Loading...
HomeMy WebLinkAbout2023-06-19 I08 Chipotle_Site PlanAGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: June 19, 2023 AGENDA ITEM:Consideration of approval of a resolution approving a site plan for Chipotle (425 East Hickman Road) FORMAT:Resolution SYNOPSIS INCLUDING PRO & CON: Waukee Partners, LLC requests approval of a site plan for a Chipotle restaurant located north of Hickman Road and west of NE Westgate Drive. The building is approximately 2,325-square feet in area and 19-feet in height. The applicant is proposing 39 parking spaces where 35 are required. The building will be constructed primarily of brick and fenestration with areas of EIFS as supporting elements. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this project at the May 9, 2023, Commission Meeting and recommended approval subject to remaining staff comments: Approval of a Site Plan for Chipotle (425 E Hickman Road) City Planner, Bill Mettee, introduced the request for approval of a site plan for a Chipotle restaurant as submitted by the applicant, Waukee Partners, LLC. The subject property is located north of Hickman Road and west of NE Westgate Drive, containing approximately 0.83 acres. Mr. Mettee advised that the project includes the construction of a single-story restaurant approximately 2,324 square feet in area. a 444 square foot patio is shown on the south side of the building and a trash enclosure is shown to the northwest of the building. a monument sign has been proposed along the south boundary line abutting Hickman Road. There will not be a menu board as the drive thru is for pick-up take-out orders only. There are 5 queueing spaces with two overflow spaces provided. Access is provided from NE Venture Drive and a pedestrian walkway has been proposed into the site from the Raccoon River Valley Trail near the southeast corner of the site. Public Utilities will be extended to the site and stormwater detention is accommodated within an existing detention basin located on the adjacent lot to the west. All landscaping, open space, parking, and lighting plan requirements have been met at this time. Staff recommends approval of the site plan for Chipotle subject to remaining staff comments. Commissioner Broderick verified that the drive-thru was just pick up. Mr. Mettee advised that was correct. I8 Commissioner Koelker verified if the building would have three signs. Mr. Mettee advised that was correct. Commissioner Tessau moved to approve the site plan for Chipotle (425 E Hickman Road) subject to any remaining staff comments. the motion was seconded by Commissioner Bankole. Ayes: Koelker, Beenken, Bankole, Lohse, Tessau, and Broderick. Nays: None. Motion Carried. STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan subject to remaining staff comments. RECOMMENDATION: Approve the resolution subject to remaining staff comments. