HomeMy WebLinkAbout2023-11-20 I07 MTG Sports Complex_Site Plan AGENDA ITEM:
CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: November 20, 2023
AGENDA ITEM: Consideration of approval of a resolution approving a site plan for MTG
Sports Complex (1650 NW Vicksburg Court)
FORMAT: Resolution
SYNOPSIS INCLUDING PRO & CON: Re/Max Precision requests approval of a site plan to
authorize the construction of a single-story building for sports practice facility. The building is 23,200
square feet in area and 22.5 feet in height. The building will also include storage space. A trash
enclosure is shown to the northeast of the building.
Two accesses will be provided into the site. One will be provided off of NW 17th Street and one will be
provided off of NW Vicksburg Court. A total of 81 parking spaces are required and they are providing
83 spaces.
The site will be serviced with all public utilities. Storm water detention will be provided with the
detention basin located at the northeast corner of the site. The landscape plan meets the requirements
of the Landscape and Open Space Ordinance.
The elevations of the building are proposed to be constructed mainly of metal wall panels, fiber
cement panels, stone, and storefront system. The trash enclosure will be constructed of split face CMU
with a steel gate.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS:
COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission
reviewed this project at the November 14, 2023, Commission Meeting and recommended
approval subject to remaining staff comments:
Item 8: Approval of a Site Plan for MTG Sports Complex (1650 NW Vicksburg Court)
Bill Mettee, City Planner, introduced the request for approval of a site plan for a sports practice
facility, as presented by the applicant, RE/Max Precision, represented by David Bentz PE-Bishop
Engineering.
The property is located north of Hickman Road and east of NW 17th Street, containing approximately
2.47-acres. The site plan identifies the construction of a 23,200 square foot building for a sports
practice facility. The building is 22.5 feet in height and will also include storage space, with a trash
enclosure shown to the northeast of the building.
Two accesses will be provided into this site from the public streets. One access will be provided from
NW 17th Street and one from NW Vicksburg Court. A total of 81 parking spaces are required for this
project. The total amount of proposed parking is 83 parking spaces, including four (4) accessible
spaces. A five-foot-wide sidewalk will be constructed on the south side of NW Vicksburg Court. A
10-foot-wide trail exists along the east side of NW 17th street. A pedestrian connection into the site is
provided from the trail along the south side of the site.
I7
The site will be serviced with all public utilities. Stormwater detention will be provided with the
detention basin located at the northeast corner of the site. A minimum of 15% of the project area is
required to be open space. The total amount of open space proposed is 42%. A 40-foot landscape
buffer is provided along the south side of the site to provide buffering between the industrial and
commercial zoning districts. The plantings shown on the landscape plan meet the minimum
requirements of the Landscape & Open Space Ordinance.
The elevations of the building are proposed to be constructed mostly of metal wall panels, fiber cement
panels, stone, and storefront system. The trash enclosure will be constructed of split face CMU with a
steel gate. A photometric plan for the site lighting complies with the requirements of the Site Plan
Ordinance. The comprehensive plan classifies the subject property as Mixed Use, which provides
flexibility and a variety of different uses within a neighborhood.
The site plan is in general conformance with the Site Plan Ordinance and Comprehensive Plan. Staff
recommends approval of the site plan for MTG Sports Complex, subject to remaining staff comments.
Discussion as follows:
• Zoning for the surrounding area
• Matt Floden of Grace Architecture, Winterset, IA indicated facility use to be primarily
baseball, softball, batting cages; to be rented by teams but may be open to the public as well
for aerobics, boxing etc. and stated the Moonshots logo is branding for softball and a business
name, not a specific team name.
Motion by Commissioner Broderick for approval of a Site Plan for MTG Sports Complex, seconded
by Commissioner Lohse. Ayes: Koelker, Beenken, Broderick, Lohse, Tessau. Nays: None. Motion
carried.
STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan subject to
remaining staff comments.
RECOMMENDATION: Approve the resolution subject to remaining staff comments.
ATTACHMENTS: I. Proposed Resolution
II. Staff Report
III. Site Plan & Elevations
PREPARED BY: Melissa DeBoer, Planning Coordinator
REVIEWED BY:
THE CITY OF WAUKEE, IOWA
RESOLUTION 2023-
APPROVING THE SITE PLAN FOR MTG SPORTS COMPLEX
(1650 NW VICKSBURG COURT)
IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA
WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal
Organization; AND,
WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of
the Site Plan for MTG Sports Complex, subject to remaining staff comments on November 14,
2023; AND,
WHEREAS, the Site Plan for MTG Sports Complex is in general conformance with §160 – Site
and Building Development Standards Ordinance of the Waukee Municipal Code; AND,
WHEREAS, the Site Plan for MTG Sports Complex is in general conformance with §161 –
Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND,
NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on
this 20th day of November, 2023 that the Site Plan for MTG Sports Complex is approved subject
to remaining staff comments.
____________________________
Courtney Clarke, Mayor
Attest:
___________________________________
Rebecca D. Schuett, City Clerk
RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN
Anna Bergman Pierce
R. Charles Bottenberg
Chris Crone
Larry R. Lyon
Ben Sinclair
PLANNING AND ZONING COMMISSION STAFF REPORT
PROJECT: MTG Sports Complex – Site Plan PREPARED BY: Melissa DeBoer, AICP – Planning
Coordinator
REPORT DATE: November 8, 2023
MEETING DATE: November 14, 2023
GENERAL INFORMATION
Applicant: Re/Max Precision
Owner:
TLM, LLC
Engineer: David Bentz, PE – Bishop Engineering
Request: The applicant is requesting approval of a site plan
for a sports practice facility.
Location and Size: Property is located north of Hickman Road and
east of NW 17th Street, containing approximately
2.47-acres.
Property Address: 1650 NW Vicksburg Court
AREA MAP
ABOVE: Aerial of subject property (outlined in RED) in relation to the surrounding area.
November 8, 2023
2 of 3
LAND USES AND ZONING
Location Existing Land Use Comprehensive Plan Current Zoning
Property in
Question
Vacant – Undeveloped Mixed Use M-1 (Light Industrial District)
North Vacant – Undeveloped Mixed Use M-1 (Light Industrial District)
South Vacant – Undeveloped Mixed Use C-1 (Community and Highway
Service Commercial District)
East Vacant – Undeveloped Mixed Use M-1 (Light Industrial District)
West Vacant – Undeveloped Mixed Use M-1 (Light Industrial District)
PROJECT DESCRIPTION
The site plan identifies the construction of a 23,200 square foot building for a sports practice facility. The
building is 22.5 feet in height. The building will also include storage space.
A trash enclosure is shown to the northeast of the building.
ACCESS AND PARKING
Two accesses will be provided into this site from the public streets. One access will be provided off of NW
17th Street and one access will be provided off of NW Vicksburg Court.
A total of 81 parking spaces are required for this project. The total amount of parking proposed is 83 parking
spaces, including 4 accessible spaces.
SIDEWALKS/TRAILS
A 5-foot-wide sidewalk will be constructed on the south side of NW Vicksburg Court. A 10-ft wide trail exists
along the east side of NW 17th Street. A pedestrian connection into the site is provided from the trail along
the south side of the site.
UTILITIES
The site will be serviced with all public utilities. Stormwater detention will be provided with the detention
basin located at the northeast corner of the site.
LANDSCAPING & OPEN SPACE
A minimum of 15% of the project area is required to be open space. The total amount of open space
proposed is 42%. A 40-foot landscape buffer is provided along the south side of the site to provide buffering
between the industrial and commercial zoning districts. The plantings shown on the landscape plan meet the
minimum requirements of the Landscape & Open Space Ordinance.
ELEVATIONS
The elevations of the building are proposed to be constructed mostly of metal wall panels, fiber cement
panels, stone, and storefront system. The trash enclosure will be constructed of split face CMU with a steel
gate.
November 8, 2023
3 of 3
PHOTOMETRIC PLAN
A photometric plan for the site lighting has been submitted and complies with the requirements of the Site Plan
Ordinance.
COMPREHENSIVE PLAN
The comprehensive plan classifies the subject property as Mixed Use. The Mixed Use classification provides
flexibility and variety of different uses within a neighborhood.
STAFF RECOMMENDATION
The site plan is in general conformance with the Site Plan Ordinance and Comprehensive Plan. Staff
recommends approval of the site plan for MTG Sports Complex subject to remaining staff comments.
SITE
MTG SPORTS COMPLEX
SITE PLAN
IOWAONE CALL
1-800-292-8989
www.iowaonecall.com
811
Know what's below. Call before you dig.
PROPERTY DESCRIPTION:
LOT 12 IN JAMES POINTE PLAT 1, AN OFFICIAL PLAT, NOW
INCLUDED IN AND FORMING A PART OF THE CITY OF WAUKEE,
DALLAS COUNTY, IOWA
ADDRESS:
1650 NW VICKSBURG COURT
WAUKEE, IOWA 50263
OWNER:
TLM, LLC.
