Loading...
HomeMy WebLinkAbout2023-10-02 J02A-B Kettlestone Central North Phase 2_Preliminary Plat, CDs AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: October 2, 2023 AGENDA ITEM: Consideration of approval of resolutions approving a preliminary plat and construction drawings for Kettlestone Central North Phase 2 / SE Danbury Place FORMAT: Resolutions SYNOPSIS INCLUDING PRO & CON: The applicant is requesting approval of a preliminary plat and construction drawings for a commercial development located south of SE Pleasantview Drive and east of Grand Prairie Parkway, containing approximately 33.47-acres. The preliminary plat includes a total of 13 lots for commercial development and 2 outlots for stormwater detention. The lots range in size from 1.55-acres to 2.82-acres in area. Stormwater detention is shown within the outlots located at the northwest and southwest corners of the plat. Outlot Y is 1.73-acres and Outlot Z is 1.92-acres. These outlots will be owned and maintained by an association. The construction drawings include a new public street and extensions of public utilities to serve the proposed plat. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed the preliminary plat at their meeting on September 26, 2023 and recommended approval: Approval of a Preliminary Plat for Kettlestone Central North Phase 2 Melissa DeBoer, Planning Coordinator, introduced the request for approval of Kettlestone Central North Phase 2, Preliminary Plat, as submitted by Jensen Group. The applicant is requesting approval of a preliminary plat for a commercial development. The property is generally located south of SE Pleasantview Drive and east of Grand Prairie Parkway, containing approximately 33.47-acres. The property is part of the Kettlestone Central North Development and was rezoned in Fall 2022. The preliminary plat identifies a total of 13 lots for commercial development and two (2) outlots for stormwater detention. The lots range anywhere in size from 1.55-acres to 2.82-acres in area. All lots meet or exceed the minimum requirements of the zoning district. As part of the improvements associated with this plat, the applicant will be required to construct a new public street, SE Danbury Place. A 10-ft wide trail exists along the east side of Grand Prairie Parkway and the south side of SE Pleasantview Drive, adjacent to the proposed plat. A 10-ft wide trail will be installed along the west side of SE Glacier Trail, adjacent to the proposed plat, with the SE Glacier J2A-B Trail public improvements. Utilities will be extended throughout the plat. Stormwater detention areas will be owned and maintained by an association. All proposed easements have been indicated on the preliminary plat. The subject property is within the Kettlestone Corridor and was included within the 2015 master plan for the corridor. The land uses shown within the Kettlestone Master Plan for the subject property are Neighborhood Commercial and Office. The Kettlestone Master Plan is intended to act as a guide for land use while at the same time allowing for flexibility of land uses. The intent is that the land use designations can move based upon market demands and the type of development. The zoning designation of K-RR still permits office type uses, but also provides additional flexibility for further commercial and retail uses. All proposed lots meet the minimum requirements of the Zoning Ordinance. Staff recommends approval of the preliminary plat for Kettlestone Central North Phase 2 subject to remaining staff comments. Discussion as follows: • Commissioner Broderick asked about lot layouts and the addition of a public street; Melissa confirmed a public street would be added • Commissioner Streit asked about the adjacent area and development of Westown Parkway. Melissa responded it was her understanding that Westown Parkway from Grand Prairie Parkway to Waco Place would be done this fall Motion by Commissioner Broderick for approval of a Preliminary Plant for Kettlestone Central North Phase 2, seconded by Commissioner Beenken. Ayes: Nays: None. Motion carried. STAFF REVIEW AND COMMENT: Staff recommends approval of the preliminary plat for Kettlestone Central North Phase 2 and the construction drawings for SE Danbury Place subject to remaining staff comments. RECOMMENDATION: Approve the resolutions. ATTACHMENTS: I. Proposed Resolutions II. Staff Report III. Preliminary Plat PREPARED BY: Melissa DeBoer, Planning Coordinator REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: THE CITY OF WAUKEE, IOWA RESOLUTION 2023- APPROVING THE PRELIMINARY PLAT FOR KETTLESTONE CENTRAL NORTH PHASE 2 IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission reviewed and recommended approval of a Preliminary Plat for Kettlestone Central North Phase 2 on September 26, 2023; AND, WHEREAS, the Preliminary Plat for Kettlestone Central North Phase 2 is in general conformance with section §176 - Subdivision Regulations of the Waukee Municipal Code. