Loading...
HomeMy WebLinkAbout2023-09-18 I06A-C Painted Woods West Townhomes Plat 1_Preliminary Plat, Final Plat, Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: September 18, 2023 AGENDA ITEM: Consideration of approval of resolutions approving a preliminary plat, final plat and site plan for Painted Woods West Townhomes Plat 1 FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: The applicant is requesting approval of a preliminary plat, final plat and site plan for a 10.85-acre multi-family townhome development located north of I-80 and west of Ute Avenue The project involves the construction of 57 townhome units within a series of five and six-plexes Each unit will be its own lot. The individual lots will range from 1,755-square feet to 2,080-square feet in area. All units will be 3- bedroom and 1,511 square feet in area. The elevations are proposed to be constructed of lap siding, board and batten, shake siding and stone. All buildings are two stories and will include a two- car garage. Several color palates will be offered to provide differentiation between buildings of the same size. A minimum of 20% is required to be open space and the applicant is providing 71% open space. Storm water detention will be accommodated with a basin on the northeast side of the site. All utilities will be brought into the site to service the units and will be private. Landscape buffers are required along the north and east sides of the site. Private five-foot sidewalks will be installed within the site to provide pedestrian circulation. A 10-foot trail will be installed along the north side of Indian Ridge Drive with the road improvements. The final plat identifies 57 lots and one outlot for common area / future development. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed the preliminary plat, site plan and final plat request at their meeting on July 11, 2023 and recommended approval: Approval of Painted Woods West Townhomes Plat 1 – Preliminary Plat, Final Plat & Site Plan City Planner, Bill Mettee, introduced the request for approval of a preliminary plat, final plat and site plan for a multi-family townhome development, as presented by D.R. Horton. I6A-C The property is generally located north of Interstate 80 and west of R-22/Ute Avenue, containing approximately 10.85 acres. The subject property is located within the existing Painted Woods West Development, which was zoned R-4 in 2022 as part of Painted Woods West Phase 2 rezoning. The final plat and site plan identify a total of 57 lots intended for a townhome development and will be developed in one phase. The lots range in size from 1,755 square feet to 2,080 square feet and meet or exceed the minimum requirement of the R-4 zoning district. The applicant is unsure if the units will be rentals or owner-occupied. With each unit on its own individual lot, either is possible. Building sizes include 5-unit and 6-unit buildings. Two (2) 6-plexes and nine (9) 5-plexes are proposed. All units will be 3-bedroom and 1,511 square feet in area. All buildings will be two-story building with a two-car attached garage. A total of 126 parking spaces are required. The site plan identifies 228 spaces to be provided which includes 12 visitor spaces. All units will be accessed by a series of private internal streets. The development will be accessed