ATTN: TRAVIS MOULTON
PH.: (515) 494-1066
EMAIL: TRAVIS@PRECISIONDSM.COM
14322 SHERIDAN AVE
URBANDALE, IOWA, 50323
PREPARED FOR:
RE/MAX PRECISION
2202 WOODLANDS PARKWAY
CLIVE, IOWA 50325
ATTN:TRAVIS MOULTON
PH.: (515) 494-1066
EMAIL: TRAVIS@PRECISIONDSM.COM
PROPOSED USE:
FACILITY WILL BE USED FOR SPORTS PRACTICE AS WELL AS
STORAGE. FACILITY WILL NOT BE USED FOR SPORTING
EVENTS. 3,200 SF OF GFA WILL BE DEDICATED STORAGE FOR
OWNER'S VEHICLE AND FACILITY EQUIPMENT.
ZONING:
M-1 (LIGHT INDUSTRIAL DISTRICT)
BULK REGULATIONS:
FRONT: 30 FEET
SIDE: NONE, 40 FEET ALONG R OR C-1 DISTRICTS
REAR: 30 FEET
MAX. BLDG. HEIGHT:40 FEET
PROPOSED BUILDING HEIGHT: 22.5 FEET
PARKING REQUIREMENTS:
FITNESS CENTER / HEALTH CLUB REQUIREMENT:
4 SPACES PER 1,000 SF GROSS FLOOR AREA
STALLS REQUIRED: 80 (20,000 SF FLOOR AREA)
SELF STORAGE / MINI WAREHOUSE REQUIREMENT:
1 SPACE PER 20,000 SF GROSS FLOOR AREA
STALLS REQUIRED: 1 (3,200 SF FLOOR AREA)
TOTAL STALLS REQUIRED: 81
TOTAL STALLS PROPOSED: 83 (INCL. 4 ADA)
OPEN SPACE REQUIREMENTS:
LOT AREA:107,837 - 2.47 ACRES
OPEN SPACE REQUIRED: 16,175 SF (15% OF LOT AREA)
OPEN SPACE PROVIDED: 45,287 SF (42.00% OF LOT AREA)
IMPERVIOUS SURFACE:
EXISTING PERVIOUS SURFACE = 107,837 SF
EXISTING IMPERVIOUS SURFACE = 0 SF
PROPOSED IMPERVIOUS SURFACE = 62,550 SF (58.00%)
PROPOSED PERVIOUS SURFACE = 45,287 SF (42.00%)
BENCHMARK:
BASIS OF BEARING OBTAINED FROM GPS OBSERVATIONS
DATUM = NAD 83, IOWA SOUTH
BENCHMARK DATUM = NAVD88, GEOID 18
VICINITY MAP
SCALE: 1' = 1,000'
COPYRIGHT 2023 BISHOP ENGINEERING. THIS DOCUMENT AND THE INFORMATION CONTAINED MAY NOT BE REPRODUCED OR EXCERPTED WITHOUT THE EXPRESS
WRITTEN PERMISSION OF BISHOP ENGINEERING. UNAUTHORIZED COPYING OR DISCLOSURE OF CONSTRUCTION USE ARE PROHIBITED BY COPYRIGHT LAW.
CO
V
E
R
S
H
E
E
T
C0.1
SHEET INDEX:
C0.1 COVER SHEET
C1.1 EX CONDITIONS & DEMO PLAN
C2.1 LAYOUT PLAN
C3.1 GRADING PLAN
C4.1 UTILITY PLAN
C5.1 LANDSCAPE PLAN
C6.1-C6.2 DETAILS SHEET
C7.1 SWPPP
UTILITY CONFLICT NOTES:
1.UTILITY CONFLICTS MAY EXIST ACROSS THE SITE WITH NEW UTILITIES, GRADING, PAVING ETC.
MOST UTILITY CONFLICTS HAVE BEEN CALLED OUT FOR CONTRACTOR CONVENIENCE.
2.CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY CONFLICTS THAT ARE EITHER CALLED OUT ON
THE PLANS OR THAT CAN BE SEEN ON THE PLANS BETWEEN AN EXISTING UTILITY AND
PROPOSED CONSTRUCTION
WETLAND NOTES:
1.BISHOP ENGINEERING DOES NOT PERFORM WETLAND STUDIES OR WETLAND MITIGATION. IT IS
THE OWNER'S RESPONSIBILITY TO DETERMINE IF ANY WETLANDS ARE LOCATED ON THE
PROJECT SITE AND PERFORM ANY NECESSARY MITIGATION PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION ACTIVITIES.
SURVEY NOTES:
1.SURVEY WORK WAS COMPLETED BY BISHOP ENGINEERING ON 2-17-2023. SEE SITE SURVEY
PROVIDED AS PART OF THIS SET OF PLANS FOR EXISTING SITE CONDITIONS AND BOUNDARY
INFORMATION.
GENERAL NOTES:
1.ALL WORK SHALL BE DONE IN ACCORDANCE WITH 2023 WAUKEE STANDARD SPECIFICATIONS, 2023 SUDAS STANDARD SPECIFICATIONS AND ANY AND ALL CITY/COUNTY
SUPPLEMENTAL SPECIFICATIONS. THE CITY OF WAUKEE MUST BE NOTIFIED BY ALL CONTRACTORS 48 HOURS PRIOR TO COMMENCING WORK.
2.IN EVENT OF A DISCREPANCY BETWEEN THE QUANTITY ESTIMATES AND THE DETAILED PLANS, THE DETAILED PLANS SHALL GOVERN.
3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION OF ALL UTILITIES. ANY DAMAGE TO SAID UTILITIES SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE.
4.ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT O.S.H.A. CODES AND STANDARDS. NOTHING INDICATED ON THESE PLANS SHALL RELIEVE THE
CONTRACTOR FROM COMPLYING WITH THE APPROPRIATE SAFETY REGULATIONS.
5.ALL NECESSARY CONSTRUCTION SIGNS, BARRICADES AND OTHER TRAFFIC CONTROL DEVICES REQUIRED DURING CONSTRUCTION WILL BE FURNISHED BY THE
CONTRACTOR. SIGNS, BARRICADES AND OTHER TRAFFIC CONTROL DEVICES MUST BE IN CONFORMANCE WITH THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
FOR STREETS AND HIGHWAYS."
6.BISHOP ENGINEERING SHALL NOT BE LIABLE FOR ANY INJURIES THAT HAPPEN ON SITE. THIS SHALL INCLUDE BUT NOT BE LIMITED TO TRENCH COLLAPSES FROM
VARYING SOIL CONDITIONS OR INJURIES CAUSED BY UNDERGROUND UTILITIES INCLUDING UTILITIES THAT ARE NOT SHOWN ON PLAN.
7.THE CONTRACTOR IS LIABLE FOR ALL DAMAGES TO PUBLIC OR PRIVATE PROPERTY CAUSED BY THEIR ACTION OR INACTION IN PROVIDING FOR STORM WATER FLOW
DURING CONSTRUCTION. DO NOT RESTRICT FLOWS IN EXISTING DRAINAGE CHANNELS, STORM SEWER, OR FACILITIES.
8.THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER A SCHEDULE FOR PERFORMANCE OF WORK ITEMS. THIS SCHEDULE SHALL BE PROVIDED BY THE CONTRACTOR AT
THE PROJECT PRECONSTRUCTION CONFERENCE. NO WORK SHALL BEGIN UNTIL A SCHEDULE HAS BEEN SUBMITTED AND ACCEPTED. THE CONTRACTOR SHALL THEN
PERFORM WORK TO CONFORM TO THE ACCEPTED SCHEDULE.
9.LABORATORY TESTS SHALL BE PERFORMED BY THE OWNER UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL PROVIDE SAMPLES OF MATERIAL REQUIRED FOR
LABORATORY TESTS AND TESTING IN ACCORDANCE WITH THE URBAN STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS.
10.SOIL IMPORT OR EXPORT ON THIS PROJECT SHALL BE CONSIDERED INCIDENTAL AND WILL NOT BE MEASURED OR PAID FOR SEPARATELY.
11.THE CONTRACTOR SHALL PROTECT ALL STRUCTURES NOT SHOWN AS REMOVALS ON THE PLANS.
12.THE CONTRACTOR SHALL OBTAIN ANY AND ALL NECESSARY PERMITS PRIOR TO ANY CONSTRUCTION. CONTRACTOR SHALL WORK WITH OWNER OR OWNERS
REPRESENTATIVE ON ALL REQUIRED STORM WATER DISCHARGE PERMITS FROM THE IOWA DEPARTMENT OF NATURAL RESOURCES AND THE CITY OF WAUKEE.
13.GRADING AND EROSION CONTROL SHALL BE DONE IN ACCORDANCE WITH THE APPROVED GRADING PLAN, SWPPP, NPDES DOCUMENTS, AND IOWA DEPARTMENT OF
NATURAL RESOURCES REQUIREMENTS.
14.THE CONTRACTOR SHALL PICK UP ANY DEBRIS SPILLED ONTO THE ADJACENT RIGHT OF WAY OR ABUTTING PROPERTIES AS THE RESULT OF CONSTRUCTION, AT THE
END OF EACH WORK DAY AND PRIOR TO A RAIN EVENT.