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this the 2nd day of October, 2023 that the Preliminary Plat for Kettlestone Central North Phase 2 be approved subject to remaining staff comments. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman Pierce R. Charles Bottenberg Chris Crone Larry R. Lyon Ben Sinclair THE CITY OF WAUKEE, IOWA RESOLUTION 2023- APPROVING THE CONSTRUCTION DRAWINGS FOR SE DANBURY PLACE IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, construction drawings have been submitted to the City for SE Danbury Place; AND, WHEREAS, the construction drawings have been reviewed by the City Engineer and City staff, and are found to be in general conformance with section §177 – Subdivision Regulations – Design Standards of the Waukee Municipal Code. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 2nd day of October, 2023 that the Construction Drawings for SE Danbury Place be approved. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman Pierce R. Charles Bottenberg Chris Crone Larry R. Lyon Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Kettlestone Central North Phase 2 – Preliminary Plat PREPARED BY: Melissa DeBoer, AICP – Planning Coordinator REPORT DATE: September 22, 2023 MEETING DATE: September 26, 2023 GENERAL INFORMATION Owner: Dickson D. & Luann C. Jensen Applicant: Jensen Group Owner’s Representative: Erin Ollendike, P.E. with Civil Design Advantage Request: The applicant is requesting approval of a preliminary plat for a commercial development. Location and Size: Property is generally located south of SE Pleasantview Drive and east of Grand Prairie Parkway, containing approximately 33.47-acres. AREA MAP ABOVE: Aerial of Property identifying the proposed plat (outlined in BLUE). September 22, 2023 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant - Undeveloped Neighborhood Commercial / Office K-RR (Kettlestone Retail Regional District) North Vacant – Undeveloped Community Commercial / High Density Residential K-OF (Kettlestone Office District) / K-RC (Kettlestone Retail Community District) South Vacant – Undeveloped Office K-RC (Kettlestone Retail Community District) East Vacant – Undeveloped Medium Density Residential K-RR (Kettlestone Retail Regional District) West Vacant – Undeveloped Neighborhood Commercial / Office K-RC (Kettlestone Retail Community District) HISTORY The property is part of the Kettlestone Central North development. The property was rezoned in Fall 2022. PROJECT DESCRIPTION LOTS The preliminary plat identifies a total of 13 lots for commercial development and 2 outlots for stormwater detention. The lots range anywhere in size from 1.55-acres to 2.82-acres in area. All lots meet or exceed the minimum requirements of the zoning district. The table below summarizes the bulk regulations for the K-RR zoning district. Stormwater detention is shown within the northwest and southwest corners of the plat, within the two outlots. Outlot Y is 1.73-acres in area and Outlot Z is 1.92-acres in area. These outlots will be owned and maintained by an association. Standard K-RR requirements. Category K-RR (minimum) Lot Area No Minimum Lot Width No Minimum Front Yard Setback No Minimum Rear Yard Setback No Minimum Side Yard Setback No Minimum STREETS AND TRAILS As part of the improvements associated with this plat, the applicant will be required to construct a new public street, SE Danbury Place. A 10-ft wide trail exists along the east side of Grand Prairie Parkway and the south side of SE Pleasant View Drive, adjacent to the proposed plat. A 10-ft wide trail will be installed along the west side of SE Glacier Trail, adjacent to the proposed plat, with the SE Glacier Trail public improvements. September 22, 2023 3 of 3 UTILITIES Utilities will be extended throughout the plat. Stormwater detention areas will be owned and maintained by an association. EASEMENTS All proposed easements have been indicated on the preliminary plat. COMPREHENSIVE PLAN The subject property is within the Kettlestone Corridor and was included within the 2015 master plan for the corridor. The land uses shown within the Kettlestone Master Plan for the subject property are Neighborhood Commercial and Office. The Kettlestone Master Plan is intended to act as a guide for land use while at the same time allowing for flexibility of land