Loading...
HomeMy WebLinkAbout2023-05-15 H03B Traffic Signal Enhancements, School and Trail Crossing Improvements_Reject Bids\AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 15, 2023 AGENDA ITEM:Consideration of approval of a resolution rejecting bids [Traffic Signal Enhancements, Waukee School & Trail Crossing Improvements Project] FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: The Iowa Department of Transportation received bids for the Traffic Signal System Enhancements Project on Tuesday, April 18, 2023. The proposed project includes replacing the overlapping right turning signal indications with flashing operations for right turn lanes that cross trails at signals and installs RRFBs for 4 separate school crossings. Two bids were received and opened. The bids were $384,519 and $405,512. Snyder’s opinion of probable construction costs was $279,150. The low bid of $384,519 was submitted by Van Maanen Electric, Inc. of Newton, Iowa. City staff’s recommendation is to reject all bids for the project. The reason for the rejection is due to the low competition (only two bidders) and the lowest bid was 145% over the engineer’s opinion of probable construction cost. The recommendation includes scheduling the reletting of this project for November 21, 2023, the earliest available, giving contractors more time to complete the project and include additional signal modifications to implement flashing yellow arrow left turn phasing at intersections that currently do not have it which are many of the same intersections of the original project. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the Resolution. ATTACHMENTS: I. Resolution II. Bid Summary PREPARED BY: Beth Richardson REVIEWED BY: Rudy Koester RK H3B RESOLUTION 2023- RESOLUTION REJECTING BIDS FOR THE TRAFFIC SIGNAL ENHANCEMENTS, WAUKEE SCHOOL & TRAIL CROSSING IMPROVEMENTS WHEREAS, on the 28th day of April, 2023, plans, specifications, form of contract and estimate of cost were filed with the Clerk for the construction of certain public improvements described in general as the Traffic Signal Enhancements, Waukee School & Trail Crossing Improvements; WHEREAS, on May 1, 2023, the Council determined that it was necessary and advisable to construct certain public improvements described in general as the Traffic Signal Enhancements, Waukee School & Trail Crossing Improvements; WHEREAS, notice of hearing on plans, specifications, form of contract and estimate of cost for the public improvements was published as required by law; WHEREAS, on April 18, 2023, the date fixed as the date for receiving bids, all bids submitted exceeded the engineer’s estimate of cost; and WHEREAS, the Council has determined it is in the best interest of the City to reject all bids. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1. That all bids received for the construction of certain public improvements described in general as construction of the Traffic Signal Enhancements, Waukee School & Trail Crossing Improvements, be and are hereby rejected. PASSED AND APPROVED this 15th day of May, 2023. Mayor ATTEST: City Clerk 2727 SW SNYDER BOULEVARD | P.O. BOX 1159 | ANKENY, IA 50023-0974 P: 515-964-2020 l F: 515-964-7938 l SNYDER-ASSOCIATES.COM v:\projects\2022\122.0627.01\administration\ltr_2023-05-01_taprecommendationletting.docx May 1, 2023 Mr. Rudy Koester, P.E. City of Waukee - Public Works 805 University Avenue Waukee, IA 50263 RE: RECOMMENDATION OF REJECTION TRAFFIC SIGNAL SYSTEM ENHANCEMENT WAUKEE, IOWA PROJECT NO.: TAP-T-8177(601)--8V-25 S&A PROJECT NO.: 122.0627.01 Dear Rudy: The Iowa Department of Transportation received bids for the Traffic Signal System Enhancements Project on Tuesday, April 18, 2023. The proposed project includes replacing the overlapping right turning signal indications with flashing operations for right turn lanes