HomeMy WebLinkAbout2023-08-07 J01F_02 NW Douglas Pkwy Grade, Partial Pave, JUT_Change Order 2AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: August 7, 2023 AGENDA ITEM:Consideration of approval of Change Order No. 2 to Concrete Technologies, Inc. for the NW Douglas Parkway – Grade, Partial Pave and JUT project increasing the contract amount by $14,997.90. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 2 is to adjust existing sanitary sewer manhole to grade. Saw cut and remove two panels of roadway pavement. Excavate existing manhole, remove existing top portion of manhole, add barrel section, replace top portion of manhole, and backfill with rock. Full depth patch with 9” PCC pavement. Includes necessary traffic control to perform work. Change Order No. 2 also modifies the contract completion date from August 4, 2023 to August 11, 2023. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $14,997.90. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 2 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: J1F2 2727 SW SNYDER BOULEVARD | P.O. BOX 1159 | ANKENY, IA 50023-0974 autofill v:\projects\2022\122.0091.01\construction\co_2023-08-01_changeorder02_letter.docm August 1, 2023 Ms. Sara Kappos, P.E. City of Waukee 805 University Avenue Waukee, IA 50263 RE: CHANGE ORDER NO. 02 NW DOUGLAS PARKWAY – GRADE, PARTIAL PAVE AND JUT Dear Sara: Enclosed is change order 02 for the NW Douglas Parkway – Grade, Partial Pave and JUT project. This change order includes work associated with adjusting an existing sanitary sewer manhole to grade. The existing manhole was installed approximately 4-feet below grade to allow agricultural use of the surface. The manhole needs to be raised to match proposed roadway finished grade and is considered a major adjustment as it involves removal of pavement, excavation, installation of an additional manhole barrel section, backfill and pavement replacement. We recommend approval of Change Order 02 in the amount of $14,997.90 to the prime contractor, Concrete Technologies, Inc. of Grimes, Iowa. Seven calendar days will be added to the contract end date to allow for this work, the substantial completion date is now August 11, 2023. Please place this change order on the next available city council meeting agenda for approval. Sincerely, SNYDER & ASSOCIATES, INC. Nathan Carhoff, P.E. Project Manager Enclosure CO_2023-08-01_ChangeOrder02.xlsx CHANGE ORDER NO. 2 OWNER: City of Waukee PROJECT: NW Douglas Parkway - Grade, Partial Pave and JUT To:Concrete Technologies, Inc.S&A PROJECT #: 000.0000122.0091 Contractor 1001 SE 37th Street Address Grimes, IA 50111 City, State, Zip You are directed to make the following changes in this contract: 1.Description of change to be made: Adjust existing sanitary sewer manhole to grade. Saw cut and remove two panels of roadway pavement. Excavate existing manhole, remove existing top portion of manhole, add barrel section, replace top portion of manhole, and backfill with rock. Full depth patch with 9" PCC pavement. Includes necessary traffic control to perform work. 2.Reason for Change: Existing manhole was installed approximately 4-feet below grade to allow agricultural use of the surface. Manhole needs to be raised to match proposed roadway finished grade to allow maintenance access to the sanitary sewer. 3.Settlement for the cost of making the change shall be as follows: Item No. Item Description Quantity Unit Unit Price Total Price 12.2 Manhole Adjustment, Major 1 LS $7,687.90 $7,687.90 12.3 Full Depth Patches, PCC, 9 Inch 34 SY $215.00 $7,310.00 TOTAL $14,997.90 4.This change order will result in a net change in the contract completion time of 7 days and a net change in the cost of the project of $14997.90 divided as follows: Contract Contract Amount Completion Date Approved funds and contract completion date as per (Engineer's Estimate, Contract or last approved C.O.)$1,390,645.65 August 4, 2023 Change due to this C.O. (+ or -)$14,997.90 7 Totals including this C.O.:$1,405,643.55 August 11, 2023 The change described herein is understood, and the terms of settlement are hereby agreed to: Concrete Technologies, Inc. CONTRACTOR By DATE: Snyder & Associates, Inc. ENGINEER By DATE: City of Waukee OWNER By DATE: August 1, 2023