HomeMy WebLinkAbout2023-07-24 I01G_03 Public Works Site Expansion Phase 1_Change Order 4AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: July 24, 2023 AGENDA ITEM:Consideration of approval of Change Order No. 4 to Core Construction Services for the Waukee Public Works Site Expansion– Phase 1 project increasing the contract amount by $20,144.86. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 4 is additional cost for re- fabricated metal weather hood, pumped concrete pavement, credit for damage to existing vault repaired by City, grading revisions, credit for omitted 4” paint stripping, additional concrete replacement, and credit for power used by the contractor during construction. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $20,144.86. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 4 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1G3 ENGINEERS | ARCHITECTS | SURVEYORS | SCIENTISTS 14225 University Avenue, Suite 110 Waukee, Iowa 50263 p 515.225.3469 www.f-w.com July 17, 2023 City of Waukee 805 University Avenue Waukee, Iowa 50263 Attn: Rudy Koester, Public Works Director Re: Change Order #004 Waukee Public Works Site Expansion Phase 1 Dear Mr. Koester: Attached please find a detailed Change Order for City Council approval on July 24, 2023. Change Description: 1. COR-014: Sheet M2.1 – WEST WING FLOOR PLAN – MECHANICAL a. Re-fabricate metal weatherhood for EF-1 to alleviate exhaust fan conflict with roof joist. Sheet M2.2 – NORTH WING FLOOR PLAN - MECHANICAL a. Re-fabricate metal weatherhood for EF-3 to alleviate exhaust fan conflict with roof joist. Farnsworth Group’s Third Amendment reduces their contract by $2,610, which offsets the additional $2,609.25 incurred by the City of Waukee. 2. COR-015: Sheet C101 – SITE PLAN a. Per the request of City Staff, contractors pumped the concrete pavement, so concrete trucks did not rut and deteriorate the stability of the subgrade. Additional cost of $18,355.80 was negotiated by City Staff. 3. COR-016: Sheet C101 – SITE PLAN a. Construction documents required the contractors to raise existing vault to grade. Construction activities damaged the existing vault. City staff installed a casting ring in lieu of re-installing the non-traffic rated vault in the concrete pavement. Core agreed to provide a deduct of -$1,634.28 for not being required to replace the damaged vault. 4. COR-017: Sheet C201 – GRADING PLAN a. Grading revisions were required in the far northwest corner of the property where no new grading was indicated to prevent ponding or diverting water onto neighboring properties. The additional cost was $2,524.05 for additional labor and equipment costs. City of Waukee July 17, 2023 Page 2 of 2 5. COR-018: Sheet A1.4 – NORTH WING FLOOR PALN a. City staff determined they will not be storing the MDPE gas pipe in the building as originally planned. Therefore, the 4” paint stripping was omitted from the project. This resulted in a deduct of $-$1,881.40. 6. COR-019: Sheet C101 – SITE PLAN a. City staff identified a 16 SY area of existing concrete damaged during construction by City staff. Core agreed to replace pavement for an additional cost of $613.44. 7. MidAmerican Energy Billing Reimbursement: a. The permanent power was energized, and the billing was changed to the City of Waukee while still providing power during construction. Core agreed to reimburse the City of Waukee for the June bill. Since the July bill has not been sent, City staff recommended doubling the June bill to cover the anticipated cost for July. This results in a deduct to the contract of -$442.00. We have reviewed the submitted Change Order Requests (CORs) from Core Construction, and the Design Team considers them to be in line with current industry pricing. If City Staff concurs with these proposed additional costs, then we recommend the City of Waukee Increase the contract price in the amount of $20,144.86 to complete the additional work associated with Change Order Number 004. If you have any questions, please contact me. Sincerely, FARNSWORTH GROUP, INC. Kristofer J. Orth, AIA Architecture