15.THE CONTRACTOR IS RESPONSIBLE FOR THE PROMPT REMOVAL OF ALL MUD THAT HAS BEEN TRACKED OR WASHED UNTO ADJACENT PROPERTY OR RIGHT OF WAY
UNTIL SUCH TIME THAT PERMANENT VEGETATION HAS BEEN ESTABLISHED.
16.DISPOSE OF ALL EXCESS MATERIALS AND TRASH IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REQUIREMENTS. PROVIDE WASTE AREAS OR DISPOSAL SITES
FOR EXCESS MATERIALS NOT DESIRABLE FOR INCORPORATION INTO THE PROJECT.
17.APPROVED FIRE APPARATUS ACCESS ROADS SHALL BE PROVIDED AS SOON AS CONSTRUCTION COMMENCES. IF PAVING IS NOT INSTALLED PRIOR TO BUILDING
CONSTRUCTION COMMENCING AFTER FOOTING INSTALLED, AN APPROVED ROUTE AROUND THE EXTERIOR OF THE BUILDING TO EXTEND WITHIN 100 FEET OF ALL
PORTIONS OF THE EXTERIOR WALLS SHALL BE PROVIDED AND COMPLY WITH THE REQUIREMENTS OF SECTION 503.2 OF THE IFC.
PAVING NOTES:
1.THE PAVING/ GRADING CONTRACTOR SHALL BACKFILL THE PAVING SLAB AND FINE GRADE THE RIGHT OF WAY AS SOON AFTER THE PAVING AS POSSIBLE. ALL AREAS
SHALL BE SEEDED IN ACCORDANCE WITH CITY OF WAUKEE STANDARD SPECIFICATIONS AND THE CURRENT VERSION OF SUDAS.
2.SUBGRADE PREPARATION AND PAVEMENTS WILL BE CONSTRUCTED FOLLOWING RECOMMENDATIONS IN THE SOILS REPORT. APPROVED SOILS ENGINEER MUST SIGN
OFF ON SUB BASE PRIOR TO ANY PAVEMENT BEING PLACED.
3.SEE DETAILS FOR ALL PAVEMENT THICKNESS.
4.ALL PEDESTRIAN WALKWAYS THAT UNLOAD INTO A VEHICLES TRAVELED PATH MUST HAVE A.D.A. DETECTABLE WARNING PANEL(S) AS PER A.D.A. REGULATIONS. PANEL
TYPE & COLOR SHALL BE PER CITY STANDARD.
5.ALL WALKS, PARKING LOTS, HANDICAP PARKING, RAMPS, ETC. SHALL COMPLY WITH ALL A.D.A. AND CITY CODES. HANDICAP PARKING SIGNAGE IS REQUIRED FOR ALL
HANDICAP STALLS AND SHALL BE CONSIDERED INCIDENTAL. IN EVENT OF A DISCREPANCY BETWEEN THE PLANS AND THE A.D.A./CITY CODES THE A.D.A./CITY CODES
SHALL GOVERN. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING A.D.A. CODES ARE MET.
UTILITY NOTES:
1.QUANTITY CALLOUTS ON PIPE LENGTHS ARE APPROXIMATE AND SHOULD BE USED FOR REFERENCE ONLY.
2.THE CONTRACTOR SHALL PROVIDE AS-BUILTS OF ALL UTILITIES, INCLUDING DEPTH AND LOCATION OF ALL SERVICES.
3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION AND ALL COSTS ASSOCIATED WITH AS-BUILT TOPO OF DETENTION POND & DETENTION POND STORM
SEWER. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING BISHOP ENGINEERING (DAVID BENTZ AT 515-276-0467) TO PERFORM SAID AS-BUILT SURVEY. IF
DETENTION PONDS HAVE BEEN GRADED INCORRECTLY, CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SUBSEQUENT AS-BUILT TOPO SURVEYS UNTIL ISSUES HAVE
BEEN RECTIFIED.
4.THE CONTRACTOR SHALL COORDINATE THE ADJUSTMENT OF ANY AND ALL EXISTING AND PROPOSED UTILITIES TO PROPOSED GRADES. EXISTING UTILITIES SHALL BE
RAISED OR LOWERED IN ACCORDANCE WITH THE UTILITY OWNER REQUIREMENTS. ANY NECESSARY ADJUSTMENTS SHALL BE CONSIDERED INCIDENTAL TO
CONSTRUCTION.
5.ACTIVE EXISTING FIELD TILES ENCOUNTERED DURING CONSTRUCTION SHALL BE REPAIRED, REROUTED, OR CONNECTED TO PUBLIC OR PRIVATE STORM SEWER TO
REMAIN IN SERVICE.
6.ALL PROPOSED RCP STORM SEWER PIPE JOINTS SHALL BE FABRIC WRAPPED AND THE LAST 3 PIPE SECTIONS ON THE APRON SHALL BE TIED WITH RF-14 TYPE II
CONNECTORS. ALL APRONS SHALL HAVE A STANDARD FOOTING AND TRASH GUARD.
7.ALL RIP RAP CALLED OUT ON PLANS SHALL BE UNDERLAIN WITH ENGINEERING FABRIC.
8.SANITARY SEWER SERVICE CONNECTIONS SHALL BE PLACED AT A SLOPE OF NO LESS THAN 2%. SERVICES SHALL MAINTAIN 18" OF VERTICAL SEPARATION FROM THE
WATERMAIN WITH 18" OF COMPACTED LOW PERMEABILITY SOIL BETWEEN THE UTILITIES WITHIN 10' OF THE CROSSING.
9.MANDREL AND PRESSURE TESTS SHALL BE REQUIRED FOR ALL PROPOSED SANITARY LINES. TELEVISING OF THE SANITARY SEWER SYSTEM SHALL BE COMPLETED
PRIOR TO PAVING UNLESS OTHERWISE APPROVED BY JURISDICTION.
10.WATERMAINS SHALL BE C-900. SIZE OF WATERMAIN AS SHOWN ON PLANS.
11.THRUST BLOCKS SHALL BE INSTALLED AS REQUIRED AND SHALL BE CONSIDERED INCIDENTAL TO WATERMAIN CONSTRUCTION.
12.PROPOSED WATERMAIN SHALL BE PRESSURE TESTED, BACTERIA TESTED AND CHLORINATED. THE FILLING OF THE WATER MAIN SHALL BE DONE BY THE CITY OF
WAUKEE.
13.TRACER WIRE SHALL BE ADDED TO ALL WATER MAIN, AND BROUGHT TO THE SURFACE AT EVERY HYDRANT.
14.ALL HYDRANTS WILL IMMEDIATELY BE COVERED WITH A BLACK PLASTIC BAG (OR EQUIVALENT) ONCE THE HYDRANT IS INSTALLED. THE CITY OF WAUKEE WILL NOTIFY
THE CONTRACTOR WHEN THE BAGS CAN BE REMOVED.
15.THE MINIMUM HYDRANT LEAD SHALL BE 3.5 FEET.
REFERENCE NUMBER:
35
0
1
1
0
4
t
h
S
t
r
e
e
t
De
s
M
o
i
n
e
s
,
I
o
w
a
5
0
3
2
2
-
3
8
2
5
Ph
o
n
e
:
(
5
1
5
)
2
7
6
-
0
4
6
7
F
a
x
:
(
5
1
5
)
2
7
6
-
0
2
1
7
"P
l
a
n
n
i
n
g
Y
o
u
r
S
u
c
c
e
s
s
f
u
l
D
e
v
e
l
o
p
m
e
n
t
"
Bi
s
h
o
p
E
n
g
i
n
e
e
r
i
n
g
Ci
v
i
l
E
n
g
i
n
e
e
r
i
n
g
&
L
a
n
d
S
u
r
v
e
y
i
n
g
E
s
t
a
b
l
i
s
h
e
d
1
9
5
9
DRAWN BY:
CHECKED BY:
REVISION DATE:
PROJECT NUMBER:
SHEET NUMBER:
MT
G
S
P
O
R
T
S
C
O
M
P
L
E
X
WA
U
K
E
E
,
I
O
W
A
DRL
DB
03/30/2023 1ST CITY SET
09/18/2023 2ND CITY SET
10/11/2023 3RD CITY SET
230051
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
L:
\
L
A
N
D
P
R
O
J
E
C
T
S
2
0
2
3
\
2
3
0
0
5
1
-
M
T
G
S
P
O
R
T
S
C
O
M
P
L
E
X
\
D
W
G
\
C
0
C
O
V
E
R
.