from the extension of Indian Ridge Drive. Sidewalks will be provided internally to the site and a 10-foot-wide trail will be installed along the north side of Indian Ridge Trail with the plat improvements. All units will be serviced by private utilities extended through the development. Stormwater detention will be provided in a pond in the northeast corner of the site. The homeowner’s association will be responsible for the maintenance of the pond and private utilities. Garbage and recycling services will be provided for each unit. All proposed easements have been indicated on the final plat. All utilities are to be privately owned and maintained. Landscape buffers will be installed along the east and north sides of the development, and proposed landscape buffer along the west side will be installed when the west half of the lot is developed. Parkland dedication requirements are being met. Elevations of the proposed units meet the requirement of the Site Plan Ordinance. Proposed materials include lap siding, board and batten, shake siding and stone. All proposed lots and units meet the minimum requirements of the Zoning Ordinance, the final plat is in general conformance with the Subdivision Ordinance, and the proposed land use of the property is consistent with the Comprehensive Plan. Staff recommends approval of the preliminary plat, final plat and site plan for Painted Woods West Townhomes Plat 1 subject to remaining staff comments and review of legal documents. Commissioner Beenken moved for approval of a Preliminary Plat for painted Woods West Townhomes Plat 1 subject to remaining staff comments and review of legal documents. The motion was seconded by Commissioner Lohse. Ayes: Beenken, Streit, Tessau, Lohse, and Bankole. Nays: None. Motion carried. Commissioner Beenken moved for approval of a Final Plat for Painted Woods West Townhomes Plat 1 subject to remaining staff comments and review of legal documents. The motion was seconded by Commissioner Tessau. Ayes: Beenken, Streit, Tessau, Lohse, and Bankole. Nays: None. Motion carried. Commissioner Beenken moved for approval of a Site Plan for Painted Woods West Townhomes Plat 1 subject to remaining staff comments and review of legal documents. The motion was seconded by Commissioner Tessau. Ayes: Beenken, Streit, Tessau, Lohse, and Bankole. Nays: None. Motion carried. STAFF REVIEW AND COMMENT: Staff recommends approval of the preliminary plat, final plat and site plan for Painted Woods West Townhomes Plat 1 subject to remaining staff comments. RECOMMENDATION: Approve the resolutions. ATTACHMENTS: I. Proposed Resolutions II. Staff Report III. Preliminary Plat / Site Plan V. Final Plat VI. Building Elevations PREPARED BY: Bill Mettee, Planner REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: THE CITY OF WAUKEE, IOWA RESOLUTION 2023- APPROVING THE PRELIMINARY PLAT FOR PAINTED WOODS WEST TOWNHOMES PLAT 1 IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission reviewed and recommended approval of a Preliminary Plat for Painted Woods West Townhomes Plat 1 on July 11, 2023; AND, WHEREAS, the Preliminary Plat for Painted Woods West Townhomes Plat 1 is in general conformance with section §176 - Subdivision Regulations of the Waukee Municipal Code. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this the 18th day of September, 2023 that the Preliminary Plat for Painted Woods West Townhomes Plat 1 be approved. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman Pierce R. Charles Bottenberg Chris Crone Larry R. Lyon Ben Sinclair THE CITY OF WAUKEE, IOWA RESOLUTION 2023- APPROVING THE FINAL PLAT FOR PAINTED WOODS WEST TOWNHOMES PLAT 1 IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, JJR HOLDINGS, LLC, has requested final plat approval of Painted Woods West Townhomes Plat 1 (the “Plat”); AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Plat on July 11, 2023, subject to remaining staff comments and review of the legal documents; AND, WHEREAS, the Final Plat for Painted Woods West Townhomes Plat 1 and the documents relating thereto will comply with section §176 – Subdivision Regulations of the Waukee Municipal Code. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 18th day of September, 2023, that the Final Plat for Painted Woods West Townhomes Plat 1 be and the same is hereby accepted and approved by the City Council of the City of Waukee. BE IT FURTHER RESOLVED that the City of Waukee does hereby accept the following easements and documents to be filed with the Plat: 1. Public Sanitary Sewer Easement; 2. Public Storm Water Detention Easement; 3. Public Ingress / Egress Easement; 4. Public Landscape Buffer Easement; 5. Public Utility Easement; 6. Monument Sign Easement; 7. Public Storm Sewer Easement; 8. Private Water Main Easement; and 9. Private Storm Sewer Easement; ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman Pierce R. Charles Bottenberg Chris Crone Larry R. Lyon Ben Sinclair THE CITY OF WAUKEE, IOWA RESOLUTION 2023- APPROVING THE SITE PLAN FOR PAINTED WOODS WEST TOWNHOMES PLAT 1 IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Painted Woods West Townhomes Plat 1, subject to remaining staff comments on July 11, 2023; AND, WHEREAS, the Site Plan for Painted Woods West Townhomes Plat 1 is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Painted Woods West Townhomes Plat 1 is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 18th day of September, 2023 that the Site Plan for Painted Woods West Townhomes Plat 1 is approved. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman Pierce R. Charles Bottenberg Chris Crone Larry R. Lyon Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Painted Woods West Townhomes Plat 1 – Preliminary Plat, Final Plat & Site Plan PREPARED BY: Bill Mettee, Planner REPORT DATE: July 7, 2023 MEETING DATE: July 11, 2023 GENERAL INFORMATION Applicant: D.R. Horton Owner: CMBK LC Owner’s Representative: Erin Ollendike, P.E. with Civil Design Advantage Request: The applicant is requesting approval of a preliminary plat, final plat and site plan for a multi-family townhome development. Location and Size: Property is generally located north of Interstate 80 and west of R-22/Ute Avenue, containing approximately 10.85-acres. AREA MAP ABOVE: Aerial of Property identifying the proposed plat (outlined in RED). July 7, 2023 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant – Undeveloped Single-Family Residential R-4 (Row Dwelling and Townhome Dwelling District) North Vacant – Undeveloped Single-Family Residential / Open Space R-2 (One & Two Family Residential District) / PD-1 (Planned Development Overlay) South Vacant – Undeveloped Single-Family Residential / Open Space R-4 (Row Dwelling and Townhome Dwelling District) East Painted Woods West Plats 1 – 4 Single Family Residential R-2 (One & Two Family Residential District) / PD-1 (Planned Development Overlay) West Vacant – Undeveloped Single-Family Residential Dallas County Zoning HISTORY The subject property is located within the existing Painted Woods West Development. The property was zoned R-4 in 2022, as part of Painted Woods West Phase 2 rezoning. PROJECT DESCRIPTION LOTS & SITE PLAN The final plat and site plan identify a total of 57 lots that are intended for a townhome development. The lots will be developed in one phase. The lots range in size from 1,755 square feet to 2,080 square feet. All proposed lots meet or exceed the minimum requirements of the R-4 zoning district. The bulk regulations for the R-4 zoning district are included below in Table 1. Table 1: R-4 requirements. Category R-4 District Lot Area 3,500 square feet per unit Lot Width 20 feet per unit Front Yard Setback 30-feet (perimeter) Rear Yard Setback 30 feet Side Yard Setback 15 feet (total) Dwelling Units (DU) per Acre (maximum) 12 DU / acre The applicant is unsure if the units will be rentals or owner-occupied. With each unit on its own individual lot, either is possible. A total of 57 units are shown on the site plan. Building sizes shown include 5-unit and 6-unit buildings. Two (2) 6-plexes and nine (9) 5-plexes are proposed. All units will be 3-bedroom and be 1,511-square feet in area. All buildings will be two-story buildings will have a two-car attached garage. July 7, 2023 3 of 3 PARKING A total of 126 parking spaces are required. The site plan identifies that 228 spaces are provided which includes 12 visitor spaces. STREETS AND TRAIL All units will be accessed by the series of private internal streets. The development will be accessed from the extension of Indian Ridge Drive. Sidewalks will be provided internal to the site to provide pedestrian access. A 10-foot wide trail will be installed along the north side of Indian Ridge Trail with the plat improvements. UTILITIES All units will be serviced by private utilities extended through the development. Stormwater detention will be provided in a pond in the northeast corner of the site. The homeowners association will be responsible for the maintenance of the pond and private utilities. Garbage and recycling services will be provided for each unit. EASEMENTS All proposed easements have been indicated on the final plat. All utilities are to be privately owned and maintained. Landscape buffers will be installed along the east and north sides of the development. The proposed landscape buffer along the west side of the development will be installed when the west half of the lot is developed. PARKLAND DEDICATION Parkland dedication is required due to the residential nature of the project. A total of 0.83-acres is required. Parkland dedication requirements are being met through the overall Painted Woods West Development. BUILDING ELEVATIONS Elevations of the various unit styles have been provided. The proposed units meet the requirements of the Site Plan Ordinance. Proposed materials include lap siding, board and batten, shake siding and stone. Multiple color schemes have been provided to provide differentiation between the buildings. STAFF RECOMMENDATION All proposed