Principal Enclosures: Change Order #004, dated July 17, 2023 07/17/2023 Jeremy Roush, PM 7-18-23 CHANGE ORDER NO. 4 - SUMMARY Waukee Public Works - Site Expansion Phase 1 Date:07/17/23 Original Contract Price:$5,922,700.00 Change Orders approved to date:$41,054.45 CHANGE ORDER ITEMS 1)COR-014 Make a deeper shroud for 2 exhaust fans $2,609.25 2)COR-015 Pump Truck for Concrete Paving $18,355.80 3)COR-016 Credit for Ground Vault -$1,634.28 4)COR-017 Grading Revisions at NW Corner of Site $2,524.05 5)COR-018 Eliminate Yellow Striping for High-Piled Storage area -$1,881.40 6)COR-019 Replace damaged existing pavement $613.44 7)-$442.00 TOTAL Changes:$20,144.86 Amount of this change order:$20,144.86 Adjusted contract price including this change order:$5,983,899.31 Reimburse City of Waukee for MidAmerican Energy Electrical Billings during construction (June & Est. July Bills) 14225 University Avenue, Suite 110 | Waukee, IA 50263 | p 515.225.3469 | www.f-w.com ENGINEERS | ARCHITECTS | SURVEYORS | SCIENTISTS 3-2-23 Kristofer Orth 14225 University Ave, Suite 110 Waukee IA 50263 RE: 21114 Waukee Public Works-Site Expansion Phase 1 COR-14 Dear Kristofer: Core proposes the following as a change in the Work: Make a deeper shroud for 2 exhaust fans Proposed change in contract sum ADD $2609.25 if approved by 3-10-23. Proposed change in schedule 00 days if approved by 3-10-23 Should approval be granted after this deadline, the schedule shall be extended further beyond the proposed change the same number of days. An estimate and back up is attached. Please review and authorize one of the actions below. If you have any questions, please contact me at your earliest convenience. Thank you. Sincerely, Jeremy Roush Project Manager Cc: Sasha Daljevic Rudy Koester Sara Kappos □ Approved, incorporate change immediately □ Pending, continue work per current contract □ Pending, stop affected work until action taken (hold time past deadline above will be added to the proposed change in schedule) □ Rejected The above action is authorized below by a duly authorized representative of the Owner and Architect: Owner: Architect: Signature ___________________________________ Signature ___________________________________ Name ______________________________________ Name ______________________________________ Title ________________________________________ Title ________________________________________ Date _______________________________________ Date _______________________________________ COR #014 Core Structural Services, LLC 3093 NW Prairie Lane Des Moines, IA 50313 (515) 987-6830 Office (515) 987-6830 Fax TO: Farnsworth Group PROJECT NAME: 14225 University Ave Suite 110 PROJECT NUMBER: Waukee IA 50263 SUBJECT: FROM: ATTN: Kristofer Orth DATE: Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total 220000.005 Fabricate a Deeper weather hood Young $ 1.00 $ 1.00 $ 2,450.00 $ 2,450.00 Subtotal -$ -$ -$ 2,450.00$ 2,450.00$ Small Tools Allowance 0.00% Warranty 0.00% 0.00% 0.00% 0.00% Overhead & Profit 0.00% 0.00% 0.00% 5.00% $ 122.50 $ 122.50 Bond 1.50% 1.50% 1.50% 1.50% $ 36.75 $ 36.75 The Contract Schedule will Increase / Decrease by: days TOTAL COR: Clarifications & Exclusions: Waukee Public Works 21114 Exaust Fan Alteration Jeremy Roush 2,609.25$ 3/2/23 Item #/ Cost Code Description Sub/Vendor Quantity Unit Labor Material Equipment Subcontractor TOTAL 21114.COR-Log.Waukee Public Works.xlsx Page 1 1 jeremyr@coreconstructionia.com From:Gayle Young <youngmechanical09@gmail.com> Sent:Tuesday, January 17, 2023 7:42 AM To:Jeremy Roush Subject:Waukee Public Works Jeremy, The wall openings for EF1 & 3 are at the same elevation as the roof joists. Inside the wall there is very little clearance between the wall and roof joists. The exhaust fans will have to be mounted further thru the wall to the outside. The weather hoods will not cover the fans. Deeper weather hoods can be built to cover these fans. The additional cost is $2450 Thanks, Gayle Young Mechanical & Plumbing Inc. 7-6-23 Kristofer Orth 14225 University Ave, Suite 110 Waukee IA 50263 RE: 21114 Waukee Public Works-Site Expansion