D
W
G
10
/
2
6
/
2
0
2
3
2
:
1
0
:
3
8
P
M
UTILITY NOTE:
THE LOCATION OF THE UTILITIES INDICATED ON THE PLANS HAVE BEEN TAKEN FROM THE FIELD SURVEY, EXISTING PUBLIC
RECORDS, AND PLANS PROVIDED BY OTHERS. SURFACE UTILITY LOCATIONS HAVE BEEN FIELD LOCATED BY BISHOP
ENGINEERING, UNLESS OTHERWISE NOTED. ALL UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE LOCATIONS
ONLY. BISHOP ENGINEERING DOES NOT GUARANTEE THE UNDERGROUND LOCATION OF ANY UTILITIES SHOWN. IT SHALL
BE THE DUTY OF THE CONTRACTOR TO DETERMINE THE LOCATION AND DEPTH OF ANY UNDERGROUND UTILITIES SHOWN
AND IF ANY ADDITIONAL UTILITIES, OTHER THAN THOSE SHOWN ON THE PLANS, MAY BE PRESENT. A REQUEST WAS MADE
TO IOWA ONE CALL FOR UTILITY PROVIDERS TO VERIFY, LOCATE, AND MARK THEIR UTILITIES IN THE FIELD.C0.1 - C7.1
ABBREVIATIONS:
AC ACRES
ASPH ASPHALT
BK BOOK
CONC CONCRETE
D DEEDED DISTANCE
EX EXISTING
ENCL ENCLOSURE
FF FINISHED FLOOR
FL FLOW LINE
FRAC FRACTIONAL
M MEASURED DISTANCE
MH MANHOLE
OPC ORANGE PLASTIC CAP
P PLATTED DISTANCE
PG PAGE
POB POINT OF BEGINNING
POC POINT OF COMMENCEMENT
PRA PREVIOUSLY RECORDED AS
PUE PUBLIC UTILITY EASEMENT
ROW RIGHT OF WAY
RPC RED PLASTIC CAP
SF SQUARE FEET
SAN SANITARY
TYP TYPICAL
YPC YELLOW PLASTIC CAP
N NORTH
S SOUTH
E EAST
W WEST
ELECTRIC VAULT
TRANSFORMER POLE
TRANSFORMER POLE
LIGHT POLE
ELECTRIC JUNCTION BOX
ELECTRIC PANEL
TRANSFORMER
GROUND LIGHT
GUY WIRE
ELECTRIC HANDHOLE
GAS METER
GAS VALVE
AIR CONDITIONING UNIT
TELEPHONE RISER
TELEPHONE VAULT
TELEPHONE MANHOLE
TRAFFIC SIGNAL MANHOLE
FIBER OPTIC MANHOLE
FIBER OPTIC RISER
FIBER OPTIC VAULT
CABLE TV RISER
SIGN
BOLLARDS
7 DENOTES NUMBER OF PARKING STALLS
PROPERTY CORNER - FOUND AS NOTED
PROPERTY CORNER- PLACED 5/8" IRON ROD
WITH YELLOW PLASTIC CAP ID # 14775
OR AS NOTED
SECTION CORNER - FOUND AS NOTED
SITE CONTROL POINT - MONUMENT AS NOTED
ELEC
EJ
EP
GM
GV
A/C
T
TEL
T
TS
FO
F/O
TV
F/O
SAN SANITARY SEWER
ST STORM SEWER
W WATER LINE
G GAS LINE
U/E UNDERGROUND ELECTRIC
O/E OVERHEAD ELECTRIC
TELE TELEPHONE LINE
F/O FIBER OPTIC
CATV CABLE TV
STORM MANHOLE
CURB INTAKE
SURFACE INTAKE
FLARED END SECTION
ROOF DRAIN
DOWNSPOUT
SANITARY MANHOLE
CLEANOUT
FIRE HYDRANT
SPRINKLER
IRRIGATION CONTROL VALVE
WATER MANHOLE
WELL
WATER VALVE
WATER SHUT OFF
YARD HYDRANT
FLAGPOLE
ELECTRIC MANHOLE
ELECTRIC METER
ELECTRIC RISER
D
S
CO
H Y D
I CV
W
WS O
YA DR
E
EM
E
W
WV
LEGEND
UTILITY MAPS PROVIDED BY:
1. ELECTRIC (MID AMERICAN / 515-252-6972)
2. STORM AND SANITARY (CITY OF WAUKEE / 515-978-7920)
3. GAS (CITY OF WAUKEE / 515-978-7920)
4. WATER (CITY OF WAUKEE / 515-978-7920)
FIRE SAFETY CONSTRUCTION:
1.APPROVED FIRE APPARATUS ACCESS ROADS SHALL BE PROVIDED AS SOON AS
CONSTRUCTION COMMENCES. IF PAVING IS NOT INSTALLED PRIOR TO BUILDING
CONSTRUCTION COMMENCING AFTER FOOTING INSTALLED, AN APPROVED ROUTE AROUND
THE EXTERIOR OF THE BUILDING TO EXTEND WITHIN 100 FEET OF ALL PROTIONS OF THE
EXTERIOR WALLS SHALL BE PROVIDED AND COMPLY WITH THE REQUIREMENTS OF SECTION
503.2 OF THE IFC.
CONSTRUCTION SCHEDULE:
1.OCTOBER 2023 - BREAK GROUND
2.SPRING 2024 - UTILITY WORK COMPLETE
3.SUMMER 2024 - PAVING COMPLETE
4.FALL 2024 - FINAL LANDSCAPING
NW
1
7
T
H
S
T
R
E
E
T
NW VICKSBURG COURT
CP #9000
D
EX STORM MH
RIM=1029.75
EX INTAKE
T/C=1029.10
RIM=1029.27
CO
CO
EX INTAKE
T/C=1029.27
RIM=1028.78
EX INTAKE
T/C=1029.22
RIM=1028.77
D
EX STORM MH
RIM=1029.79
FL(S 42"RCP)=1024.54
FL(N 42"RCP)=1024.47
FL(SE 18"RCP)=1024.41
FL(W 18"RCP)=1024.39
S
EX SAN MH
RIM=1032.32
INV(E 8"PVC)=1021.50 S
EX SAN MH
RIM=1030.12
INV(W 8"PVC)=1019.57
INV(E 8"PVC)=1019.52
EX 18"FES
FL=1024.40
H Y D
TBM: BURY BOLT
ELEV=1032.70
CO
EX SAN CO
RIM=1030.36
INV=1021.13
PER OLD PLAN
D
EX STORM MH
RIM=1030.93
FL(E 15"RCP)=1024.80
FL(NW 18"RCP)=1024.77
FL(S 15"RCP)=1024.73
EX 15" FES
FL=1024.75
EX 15"FES
FL=1025.84
EX INTAKE
T/C=1029.79
RIM=1029.27
CP #9001
D
EX STORM MH
RIM=1032.63
FL(N 42"RCP)=1023.38
FL(S 42"RCP)=1023.33
EX INTAKE
T/C=1029.27
RIM=1028.80
U/E
U/E
U/E
U/E U/E U/E U/E U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
ST
18"
S
T
1
5
"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
S
T
6"
ST 6"
ST 6"
ST
6"
ST
6"
ST
6"
ST
6"
ST
6"
ST 6"
ST 6"ST 6"ST 6"ST 6"ST 6"ST 6"
APPROX. LOCATION SUBDRAIN
PER CITY OF WAUKEE GIS
EX SUBDRAIN PER
CITY OF WAUKEE GIS
ST
42
"
ST
42
"
ST
42
"
ST
18
"
ST 18"
ST 15"ST 15"ST 15"ST 15"ST 15"
SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"
SAN
6"
SAN
6"
ST
42"
70'
R
.
O
.
W
.
(
P
U
B
L
I
C
S
T
R
E
E
T
-
C
O
N
C
R
E
T
E
S
U
R
F
A
C
E
)
60' R.O.W.(PUBLIC STREET-CONCRETE SURFACE)
30' BUILDING SETBACK LINE
30'
B
U
I
L
D
I
N
G
S
E
T
B
A
C
K
L
I
N
E
20
'
P
R
I
V
A
T
E
S
T
O
R
M
S
E
W
E
R
EA
S
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
5
1
)
40
'
L
A
N
D
S
C
A
P
E
B
U
F
F
E
R
EA
S
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
4
7
)
10'
P
U
B
L
I
C
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
(B
K
2
0
2
1
,
P
G
2
4
5
)
15
'
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
(B
K
2
0
2
1
,
P
G
2
4
6
)
10
'
P
.
U
.
E
.
(B
K
.
2
0
2
1
,
P
G
.
2
4
5
)
20' PRIVATE STORM SEWER
EASEMENT(BK 2021, PG 251)
F/O
10
3
4
1034
1030
1030
1033
1034
1032
1
0
3
2
1026
1030
1030
10
3
2
10
3
0
1030 1028
1028
1026
1026
1035
103
5
103
3
1030
1030
1031
1030
1029
LOT 12
AREA = 107,837 SF (2.47 ACRES)
LOT 13
OWNER:TERRA INVESTMENTS LLC.
ZONED:M-1
LOT 17
OWNER:SCOTT L. TEMPLE PROPERTY MANAGEMENT TRUST
ZONED:M-1
EX
.
1
0
'
C
O
N
C
R
E
T
E
S
I
D
E
W
A
L
K
G4"
G4"
G4"
G4"
G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"
W8"
W8"
W8"
W8"W8"W8"W8"W8"W8"W8"
W6"
W6"
APPROX LOCATION PER CITY OF WAUKEE GIS
APPROX LOCATION PER
CITY OF WAUKEE GIS
LOT 18
OWNER:WAUKEE LAND INVESTMENT, LLC.
ZONED:M-1
LOT 11
OWNER:DILEEP KUMAR PAYAWALA ET. ALL
ZONED:C-1
LOT 10
OWNER:WAUKEE LAND INVESTEMENNTS LLC.