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan & Elevations PREPARED BY:Bill Mettee, Planner REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 2023 APPROVING THE SITE PLAN FOR CHIPOTLE (425 EAST HICKMAN ROAD) IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Chipotle, subject to remaining staff comments on May 9, 2023; AND, WHEREAS, the Site Plan for Chipotle is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Chipotle is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 19th day of June, 2023 that the Site Plan for Chipotle is approved subject to remaining staff comments. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman Pierce R. Charles Bottenberg Chris Crone Larry R. Lyon Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Chipotle – Site Plan PREPARED BY: Bill Mettee – Planner REPORT DATE: May 5, 2023 MEETING DATE: May 9, 2023 GENERAL INFORMATION Owner: Fridley Properties, LLC Applicant: Waukee Partners, LLC Project Manager: Erin Ollendike, P.E., CDA Request: The applicant is requesting approval of a site plan for a restaurant. Location and Size: Property is located north of Hickman Road and west of NE Westgate Drive, containing approximately 0.83 acres. Property Address: 425 E. Hickman Road AREA MAP ABOVE: Aerial of subject property (outlined in RED) in relation to the surrounding area. May 5, 2023 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant - Undeveloped Mixed Use C-1B (Large-Scale Commercial District) North The Palms Theatre Mixed Use C-1B (Large-Scale Commercial District) South Waukee Dental Office Mixed Use C-1 (Community and Highway Service Commercial District) East Culver’s Restaurant Mixed Use C-1B (Large-Scale Commercial District) West Vacant – Undeveloped Mixed Use C-1B (Large-Scale Commercial District) PROJECT DESCRIPTION The project involves the construction of a single-story restaurant. The building is proposed to be approximately 2,325 square feet in area. A 444-square foot patio is shown on the south side of the building. The trash enclosure is shown to the northwest of the building. A monument sign has been proposed along the south boundary line abutting Hickman Road. The restaurant won’t be a traditional drive-thru with a menu board, however, there are five (5) queueing spaces for customers to pick-up take-out orders. The applicant has also designated two drive-thru overflow spaces. ACCESS AND PARKING One point of access will be provided from NE Venture Drive. A total of 35 parking spaces are required and 39 spaces have been provided, including two handicap accessible spaces. SIDEWALKS/TRAILS The Raccoon River Valley Trail exists along the north side of Hickman Road. A pedestrian walkway has been proposed into the site from the trail near the southeast corner of the site. UTILITIES All utilities exist in the immediate area and will be extended as required to this site. Storm water detention will be accommodated with