HomeMy WebLinkAbout2023-07-28 D01 Musco, Larson AgreementAGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: July 28, 2023
AGENDA ITEM:Consideration of approval of a resolution approving an agreement between the
City and Larson Construction Co, Inc. and Musco Sports Lighting, LLC aka
Iowa Sports Turf Management
FORMAT:Resolution
SYNOPSIS INCLUDING PRO & CON: Larson Construction was the general contractor for the
Triumph Park Project which included among other things the construction of
12 ballfields. It has been determined that the fields do not have positive
drainage and certain work needs to be undertaken to assure that the fields
grades provide adequate drainage as planned. The City of Waukee has
engaged, DuraEdge Products, Inc to act as a consultant to oversee the work to
bring the fields into specification and supervise and approve said work. Iowa
Sports Turf has indicated that they will provide the equipment, labor and
materials necessary to complete the necessary work. Under the supervision of
the DuraEdge Consulting agreement Iowa Sports Turf will pay for the costs
associated with material, transportation, mixing and labor to complete the
project. In addition, Iowa Sports Turf will coordinate, acquire, and install sod
material of the same type that exists on the fields that may be necessary to
replace sod removed or otherwise disturbed as part of the project at Iowa
Sports turf’s expense. The City of Waukee will provide adequate space in the
parking lot for storing and mixing of materials.
The parties agree that the undertakings in this agreement should commence no
later than July 31, 2023. The work will be continuous throughout the month
of August with no less than 8 fields being completed by Friday, September 1,
2023.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT: Approve Resolution
RECOMMENDATION: Approve the resolution.
ATTACHMENTS: I. Agreement
PREPARED BY: Matt Jermier
REVIEWED BY:
PUBLIC NOTICE INFORMATION –
D1
NAME OF PUBLICATION:
DATE OF PUBLICATION:
THE CITY OF WAUKEE, IOWA
RESOLUTION 2023-
APPROVING AN AGREEMENT BETWEEN THE CITY AND LARSON
CONSTRUCTION CO, INC AND MUSCO SPORTS LIGHTING, LLC AKA IOWA
SPORTS TURF MANAGEMENT.
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA
WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal
Organization; AND,
WHEREAS, the City of Waukee, Larson Construction Co, Inc. and Musco Sports Lighting,
LLC a.k.a. Iowa Sports Turf Management have been discussing certain issues occurring at the 12
ballfields located in Triumph Park in Waukee; AND,
WHEREAS, the parties have reached an agreement pertaining to correcting the issues at the
ballfields in Triumph Park; AND,
NOW THEREFORE BE IT RESOLVED by the City of Waukee City Council that the
proposed Agreement between Larson Construction Co, Inc., Musco Sports Lighting, LLC a.k.a.
Iowa Sports Turf Management and the City of Waukee is approved.
Passed by the City Council of the City of Waukee, Iowa, and approved this the 28th day of July,
2023.
____________________________
Courtney Clarke, Mayor
Attest:
___________________________________
Rebecca D. Schuett, City Clerk
RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN
Anna Bergman Pierce
R. Charles Bottenberg
Chris Crone
Larry R. Lyon
Ben Sinclair
{02093239.DOCX} -1-
AGREEMENT
This Agreement (“Agreement”) is entered into between the City of Waukee (the “City”)
Musco Sports Lighting, LLC aka Iowa Sports Turf Management (“Iowa Sports”) and Larson
Construction Co, Inc (“Larson”) (collectively the “Parties” and individually a “Party”). The date
of the last signature is the “Effective Date.”
WHEREAS, the City undertook to construct 12 ballfields within the property known as
Triumph Park, 700 NW Douglas Parkway, Waukee, IA 50263 (hereinafter referred to as
“Ballfields”); and
WHEREAS, Larson was the general contractor for the Triumph Park Project which
included among other things the construction of the Ballfields; and
WHEREAS, the Ballfields do not have positive drainage and certain work needs to be
undertaken to assure that the fields grades provide adequate drainage as planned; and
WHEREAS, the City has engaged, DuraEdge Products, Inc to act as a consultant for the
City to advise as to the necessary work to bring the fields into specification and supervise and
approve said work, among other things (hereinafter referred to as “Consultant”); and
WHEREAS, Iowa Sports has indicated that they will provide the equipment, labor and
materials necessary to complete the necessary work; and
WHEREAS the Parties now desire to set forth their agreement, as more fully set forth
below.
