HomeMy WebLinkAbout2023-09-18 I01F_05 Stratford Crossing Park_Change Order 2AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: September 18, 2023 AGENDA ITEM:Consideration of approval of Change Order No. 2 to Elder Corporation for the Stratford Crossing Park Project in the amount of $5,225.25. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 2 to Elder Corporation decreases the contract amount by $5,225.25. The work is associated with three project scope items: 1. Repair of a drain tile that was severed due to a footing conflict. 2. Regrading and establishment of sidewalk forms due to a change in adjacent property installing a fence and changing property grades, which impacted drainage. 3. Replacing native seeding with a combination of standard lawn seeding and tall fescue seeding. Representatives from Genus Landscape Architects and City Staff have reviewed the quantities and find them to be accurate. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: Approve Payment RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Letter of Recommendation II. Change Order No. 2 PREPARED BY: Matt Jermier REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1F5 gēnus [ landscape architects ] 520 42ND STREET SUITE 400 DES MOINES, IA 50312 T 515 284 1010 WWW.GENUS-LA.COM September 14, 2023 Mr. Matt Jermier Parks and Recreation Director, Waukee 805 University Avenue Waukee, IA 50263 Re: Stratford Crossing Park Change Order #2 Genus Project No. 22024 Dear Mr. Jermier: Please find Change Order #2 attached for a project credit in the amount of $5,225.25 for the above-referenced project. This work is associated with three project scope items: 1) Repair of a drain tile that was severed due to a footing conflict. 2) Regrading and establishment of sidewalk forms due to a change in adjacent property installing a fence and changing property grades, which impacted drainage. 3) Replacing native seeding with a combination of standard lawn seeding and tall fescue seeding. Genus recommends that the City of Waukee approve Change Order #2 for Elder Corporation. Don’t hesitate to reach out if you have questions or need additional information. Sincerely, Brett Douglas, ASLA, PLA Principal CC: Nick Yeast, Elder Corporation Daniel Laughridge, City of Waukee 11:11 am Wednesday, September 13, 2023 Stratford Crossing Park Combined CO#02 Waukee, IA City of Waukee Nick Yeast (515) 402-5427 Project: Location: Owner: Contact: Phone 515-266-3111 Fax 515-265-4565 5088 E. University Ave. Des Moines, Iowa 50327 23-0809NY CO#02CO: Project Notes DESCRIPTION AMOUNTUNIT PRICEUNITQUANTITYITEM $283.25EA 3.009006 $849.75Swingset Subdrain Repair $2,900.00LS 1.009007 $2,900.00Regrade Trail @ West Side $2,600.00LS 1.009008 $2,600.00Remove Forms, Regrade, & Pave @ West Side $1,100.00LS 1.009009 $1,100.00Survey @ West Side $-23,000.00AC 0.759010 $-17,250.00Native Seed Mix Deduct (Item 5.11) $6,100.00AC 0.759011 $4,575.00ADD Super Turf 1 Seed This includes Elders 10% Markup.NOTES: This is a deduct from original contract value. We are no longer doing Native Seed Mix . The Super Turf II will overrun on quantities and will need updated. NOTES: Pricing is based off of unit cost from bid tab.NOTES: +/- 10,000 SF Super Turf II LS +/- 22,670 SF Super Turf 1 LS NOTES: GRAND TOTAL $-5,225.25 NOTES: 1. EXCLUSIONS: A.We exclude in our scope of work: bonds, permits and AGC dues, liquidated damages, Pollution Liability Insurance Coverage, cost of inspection, layout staking/surveying, compaction tests, soil testing, utility cut-offs, saw cuts, damage to utilities or conduits embedded in concrete, dewatering, abandoning or removal of intakes or manholes, temporary access roads, sheeting or shoring, handling of contaminated soils, unacceptable soil removal or replacement, frost excavation, frost removal, work when temps are 10 degrees or below, over excavation or recompaction, soil stabilization, foundation or footing excavation, backfill of foundation walls, removal of foundation spoil, excavation or backfill of retaining walls, handling of other contractor's soil, import or export of soil, import or export of granular materials, import of topsoil or black dirt, well abandonment, under cutting fill areas, fine grading, hand excavation, grading for sidewalks, repair to any work damaged by others, traffic control, hand tamping, silt fences, erosion control, mowing, seeding or sodding, connection fees, pavement removal or replacement for utilities unless stated above, boxout paving around intakes or steel plates to cover intakes and adjustment of fixtures, System Development Fee, As-Built Drawing . 2. SPECIAL CONSIDERATIONS: A.All service lines stop 5' away from building. Utility items tied to Earthwork items. All utilities backfilled with trench spoils - Compaction to be with existing soil to 95% Standard Proctor. This Proposal may be withdrawn by us if not accepted within 14 days. Payment to be made in monthly draws. Nothing shall obligate Elder Corporation outside the scope listed herein. B. We are not responsible for locating or notifying private utilities . C. Contractor shall accept pad or parking grades prior to work done by other trades. Grading tolerances to be within plus or minus two tenths of a foot. 3.The Agreement may be withdrawn by Elder Corporation without notice at any time prior to receipt by Elder Corporation at its home office of a fully executed copy of same . 4.The laws of the State of Iowa shall apply to all claims and disputes arising out of or related to this Agreement and/or the Project. ACCEPTANCE OF PROPOSAL We have carefully read and reviewed and hereby accept the foregoing Proposal for Construction Agreement from Elder Corporation. By: _________________________________________________ Date: _____________________ Title: ____________________________ This Agreement is not binding on Elder Corporation unless and until signed by an officer of Elder Corporation in the space indicated below and delivered to the Owner. By:__________________________________________________ Date:______________________ Title:_____________________________ Nick Yeast 09/14/2023 Project Manager/Estimator