HomeMy WebLinkAbout2023-08-21 I01G_02 Heart of the Warrior Trailside Improvements_Change Order 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: August 21, 2023 AGENDA ITEM:Consideration of approval of Change Order No. 1 to Elder Corporation for the Heart of the Warrior Trailside Improvements Project in the amount of $5,410.00. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 1 to Elder Corporation is for an additional subdrain to be added to the edge of the planting bed on the low side of the project site. The subdrain will improve drainage within the planting soils which have been saturated due to low infiltration rates in the surround on-site soils. This will improve the short and long term health of the butterfly garden plants. Additional permanent seeding quantity is being added to match the actual disturbed area to be stabilized. The quantities completed to date have been reviewed and agreed upon by the contractor, City of Waukee Staff, and Shive-Hattery. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Approve Payment RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Letter of Recommendation II. Change Order No. 1 PREPARED BY: Matt Jermier REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1G2 S-H Project No.: 2142202390 August 16, 2023 Matt Jermier, Parks & Recreation Director City of Waukee 805 University Avenue Waukee, IA 50263 RE: Change Order #1 – Review and Recommendation to Approve Heart of the Warrior Trail - Trailside Improvements Dear Mr. Jermier: Please find attached Change Order #1 for the Heart of the Warrior Trail - Trailside Improvements project. The change order includes the following items: • Added Subdrain • Additional Permanent Seeding A subdrain is being added to the edge of the planting bed on the low side of the project site. The subdrain will improve drainage within the planting soils which have been saturated due to low infiltration rates in the surrounding on-site soils. This will improve the short- and long-term health of the butterfly garden plants. Additional permanent seeding quantity is being added to match the actual disturbed area to be stabilized. We have reviewed the change order items and unit prices, and both are in line with anticipated amounts. If City staff concurs with this change, we recommend the City of Waukee approve this change order in the amount of $5,410.00 to the construction contract for the Heart of the Warrior Trail - Trailside Improvements with Elder Corporation of Pleasant Hill, IA. Sincerely, SHIVE-HATTERY, INC. Blake Peterson, PE Civil Engineer Enc. Change Order #1 CITY OF WAUKEE 230 W HICKMAN ROAD WAUKEE, IOWA 50263 Contractor: 5088 East University Avenue Pleasant Hill, IA 50327 $163,582.85 01/16/23 9 AC $ 10,250.00 0.08 $ 820.00 CO-1.1 LS $ 4,590.00 1.00 $ 4,590.00 $ 5,410.00 $163,582.85 $0.00 $163,582.85 $5,410.00 $168,992.85 3.31% 0 Days June 30, 2023 Date: Approved By: City of Waukee Signature: Name: Title: Date: Recommended By: Shive-Hattery Inc. Signature: Name: Title: Title: Date: Heart of the Warrior Trail - Trailside Improvements 2142202390 Net Change by previously authorized Change Orders The Contract Sum prior to This Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be Description THE CONTRACT IS CHANGED AS FOLLOWS: Item 9 is being increased in quantity to match the actual disturbed area required for stabilization. Change Order Item CO-1.1 is for 4-inch subdrain installed with porous backfill along the southwest edge of the southern planting bed. Installation plan location and detail will comply with plan drawing CSK01 issued to contractor on 8/11/2023. Item Value Adjustment CHANGE ORDER SUMMARY Quantity AdjustmentUnit Price Contractor: Elder Corporation Elder Corporation Signature: Name: PLANTING BED SUBDRAIN, 4 IN. CHANGE ORDER Aggregate Change Order as a percent of Original Contract The date of Final Completion as of the date of this Change Order therefore is NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER Project Title S-H Project File Number Orig. Contract Amount & Date Change Order Number Date 1 The Contract Time will be changed by TOTAL The Original Contract Sum was Unit August 16, 2023 HYDRAULIC SEED, FERTILIZE, MULCH TYPE 1 (URBAN) P:\Projects\DM\2142202390\Construction\CASupport\CO\01\ChangeOrder01_Heart of the Warrior Trailside.xlsx 1 of 1 Brandon Stevens Project Manager Blake Peterson, PE Project Engineer Brad Deets City Administrator 8/16/23 8/16/2023