an existing detention basin located on the adjacent lot to the west. LANDSCAPING & OPEN SPACE A minimum of 20% of the project area is required to be open space. The total amount of open space proposed is 32%. The applicant has provided the required number of plantings per the landscaping ordinance. ELEVATIONS The elevations of the building are proposed to be constructed primarily of brick and fenestration with areas of EIFS. The elevations comply with the Site Plan Ordinance. May 5, 2023 3 of 3 PHOTOMETRIC The applicant has submitted a photometric plan and associated light fixture cut sheets. The lighting plan meets the lighting requirements of the Site and Building Development Standards. COMPREHENSIVE PLAN The comprehensive plan classifies the subject property as Community Commercial. The Community Commercial classification provides a variety of uses that would serve the community and are located along minor or major arterials. STAFF RECOMMENDATION Staff recommends approval of the site plan for Chipotle subject to remaining staff comments. Chipotle 4121 NW URBANDALE DRIVE, URBANDALE, IA 50322 PH: (515) 369-4400 CIVIL DESIGN ADVANTAGE UTILITY WARNING CONSTRUCTION SCHEDULE DEVELOPMENT SUMMARY SUBMITTAL DATES ARCHITECT (SITE) PROJECT SITE ADDRESS SURVEYOR ZONING OWNER INDEX OF SHEETSVICINITY MAP GENERAL LEGEND ENGINEER APPLICANT LEGAL DESCRIPTION DATE OF SURVEY BENCHMARKS Chipotle SITE PLAN FOR: WAUKEE, IOWA HICKMAN ROAD PRELIMI N A R Y NOT FOR C O N S T R U C T I O N l l l l l l www.iowaonecall.com 1-800-292-8989 ONE CALL IOWA ONE CALL Know what's before you dig. below.Call WAUKEE, IOWA PARKING SUMMARY NOTES NE W E S T G A T E D R I V E NE D A R T M O O R D R I V E AREA OF PROPERTY ARCHITECT (BUILDING) LOT 2 LOT 1 N89°35'42"W 75.90' Δ=14°02'18" L=69.83' R=285.00' CH=69.65' CHB=N82°3 4 ' 3 3 " W S0 0 ° 0 9 ' 5 5 " E 3 1 4 . 5 5 ' N89°50'05"E 144.83' N0 0 ° 0 8 ' 3 8 " W 2 5 7 . 2 8 ' N89°35'42"W 119.46' N89°50'05"E 119.46' N0 0 ° 0 8 ' 3 8 " W 3 0 3 . 4 1 ' RACOON RIVER VALLEY TRAIL NE VENTURE DRIVE HICKMAN ROAD FUTURE DEVELOPMENT TRAFFIC CONTROL NOTES PAVEMENT THICKNESS SIGN LEGEND VAN ACCESSIBLE GENERAL NOTES DI M E N S I O N P L A N C2.0 CI V I L D E S I G N A D V A N T A G E 2210.676 CH I P O T L E EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 1 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 05 / 1 6 / 2 0 2 3 FO U R T H S U B M I T T A L 05 / 3 0 / 2 0 2 3 FI F T H S U B M I T T A L 06 / 1 2 / 2 0 2 3 FIRE SAFETY CONSTRUCTION NOTE LOT 2 LOT 1 RACOON RIVER VALLEY TRAIL NE VENTURE DRIVE HICKMAN ROAD FUTURE DEVELOPMENT GR A D I N G P L A N C3.0 GRADING NOTES CI V I L D E S I G N A D V A N T A G E 2210.676 CH I P O T L E EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 1 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 05 / 1 6 / 2 0 2 3 FO U R T H S U B M I T T A L 05 / 3 0 / 2 0 2 3 FI F T H S U B M I T T A L 06 / 1 2 / 2 0 2 