lots and units meet the minimum requirements of the Zoning Ordinance, the final plat is in general conformance with the Subdivision Ordinance, and the proposed land use of the property is consistent with the Comprehensive Plan. Staff recommends approval of the preliminary plat, final plat and site for Painted Woods West Townhomes Plat 1 subject to remaining staff comments and review of the legal documents. PAINTED WOODS WEST TOWNHOMES PLAT 1 INDEX OF SHEETS PAINTED WOODS WEST TOWNHOMES PLAT 1 PRELIMINARY PLAT & SITE PLAN FOR: WAUKEE, IOWA VICINITY MAP WAUKEE, IOWA PROJECT C1.0 GENERAL LEGEND l l l l l l 4121 NW URBANDALE DRIVE, URBANDALE, IOWA 50322 PH: (515) 369-4400 CIVIL DESIGN ADVANTAGE CONSTRUCTION SCHEDULE SUBMITTAL DATES SURVEYOR ENGINEER OWNER DATE OF SURVEY BENCHMARKS ZONING PLAT DESCRIPTION NOTES PARKLAND DEDICATION www.iowaonecall.com 1-800-292-8989 ONE CALL IOWA ONE CALL Know what's before you dig. below.Call UTILITY WARNING APPLICANT DEVELOPMENT SUMMARY CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 DE T A I L S C2.0 12" SUBGRADE PREPARATION HYDRANT ASSEMBLY DETAIL DETECTABLE WARNING DETAIL CURB RAMP FOR CLASS B OR C SIDEWALK STANDARD CURB ROCK APRON FOR PIPE OUTLET RCP APRON FOOTING DETAIL INTEGRAL 6" TYPICAL SECTION - 26' B/B P.C.C. ROADWAY3" ROLLED CURB DETAIL CLASS 'A' INTEGRAL CURB AND SIDEWALK CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 DE T A I L S C2.14' X 4' SW-513 INTAKE (ST-22)P.C.C. FLUME DETAIL DOWNSPOUT CONNECTION WITH TEE SERVICE LOCATION DETAIL ST-2 - 96" SW-401 MH 21 20 19 18 1726 31 37 36 35 34 33 32 43 42 41 40 39 38 57 56 55 54 53 52 51 50 49 48 6 5 4 3 2 1 OUTLOT Z N89°42'49"W 430.22'N89°42'49"W 214.22' N0 0 ° 1 7 ' 1 1 " E 1 2 0 . 0 0 ' N 0 3 ° 3 1 ' 3 9 " W 7 5 . 1 7 ' N0 0 ° 1 7 ' 1 1 " E 4 2 7 . 0 6 ' N0 0 ° 1 6 ' 5 6 " E 4 5 . 0 7 ' S89°42'49"E 679.44' S0 0 ° 1 7 ' 1 1 " W 6 9 7 . 1 3 ' MAGNOLIA LANE PE R S H I N G L A N E JA S M I N E L A N E INDIAN RIDGE DRIVE U P L A C E 16 15 14 13 12 11 Δ=90°00'00" L=47.12' R=30.00' CH=42.43' CHB=N44°42'49"W 25 24 23 22 30 29 28 27 44 45 46 47 10 9 8 7 CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 PR E L I M I N A R Y P L A T C3.0 U P L A C E LOT 9 LOT 10 LOT 46 LOT 47 LOT 48 LOT 49 LO T 1 1 LO T 1 2 LO T 1 3 LO T 1 4 LO T 1 5 LO T 1 6 LOT 27 LOT 28 LOT 29 LOT 30 LOT 31 LOT 17 LOT 18 LOT 19 LOT 20 LOT 21LOT 22 LOT 23 LOT 24 LOT 25 LOT 26 MAGNOLIA LANE JA S M I N E L A N E PE R S H I N G L A N E CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 DI M E N S I O N P L A N C4.0 TRAFFIC CONTROL NOTES PAVEMENT THICKNESS GENERAL NOTES TYPICAL TOWNHOME UNIT #1 INDIAN RIDGE DRIVE LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 43 LOT 44 LOT 45 LOT 46 LOT 47 LOT 48 LOT 49 LOT 50 LOT 51 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LO T 1 1 LO T 1 2 LO T 1 3 LO T 1 4 LO T 1 5 LO T 1 6 LOT 38 LOT 39 LOT 40 LOT 41 LOT 42 LOT 27 LOT 28 LOT 29 LOT 30 LOT 31 LOT 32 LOT 33 LOT 34 LOT 35 LOT 36 LOT 37 LOT 17 LOT 18LOT 25 LOT 26 MAGNOLIA LANE PE R S H I N G L A N E JA S M I N E L A N E PE R S H I N G L A N E U P L A C E CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 DI M E N S I O N P L A N C4.1 U P L A C E PE R S H I N G LA N E MAGNOLIA LANE LOT 23 LOT 24 LOT 25 LOT 26 LOT 27 LOT 28 LOT 20 LOT 21 LOT 19 LOT 18 LOT 17 LOT 16LOT 15 LOT 22 CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 