ZONED:C-1
LOT 9
OWNER:WAUKEE LAND INVESTEMENNTS LLC.
ZONED:C-1
(148.65' S89°53'57"W)
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W8"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G4"
SA
N
8"
SA
N
8"
W
6"
20'
P
R
I
V
A
T
E
S
T
O
R
M
S
E
W
E
R
EAS
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
5
1
)
(R=25' Δ=84°16'12"
L=38.77' CH=33.54'
S62°10'59"W)
(R=363' Δ=14°25'
0
8
"
L=91.35' CH=91.1
1
'
N82°53'29"W)
(R=340' Δ=01°22'05"
L=8.12' CH=8.12'
S43°25'46"W)
(R=
6
3
5
'
Δ
=
2
4
°
0
3
'
5
5
"
L
=
2
6
6
.
7
1
'
CH
=
2
6
4
.
7
6
'
S
3
2
°
0
4
'
5
1
"
W
)
(480.60' S89°53'57"W)
(3
0
1
.
2
1
'
S
0
0
°
0
6
'
0
3
"
E
)
D
EX STORM MH
RIM=1031.16
FL(W 15"RCP)=1025.56
FL(S 15"RCP)=1025.54
D
EX STORM MH
RIM=1030.84
FL(NE 42"RCP)=1024.24
FL(SW 42"RCP)=1024.22
30' BUILDING SETBACK LINE
1032
1030
1028
1032
1028
1030
1032
1033
1030
1033
U/E
U/E
ST
O
R
M
W
A
T
E
R
E
A
S
E
M
E
N
T
(BO
O
K
2
0
2
1
P
A
G
E
2
5
0
)
1033
1029
1027
1026
1029
1031
1034
WV
EX 8" VALVE PER
JAMES POINTE CDS
EX 6" SAN STUB
15"
1029
1028
1027
10
3
1
SAW CUT 62.7 LF OF CURB
AT PROPOSED DRIVE
SAWCUT AND
REMOVE PAVEMENT
SAW CUT 64' LF OF CURB
AT PROPOSED DRIVE
REMOVE EX FES
REMOVE &
RELOCATE
HYDRANT
REMOVE APPROX 18'
OF EX 18" STORM
PROTECT REMAINDER OF EX PIPE
SITESITE
REFERENCE NUMBER:
35
0
1
1
0
4
t
h
S
t
r
e
e
t
De
s
M
o
i
n
e
s
,
I
o
w
a
5
0
3
2
2
-
3
8
2
5
Ph
o
n
e
:
(
5
1
5
)
2
7
6
-
0
4
6
7
F
a
x
:
(
5
1
5
)
2
7
6
-
0
2
1
7
"P
l
a
n
n
i
n
g
Y
o
u
r
S
u
c
c
e
s
s
f
u
l
D
e
v
e
l
o
p
m
e
n
t
"
Bi
s
h
o
p
E
n
g
i
n
e
e
r
i
n
g
Ci
v
i
l
E
n
g
i
n
e
e
r
i
n
g
&
L
a
n
d
S
u
r
v
e
y
i
n
g
E
s
t
a
b
l
i
s
h
e
d
1
9
5
9
DRAWN BY:
CHECKED BY:
REVISION DATE:
PROJECT NUMBER:
SHEET NUMBER:
MT
G
S
P
O
R
T
S
C
E
N
T
E
R
WA
U
K
E
E
,
I
O
W
A
EX
I
S
T
I
N
G
C
O
N
D
I
T
I
O
N
S
&
D
E
M
O
.
JPN
MDH
230051
C1.1
MTG SPORTS COMPLEX
EXISTING CONDITIONS
& DEMO.
L:
\
L
A
N
D
P
R
O
J
E
C
T
S
2
0
2
3
\
2
3
0
0
5
1
-
M
T
G
S
P
O
R
T
S
C
O
M
P
L
E
X
\
D
W
G
\
C
1
E
X
I
S
T
I
N
G
C
O
N
D
I
T
I
O
N
S
&
D
E
M
O
.
D
W
G
10
/
2
6
/
2
0
2
3
2
:
1
0
:
4
7
P
M
IOWAONE CALL
1-800-292-8989
www.iowaonecall.com
811
Know what's below. Call before you dig.
UTILITY NOTE:
THE LOCATION OF THE UTILITIES INDICATED ON THE PLANS HAVE BEEN TAKEN FROM THE FIELD SURVEY, EXISTING PUBLIC
RECORDS, AND PLANS PROVIDED BY OTHERS. SURFACE UTILITY LOCATIONS HAVE BEEN FIELD LOCATED BY BISHOP
ENGINEERING, UNLESS OTHERWISE NOTED. ALL UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE LOCATIONS
ONLY. BISHOP ENGINEERING DOES NOT GUARANTEE THE UNDERGROUND LOCATION OF ANY UTILITIES SHOWN. IT SHALL
BE THE DUTY OF THE CONTRACTOR TO DETERMINE THE LOCATION AND DEPTH OF ANY UNDERGROUND UTILITIES SHOWN
AND IF ANY ADDITIONAL UTILITIES, OTHER THAN THOSE SHOWN ON THE PLANS, MAY BE PRESENT. A REQUEST WAS MADE
TO IOWA ONE CALL FOR UTILITY PROVIDERS TO VERIFY, LOCATE, AND MARK THEIR UTILITIES IN THE FIELD.FIELD WORK COMPLETED ON: 2-17-2023
COPYRIGHT 2023 BISHOP ENGINEERING. THIS DOCUMENT AND THE INFORMATION CONTAINED MAY NOT BE REPRODUCED OR EXCERPTED WITHOUT THE EXPRESS
WRITTEN PERMISSION OF BISHOP ENGINEERING. UNAUTHORIZED COPYING OR DISCLOSURE OF CONSTRUCTION USE ARE PROHIBITED BY COPYRIGHT LAW.
NOTES:
1. ADJACENT PROPERTY OWNER INFORMATION OBTAINED
FROM DALLAS COUNTY ASSESSORS WEB PAGE
2. PARENTHESIS ( ) DENOTES PREVIOUSLY RECORDED
BEARINGS AND DISTANCES
C0.1
GRAPHIC SCALE
020 10 20 40
SCALE: 1" =20'
VICINITY MAP
(1" = 1,000')
UTILITY MAPS PROVIDED BY:
1. ELECTRIC (MID AMERICAN / 515-252-6972)
2. STORM AND SANITARY (CITY OF WAUKEE / 515-978-7920)
3. GAS (CITY OF WAUKEE / 515-978-7920)
4. WATER (CITY OF WAUKEE / 515-978-7920)
PROPOSED SPORTS COMPLEX
AREA = 23,200 SF
FF=1035.00'
D
D
D
D
W 6"
W 6"
W 6"
W 6"
W 6"
W 6"
SA
N
SA
N
SA
N
H Y D
CO
R
3
'R7'
11
13
9
12
12
10
4
5" PCC WALK5" PCC WALK BEHIND CURB
(REF DETAIL 17/C6.1)
TURNED DOWN WALK
(REF DETAIL 11/C6.2)5" PCC WALK
5" PCC W
A
L
K
5" PCC WALK
TYPE 1 PAVEMENT
(REF DETAIL 4/C6.1)
6" PCC
DRIVE
90°0'0"
90°0'0"
36.23'
117'
17
'
9'
24
'
19
'
19
'
9'
24'
24
'
17
'
8'
8'
7'
17'
9'
24'
17
'
9'
17'
9'
24'
24
'
17'
14'
14.5'7.96'
6'
41
'
14
'
R
3
'
R
2
0
'
R20'
R
2
0
'
R2
5
'
R4
9
'
R
2
5
'
R5'
R5'
R2
5
'
R4
'
R5'
R
1
0
'
R20'
R5
'
R
3
'
R45'
R22
5
'
R5'
R
1
2
'
R3'
R1
2
.
5
'
R69'
12' x 14'
TRASH
ENCLOSURE
(REF ARCH)
11.0
4
'
11.
8
4
'
24'
24'
24'
CO
CO
D
CO
W6"
W6"
G4"G4"G4"G4"
G
4"
G
4"
G
4"
G
4"
G
4"
G 4"
G 4"
G 4"
G 4"
R
5
'
R2'R
2
'
R
5
'R5'
230.4'
230.4'
10
0
.
4
'
10
0
.
4
'
TYP
E
2
P
A
V
E
M
E
N
T
(RE
F
D
E
T
A
I
L
5
/
C
6
.
1
)
TYPE 2 PAVEMENT
(REF DETAIL 5/C6.1)
WV WV
7
9'
8.33'
4.
7
9
'
5'
O/H DOOR
ONLY FOR EQUIPMENT
DURING CONSTRUCTION
AND EQUIPMENT TRANSPORT
TRANSITION
TO 3" ROLLOVER
CURB OVER 11'
PCC TURNED DOWN WALK
(REF DETAIL 11/C6.2)
HANDICAP
BOLLARD x4
(REF DETAIL 3/C6.1)
ADA RAMP WITH
5'x5' LANDING
ADA RAMP WITH
5'x5' LANDING
ADA RAMP
(EX WALK PROVIDES
ADA LANDING)
ADA RAMP
(EX WALK PROVIDES
ADA LANDING)
ADA RAMP
WITH 5'x5' LANDING
ADA RAMP
WITH LANDING
6" CURB
(TYP)
6" CURB
(TYP)
STRUCTURAL
STOOP (REF. ARCH.)