Phase 1 COR-15R1 Dear Kristofer: Core proposes the following as a change in the Work: Pump Site Paving Proposed change in contract sum add $18355.80 if approved by 7-11-23. Proposed change in schedule 00 days if approved by 7-11-23 Should approval be granted after this deadline, the schedule shall be extended further beyond the proposed change the same number of days. An estimate and back up is attached. Please review and authorize one of the actions below. If you have any questions, please contact me at your earliest convenience. Thank you. Sincerely, Jeremy Roush Project Manager Cc: Sasha Daljevic Rudy Koester Sara Kappos □ Approved, incorporate change immediately □ Pending, continue work per current contract □ Pending, stop affected work until action taken (hold time past deadline above will be added to the proposed change in schedule) □ Rejected The above action is authorized below by a duly authorized representative of the Owner and Architect: Owner: Architect: Signature ___________________________________ Signature ___________________________________ Name ______________________________________ Name ______________________________________ Title ________________________________________ Title ________________________________________ Date _______________________________________ Date _______________________________________ COR #015 Core Structural Services, LLC 3093 NW Prairie Lane Des Moines, IA 50313 (515) 987-6830 Office (515) 987-6830 Fax TO: Farnsworth Group PROJECT NAME: 14225 University Ave Suite 110 PROJECT NUMBER: Waukee IA 50263 SUBJECT: FROM: ATTN: Kristofer Orth DATE: Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total 1 320013 Price to pump 70000 sq ft of Paving Jordison $ 1.00 $ 17,235.49 $ 17,235.49 3 4 5 6 7 8 9 10 92 93 94 95 96 97 98 99 100 Subtotal -$ -$ -$ 17,235.49$ 17,235.49$ Small Tools Allowance 0.00% Warranty 0.00% 10.00% 10.00% 0.00% Overhead & Profit 0.00% 15.00% 15.00% 5.00% $ 861.77 $ 861.77 Bond 1.50% 1.50% 1.50% 1.50% $ 258.53 $ 258.53 The Contract Schedule will Increase / Decrease by: days TOTAL COR: Clarifications & Exclusions: Labor Material Equipment Subcontractor TOTALItem #/ Cost Code Description Sub/Vendor Quantity Unit Waukee Public Works 21114 Pump Parking Lot Jeremy Roush 18,355.80$ 6/19/23 21114.COR-Log.Waukee Public Works.xlsx Page 1 5-16-23 Kristofer Orth 14225 University Ave, Suite 110 Waukee IA 50263 RE: 21114 Waukee Public Works-Site Expansion Phase 1 COR-16 Dear Kristofer: Core proposes the following as a change in the Work: Deduct for replacement of ground vault in parking / cost of 1 yard of concrete for city subcontractor Proposed change in contract sum deduct $-1634.28 if approved by 5-19-23. Proposed change in schedule 00 days if approved by 5-19-23 Should approval be granted after this deadline, the schedule shall be extended further beyond the proposed change the same number of days. An estimate and back up is attached. Please review and authorize one of the actions below. If you have any questions, please contact me at your earliest convenience. Thank you. Sincerely, Jeremy Roush Project Manager Cc: Sasha Daljevic Rudy Koester Sara Kappos □ Approved, incorporate change immediately □ Pending, continue work per current contract □ Pending, stop affected work until action taken (hold time past deadline above will be added to the proposed change in schedule) □ Rejected The above action is authorized below by a duly authorized representative of the Owner and Architect: Owner: Architect: Signature ___________________________________ Signature ___________________________________ Name ______________________________________ Name ______________________________________ Title ________________________________________ Title ________________________________________ Date _______________________________________ Date _______________________________________ COR #016 Core Structural Services, LLC 3093 NW Prairie Lane Des Moines, IA 50313 (515) 987-6830 Office (515) 987-6830 Fax TO: Farnsworth Group PROJECT NAME: 14225 University Ave Suite 110 PROJECT NUMBER: Waukee IA 50263 SUBJECT: FROM: ATTN: Kristofer