3 LOT 1 GR A D I N G P L A N C3.1 DETAIL 'A'DETAIL 'B' CI V I L D E S I G N A D V A N T A G E 2210.676 CH I P O T L E EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 1 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 05 / 1 6 / 2 0 2 3 FO U R T H S U B M I T T A L 05 / 3 0 / 2 0 2 3 FI F T H S U B M I T T A L 06 / 1 2 / 2 0 2 3 R l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll l l l l l l l l l l ll lllllllllllllllllllllllll l l lll l l llll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l lll l l l l l DA #1 1.99 AC RACOON RIVER VALLEY TRAIL NE VENTURE DRIVE HICKMAN ROAD FUTURE DEVELOPEMNT EROSION AND SEDIMENT CONTROL PLAN R l l l l SWPPP LEGEND CHIPOTLE VICINITY MAP WAUKEE, IOWA CHIPOTLE DISCHARGE POINT SUMMARY STABILIZATION QUANTITIES NOTES: CI V I L D E S I G N A D V A N T A G E 2210.676 CH I P O T L E EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 1 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 05 / 1 6 / 2 0 2 3 FO U R T H S U B M I T T A L 05 / 3 0 / 2 0 2 3 FI F T H S U B M I T T A L 06 / 1 2 / 2 0 2 3 ER O S I O N A N D S E D I M E N T C O N T R O L P L A N C4.0 HICKMAN ROAD SITE AL I C E ' S R O A D NE D A R T M O O R D R I V E NE VENTURE DRIVE LOT 2 LOT 1 RACOON RIVER VALLEY TRAIL NE VENTURE DRIVE HICKMAN ROAD FUTURE DEVELOPMENT ° UT I L I T Y P L A N C5.0 UTILITY NOTES BIO-RETENTION CONSTRUCTION NOTES POND 1 - BIORETENTION CELL SECTION VIEW CI V I L D E S I G N A D V A N T A G E 2210.676 CH I P O T L E EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 1 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 05 / 1 6 / 2 0 2 3 FO U R T H S U B M I T T A L 05 / 3 0 / 2 0 2 3 FI F T H S U B M I T T A L 06 / 1 2 / 2 0 2 3 DOWNSPOUT CONNECTION WITH TEE DE T A I L S C6.012" SUBGRADE PREPARATION SW-203 SANITARY CLEANOUT CURB RAMP FOR CLASS B OR C SIDEWALK CLASS 'A' INTEGRAL CURB AND SIDEWALKINTEGRAL 6" STANDARD CURB CI V I L D E S I G N A D V A N T A G E 2210.676 CH I P O T L E EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 1 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 05 / 1 6 / 2 0 2 3 FO U R T H S U B M I T T A L 05 / 3 0 / 2 0 2 3 FI F T H S U B M I T T A L 06 / 1 2 / 2 0 2 3 BOLLARD ORIFICE PLATE DETAIL EXISTING 4' X 4' SW-513 INTAKE (ST-11) CROSS SECTION AA"THE PRESERVER" BY MOMENTUM ENVIRONMENTAL (ST-2) (HYDRODYNAMIC SEPARATOR) PLAN VIEW HYDRANT ASSEMBLY DETAIL LOT 2 LOT 1 RACOON RIVER VALLEY TRAIL NE VENTURE DRIVE HICKMAN ROAD FUTURE DEVELOPMENT ® PLANT SCHEDULE LA N D S C A P E P L A N C7.0 LOT 1 LANDSCAPE REQUIREMENTS MINIMUM PLANTING REQUIREMENTS LANDSCAPE NOTES OFF-STREET PARKING LANDSCAPE REQUIREMENTS CI V I L D E S I G N A D V A N T A G E 2210.676 CH I P O T L E EN G I N E E R : E K O EN G I N E E R : G H RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 1 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 05 / 1 6 / 2 0 2 3 FO U R T H S U B M I T T A L 05 / 3 0 / 