STRUCTURAL
STOOP (REF. ARCH.) STRUCTURAL
STOOP (REF. ARCH.)
5'x5' LANDING
MODULAR BLOCK
RETAINING WALL
WILL NEED TO BE DESIGNED
BY IOWA LICENSED
STRUCTURAL ENGINEER
TRANSFORMER PAD
COORDINATE WITH
MIDAMERICAN
FOR SIZING & LOCATION
(REF DETAIL 9/C6.1)
SUDAS TYPE A
DRIVEWAY
SUDAS TYPE A
DRIVEWAY
BOUNDARY OF
BIORETENTION
FILTER BED
(REF DETAIL 8/C6.1)
BOUNDARY OF
BIORETENTION
PRETREATMENT
(REF DETAIL 8/C6.1)
TRANSITION
TO 3" ROLLOVER
CURB OVER 8'
TURNED DOWN WALK
(REF DETAIL 11/C6.2)
6" CURB
3" ROLLOVER
CURB
6" CURB
6" CURB
TRANSITION
FROM 6" CURB
TO TURNED
DOWN WALK
6" CURB
6" CURB
6" CURB
PAVEMENT
TRANSITION
LINE
PAVEMENT
TRANSITION
LINE
TRUNCATED DOMES
(TYP)
TRUNCATED DOMES
(TYP)
2.
3
'
2.
5
1
'
5'
TYPE 1 PAVEMENT
(REF DETAIL 4/C6.1)
9'
6'
R
5
'
41
'
36.22'
O/H DOOR
STRUCTURAL
STOOP (REF. ARCH.)
8'
9'8'8'5'8'
TYPE 1 PAVEMENT
(REF DETAIL 4/C6.1)
TYPE 1 PAVEMENT
(REF DETAIL 4/C6.1)
TYPE 1 PAVEMENT
(REF DETAIL 4/C6.1)
TY
P
E
1
P
A
V
E
M
E
N
T
(R
E
F
D
E
T
A
I
L
4
/
C
6
.
1
)
5'
2.
6
8
'
5'
GM
NW
1
7
T
H
S
T
R
E
E
T
NW VICKSBURG COURT
CP #9000
D
CO
CO
D
S
S
CO
D
CP #9001
D
U/E
U/E
U/E
U/E U/E U/E U/E U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
ST
18"
S
T
1
5
"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
S
T
6"
ST 6"
ST
6"
ST
6"
ST
6"
ST
6"
ST
6"
ST
6"
ST 6"
ST 6"ST 6"ST 6"ST 6"ST 6"ST 6"
ST
42
"
ST
42
"
ST
42
"
ST
18
"
ST 18"
ST 15"ST 15"ST 15"ST 15"ST 15"
SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"
SAN
6"
SAN
6"
ST
42"
70'
R
.
O
.
W
.
(
P
U
B
L
I
C
S
T
R
E
E
T
-
C
O
N
C
R
E
T
E
S
U
R
F
A
C
E
)
60' R.O.W.(PUBLIC STREET-CONCRETE SURFACE)
30' BUILDING SETBACK LINE
30'
B
U
I
L
D
I
N
G
S
E
T
B
A
C
K
L
I
N
E
20
'
P
R
I
V
A
T
E
S
T
O
R
M
S
E
W
E
R
EA
S
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
5
1
)
40
'
L
A
N
D
S
C
A
P
E
B
U
F
F
E
R
EA
S
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
4
7
)
10'
P
U
B
L
I
C
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
(B
K
2
0
2
1
,
P
G
2
4
5
)
15
'
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
(B
K
2
0
2
1
,
P
G
2
4
6
)
10
'
P
.
U
.
E
.
(B
K
.
2
0
2
1
,
P
G
.
2
4
5
)
20' PRIVATE STORM SEWER
EASEMENT(BK 2021, PG 251)
F/O
LOT 12
AREA = 107,837 SF (2.47 ACRES)
LOT 13
OWNER:TERRA INVESTMENTS LLC.
ZONED:M-1
LOT 17
OWNER:SCOTT L. TEMPLE PROPERTY MANAGEMENT TRUST
ZONED:M-1
EX
.
1
0
'
C
O
N
C
R
E
T
E
S
I
D
E
W
A
L
K
G
4"
G4"
G4"
G4"
G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"
W8"
W8"
W8"
W8"
W8"W8"W8"W8"W8"W8"W8"W8"
W6"
W6"
LOT 18
OWNER:WAUKEE LAND INVESTMENT, LLC.
ZONED:M-1
LOT 11
OWNER:DILEEP KUMAR PAYAWALA ET. ALL
ZONED:C-1
LOT 10
OWNER:WAUKEE LAND INVESTEMENNTS LLC.
ZONED:C-1
LOT 9
OWNER:WAUKEE LAND INVESTEMENNTS LLC.
ZONED:C-1
(148.65' S89°53'57"W)
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W8"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G4"
SA
N
8"
SA
N
8"
W
6"
20'
P
R
I
V
A
T
E
S
T
O
R
M
S
E
W
E
R
EAS
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
5
1
)
(R=25' Δ=84°16'12"
L=38.77' CH=33.54'
S62°10'59"W)
(R=363' Δ=14°25'
0
8
"
L=91.35' CH=91.1
1
'
N82°53'29"W)
(R=340' Δ=01°22'05"
L=8.12' CH=8.12'
S43°25'46"W)
(R=
6
3
5
'
Δ
=
2
4
°
0
3
'
5
5
"
L
=
2
6
6
.
7
1
'
CH
=
2
6
4
.
7
6
'
S
3
2
°
0
4
'
5
1
"
W
)
(480.60' S89°53'57"W)
(3
0
1
.
2
1
'
S
0
0
°
0
6
'
0
3
"
E
)
D
D
30' BUILDING SETBACK LINE
U/E
U/E
ST
O
R
M
W
A
T
E
R
E
A
S
E
M
E
N
T
(BO
O
K
2
0
2
1
P
A
G
E
2
5
0
)
WV
Xref ..\Plans By Others\Architect\Builting layout (3-13-2023).dwg
LA
Y
O
U
T
P
L
A
N
C2.1
REFERENCE NUMBER:
35
0
1
1
0
4
t
h
S
t
r
e
e
t
De
s
M
o
i
n
e
s
,
I
o
w
a
5
0
3
2
2
-
3
8
2
5
Ph
o
n
e
:
(
5
1
5
)
2
7
6
-
0
4
6
7
F
a
x
:
(
5
1
5
)
2
7
6
-
0
2
1
7
"P
l
a
n
n
i
n
g
Y
o
u
r
S
u
c
c
e
s
s
f
u
l
D
e
v
e
l
o
p
m
e
n
t
"
Bi
s
h
o
p
E
n
g
i
n
e
e
r
i
n
g
Ci
v
i
l
E
n
g
i
n
e
e
r
i
n
g
&
L
a
n
d
S
u
r
v
e
y
i
n
g
E
s
t
a
b
l
i
s
h
e
d
1
9
5
9
DRAWN BY:
CHECKED BY:
REVISION DATE:
PROJECT NUMBER:
SHEET NUMBER:
MT
G
S
P
O
R
T
S
C
O
M
P
L
E
X
WA
U
K
E
E
,
I
O
W
A
DRL
DB
03/30/2023 1ST CITY SET
09/18/2023 2ND CITY SET
10/11/2023 3RD CITY SET
230051
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
L:
\
L
A
N
D
P
R
O
J
E
C
T
S
2
0
2
3
\
2
3
0
0
5
1
-
M
T
G
S
P
O
R
T
S
C
O
M
P
L
E
X
\
D
W
G
\
C
2
L
A
Y
O
U
T
.
D
W
G
10
/
2
6
/
2
0
2
3
2
:
1
1
:
0
1
P
M
GRAPHIC SCALE
020 10 20 40
PROPOSED SPORTS COMPLEX
AREA = 23,200 SF
FF=1035.00'
1033
EX 1030.10±
EX 1030.20±
EX 1030.74±
EX 1030.64±
10
3
3
10
3
3
1033
1
0
3
3
D
D
D
D
1
0
3
3
HI
G
H
P
O
I
N
T
W 6"
W 6"
W 6"
W 6"
W 6"
W 6"
SA
N
SA
N
SA
N
H Y D
CO
103
3
103
2
1032
3.5%
16.4
%
7.2%
HP
HP
1.5%
1.
5
%
1.
5
%
0.6%
0.6%
1.2%
1.2%
1.7%
1.
5
%
0.7%
0.9%
1.
2
%
1.
5
%
1.5%
1.0%
1.
5
%
4.
2
%
1.0
%
1.
2
%
1.
3
%
1
.
0
%
1.
1
%
1.
2
%
3.
1
%
0.6%0.6%
1.