Orth DATE: Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Deduct for city replacing the ground vault $ 1.00 $ (2,000.00) $ (2,000.00) 1 yrd concrete for city contractor $ 1.00 $ 328.00 $ 328.00 Subtotal -$ 328.00$ -$ (2,000.00)$ (1,672.00)$ Small Tools Allowance 0.00% Warranty 0.00% 0.00% 0.00% 0.00% Overhead & Profit 5.00% 10.00% $ 32.80 5.00% 0.00% $ 32.80 Bond 1.50% 1.50% $ 4.92 1.50% 0.00% $ 4.92 The Contract Schedule will Increase / Decrease by: days TOTAL COR: Clarifications & Exclusions: Labor Material Equipment Subcontractor TOTALItem #/ Cost Code Description Sub/Vendor Quantity Unit Waukee Public Works 21114 Electric Ground Box Jeremy Roush (1,634.28)$ 5/16/23 21114.COR-Log.Waukee Public Works.xlsx Page 1 CORE Construction 3093 nw prairie lane des moines, Iowa 50313 P: +15152645156 Project: 21114 Waukee Public Works 805 University Ave Waukee, Iowa 50263     RFI #42: Electric Vaults   Status Closed on 05/05/23   To Brent Strauch (Shive Hattery)  Sasha Daljevic (Farnsworth Group)  Kristofer Orth (Farnsworth Group)  From Jeremy Roush (Core Construction)   Date Initiated Apr 3, 2023 Due Date Apr 13, 2023 Location Project Stage Cost Impact Yes (Unknown)Schedule Impact Yes (Unknown) Spec Section Cost Code Drawing Number Reference C101, E1.0 Linked Drawings   Received From Steve Koester (Core Construction) Copies To Matt Brown (Core Construction), Sasha Daljevic (Farnsworth Group), Steve Koester (Core Construction), Kristofer Orth (Farnsworth Group), Brent Strauch (Shive Hattery)      Activity   Question Question from Jeremy Roush Core Construction on Monday, Apr 3, 2023 at 03:05 PM CDT  Drawings indicate to raise one existing vault to grade with paving/utilities There are actually two Vaults and one was damaged over the winter by construction traffic.   We will replace with similar box however the existing Vault is only rated for 15,000 #’s   Should we replace both vaults with 24’000 vaults as they are in a high traffic location?  Attachments RFI-042.ElectricVaultvault.pdf    Awaiting an Official Response   All Replies Response from Kristofer Orth Farnsworth Group on Friday, Apr 14, 2023 at 08:17 AM CDT  See attached response from Farnsworth Group.   Attachments 21114.RFI-042 Electric Vaults_FG Response.pdf     CORE Construction Page 1 of 1 Printed On: May 16, 2023 11:40 AM EDT    INVOICELiberty Ready Mix 12012 Ridgemont Drive Urbandale, IA 50323 515-278-4807 Customer No.COR020 Invoice Date 5/12/2023 Invoice Number 207330 Page 1 Job Id 22113 WAUK PUBLWR2 Lot #805 UNIVERSITY AVE PO#22-113 STEVE City WAUKEE Core Structural Services LLC 3093 NW Prairie Lane Des Moines IA 50313 Date Ticket Qty Description Price Amount 05/12/23 1079376 1.00 CY C-4 WR 88.00 88.00 05/12/23 1079376 1.00 CY Haul 40.00 40.00 05/12/23 1079376 1.00 EA Small Load 100.00 100.00 05/12/23 1079376 1.00 EA Long Haul $100/Ld 100.00 100.00 Credit Terms:Net 30 Days Total Cubic Yards 1.00 All Invoices Are Subject to a Mechanic's Lien If Sub-Total 328.00 Not Paid Within 30 Days Sales Tax-0000 0.00 Invoice Total 328.00 CORE Construction 3093 nw prairie lane des moines, Iowa 50313 P: +15152645156 Project: 21114 Waukee Public Works 805 University Ave Waukee, Iowa 50263     RFI #42: Electric Vaults   Status Open   To Kristofer Orth (Farnsworth Group)  Sasha Daljevic (Farnsworth Group)  Brent Strauch (Shive Hattery)  From Jeremy Roush (Core Construction)   Date Initiated Apr 3, 2023 Due Date Apr 6, 2023 Location Project Stage Cost Impact Yes (Unknown)Schedule Impact Yes (Unknown) Spec Section Cost Code Drawing Number Reference C101, E1.0 Linked Drawings   Received From Steve Koester (Core Construction) Copies To Matt Brown (Core Construction), Sasha Daljevic (Farnsworth Group), Steve Koester (Core Construction), Kristofer Orth (Farnsworth Group), Brent Strauch (Shive Hattery)      Activity   Question Question from Jeremy Roush Core Construction on Monday, Apr 3, 2023 at 03:05 PM CDT  Drawings indicate to raise one existing vault to grade with paving/utilities There are actually two Vaults and one was damaged over the winter by construction traffic. We will replace with similar box however the existing Vault is only rated for 15,000 #’s Should we replace both vaults with 24’000 vaults as they are in a high traffic location?  