2 0 2 3 FI F T H S U B M I T T A L 06 / 1 2 / 2 0 2 3 METAL COPING TO MATCH ADJACENT EIFS, TYP. EL. 19'-4" A.F.F. T.O. PARAPET FRAMING EIFS SYSTEM, PPG 'FOG' EL. 11-0" A.F.F. B.O. SOFFIT THIN BRICK, ENDICOTT, EXECUTIVE IRONSPOT - VELOUR TEXTURE ROOF DRAIN OVERFLOW W/ DOWNSPOUT NOZZLE, RE: PLUMBING DRAWINGS EL. 20'-8" A.F.F. T.O. PARAPET FRAMING PREFINISHED METAL COPING, TO MATCH STOREFRONT THIN BRICK, ENDICOTT, EXECUTIVE IRONSPOT - VELOUR TEXTURE PREFINISHED METAL CANOPY TO MATCH STOREFRONT, COORDINATE W/ STEEL SUPPORT LOCATIONS DARK BRONZE ALUMINUM PASS- THRU WINDOW WITH INTEGRATED INTERIOR AIR CURTAIN, RE: ELECTRICAL DRAWINGS EL. 19'-4" A.F.F. T.O. PARAPET FRAMING EIFS SYSTEM, PPG 'FOG' CHARCOAL ALUMINUM STOREFRONT, TYP. EL. 10-0" A.F.F. T.O. STOREFRONT / B.O. CANOPY EL. 11-0" A.F.F. B.O. SOFFIT BOLLARD, RE: CIVIL DRAWINGS ROOF DRAIN OVERFLOW W/ DOWNSPOUT NOZZLE, RE: PLUMBING DRAWINGS PREFINISHED BRAKE METAL TO MATCH STOREFRONT, TYP. EIFS ACCENT JOINT EIFS SYSTEM ON BOTTOM OF SOFFIT, PPG 'FOG', THIN BRICK, ENDICOTT, LIGHT SANDSTONE - VELOUR TEXTURE MECHANICAL EQUIPMENT ON ROOF SHOWN DASHED PREFINISHED METAL COPING TO MATCH STOREFRONT 1 EL. 20'-8" A.F.F. T.O. PARAPET FRAMING THIN BRICK, ENDICOTT, EXECUTIVE IRONSPOT - VELOUR TEXTURE PREFINISHED METAL CANOPY BEYOND EIFS SYSTEM, PPG "KNIGHT'S ARMOR" PREFINISHED BRAKE METAL TO MATCH STOREFRONT, TYP. PREFINISHED METAL CANOPY BEYOND CHARCOAL ALUMINUM STOREFRONT, TYP. PREFINISHED METAL COPING TO MATCH ADJACENT EIFS, TYP. EL. 10-0" A.F.F. T.O. STORFRONT EL. 11-0" A.F.F. B.O. SOFFIT BOLLARD BEYOND EIFS SYSTEM, PPG 'FOG' EIFS SYSTEM ON BOTTOM OF SOFFIT, PPG 'FOG', PREFINISHED METAL COPING, TO MATCH STOREFRONT PREFINISHED BRAKE METAL TO MATCH STOREFRONT, TYP. THIN BRICK, ENDICOTT, LIGHT SANDSTONE - VELOUR TEXTURE EL. 20'-8" A.F.F. T.O. PARAPET FRAMING MECHANICAL EQUIPMENT ON ROOF SHOWN DASHED EL. 19'-4" A.F.F. T.O. PARAPET FRAMING EL. 12-8" A.F.F. B.O. SOFFIT EL. 10-0" A.F.F. T.O. STOREFRONT EL. 11-0" A.F.F. B.O. SOFFIT EL. 19'-4" A.F.F. T.O. PARAPET FRAMING PREFINISHED METAL COPING TO MATCH ADJACENT EIFS, TYP. EIFS SYSTEM, PPG 'FOG' FROSTED GLASS TRANSOM WINDOW HOLLOW METAL SERVICE DOOR & FRAME, PAINT 'KNIGHTS ARMOR' EXTERIOR ROOF LADDER WITH LOCKING GATE, PAINT 'KNIGHTS ARMOR' THIN BRICK, ENDICOTT, EXECUTIVE IRONSPOT - VELOUR TEXTURE PREFINISHED METAL CANOPY BEYOND EL. 20'-8" A.F.F. T.O. PARAPET FRAMING EIFS SYSTEM, 'FOG' LIGHT FIXTURE, RE: A201 & ELECTRICAL DRAWINGS PREFINISHED METAL COPING, PAINT TO MATCH STOREFRONT EIFS SYSTEM ON BOTTOM OF SOFFIT, PPG 'FOG', THIN BRICK, ENDICOTT, EXECUTIVE IRONSPOT - VELOUR TEXTURE GAS SERVICE BEYOND, SEE PLUMBING DRAWINGS FOR ACTUAL LOCATION, PAINT METER & ALL VISIBLE PIPING 'KNIGHTS ARMOR' IF ALLOWED BY UTILITY COMPANY ELECTRICAL SERVICE BEYONE, SEE ELECTRICAL DRAWINGS FOR ACTUAL LOCATION, PAINT ALL CABINETS, METERS, & CONDUIT 'KNIGHTS ARMOR' IF ALLOWED BY UTILITY COMPANY