that cross trails at signals and installs RRFBs for 4 separate school crossings. Two bids were received and opened. The bids were $384,519 and $405,512. Our opinion of probable construction costs was $279,150. The low bid of $384,519 was submitted by Van Maanen Electric, Inc. of Newton, Iowa. Please refer to the attached bid tabulation. Our recommendation is to reject all bids for the project. The reason for the rejection is due to the low competition (only two bidders) and the lowest bid was 145% over the engineer’s opinion of probable construction cost. The recommendation includes scheduling the letting for November 21, 2023, the earliest available, giving contractors more time to complete the project and include additional signal modifications to implement flashing yellow arrow left turn phasing at intersections that currently do not have it which are many of the same intersections of the original project. Sincerely SNYDER & ASSOCIATES, INC. Todd Knox Project Manager ITEM #ITEM CODE DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENDED PRICE Unit Price Total Difference from Opinion Unit Price Total Difference from Opinion 1 2528-8445110 Traffic Control 1 LS 10,000.00$ 10,000.00$ 35,850.00$ 35,850.00$ 25,850.00$ 16,000.00$ 16,000.00$ 6,000.00$ 2 2533-4980005 Mobilization 1 LS 10,000.00$ 10,000.00$ 13,254.00$ 13,254.00$ 3,254.00$ 18,100.00$ 18,100.00$ 8,100.00$ 3 2595-0005150 Railroad Protective Liability Insurance for Union Pacific Railroad Co.1 LS 10,000.00$ 10,000.00$ 8,215.00$ 8,215.00$ (1,785.00)$ 10,012.00$ 10,012.00$ 12.00$ 4 2599-9999005 Accessible Pedestrian Signal Push Button and Sign 24 EA 1,000.00$ 24,000.00$ 1,480.00$ 35,520.00$ 11,520.00$ 2,100.00$ 50,400.00$ 26,400.00$ 5 2599-9999005 Rectangular Rapid Flashing Beacon Assembly, per post 8 EA 15,000.00$ 120,000.00$ 11,250.00$ 90,000.00$ (30,000.00)$ 8,500.00$ 68,000.00$ (52,000.00)$ 6 2599-9999005 Signal Cabinet Modification 17 EA 1,500.00$ 25,500.00$ 6,210.00$ 105,570.00$ 80,070.00$ 6,000.00$ 102,000.00$ 76,500.00$ 7 2599-9999005 Traffic Sign - R10-15, 30" x 30", Mast-Arm/Pole Mounted 37 EA 450.00$ 16,650.00$ 750.00$ 27,750.00$ 11,100.00$ 900.00$ 33,300.00$ 16,650.00$ 8 2599-9999005 Traffic Signal, New, 12" <R,<Y,<FY,<G (All LED) w/ Backplate, Mast-Arm Mounted 2 EA 1,200.00$ 2,400.00$ 1,200.00$ 2,400.00$ -$ 1,400.00$ 2,800.00$ 400.00$ 9 2599-9999005 Traffic Signal, Relocate, Existing, 12" R,Y,G, w/ Backplate, Mast-Arm Mounted 2 EA 200.00$ 400.00$ 500.00$ 1,000.00$ 600.00$ 750.00$ 1,500.00$ 1,100.00$ 10 2599-9999005 Traffic Signal, Replacement, 16" Pedestrian Head, Hand/Person, Countdown 16 EA 500.00$ 8,000.00$ 800.00$ 12,800.00$ 4,800.00$ 1,400.00$ 22,400.00$ 14,400.00$ 11 2599-9999005 Traffic Signal, Replacement/Modification, 12" <R,<Y,<FY,<G (All LED) w/ Backplate, Mast-Arm Mounted 7 EA 650.00$ 4,550.00$ 1,100.00$ 7,700.00$ 3,150.00$ 1,500.00$ 10,500.00$ 5,950.00$ 12 2599-9999005 Traffic Signal, Replacement/Modification, 12" R,Y>,FY>,G> (All LED) w/ Backplate, Mast-Arm Mounted 24 EA 650.00$ 15,600.00$ 990.00$ 23,760.00$ 8,160.00$ 1,500.00$ 36,000.00$ 20,400.00$ 13 2599-9999005 Traffic Signal, Replacement/Modification, 12" R,Y>,FY>,G> (All LED), Side of Pole Mounted 15 EA 650.00$ 9,750.00$ 980.00$ 14,700.00$ 4,950.00$ 1,500.00$ 22,500.00$ 12,750.00$ 14 2599-9999009 Signal Cable, 5c 3000 LF 3.00$ 9,000.00$ 2.00$ 6,000.00$ (3,000.00)$ 4.00$ 12,000.00$ 3,000.00$ 265,850.00$ 384,519.00$ 118,669.00$ 405,512.00$ 139,662.00$ 13,300.00$ 279,150.00$ 279,150.00$ TOTAL PROJECT COST: Van Maanen Electric Iowa Signal Subtotal: Contingency (5%): CONSTRUCTION TOTAL: BID TABULATION TRAFFIC SIGNAL ENHANCEMENT WAUKEE, IOWA DOT Project Number: TAP-T-8177(601)--8V-25 Snyder & Associates Project Number: 122.0627.01 Engineer's Opinion V:\Projects\2022\122.0627.01\Administration\BidTab_2023-04-21_WaukeeTAP.xlsm 4/21/2023 Page 1 of 1