Attachments RFI-042.ElectricVaultvault.pdf    Awaiting an Official Response     CORE Construction Page 1 of 1 Printed On: Apr 3, 2023 04:09 PM EDT    BASED ON DISCUSSION ON SITE ON 04/10/23 WITH TIM ROYER, THE CITY OF WAUKEE WILL INSTALL TRAFFIC RATED MANHOLE STRUCTURE, UNDER SEPARATE CONTRACT, IN PLACE OF EXISTING VAULT. EXISTING VAULT WAS DAMAGED BY CONSTRUCTION ACTIVITIES. CORE CONSTRUCTION SHALL PROVIDE A CREDIT SINCE THEY WILL NOT BE REQUIRED TO REPLACE EXISTING DAMAGED VAULT. ANSWERED BY: KRISTOFER J. ORTH, AIA - FARNSWORTH GROUP, INC. DATE: 04/14/2023 1 jeremyr@coreconstructionia.com From:Rudy Koester <rkoester@waukee.org> Sent:Tuesday, May 9, 2023 8:16 AM To:jeremyr@coreconstructionia.com Cc:Sara Kappos; Tim Royer Subject:RE: Ground box deduct Hi Jeremy, we have about $2K wrapped up in the HH replacement/install so that amount would be our ask. Thanks. Rudy Koester | Director of Public Works/City Engineer City of Waukee 805 University Ave, Waukee, Iowa 50263 O: 515-978-7388 rkoester@waukee.org | Waukee.org This e-mail, its content, and any files transmitted with it are intended solely for the addressee(s) and may be legally privileged and/or confidential. Access by any other party is unauthorized without the express written permission of the sender. If you have received this e-mail in error - you may not copy, forward, or use the contents, attachments, or information in any way. Although attachments to this e-mail have been checked for malware and virus, the sender does not accept liability for any virus or malware that have not been detected. From: jeremyr@coreconstructionia.com <jeremyr@coreconstructionia.com> Sent: Monday, May 8, 2023 2:26 PM To: Tim Royer <troyer@waukee.org>; Rudy Koester <rkoester@waukee.org> Subject: Ground box deduct sophospsmartbannerend Just so we don’t have to go through the exercise and paperwork mul0ple 0mes, what are looking at ge1ng for a credit back? Note my email address has changed please update my contact info Jeremy Roush Project Manager / Estimator 3093 NW Prairie Ln, Des Moines IA 50313 Office 515/264-5156 x204 Cell 515/419-3700 Fax 515/257-4311 5-16-23 Kristofer Orth 14225 University Ave, Suite 110 Waukee IA 50263 RE: 21114 Waukee Public Works-Site Expansion Phase 1 COR-16 Dear Kristofer: Core proposes the following as a change in the Work: Grading Revisions Proposed change in contract sum deduct $2524.05 if approved by 5-19-23. Proposed change in schedule 00 days if approved by 5-19-23 Should approval be granted after this deadline, the schedule shall be extended further beyond the proposed change the same number of days. An estimate and back up is attached. Please review and authorize one of the actions below. If you have any questions, please contact me at your earliest convenience. Thank you. Sincerely, Jeremy Roush Project Manager Cc: Sasha Daljevic Rudy Koester Sara Kappos □ Approved, incorporate change immediately □ Pending, continue work per current contract □ Pending, stop affected work until action taken (hold time past deadline above will be added to the proposed change in schedule) □ Rejected The above action is authorized below by a duly authorized representative of the Owner and Architect: Owner: Architect: Signature ___________________________________ Signature ___________________________________ Name ______________________________________ Name ______________________________________ Title ________________________________________ Title ________________________________________ Date _______________________________________ Date _______________________________________ 17 Add COR #017 Core Structural Services, LLC 3093 NW Prairie Lane Des Moines, IA 50313 (515) 987-6830 Office (515) 987-6830 Fax TO: Farnsworth Group PROJECT NAME: 14225 University Ave Suite 110 PROJECT NUMBER: Waukee IA 50263 SUBJECT: FROM: ATTN: Kristofer Orth DATE: Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total 310000.01 Grading revisions Elder $ 1.00 $ 