EL. 11'-0" A.F.F. B.O. SOFFIT EIFS SYSTEM ON SIDE/RETURN OF SOFFIT AT LADDER OPENING, 'FOG' EIFS SYSTEM ON BOTTOM OF SOFFIT, PPG 'FOG', EL. 20'-8" A.F.F. T.O. PARAPET FRAMING MECHANICAL EQUIPMENT ON ROOF SHOWN DASHED PREFINISHED METAL COPING TO MATCH STOREFRONT PREFINISHED METAL COPING TO MATCH STOREFRONT1 PREFINISHED METAL COPING TO MATCH ADJACENT EIFS, TYP. EL. 19'-4" A.F.F. T.O. PARAPET FRAMING EIFS SYSTEM, PPG 'FOG' THIN BRICK, ENDICOTT, EXECUTIVE IRONSPOT - VELOUR TEXTURE EL. 11-0" A.F.F. B.O. SOFFIT PREFINISHED BRAKE METAL TO MATCH STOREFRONT, TYP. PREFINISHED METAL CANOPY TO MATCH STOREFRONT, COORDINATE W/ STEEL SUPPORT LOCATIONS CHARCOAL ALUMINUM STOREFRONT, TYP. EL. 10-0" A.F.F. T.O. STOREFRONT EIFS SYSTEM, PPG 'KNIGHT'S ARMOR' EL. 7-2" A.F.F. B.O. CANOPY 6" VINYL ADDRESS LETTERS, LOCATION & COLOR TO BE SPECIFIED BY THE FIRE MARSHAL XXXX EIFS ACCENT JOINT EIFS SYSTEM ON BOTTOM OF SOFFIT, PPG 'FOG', PREFINISHED BRAKE METAL TO MATCH STOREFRONT, TYP. THIN BRICK, ENDICOTT, LIGHT SANDSTONE - VELOUR TEXTURE EL. 20'-8" A.F.F. T.O. PARAPET FRAMING MECHANICAL EQUIPMENT ON ROOF SHOWN DASHED PREFINISHED METAL COPING TO MATCH ADJACENT EIFS, TYP. EL. 11-0" A.F.F. B.O. SOFFIT EL. 12-8" A.F.F. B.O. THIN BRICK HOLLOW METAL SERVICE DOOR & FRAME, PAINT 'KNIGHT'S ARMOR' FROSTED GLASS TRANSOM WINDOW 1 LIGHT FIXTURE, RE: A201 & ELECTRICAL DRAWINGS 8826 Santa Fe Drive Suite 304 Overland Park, KS 66212 913-341-2466 COPYRIGHT 2023 THIS DRAWING IN AN INSTRUMENT OF SERVICE, AND AS SUCH, REMAINS THE PROPERTY OF DUNGAN DESIGN GROUP, LLC. PERMISSION FOR USE OF THIS DOCUMENT IS LIMITED AND CAN BE EXTENDED ONLY BY WRITTEN AGREEMENT WITH DUNGAN DESIGN GROUP, LLC. Project No. Revisions: Issue Record: 1 04/20/23 (S h e l l B u i l d i n g ) 42 5 E . H i c k m a n R d . Wa u k e e , I A 5 0 2 6 3 05/31/23 Planning Comments 029134 Exterior Elevations A301 04/20/23 Permit Issue Wa u k e e GENERAL NOTES 1. ENSURE THAT ALL STOREFRONT HAS CONTINUOUS, CLEAN SEALANT AROUND THE INTERIOR AND EXTERIOR PERIMETER BETWEEN THE STOREFRONT AND THE EXTERIOR WALL FINISHES 2. SIGNAGE SHOWN FOR DESIGN INTENT ONLY. ALL SIGNS TO BE PERMITTED SEPARATELY BY CHIPOTLE'S SIGN VENDOR. 1/4" = 1'-0"1 EXTERIOR ELEVATION - EAST 1/4" = 1'-0"2 EXTERIOR ELEVATION - SOUTH 1/4" = 1'-0"3 EXTERIOR ELEVATION - NORTH 1/4" = 1'-0"4 EXTERIOR ELEVATION - WEST SQUARE FOOTAGE OF WEST ELEVATION: 1,375 SF SQUARE FOOTAGE OF EIFS ON WEST ELEVATION: 129 SF SQUARE FOOTAGE OF BRICK ON WEST ELEVATION: 795 SF SQUARE FOOTAGE OF STOREFRONT ON WEST ELEVATION: 378 SF SQUARE FOOTAGE OF BREAKMETAL ON WEST ELEVATION: 73 SF SQUARE FOOTAGE OF SOUTH ELEVATION: 806 SF SQUARE FOOTAGE OF EIFS ON SOUTH ELEVATION: 102 SF SQUARE FOOTAGE OF BRICK ON SOUTH ELEVATION: 450 SF SQUARE FOOTAGE OF STOREFRONT ON SOUTH ELEVATION: 211 SF SQUARE FOOTAGE OF BREAKMETAL ON SOUTH ELEVATION: 43 SF SQUARE FOOTAGE OF EAST ELEVATION: 1,339 SF SQUARE FOOTAGE OF EIFS ON