GR A D I N G P L A N C5.0 GRADING NOTES PE R S H I N G LA N E MAGNOLIA LANE LOT 23 LOT 24 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29 LOT 20 LOT 21 LOT 19 LOT 18 LOT 17 LOT 16LOT 15LOT 14LOT 13LOT 12LOT 11 LOT 22 CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 GR A D I N G P L A N C5.1 INDIAN RIDGE DRIVE U P L A C E MAGNOLIA LANE LOT 29 LOT 30 LOT 31 LOT 32 LOT 33 LOT 34 LOT 35 LOT 36 LOT 37 PE R S H I N G LA N E LOT 47 LOT 46 LOT 45 LOT 44 LOT 43 LOT 48 LOT 49 LOT 51 LOT 52 LOT 50 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LOT 42 LOT 41 LOT 40 LOT 39 LOT 38 CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 GR A D I N G P L A N C5.2 INDIAN RIDGE DRIVE JA S M I N E LA N E MAGNOLIA LANE LOT 28 LOT 29 LOT 30 LOT 31 LOT 32 LOT 33 LOT 34 LOT 35 LOT 36 LOT 37 PE R S H I N G LA N E LOT 47 LOT 46 LOT 45 LOT 44 LOT 43 LOT 48 LOT 49 LOT 51 LOT 52 LOT 50 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LOT 42 LOT 41 LOT 40 LOT 39 LOT 38 LOT 10 LOT 9 LOT 8 LOT 7 LOT 6 LOT 5 LOT 4 LOT 3 LOT 2 LOT 1 CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 GR A D I N G P L A N C5.3 DETAIL 'A' (1"=10' FULL-SIZE) DETAIL 'B' (1"=10' FULL-SIZE) INDIAN RIDGE DRIVE JA S M I N E LA N E PE R S H I N G LA N E INDIAN RIDGE DRIVE CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 GR A D I N G P L A N C5.4DETAIL 'D' (1"=10' FULL-SIZE) DETAIL 'C' (1"=10' FULL-SIZE) MAGNOLIA LANE PE R S H I N G LA N E PE R S H I N G LA N E DETAIL 'E' (1"=10' FULL-SIZE) MAGNOLIA LANE JA S M I N E LA N E lll l ll l l lll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll l l l l l l l l l l l l l l l l l l l l l l l l l l l lll lll l 11121314151617 18 19 20 21 24 25 26 22 23 DA #1 11.66 AC EXISTING TSB #1 PE R S H I N G LA N E EROSION AND SEDIMENT CONTROL PLAN PAINTED WOODS WEST TOWNHOMES PLAT 1PAINTED WOODS WEST TOWNHOMES PLAT 1 ER O S I O N A N D S E D I M E N T C O N T R O L P L A N CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 R TSB # l l l l SWPPP LEGEND VICINITY MAP DISCHARGE POINT SUMMARY STABILIZATION QUANTITIES WAUKEE, IOWA C6.0 NOTES: PROJECT MAINTENANCE PLANS FOR HYDRODYNAMIC SEPARATORS: MAINTENANCE AT A GLANCE FOR HYDRODYNAMIC SEPARATORS R l l l l l l lll lll lll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l ll l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l 1 2 3 8 9 11121314151617 18 19 35 36 37 38 39 40 55 56 57 4 5 6 7 20 21 33 34 29 30 31 27 28 24 25 26 22 23 41 42 43 44 45 46 47 53 54 50 51 52 48 49 32 U P L A C E INDIAN RIDGE DRIVE 10 PE R S H I N G LA N E JA S M I N E LA N E DA #1 11.66 AC C6.1 ER O S I O N A N D S E D I M E N T C O N T R O L P L A N CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 LO T 1 6 LOT 27 LOT 17 LOT 18 LOT 19 LOT 20 LOT 21LOT 22 LOT 23 LOT 24 LOT 25 LOT 26 U P L A C E PE R S H I N G L A N E MAGNOLIA LANE CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 UT I L I T Y P L A N C7.0 LO T 1 1 LO T 1 2 LO T 1 3 LO T 1 4 LO T 1 5 LO T 1 6 LOT 27 LOT 17 LOT 18 LOT 19 LOT 20 LOT 21LOT 22 LOT 23 LOT 24 LOT 25 LOT 26 PE R S H I N G L A N E MAGNOLIA CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 UT I L I T Y P L A N C7.1 UTILITY NOTES LOT 43 LOT 44 LOT 45 LOT 46 LOT 47 LOT 48 LOT 49 LOT 50 LOT 51 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57LOT 38 LOT 39 LOT 40 LOT 41 LOT 42 LOT 27 LOT 28 LOT 30 LOT 