2,370.00 $ 2,370.00 Subtotal -$ -$ -$ 2,370.00$ 2,370.00$ Small Tools Allowance 10.00% Warranty 2.00% 2.00% 2.00% 0.00% Overhead & Profit 10.00% 10.00% 10.00% 5.00% $ 118.50 $ 118.50 Bond 1.50% 1.50% 1.50% 1.50% $ 35.55 $ 35.55 The Contract Schedule will Increase / Decrease by: days TOTAL COR: Clarifications & Exclusions: Labor Material Equipment Subcontractor TOTALItem #/ Cost Code Description Sub/Vendor Quantity Unit Waukee Public Works 21114 PR-02 Jeremy Roush 2,524.05$ 5/16/23 21114.COR-Log.Waukee Public Works.xlsx Page 1 Proposal Request 14225 University Avenue, Suite 110 | Waukee, IA 50263 | p 515.225.3469 | www.f-w.com ENGINEERS | ARCHITECTS | SURVEYORS | SCIENTISTS Proposal Request Number: 02 Issue Date: May 4, 2023 Owner: City of Waukee, Iowa Project Name: Waukee Public Works Site Expansion Ph1 Project Number: 0201440.00 To: Core Construction Services, LLC Contract for: General Construction Contract Dated: December 17, 2021 Please submit an itemized quotation for changes in the contract sum and time incidental to proposed modifications to the contract documents described above. THIS IS NOT A CHANGE ORDER OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED BELOW. Description: Sheet C201 – GRADING PLAN 1. REVISE grading in northwest corner of site per attached revised sheet C201. Issued By: FARNSWORTH GROUP, INC. Kristofer J. Orth, AIA Architecture Principal Attachments: C201 – GRADING PLAN, REVISION: PR002, DATED 05/03/2023. 6-9-23 Kristofer Orth 14225 University Ave, Suite 110 Waukee IA 50263 RE: 21114 Waukee Public Works-Site Expansion Phase 1 COR-18 Dear Kristofer: Core proposes the following as a change in the Work: Eliminate yellow striping Proposed change in contract sum deduct $-1881.40 if approved by 6-16-23-23. Proposed change in schedule 00 days if approved by 6-16-23 Should approval be granted after this deadline, the schedule shall be extended further beyond the proposed change the same number of days. An estimate and back up is attached. Please review and authorize one of the actions below. If you have any questions, please contact me at your earliest convenience. Thank you. Sincerely, Jeremy Roush Project Manager Cc: Sasha Daljevic Rudy Koester Sara Kappos □ Approved, incorporate change immediately □ Pending, continue work per current contract □ Pending, stop affected work until action taken (hold time past deadline above will be added to the proposed change in schedule) □ Rejected The above action is authorized below by a duly authorized representative of the Owner and Architect: Owner: Architect: Signature ___________________________________ Signature ___________________________________ Name ______________________________________ Name ______________________________________ Title ________________________________________ Title ________________________________________ Date _______________________________________ Date _______________________________________ COR #018 Core Structural Services, LLC 3093 NW Prairie Lane Des Moines, IA 50313 (515) 987-6830 Office (515) 987-6830 Fax TO: Farnsworth Group PROJECT NAME: 14225 University Ave Suite 110 PROJECT NUMBER: Waukee IA 50263 SUBJECT: FROM: ATTN: Kristofer Orth DATE: Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Eliminate yellow striping per the city SCS $ 1.00 $ (1,881.40) $ (1,881.40) Subtotal -$ -$ -$ (1,881.40)$ (1,881.40)$ Small Tools Allowance 10.00% Warranty 2.00% 2.00% 2.00% 0.00% Overhead & Profit 10.00% 10.00% 10.00% 0.00% Bond 1.50% 1.50% 1.50% 0.00% The Contract Schedule will Increase / Decrease by: days TOTAL COR: Clarifications & Exclusions: Labor Material Equipment Subcontractor TOTALItem #/ Cost Code Description Sub/Vendor Quantity Unit Waukee Public Works 21114 Eliminate Striping Jeremy Roush (1,881.40)$ 6/9/23 21114.COR-Log.Waukee Public Works.xlsx Page 1 SCS Midwest Inc.Page 1 of 2 3314 Hwy #6 Trail Homestead, IA. Phone: (319) 622 3049 Fax (319) 622 3069 E-Mail : ron@scsflooring.com CO #1 Date :6/9/2023 Job Name :Waukee Public Works Site Expansion Phase 1 General Contractor / Owners Name:Core Construction General Contractor / Owners Representative