EAST ELEVATION: 465 SF SQUARE FOOTAGE OF BRICK ON EAST ELEVATION: 741 SF SQUARE FOOTAGE OF STOREFRONT ON EAST ELEVATION: 115 SF SQUARE FOOTAGE OF BREAKMETAL ON EAST ELEVATION: 18 SF SQUARE FOOTAGE OF NORTH ELEVATION: 776 SF SQUARE FOOTAE OF EIFS ON NORTH ELEVATION: 262 SF SQUARE FOOTAGE OF BRICK ON NORTH ELEVATION: 478 SF SQUARE FOOTAGE OF STOREFRONT ON NORTH ELEVATION: 36 SF SQUARE FOOTAGE OF BREAKMETAL ON NORTH ELEVATION: 0 SF OVERALL SQUARE FOOTAGE: 4,296 SF AMOUNT OF ALLOWED EIFS (25% OF OVERALL SF): 1,074 SF AMOUNT OF PROPOSED EIFS: 958 SF AMOUNT OF PROPOSED BRICK:2,464 SF AMOUNT OF PROPOSED STOREFRONT: 740 SF AMOUNT OF PROPOSED BREAKMETAL: 134 SF EXTERIOR FINISH CALCULATION 1 PREFINISHED METAL COPING BOLLARD & PIVOT, PAINTED 7' - 6 " 16" X 8" CMU, PAINTED 7' - 6 " BOLLARD & PIVOT, PAINTED CANE BOLT, REFER TO 9/SP102 TYP 1/8 4" GATE, PAINTED PREFINISHED METAL COPING BOLLARD & PIVOT, PAINTED 16" X 8" CMU, PAINTED MAN DOOR, PAINTED BOLLARD & PIVOT, PAINTED PREFINISHED METAL COPING 16" X 8" CMU, PAINTED 9" DIA. SCHEDULE 80 STEEL PIPE PIVOT, PROVIDE STEEL SHIM BETWEEN PIVOT & BOLLARD GREASE FITTING AT EACH HINGE POINT 2" x 2" x 1/4" STL. ANGLE DOOR FRAME (STILES & RAILS) - WELD TO DOOR PIVOT - SHOP PRIME & PAINT 8" DIA. SCHEDULE 40 STEEL BOLLARD, GROUT SOLID & ROUND & TROWEL @ TOP, ENCASE IN 24" DIA. CONCRETE BASE 36" DEEP TRASH ENCLOSURE DOOR: 2" x 2" x 1/4" STEEL ANGLE STILES & RAILS W/ 1-1/2", 22 GA GALVANIZED CORRUGATED METAL DECKING "C" PANELS & 1-1/4" x 1-1/4" x 3/16" STEEL ANGLE BRACE - SHOP PRIME ANGLES & PAINT 1' - 0 " 2" TYP 3/16 9"ø SCHEDULE 80 STEEL PIPE PIVOT, PROVIDE STEEL SHIM BETWEEN PIVOT & BOLLARD, REFER TO DETAIL 5/SP102 8"ø SCHEDULE 40 BOLLARD GROUT SOLID. ROUND & TROWEL @ TOP. ENCASE IN 24" DIA CONCRETE BASE 36" DEEP GREASE FITTING AT EACH HINGE POINT 2" X 2" X 1/4" STL ANGLE DOOR FRAME (STILES & RAILS) - WELD TO DOOR PIVOT - SHOP PRIME & PAINT 1-1/2", 22 GA GALVANIZED CORRUGATED METAL "C" PANELS (LEAVE RAW) - WELD TO DOOR FRAME AS SHOWN 8" x 16" CMU BLOCK, PAINTED, RE: FINISH SCHEDULE THIS SHEET 6" CONCRETE SLAB, SLOPE TO FRONT TO DRAIN, RE: STRUCTURAL DRAWINGS FINISHED GRADE - REFER TO CIVIL DRAWINGS - SLOPE AWAY FROM ENCLOSURE 8" CMU, RE: STRUCTURAL DRAWINGS, PAINT PER FINISH SCHEDULE THIS SHEET 8 ' - 0 " PREFINISHED METAL COPING AND HOLD DOWN CLIPS W/ CONTINUOUS DRIP EDGES @ EACH SIDE 4" REINFORCED CONCRETE FOUNDATION, RE: STRUCTURAL DRAWINGS 1' - 0 " 1' - 7 " 6" 2" 6" 3" 1" 5" 1-1/2" I.D. x 6" LONG STEEL PIPE SLEEVE FLUSH WITH TOP OF PAVING - PROVIDE AT CLOSED AND FULLY OPEN POSITION CONCRETE PAVING 3/4" DIAMETER STEEL CANE BOLT BOTTOM OF GATE PIPE SLEEVE - WELD TO FRAME, GALVANIZED FINISH 1/8" BAR IN "ZEE" PROFILE, 1" WIDE - PROFILE TO ACCEPT CANE BOLT - WELD TO FRAME TRASH ENCLOSURE DOOR: 2" X 2" X 1/4" STEEL ANGLE STILES & RAILS WITH 1-1/2", 22 GA GALVANIZED CORRUGATED METAL "C" PANELS & 1-1/4" x 1-1/4" x 3/16" STEEL ANGLE BRACE ON INTERIOR SIDE5" EQ . 