uses. The intent is that the land use designations can move based upon market demands and the type of development. The zoning designation of K-RR still permits office type uses, but also provides additional flexibility for further commercial and retail uses. STAFF RECOMMENDATION All proposed lots meet the minimum requirements of the Zoning Ordinance and the preliminary plat is in general conformance with the Subdivision Ordinance. Staff recommends approval of the preliminary plat for Kettlestone Central North Phase 2 subject to remaining staff comments. SE D A N B U R Y P L A C E SE G L A C I E R T R A I L GR A N D P R A I R I E P A R K W A Y SE WESTOWN P A R K W A Y SE PLEASANTV I E W D R I V E 13 12 11 10 9 8 7 6 54 3 2 1 OUTLOT 'Y' OUTLOT 'Z' CI V I L D E S I G N A D V A N T A G E 2202.118 EN G I N E E R : E K O RE V I S I O N S DA T E WA U K E E , I O W A 6 FI R S T S U B M I T T A L 08 / 0 9 / 2 0 2 3 PR E L I M I N A R Y P L A T PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 KE T T L E S T O N E C E N T R A L - N O R T H PH A S E 2 EN G I N E E R : J W M / G H T E C H : M A E / M S T SE C O N D S U B M I T T A L 08 / 2 9 / 2 0 2 3 TH I R D S U B M I T T A L 09 / 1 3 / 2 0 2 3 1 PRELIMINARY PLAT DESCRIPTION ZONING ENGINEER / SURVEYOR DATE OF SURVEY LEGEND WAUKEE, IOWA KETTLESTONE CENTRAL - NORTH - PHASE 2KETTLESTONE CENTRAL - NORTH - PHASE 2 PRELIMINARY PLAT FOR: BENCHMARKS GENERAL NOTES UTILITY WARNING DEVELOPMENT SUMMARY DEVELOPMENT SCHEDULE BULK REGULATIONS OWNER APPLICANT VICINITY MAP WAUKEE, IOWA PROJECT PRELIMI N A R Y NOT FOR C O N S T R U C T I O N 1 2 3 6 7 11 10 8 9 OUTLOT 'Y' SE D A N B U R Y P L A C E SE PLEASANT V I E W D R I V E SE G L A C I E R T R A I L GR A N D P R A I R I E P A R K W A Y CI V I L D E S I G N A D V A N T A G E 2202.118 EN G I N E E R : E K O RE V I S I O N S DA T E WA U K E E , I O W A 6 FI R S T S U B M I T T A L 08 / 0 9 / 2 0 2 3 PR E L I M I N A R Y P L A T PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 KE T T L E S T O N E C E N T R A L - N O R T H PH A S E 2 EN G I N E E R : J W M / G H T E C H : M A E / M S T SE C O N D S U B M I T T A L 08 / 2 9 / 2 0 2 3 TH I R D S U B M I T T A L 09 / 1 3 / 2 0 2 3 2 2 3 OUTLOT 'Z' 4 5 13 12 6 7 11 SE D A N B U R Y P L A C E SE G L A C I E R T R A I L SE WESTOWN P A R K W A Y GR A N D P R A I R I E P A R K W A Y CI V I L D E S I G N A D V A N T A G E 2202.118 EN G I N E E R : E K O RE V I S I O N S DA T E WA U K E E , I O W A 6 FI R S T S U B M I T T A L 08 / 0 9 / 2 0 2 3 PR E L I M I N A R Y P L A T PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 KE T T L E S T O N E C E N T R A L - N O R T H PH A S E 2 EN G I N E E R : J W M / G H T E C H : M A E / M S T SE C O N D S U B M I T T A L 08 / 2 9 / 2 0 2 3 TH I R D S U B M I T T A L 09 / 1 3 / 2 0 2 3 3 3 4 5 1 2 3 6 7 11 10 8 9 OUTLOT 'Y' SE D A N B U R Y P L A C E SE PLEASANT V I E W D R I V E SE G L A C I E R T R A I L GR A N D P R A I R I E P A R K W A Y CI V I L D E S I G N A D V A N T A G E 2202.118 EN G I N E E R : E K O RE V I S I O N S DA T E WA U K E E , I O W A 6 FI R S T S U B M I T T A L 08 / 0 9 / 2 0 2 3 PR E L I M I N A R Y P L A T PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 KE T T L E S T O N E C E N T R A L - N O R T H PH A S E 2 EN G I N E E R : J W M / G H T E C H : M A E / M S T SE C O N D S U B M I T T A L 08 / 2 9 / 2 0 2 3 TH I R D S U B M I T T A L 09 / 1 3 / 2 0 2 3 4 2 3 OUTLOT 'Z' 4 5 13 12 6 7 11 SE D A N B U R Y P L A C E SE G L A C I E R T R A I L SE WESTOWN P A R K W A Y S E W E S T O W N P A R K W A Y GR A N D P R A I R I E P A R K W A Y CI V I L D E S I G N A D V A N T A G E 2202.118 EN G I N E E R : E K O RE V I S I O N S DA T E WA U K E E , I O W A 6 FI R S T S U B M I T T A L 08 / 0 9 / 2 0 2 3 PR E L I M I N A R Y P L A T PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 KE T T L E S T O N E C E N T R A L - N O R T H PH A S E 2 EN G I N E E R : J W M / G H T E C H : M A E / M S T SE C O N D S U B M I T T A L 08 / 2 9 / 2 0 2 3 TH I R D S U B M I T T A L 09 / 1 3 / 2 0 2 3 5 CI V I L D E S I G N A D V A N T A G E 2202.118 EN G I N E E R : E K O RE V I S I O N S DA T E WA U K E E , I O W A 6 FI R S T S U B M I T T A L 08 / 0 9 / 2 0 2 3 PR E L I M I N A R Y P L A T PH O N E : ( 5 1 5 ) 3 6 9 - 4 4 0 0 41 2 1 N W U R B A N D A L E D R I V E UR B A N D A L E , I A 5 0 3 2 2 KE T T L E S T O N E C E N T R A L - N O R T H PH A S E 2 EN G I N E E R : J W M / G H T E C H : M A E / M S T SE C O N D S U B M I T T A L 08 / 2 9 / 2 0 2 3 TH I R D S U B M I T T A L 09 / 1 3 / 2 0 2 3 6 5' X 5' SW-513 INTAKE WITH PERMANENT STAND PIPE (ST-2) 5' X 5' SW-513 INTAKE WITH PERMANENT STAND PIPE (ST-5)