2
%
2
.
0
%
9.
2
%
10
.
3
%
7.
3
%
10.3%
14.4%
17.6%
6.
5
%
3.
6
%
3.3
%
3
.
0
%
4.5
%
17
.
2
%
9
.
9
%
25
.
1
%
8.8%
2
5
.
1
%
25
.
0
%
2
5
.
1
%
25
.
0
%
25
.
1
%
24
.
9
%
25.
0
%
25.0
%
24
.
9
%
25
.
0
%
9.2%
2.4%
3.2%
1.8%
1
.
6
%
2.
6
%
3.
6
%
2
.
9
%
2.5
%
3.
3
%
100-YR PONDING
ELEVATION = 1031.61
100-YR PONDING
ELEVATION = 1032.53
100-YR PONDING
ELEVATION = 1031.62
100-YR PONDING
ELEVATION = 1032.43
100-YR PONDING
ELEVATION = 1033.26 1034.90 RIDGE
1034.90 RIDGE
CO
CO
1034
1
0
3
2
1033
103
1
103
0
10
3
1
1
0
3
3
1034
1032
1034
1032
1034
1032 1033
1034
10331034
10
3
4
1
0
3
3
1
0
3
4
1034
1033
103
3
1033
1032
1033
1032
1030
10
3
3
1026
10
2
6
1
0
3
1
1.
5
%
1.
0
%
1.
5
%
1.
0
%
1
.
0
%
1.
1
%
0.
0
%
1.
1
%
0.4%
0.0%
D
CO
DETENTION BASIN
TOP=1032.00
BOTTOM=1025.90
100-YEAR ELEV=1030.46
VOLUME=21,010 CF
FOOTPRINT=3,103 SF
PRETREATMENT AREA
TOP=1026.65
BOTTOM=1025.90 CF
FOOTPRINT=322 SF
0.0%
1.
5
%
1.5%
1.
6
%
1.
5
%
1.
5
%
0.0%6.3%
6.3%
1.
5
%
1.
5
%
1.
5
%
1.
5
%
1.
5
%
1.
5
%
1.
5
%
5.6%
5.6%
1.
5
%
1.
5
%
1.
5
%
1.
5
%
0.0%
1.
6
%
1.
6
%
1.
5
%
EX 1029.73± G
1034.91T/C
1034.41G
1034.91T/C
1034.41G
1034.77
1034.78T/C
1034.28G
1034.78T/C
1034.28G
1035.00
1035.00
1032.30T/C
1031.80G
1034.49T/C
1033.99G
1034.37T/C
1033.87G
1034.17T/C
1033.67G
1033.42T/C
1032.92G
1034.93
1034.44T/C
1033.94G
1034.44T/C
1033.94G
1034.77T/C
1034.52G
1035.00
1034.17T/C
1033.67G
1034.13T/C
1033.63G
1033.90T/C
1033.40G
1034.10T/C
1033.60G
EX 1030.14±
1029.78T/C
1029.28G
1030.69T/C
1030.19G
1031.91
1033.06T/C
1032.56G
1030.89T/C
1030.39G
1033.52T/C
1033.02G
1032.84T/C
1032.34G OVERFLOW
1033.86T/C
1033.36G
1031.01T/C
1030.51G
EX 1030.59±
EX 1030.71±
OVERSPILL
HP 1034.00
1034.63T/C
1034.13G
1035.00
1034.17T/C
1033.67G
1033.80T/C
1033.30G
1033.20T/C
1032.70G
1033.71T/C
1033.21G
1033.72T/C
1033.22G
1033.56T/C
1033.06G
1033.44T/C
1032.94G
1033.31T/C
1032.81G
1033.80T/C
1033.30G
1033.60T/C
1033.10G
1032.55T/C
1032.05G
1032.40T/C
1031.90G
1031.94T/C
1031.44G
1033.14T/C
1032.64G
1033.50T/C
1033.00G
1033.45T/C
1032.95G
1033.18T/C
1032.68G
1032.69T/C
1032.19G 1031.70T/C
1031.20G
EX 1030.17± T/C
EX 1029.65± GEX 1030.57± T/C
EX 1030.09± G
EX 1029.73± T/C
EX 1029.21± G
EX 1030.27± T/C
EX 1029.85± G
1032.14T/C
1031.64G
1030.24T/C
1029.74G
1030.67T/C
1030.17G
OVERFLOW
1031.80T/C
1031.30G
1031.06T/C
1030.56G
1031.00T/C
1030.50G
1030.45
1030.51
1030.00
1030.15
1031.37T/C
1030.87G
1031.32T/C
1030.82G
EX 1031.48±
EX 1031.41±
1030.85
1030.92
1034.28
1034.28
1035.03T/C
1034.53G
1034.40
1034.90
1034.90 1034.90
1030.93
1030.87
1030.49
1030.42
1031.12T/C
1030.62G
1033.36T/C
1032.86G
1034.77T/C
1034.40G
1035.00
1033.13 1034.51
1034.63T/C
1034.13G
1033.36T/C
1032.86G
1032.87T/C
1032.37G
1031.49T/C
1030.99G
1032.98T/C
1032.48G 1031.60T/C
1031.10G
1032.81T/C
1032.31G
1034.02T/C
1033.52G
EX 1029.82± G
EX 1029.46± G
EX 1030.01±
EX 1029.88±EX 1029.79±
1030.29
1031.88T/C
1031.38G
1030.40T/C
1029.90G
1032.37T/C
1031.87G
1031.94T/C
1031.44G
1031.79T/C
1031.29G
1031.44T/C
1030.94G
1031.30
1031.54
1031.23
1031.46
1033.50T/C
1033.00G
1032.77T/C
1032.27G
1032.37T/C
1031.87G
1031.84T/C
1031.34G
1031.47T/C
1030.97G
1035.02T/C
1034.52G
1034.75
1034.89
1035.00
1034.90
EX 1030.24±
1030.34
1030.31
1032.10
1032.02
1034.84
1035.00
1034.40
1031.29T/C
1030.79G
1033.87
1034.62
1034.89
1033.77
EX 1031.61±
EX 1032.38±
EX 1032.63±
EX 1030.02±
EX 1031.50±
EX 1033.12±
EX 1031.97±
EX 1033.98±
EX 1031.19±
EX 1030.81±
1032.38T/C
1031.88G
OVERFLOW
1032.12T/C
1031.62G
EX 1030.79±
EX 1030.99±
EX 1031.37±
EX 1030.17±
1031.34
1030.64
EX 1029.90±
EX 1029.81±
EX 1032.01±
1030.73
1031.82
EX 1031.15±
EX 1029.83±
1030.27
EX 1032.08±
EX 1031.95±
1031.60
1032.25
1032.80T/C
1032.30G
1031.27T/C
1030.77G
1033.73
1034.53
OVERSPILL
1034.50
1033.89T/C
1033.39G
1033.65T/C
1033.15G
1033.51T/C
1033.01G
1033.62T/C
1033.12G
1033.80T/C
1033.30G
1034.78
1034.84
1034.91
1034.50T/C
1034.00G
1034.00
1034.92
1035.00
1034.90
1034.90
1034.78T/C
1034.28G
1034.78T/C
1034.28G
1034.90
1034.90
1035.00
1034.781034.78
1034.52T/C
1034.02G
1034.52T/C
1034.02G
1034.61T/C
1034.11G
1034.64T/C
1034.14G1034.02
1034.021034.021034.02
1034.02
1034.02
1034.03
1034.71
1031.40
1.
5
%
1.
5
%
W6"
W6"
G4"G4"G4"G4"
G
4"
G
4"
G
4"
G
4"
G
4"
G 4"
G 4"
G 4"
G 4"
1034.50
1034.50
3.9
%
4.
4
%
4.1
%
2.
7
%
1034
1030
1026
1026
1
7
.
2
%
17
.
7
%
6.7
%
6.
9
%
4
.
7
%
1.9%
3.6%
7.2%
3.4
%
3.2
%
3.1%
18
.
3
%
25
.
0
%
12
.
4
%
25
.
0
%
2
5
.
0
%
25
.
0
%
25.0%
27
.
2
%
2
5
.
0
%
2
5
.
0
%
25.1
%
WV WV
1025.90
1025.90
1025.90
1025.90
1025.90
1025.90
1025.90
1025.90
1025.90
1026.65
1026.65
1026.65
1026.65
1025.90
1.7%
2.
0
%
2.9
%
POND OVERFLOW
1030.50
1030.50
1025.90
1032.00T/W
1032.00T/W
1032.00T/W
1032.00T/W
1032.00T/W 1032.00T/W
1032.00T/W
1026.65B/W
1026.65B/W
1026.65B/W
1026.65B/W
1026.65B/W
1026.65B/W
3.
0
%
2.8
%
2.6%
2.7%
1.4%
2.4
%
2.5
%
13.
0
%
2.9%
16
.
0
%
1.
5
%
1.
5
%
9.
2
%
3.5%
1
.
6
%
3.0
%
1033.97
1033.97
1034.53
1034.53
0
.
7
%
0.6
%
0
.
5
%
0
.
8
%
1
.
2
%
0
.
8
%
1
.
