORD CORD WIRE POST FABRIC FABRIC BACK VIEW OF FABRIC BACK VIEW ATTACHMENT TO POST 3 4 NOTES : 3 MAKE VERTICAL CUT IN TOP OF FABRIC. PULL OUT AND TWIST CORD. 4 LOOP CORD AROUND POST FORMING A LOOP. PULL WIRE THROUGH FOLD AREA OF FABRIC AND SECURE AROUND POST. 'T' STEEL FENCE POST NORMAL FORESLOPE 2" RISE IN FENCE 31" MIN. NORMAL BACKSLOPE 31 " M I N . 6" TRENCH DEPTH FOR NORMAL INSTALLATION (MIN.) 12" TRENCH DEPTH FOR DITCH INSTALLATION NOT TO SCALE (SECTION VIEW) (PROFILE VIEW) SILT FENCE DETAILS NOT TO SCALE INLET 5'-0" 5'-0" 'T' FENCE POST, 5' MIN. NOTES: 1. SECURE TOP OF FABRIC TO POSTS, USING CABLE TIES OR WIRE. 2. FABRIC TO BE BURIED 12", AND FOLDED ALONG BOTTOM. 3. STEEL POSTS TO BE EMBEDDED 28". (PLAN VIEW) DROP INLET BASKET PROTECTION SILT FENCE FABRIC IF APPLICABLE INLET PROTECTION DETAIL NOT TO SCALE NOTES: 1. 1 C.Y. CONCRETE BAG SHALL BE REQUIRED AT ANY LOCATION WHERE CONCRETE IS USED. 2. CONCRETE WASHOUT DUMPSTER W/ HEAVY DUTY LINER IS AN ACCEPTIBLE ALTERNATIVE (PLAN VIEW) 1 C.Y. CONCRETE WASH-OUT BAG 'T' FENCE POST 5' MIN CONCRETE WASH-OUT BAG DETAIL (PROFILE VIEW) 1 C.Y. CONCRETE WASH-OUT BAG L: \ L A N D P R O J E C T S 2 0 2 2 \ 2 2 0 4 1 6 W A U K E E H S B A S E B A L L - S O F T B A L L S Y N T H E T I C T U R F P R O J E C T \ D W G \ C 7 S W P P P . D W G 2/ 2 0 / 2 0 2 3 4 : 1 8 : 3 0 P M GRAPHIC SCALE 030 15 30 60 C-701 EROSION CONTROL PLAN EROSION CONTROL NOTES: 1.SEE SUPPLEMENTAL DETAIL STORM WATER POLLUTION PLAN NARRATIVE FOR ALL EROSION CONTROL MEASURES, ADDITIONAL DETAILS AND NOTE. ADDITIONAL NOTES AND MEASURES IN NARRATIVE SHALL BE CONSIDERED INCIDENTAL AND SHALL BE INCLUDED IN THE ORIGINAL BID. 2.SWPPP PLAN AND NARRATIVE ARE CONSIDERED A LIVING DOCUMENT AND WILL NEED PERIODIC UPDATES AND ADJUSTMENTS AS NECESSARY DEPENDING ON SITE CONDITIONS TO ASSURE COMPLIANCE WITH NPDES GENERAL PERMIT NO. 2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO UPDATE THE SWPPP AND IMPLEMENT ANY AND ALL MEASURES NECESSARY TO COMPLY WITH SAID PERMIT NO. 2. 3.INSTALL PERIMETER SILT FENCE AS SHOWN ON PLANS PRIOR TO CONSTRUCTION. 4.INSTALL INTAKE PROTECTION WITH SILT FENCE IMMEDIATELY AFTER STORM SEWER CONSTRUCTION. 5.INSTALL FINISHED PAVING INLET PROTECTION IMMEDIATELY AFTER PAVING IS COMPLETED AROUND INTAKE. 6.OTHER EROSION CONTROL TYPES MAY NOT BE SUBSTITUTED FOR SILT FENCE. 7.CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING A CONCRETE WASHOUT IN ACCORDANCE WITH NPDES GENERAL PERMIT NO. 2 DURING ALL CONCRETE WORK. CONCRETE WASHOUT SHALL MEET SUDAS SPEC 11050. 8.CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING TEMPORARY RESTROOM FACILITIES. SANITARY WASTE SHALL BE DISPOSED OF PER ALL FEDERAL, STATE AND LOCAL REGULATIONS. 9.CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL TOPSOIL REQUIREMENTS OF NPDES GENERAL PERMIT NO. 2 ARE MET. 10.THIS PROJECT INCLUDES SAWCUTTING OR CONCRETE GRINDING SO PROTECTION OF STORM SEWERS AND DRAINAGE WAYS WILL NEED TO BE PROVIDED FROM SLURRY FROM THE CONCRETE OPERATIONS TO DISCHARGE OFFSITE. SEE SWPPP SHEET AND NARRATIVE FOR ADDITIONAL DETAILS. 11.CONTRACTOR SHALL PROVIDE APPROPRIATE CONTROLS TO PREVENT DISCHARGES FROM ANY AND ALL DEWATERING ACTIVITIES. 12.SEE LANDSCAPE PLAN FOR FINAL STABILIZATION INCLUDING SEEDING AND SODDING AREAS. 13.PER NPDES GENERAL PERMIT NO. 2, IF CONSTRUCTION ACTIVITY IS NOT PLANNED FOR AT LEAST 14 DAYS, ALL DISTURBED AREAS SHALL BE STABILIZED IMMEDIATELY BY TEMPORARY EROSION CONTROL MEASURES. 