Jeremy Roush SCS Midwest Representative Kenneth Lukat SCOPE OF WORK TO BE CHANGED The decision was made by the owner to not proceed with the installation of the specified 785 LF of 4" Wide Safety Yellow Striping originally contracted. Elimination of this scope of work results in a credit for labor and materials originally included in the contract. Amount of Change (1,881.40)$ Deduct Signatures Date Gen Contractor / Owners Representative: SCS Midwest Representative: Kenneth Lukat 6/9/2023 Please sign and return one copy SCS Midwest Inc.Page 2 of 2 3314 Hwy #6 Trail Homestead, IA. Phone: (319) 622 3049 Fax (319) 622 3069 E-Mail : ron@scsflooring.com CO #1 Date :6/9/2023 Job Name :Waukee Public Works Site Expansion Phase 1 COST BREAKDOWN LABOR (1,222.00)$ MATERIALS (414.00)$ OVERHEAD 10% (163.60)$ PROFIT 5% (81.80)$ TOTAL (1,881.40)$ 7-6-23 Kristofer Orth 14225 University Ave, Suite 110 Waukee IA 50263 RE: 21114 Waukee Public Works-Site Expansion Phase 1 COR-19 Dear Kristofer: Core proposes the following as a change in the Work: Pump Site Paving Proposed change in contract sum add $613.44 if approved by 7-11-23. Proposed change in schedule 00 days if approved by 7-11-23 Should approval be granted after this deadline, the schedule shall be extended further beyond the proposed change the same number of days. An estimate and back up is attached. Please review and authorize one of the actions below. If you have any questions, please contact me at your earliest convenience. Thank you. Sincerely, Jeremy Roush Project Manager Cc: Sasha Daljevic Rudy Koester Sara Kappos □ Approved, incorporate change immediately □ Pending, continue work per current contract □ Pending, stop affected work until action taken (hold time past deadline above will be added to the proposed change in schedule) □ Rejected The above action is authorized below by a duly authorized representative of the Owner and Architect: Owner: Architect: Signature ___________________________________ Signature ___________________________________ Name ______________________________________ Name ______________________________________ Title ________________________________________ Title ________________________________________ Date _______________________________________ Date _______________________________________ COR #019 Core Structural Services, LLC 3093 NW Prairie Lane Des Moines, IA 50313 (515) 987-6830 Office (515) 987-6830 Fax TO: Farnsworth Group PROJECT NAME: 14225 University Ave Suite 110 PROJECT NUMBER: Waukee IA 50263 SUBJECT: FROM: ATTN: Kristofer Orth DATE: Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total 1 2 320013 Replace pavement from construction damage Jordison 144 $ 4.00 $ 576.00 $ 576.00 4 5 6 7 8 9 10 92 93 94 95 96 97 98 99 100 Subtotal -$ -$ -$ 576.00$ 576.00$ Small Tools Allowance 0.00% Warranty 0.00% 10.00% 10.00% 0.00% Overhead & Profit 0.00% 15.00% 15.00% 5.00% $ 28.80 $ 28.80 Bond 0.00% 1.50% 1.50% 1.50% $ 8.64 $ 8.64 The Contract Schedule will Increase / Decrease by: days TOTAL COR: Clarifications & Exclusions: Waukee Public Works 21114 Pavement Replacement Jeremy Roush 613.44$ 7/6/23 Item #/ Cost Code Description Sub/Vendor Quantity Unit Labor Material Equipment Subcontractor TOTAL 21114.COR-Log.Waukee Public Works.xlsx Page 1 Jordison Construction Inc. 12014 Ridgemont Dr. Ph : (515)225-4196 Urbandale, IA 50323 Change Request Phone: Job:21-095 Waukee Public Works-Core Number: Date: 3 5/4/23 To:Jeremy Roush Core Structural Services PO Box 429 Waukee, IA 50263-9718 Ph: 515-202-9870 Fax: 515-257-4311 Description:Added 1,622sf of 7" PCC We are pleased to offer the following specifications and pricing to make the following changes: Add 1,622sf of 7" PCC The total amount to provide this work is ..................................................................................................$6,500.00 If you have any questions, please contact me at (515)225-4196. Submitted by:Approved by: Date: Eldin Ikeljic Jordison Construction Any outstanding Change Request over 45 days is subject to invoice. Price is valid for 30 days. Page 1 of 1 $576 to Waukee $5912 to Core