31 LOT 32 LOT 33 LOT 34 LOT 35 LOT 36 LOT 37 LOT 29 INDIAN RIDGE DRIVE PE R S H I N G L A N E U P L A C E MAGNOLIA LANE CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 UT I L I T Y P L A N C7.2 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 43 LOT 44 LOT 45 LOT 46 LOT 47 LOT 48 LOT 49 LOT 50 LOT 51 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57LOT 38 LOT 39 LOT 40 LOT 41 LOT 42 LOT 28 LOT 30 LOT 31 LOT 32 LOT 33 LOT 34 LOT 35 LOT 36 LOT 37 LOT 29 INDIAN RIDGE DRIVE PE R S H I N G L A N E JA S M I N E L A N E MAGNOLIA LANE CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 UT I L I T Y P L A N C7.3 U P L A C E LO T 1 1 LO T 1 2 LO T 1 3 LO T 1 4 LO T 1 5 LO T 1 6 LOT 27 LOT 17 LOT 18 LOT 19 LOT 20 LOT 21 LOT 22 LOT 23 LOT 24 LOT 25 LOT 26 FUTU R E FUTU R E MAGNOLIA LANE PE R S H I N G L A N E PLANT SCHEDULE NORTH BUFFER PLANT SCHEDULE EAST BUFFER PLANT SCHEDULE OPEN SPACE CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 LA N D S C A P E P L A N L1.0 25' BUFFER REQUIREMENTS (NORTH) LANDSCAPE REQUIREMENTS MINIMUM PLANTING REQUIREMENTS LANDSCAPE NOTES 25' BUFFER REQUIREMENTS (EAST) OPEN SPACE REQUIREMENTS (PHASE 1) U P L A C E LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 43 LOT 44 LOT 45 LOT 46 LOT 47 LOT 48 LOT 49 LOT 50 LOT 51 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LO T 1 1 LO T 1 2 LO T 1 3 LO T 1 4 LO T 1 5 LO T 1 6 LOT 38 LOT 39 LOT 40 LOT 41 LOT 42 LOT 27 LOT 28 LOT 29 LOT 30 LOT 31 LOT 32 LOT 33 LOT 34 LOT 35 LOT 36 LOT 37 LOT 17 LOT 18 LOT 19 LOT 20 LOT 23 LOT 24 LOT 25 LOT 26 FUTU R E FUTU R E FUTU R E INDIAN RIDGE DRIVE MAGNOLIA LANE PE R S H I N G L A N E JA S M I N E L A N E CI V I L D E S I G N A D V A N T A G E 2303.180 RE V I S I O N S DA T E WA U K E E , I O W A FI R S T S U B M I T T A L 03 / 2 8 / 2 0 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 F A X : ( 5 1 5 ) 3 6 9 - 4 4 1 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I O W A 5 0 3 2 2 EN G I N E E R : E K O EN G I N E E R : G H / J W M T E C H : M S T PA I N T E D W O O D S W E S T T O W N H O M E S P L A T 1 SHEET NUMBER: SE C O N D S U B M I T T A L 04 / 2 5 / 2 0 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 0 2 3 FO U R T H S U B M I T T A L 06 / 2 1 / 2 0 2 3 FI F T H S U B M I T T A L 07 / 1 1 / 2 0 2 3 FI N A L S U B M I T T A L 07 / 2 5 / 2 0 2 3 LA N D S C A P E P L A N L1.1 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57LOT 38 LOT 39 LOT 40 LOT 41 LOT 42 LOT 43 LOT 44 LOT 45 LOT 46 LOT 47 LOT 33 LOT 34 LOT 35 LOT 36 LOT 37 LO T 1 6 LO T 1 5 LO T 1 4 LO T 1 3 LO T 1 2 LO T 1 1 LOT 31 LOT 30 LOT 29 LOT 28 LOT 27 LOT 26 LOT 25 LOT 24 LOT 23 LOT 22 LOT 17 LOT 18 LOT 19 LOT 20 LOT 21 INDIAN RIDGE DRIVE U P L A C E S89°42'49"E 679.44' N00°16'56"E 45.07' N 0 3 ° 3 1 ' 3 9 " W 7 5 . 1 7 ' N0 0 ° 1 7 ' 1 1 " E 12 0 . 0 0 ' Δ=90°00'00" L=47.12' R=30.00' CH=42.43' CHB=N44°42'49"W N89°42'49"W 644.44' S0 0 ° 1 7 ' 1 1 " W 6 9 7 . 