14.THE FOLLOWING DISCHARGES ARE PROHIBITED: WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OIL, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS, FUEL, OILS OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE, AND SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. 15.CONTACTOR SHALL BE RESPONSIBLE FOR SUBMITTING THE NOTICE OF DISCONTINUATION TO THE DNR AFTER FINAL STABILIZATION AND THE CITY HAS AGGREED THAT PERMIT CAN BE DISCONTINUED. EROSION CONTROL REMOVAL NOTES: 1.AFTER FINAL STABILIZATION HAS OCCURED, AS DEFINED IN NPDES GENERAL PERMIT NO. 2, CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL TEMPORARY EROSION CONTROL DEVICES INCLUDING, BUT NOT LIMITED TO: SILT FENCE, INLET PROTECTION, AND TEMPORARY STANDPIPES. EROSION CONTROL QUANTITIES: DISTURBED AREA 7.0 ACRES (NPDES PERMIT IS REQUIRED) SILT FENCE 1,550 LF INLET PROTECTION 13 EA SUDAS TYPE 2.D RECP 4,100 SY SUDAS TYPE 2 TRM 95 SY FLOW TRANSITION MATS 8 EA CONSTRUCTION ENTRANCE 1 EA CONCRETE WASHOUT 1 EA PERMANENT SOD 27,500 SF PERMANENT SEEDING 2.0 ACRES **SEE LANDSCAPE PLAN FOR SEEDING/SOD TYPES & LOCATIONS** TEMPORARY SEEDING (SUDAS TYPE 4)AS NECESSARY *NOTE: EROSION CONTROL QUANTITIES ARE PROVIDED FOR CITY REQUIREMENT ONLY AND ARE A ROUGH ESTIMATE. CONTRACTOR SHALL PROVIDE EROSION CONTROL MEASURES AS NECESSARY TO MEET SITE CONDITIONS. T.O. MAS 12' -0" MAIN LEVEL 0" FACEBRICK 'A' METAL WALL PANEL STANDING SEAM METAL ROOF SIGNAGE BY OWNER T.O. MAS 12' -0" T.O. WALL 20' -6" MAIN LEVEL 0" FACEBRICK 'A'FACEBRICK 'B' METAL WALL PANEL STANDING SEAM METAL ROOF FACEBRICK 'A' OVERHEAD CANOPY T.O. MAS 12' -0" T.O. WALL 20' -6" MAIN LEVEL 0" METAL WALL PANEL FACEBRICK 'A'FACEBRICK 'B' STANDING SEAM METAL ROOF OVERHEAD CANOPY OVERHEAD CANOPY T.O. MAS 12' -0" T.O. WALL 20' -6" MAIN LEVEL 0" METAL WALL PANEL FACEBRICK 'A' STANDING SEAM METAL ROOF OVERHEAD CANOPY STANDING SEAM METAL ROOF FACEBRICK 'A' STANDING SEAM METAL ROOF FACEBRICK 'A' METAL WALL PANEL 4' - 0 " 10 ' - 0 " STANDING SEAM METAL ROOF FACEBRICK 'A' STANDING SEAM METAL ROOF FACEBRICK 'A' METAL WALL PANEL CO P Y R I G H T 2 0 2 2 F R E V E R T -RA M S E Y -KO B E S A R C H I T E C T S -EN G I N E E R S P . C . T H I S D O C U M E N T A N D T H E IN F O R M A T I O N C O N T A I N E D M A Y N O T B E R E P R O D U C E D O R E X C E RP T E D F R O M W I T H O U T T H E E X P R E S S W R I T T E N P E R M I S S I O N O F F R E V E R T -RA M S E Y -KO B E S A R C H I T E C T S -EN G I N E E R S P . C . U N A U T H O R I Z E D CO P Y I N G O R D I S C L O S U R E O F C O N S T R U C T I O N U S E A R E P R O H I BI T E D B Y T H E C O P Y R I G H T L A W PR E L I M I N A R Y NO T T O B E U S E D FO R C O N S T R U C T I O N PROJECT NO.: DATE: REVISIONS: DRAWING TITLE: DRAWING NO.: fr k 26 0 0 w e s t o w n p a r k w a y , s u i t e 3 4 0 , w e s t d e s m o i n e s , i o w a 5 0 2 6 6 p 5 1 5 . 2 2 3 . 5 1 0 0 f 5 1 5 . 2 2 3 . 7 2 2 6 w w w . f r k - a e . c o m ar c h i t e c t s + e n g i n e e r s 1/24/2023 3:24:34 PM 1018D07 COLORED ELEVATIONS A-202 FEBRUARY 2023 BA S E B A L L / S O F T B A L L S T A D I U M WA U K E E C O M M U N I T Y S C H O O L D I S T R I C T RE N O V A T I O N T O WA U K E E , I O W A 1/8" = 1'-0"A-202 1 NORTH ELEVATION 1/8" = 1'-0"A-202 2 EAST ELEVATION 1/8" = 1'-0"A-202 3 SOUTH ELEVATION 1/8" = 1'-0"A-202 4 WEST ELEVATION MATERIAL BREAKDOWN OF BATTING FACILITY: 66% BRICK 23% METAL WALL PANEL 5% WINDOWS 6% DOORS (INCLUDING CONCESSIONS) 1/8" = 1'-0"A-202 5 STORAGE NORTH ELEVATION - ALT 1/8" = 1'-0"A-202 6 STORAGE EAST ELEVATION - ALT 1/8" = 1'-0"A-202 7 STORAGE SOUTH ELEVATION - ALT 1/8" = 1'-0"A-202 8 STORAGE WEST ELEVATION - ALT