4 ' - 0 " 4 ' - 8 " 4 ' - 0 " E Q . 8 YARD DUMPSTER 6'W x 6'L x 6'H RE: STRUCTURAL DRAWINGS FOR REINFORCEMENT COMPOST TOTER, TYP. OF 3 8'D x 10'W CLEAR FLOOR SPACE AT DUMPSTER 8" BOLLARD FILLED WITH CONCRETE, RE: 11/SP102 3'-0" MAN DOOR 20 ' - 0 " 2' - 8" 4' - 0" 7' - 4" 14' - 0" SP102 12 SP102 6 HEAVY DUTY APRON 10' - 0" MIN. 8 YARD DUMPSTER 6'W x 6'L x 6'H SP102 7 8 SP102 2 SP102 1 SP102 4 SP102 3 SP102 3' - 6 " 5' - 0 " FINISH TOP W/ ROUNDED CONCRETE FORM 8" DIA. SCHED. 40 STEEL POST FILLED W/ CONC. PAINT 'KNIGHTS ARMOR' TO PREVENT CRACKING IN SLAB WRAP PIPE W/3-LAYERS OF 30# FELT PAPER FROM 2" ABOVE T.O. SLAB DOWN TO T.O. FTG.. CUT OFF EXCESS FELT ABOVE SLAB AFTER CURE FINISHED CONC. TO SLOPE AWAY FROM BOLLARD CONCRETE SLAB 18" Ø CONCRETE FOOTING 8" x 16" CMU BLOCK, PAINTED, RE: FINISH SCHEDULE THIS SHEET 6" DIA. SCHEDULE 40 STL. BOLLARD GROUT SOLID & ROUND & TROWEL @ TOP. EMBED 2'-3" INTO CONCRETE PIER 7" DIA. SCHEDULE 80 x 1'-0" STEEL PIPE PIVOTS - PROVIDE STL. SHIM BETWEEN PIVOT & BOLLARD - WELD PIVOT TO DOOR, REFER TO DETAIL 13/SP102 GREASE FITTING AT EACH HINGE POINT 6" 6" DIA. SCHEDULE 40 STL. BOLLARD GROUT SOLID & ROUND & TROWEL @ TOP. EMBED 2'-3" INTO CONCRETE PIER TRASH ENCLOSURE DOOR: 2" x 2" x 1/4" STEEL ANGLE STILES & RAILS WITH 1-1/2", 22 GA GALVANIZED CORRUGATED METAL DECKING "C" PANELS & 1-1/4" x 1-1/4" x 3/16" STEEL ANGLE BRACE - SHOP PRIME ANGLES & PAINT 7" DIA. SCHEDULE 80 x 1'-0"STEEL PIPE PIVOTS - PROVIDE STEEL SHIM BETWEEN PIVOT & BOLLARD - WELD PIVOT TO DOOR. SHOP PRIME AND PAINT 3/16 TYP GREASE FITTING AT EACH HINGE POINT MAN DOOR STEEL PLATE WELDED TO FRAME ANGLE WITH HANDLE CMU BLOCK MAGNETIC CATCH 2" X 2" X 12" ANGLE, BOLT TO BLOCK 8826 Santa Fe Drive Suite 304 Overland Park, KS 66212 913-341-2466 COPYRIGHT 2023 THIS DRAWING IN AN INSTRUMENT OF SERVICE, AND AS SUCH, REMAINS THE PROPERTY OF DUNGAN DESIGN GROUP, LLC. PERMISSION FOR USE OF THIS DOCUMENT IS LIMITED AND CAN BE EXTENDED ONLY BY WRITTEN AGREEMENT WITH DUNGAN DESIGN GROUP, LLC. Project No. Revisions: Issue Record: 03/20/23 (S h e l l B u i l d i n g ) TB D H i c k m a n R d . Wa u k e e , I A 5 0 2 6 3 029xxx Trash Enclosure Details SP102 mm/dd/yy Permit Issue Wa u k e e 1/4" = 1'-0"1 DUMPSTER ELEVATION1/4" = 1'-0"2 DUMPSTER ELEVATION 1/4" = 1'-0"3 DUMPSTER ELEVATION 1/4" = 1'-0"4 DUMPSTER ELEVATION 1 1/2" = 1'-0"5 TYPICAL GATE HINGE DETAIL 1 1/2" = 1'-0"6 DOOR PIVOT PLAN DETAIL 3/4" = 1'-0"8 WALL SECTION 1 1/2" = 1'-0"9 TYPICAL CANE BOLT DETAIL 1/4" = 1'-0"10 DUMPSTER ENCLOSURE PLAN 1/2" = 1'-0"11 TYP. BOLLARD DETAIL 1 1/2" = 1'-0"12 MAN DOOR PIVOT DETAIL 1 1/2" = 1'-0"13 MAN DOOR PIVOT 1 1/2" = 1'-0"7 MAN DOOR LATCH DETAIL DUMPSTER ENCLOSURE FINISH SCHEDULE MATERIAL CMU METAL COPING GATES/DOOR & BOLLARDS COLOR / FINISH - RE: SPEC FOR ADDITIONAL DETAIL PAINT PPG 'KNIGHTS ARMOR' PREFINISHED TO MATCH PAINTED CMU PAINT PPG 'KNIGHTS ARMOR'