1 3 ' OUTLOT 'Z' PE R S H I N G L A N E JA S M I N E L A N E MAGNOLIA LANE LOT 51 LOT 50 LOT 49 LOT 48 LOT 32 PAINTED WOODS WEST TOWNHOMES PLAT 1 FINAL PLAT ENGINEER / SURVEYOR CI V I L D E S I G N A D V A N T A G E 2303.180 EN G I N E E R : TE C H : RE V I S I O N S DA T E WA U K E E , I O W A 3 FI R S T S U B M I T T A L 03 / 2 8 / 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 RE V I E W : PA I N T E D W O O D S W E S T TO W N H O M E S P L A T 1 SE C O N D S U B M I T T A L 04 / 2 5 / 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 3 FO U R T H S U B M I T T A L 07 / 1 2 / 2 3 1 FI N A L P L A T LEGENDOWNER / DEVELOPER ZONING BULK REGULATIONS DATE OF SURVEY PLAT DESCRIPTION NOTES VICINITY MAP WAUKEE, IOWA PROJECT POINT OF COMMENCEMENT POINT OF BEGINNING INDEX LEGEND PRELIMIN A R Y NOT FOR C O N S T R U C T I O N LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57LOT 38 LOT 39 LOT 40 LOT 41 LOT 42 LOT 43 LOT 44 LOT 45 LOT 46 LOT 47 LOT 33 LOT 34 LOT 35 LOT 36 LOT 37 LOT 31 LOT 30 LOT 29 LOT 28 LOT 27 N89°42'49"W 644.44' S0 0 ° 1 7 ' 1 1 " W 6 9 7 . 1 3 ' OUTLOT 'Z' PE R S H I N G L A N E JA S M I N E L A N E MAGNOLIA LANE LOT 51 LOT 50 LOT 49 LOT 48 LOT 32 CI V I L D E S I G N A D V A N T A G E 2303.180 EN G I N E E R : TE C H : RE V I S I O N S DA T E WA U K E E , I O W A 3 FI R S T S U B M I T T A L 03 / 2 8 / 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 RE V I E W : PA I N T E D W O O D S W E S T TO W N H O M E S P L A T 1 SE C O N D S U B M I T T A L 04 / 2 5 / 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 3 FO U R T H S U B M I T T A L 07 / 1 2 / 2 3 2 FI N A L P L A T PAINTED WOODS WEST TOWNHOMES PLAT 1 FINAL PLAT LO T 1 6 LO T 1 5 LO T 1 4 LO T 1 3 LO T 1 2 LO T 1 1 LOT 29 LOT 28 LOT 27 LOT 26 LOT 25 LOT 24 LOT 23 LOT 22 LOT 17 LOT 18 LOT 19 LOT 20 LOT 21 S89°42'49"E 679.44' S0 0 ° 1 7 ' 1 1 " W 6 9 7 . 1 3 ' OUTLOT 'Z' N00°16'56"E 45.07' CI V I L D E S I G N A D V A N T A G E 2303.180 EN G I N E E R : TE C H : RE V I S I O N S DA T E WA U K E E , I O W A 3 FI R S T S U B M I T T A L 03 / 2 8 / 2 3 PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 RE V I E W : PA I N T E D W O O D S W E S T TO W N H O M E S P L A T 1 SE C O N D S U B M I T T A L 04 / 2 5 / 2 3 TH I R D S U B M I T T A L 06 / 0 6 / 2 3 FO U R T H S U B M I T T A L 07 / 1 2 / 2 3 3 FI N A L P L A T PAINTED WOODS WEST TOWNHOMES PLAT 1 FINAL PLAT DETAIL 'A' Painted Woods West West Townhome Re-Submittal • Front, rear and side elevations attached for 3, 5 and 6 plex. • The 5 & 6 plex has 4 or more buildings therefore we have 4 different color schemes. • The 3 plex, 5 plex and 6 plex will all back to a public street therefore we have enhanced rear elevations for those 3 floor plans • We have stone on the front of the garage which meets the 20% or more stone requirement per building • Building Material List: Sydney Material Breakdown: Pearson Material Breakdown: Color Schemes: We only have multiple color schemes using these siding colors below. Sydney Plan: Harvest Moon- Shakes (3/5/6- plex’s- showing front/rear/side enhancements. These are for the public street requirement) Sydney Plan: Royal Crest Sterling- Shakes (5/6 Plex- showing front/rear/side enhancements. These are for the public street requirement) Sydney Plan: Costal Highway- Board & Batten (5/6 plex showing front/rear/side enhancements. These are for the public street requirement) Sydney Plan: Midnight Boardwalk – Board & Batten (5/6 plex’s front and side) Pearson Plan: Harvest Moon – Shakes (3/5/6 plexs includes front/rear/side enhancements. These are for the public street requirement) Pearson Plan: Midnight Boardwalk – Board/Batten (3/5/6 plex’s includes front/rear/side enhancements. These are for the public street requirement)