NOW THEREFORE, in consideration for entering into this Agreement, the promises set
forth above and the mutual promises and obligations set forth below, and for other good and
valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Parties
agree as follows:
1.Project. The City’s Consultant will provide preliminary report will be provided to explain
the work and material tonnage needed on each individual field to achieve positive
surface drainage at 0.75% slope at a conical finish grade for the infield for each Ballfield.
The report will also determine how far out the existing sod will need to be removed and
replaced to carry the grade out, contemplated to be at least 10 feet into the outfield at the
minimum. The report will be considered a general description of the Project parameters
(hereinafter referred to as “Project”).
2.Iowa Sports. Under the supervision of Consultant, Iowa Sports will perform and be
responsible for providing the material, labor and equipment for the completion of the Project
as follows:
a.Iowa Sports will contract with DuraEdge Products, Inc, or its designated subsidiary,
to provide the material necessary to complete the Project. Iowa Sports will pay for the
costs associated with material, transportation and mixing undertakings. It is
contemplated that DuraEdge will be mobilizing its equipment and some associated
{02093239.DOCX} -2-
labor for the purpose of mixing and/or producing the material on site at the Project.
b.Certain material including but not limited to sand, clay, and dirt will be necessary for
the purpose of producing the necessary material and the arrangements and costs
associated with acquiring and delivering the required materials will be arranged and
paid for by Iowa Sports. The amount, types, and delivery dates will be undertaken by
Iowa Sports in coordination with DuraEdge Products, Inc.
c.In addition, Iowa Sports will coordinate, acquire, and install sod material of the same
type that exists on the Ballfields that may be necessary to replace sod removed or
otherwise disturbed as part of the Project, at its cost and expense. This work will also
be completed as directed by the Consultant.
d.Iowa Sports will provide the labor and equipment necessary to complete the Project
as directed by the Consultant engaged by the City.
e.In providing the Services under this Agreement it is expressly agreed that Iowa Sports
is acting as an independent contractor and not as an employee. Iowa Sports
acknowledge that this Agreement does not create a partnership or joint venture
between and the City, or the Consultant. The City is not required to pay, or make
any contributions to, any social security, local, state or federal tax, unemployment
compensation, workers' compensation, insurance premium, profit-sharing, pension
or any other employee benefit for the Iowa Sports or its labor forces, for any work
performed pursuant to this agreement, or otherwise.
f.Completion Timeframes. Time is of the essence. The parties agree that the
undertakings in this agreement should commence no later than July 31, 2023. The
work will be continuous throughout the month of August with no less than 8 Ballfields
being completed by Friday, September 1, 2023. Any work associated with any
Ballfields that have not been completed by said date will continue expeditiously until
the Project is completed.
3.City. Iowa Sports will perform and be responsible for providing the following:
a.The City will coordinate with Iowa Sports and the Consultant to make Ballfields
available for performance of the work in furtherance of the Project.
b.The City will designate a portion of the Parking lots at Triumph park for the purpose
equipment and material staging and production.
c.The City will provide the equipment and labor necessary to strip or remove conditioner
from a Ballfield before the project is commenced with regard to any particular
Ballfield.
d.The City will engage Consultant, at its cost and expense, to provide consultation
services and supervision of the Project.
{02093239.DOCX} -3-
4.Governing Law. This Agreement shall be governed by and construed and interpreted
according to the laws of the State of Iowa.
5.Modification. This Agreement shall not be modified in any fashion except by written
agreement executed by all Parties hereto.
6.Binding Effect. This Agreement will be binding upon, and inure to the benefit of, the
successors, heirs and assigns of the Parties.
7.Electronic, Facsimile and Counterparts. This Agreement may be executed simultaneously in
two or more counterparts, each of which shall be deemed an original, but all of which together
shall constitute but one and the same instrument. An electronic copy of this Agreement shall
be deemed an original. It shall not be necessary in making proof of this Agreement to produce
or account for more than one such counterpart.
8.Additional documents.Both Parties agree to take any additional action, such as, but without
limitation, executing supplemental, administrative, or other clerical documents that are
necessary or appropriate to give full force and effect to the terms and intentions of this
Agreement.
MUSCO SPORTS LIGHTING, LLC aka Iowa Sports Turf
By: _____________________
Signature:
Date:
CITY OF WAUKEE
By: _____________________
Signature:
Date:
LARSON CONSTRUCTION CO, INC
By: _____________________
Signature:
Date:
{02093239.DOCX} -4-