0
%
1
.
1
%
1
.
2
%
1025.80
1025.90
1025.80
1025.80
1025.90
1025.80
1034.77T/C
1034.52G
100-YR PONDING
ELEVATION = 1030.46
1034.90 1034.90
1035.001035.00
1034.92
1035.00
1035.00
1035.00
1035.00 1035.00 1035.00
1035.00
1035.00
103
2
1034
1032
1032
1032.25
1032.25
1032.25
10
3
2
1
0
3
2
10
3
2
1030.331030.37
1030.31 1030.26
1031.00T/W
1031.00T/W1032
1031 1031
POND
OVERFLOW
ROUTE
1032.25
1032.25 1032.25
1032.25
2.0%2.0%4.2%2.0%
2.
0
%
2.
0
%
0.4%
0.4%0.4%0.4%
1034
1033.33
1033.71
1033.93
GM
NW
1
7
T
H
S
T
R
E
E
T
NW VICKSBURG COURT
CP #9000
D
CO
CO
D
S
S
CO
D
CP #9001
D
U/E
U/E
U/E
U/E U/E U/E U/E U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
ST
18"
S
T
1
5
"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
S
T
6"
ST 6"
ST 6"
ST
6"
ST
6"
ST
6"
ST
6"
ST
6"
ST 6"
ST 6"ST 6"ST 6"ST 6"ST 6"ST 6"
ST
42
"
ST
42
"
ST
42
"
ST
18
"
ST 18"
ST 15"ST 15"ST 15"ST 15"ST 15"
SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"
SAN
6"
SAN
6"
ST
42"
70'
R
.
O
.
W
.
(
P
U
B
L
I
C
S
T
R
E
E
T
-
C
O
N
C
R
E
T
E
S
U
R
F
A
C
E
)
60' R.O.W.(PUBLIC STREET-CONCRETE SURFACE)
30' BUILDING SETBACK LINE
30'
B
U
I
L
D
I
N
G
S
E
T
B
A
C
K
L
I
N
E
20
'
P
R
I
V
A
T
E
S
T
O
R
M
S
E
W
E
R
EA
S
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
5
1
)
40
'
L
A
N
D
S
C
A
P
E
B
U
F
F
E
R
EA
S
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
4
7
)
10'
P
U
B
L
I
C
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
(B
K
2
0
2
1
,
P
G
2
4
5
)
15
'
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
(B
K
2
0
2
1
,
P
G
2
4
6
)
10
'
P
.
U
.
E
.
(B
K
.
2
0
2
1
,
P
G
.
2
4
5
)
20' PRIVATE STORM SEWER
EASEMENT(BK 2021, PG 251)
F/O
10
3
4
1034
1030
1030
1033
1034
1032
1
0
3
2
1026
1030
1030
10
3
2
10
3
0
1028
1026
1026
1035
103
5
103
3
1030
1030
1031
1030
1029
LOT 12
LOT 13
LOT 17
EX
.
1
0
'
C
O
N
C
R
E
T
E
S
I
D
E
W
A
L
K
G4"
G4"
G4"
G4"
G 4"G 4"G 4"G 4"G 4"G 4"G 4"
W8"
W8"
W8"
W8"
W8"W8"W8"W8"W8"W8"W8"
W6"
W6"
LOT 18
LOT 11 LOT 10
LOT 9
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W8"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G4"
SA
N
8"
SA
N
8"
W
6"
20'
P
R
I
V
A
T
E
S
T
O
R
M
S
E
W
E
R
EAS
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
5
1
)
D
D
30' BUILDING SETBACK LINE
1032
1030
1028
1032
1028
1030
1032
1033
1030
1033
U/E
U/E
ST
O
R
M
W
A
T
E
R
E
A
S
E
M
E
N
T
(BO
O
K
2
0
2
1
P
A
G
E
2
5
0
)
1033
1029
1027
1026
1029
1031
1034
WV
1029
1028
1027
10
3
1
TOPSOIL NOTES:
1.STRIP AND STOCKPILE THE TOP 8" OF SOIL ON ALL DISTURBED AREAS.
2.RESPREAD TOPSOIL TO A MINIMUM DEPTH OF 8" ON ALL GREEN (NON PAVED)
AREAS. IMPORT TOPSOIL AS NECESSARY TO ACHIEVE A MINIMUM DEPTH OF 6".
3.TOPSOIL SHALL BE FREE OF ALL ROCK AND DEBRIS LARGER THAN 3/4" IN SIZE.
4.TOPSOIL IS DEFINED AS: FERTILE, FRIABLE LOAM, CAPABLE OF SUSTAINING
VIGOROUS PLANT GROWTH, FROM WELL DRAINED SITE FREE FROM FLOODING, NOT
IN FROZEN OR MUDDY CONDITIONS; REASONABLE FREE FROM SUBSOIL, CLAY
LUMPS, ROOTS, GRASS, WEEDS, STONES LARGER THAN 3/4 INCH IN DIAMETER, AND
FOREIGN MATTER; ACIDITY RANGE (PH) OF 5.5 TO 7.5; CONTAINING MINIMUM 4
PERCENT AND MAXIMUM 20 PERCENT ORGANIC MATTER.
5.CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL TOPSOIL
REQUIREMENTS OF NPDES GENERAL PERMIT NO. 2 ARE MET.
GR
A
D
I
N
G
P
L
A
N
C3.1
REFERENCE NUMBER:
35
0
1
1
0
4
t
h
S
t
r
e
e
t
De
s
M
o
i
n
e
s
,
I
o
w
a
5
0
3
2
2
-
3
8
2
5
Ph
o
n
e
:
(
5
1
5
)
2
7
6
-
0
4
6
7
F
a
x
:
(
5
1
5
)
2
7
6
-
0
2
1
7
"P
l
a
n
n
i
n
g
Y
o
u
r
S
u
c
c
e
s
s
f
u
l
D
e
v
e
l
o
p
m
e
n
t
"
Bi
s
h
o
p
E
n
g
i
n
e
e
r
i
n
g
Ci
v
i
l
E
n
g
i
n
e
e
r
i
n
g
&
L
a
n
d
S
u
r
v
e
y
i
n
g
E
s
t
a
b
l
i
s
h
e
d
1
9
5
9
DRAWN BY:
CHECKED BY:
REVISION DATE:
PROJECT NUMBER:
SHEET NUMBER:
MT
G
S
P
O
R
T
S
C
O
M
P
L
E
X
WA
U
K
E
E
,
I
O
W
A
DRL
DB
03/30/2023 1ST CITY SET
09/18/2023 2ND CITY SET
10/11/2023 3RD CITY SET
230051
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
GRADING LEGEND:
EXISTING CONTOUR
PROPOSED CONTOUR
FINISHED GROUND ELEVATION
TOP OF CURB ELEVATION
GUTTER ELEVATION
TOP OF WALL ELEVATION
BOTTOM OF WALL ELEVATION
EDGE OF WALK ELEVATION
TOP OF STAIR ELEVATION
BOTTOM OF STAIR ELEVATION
NOTE: WALL ELEVATIONS SHOWN ON PLAN ARE FINISHED
GROUND GRADES AT THE TOP AND BOTTOM OF THE WALL.
150.50E/W
150.50B/W
150.50T/W
150.50G
150.50T/C
150.50
150
150
150.50T/S
150.50B/S
L:
\
L
A
N
D
P
R
O
J
E
C
T
S
2
0
2
3
\
2
3
0
0
5
1
-
M
T
G
S
P
O
R
T
S
C
O
M
P
L
E
X
\
D
W
G
\
C
3
G
R
A
D
I
N
G
.
D
W
G
10
/
2
6
/
2
0
2
3
2
:
1
1
:
1
2
P
M
GRAPHIC SCALE
020 10 20 40
PROPOSED SPORTS COMPLEX
AREA = 23,200 SF
FF=1035.00'
D
D
D
D
CONTRACTOR TO
COORDINATE
WITH UTILITY
PROVIDER, LOWER
IF NEEDED
CONTRACTOR TO COORDINATE
WITH UTILITY PROVIDER, LOWER
IF NEEDED
W 6"
W 6"
W 6"
W 6"
W 6"
W 6"
SA
N
SA
N
SA
N
96 LF 6" SDR 23.5 PIPE
SANITARY SERVICE PER SUDAS
@S=4.0%
H Y D
SANITARY SERVICE
INV(N)=1030.00
CO
SANITARY
CLEANOUT
RIM=1033.83
ADJUST RIM TO
GRADE - CONTRACTOR
TO VERIFY INVERT
ELEVATION PRIOR
TO CONSTRUCTION
**CRITICAL CROSSING**
BOTTOM OF STORM=1028.70±
TOP OF SAN=1026.28±
**CRITICAL CROSSING**
TOP OF STORM=1028.78±
BOTTOM OF STORM=1027.45±
ENSURE 18" CLEANANCE
BETWEEN STORM AND WATER
150
'
H
Y
D
R
A
N
T
RA
D
I
U
S
CO
CO
D
CO
A101.1
A4
A101.1
C4
W6"
W6"
G4"G4"G4"G4"
G
4"
G
4"
G
4"
G
4"
G
4"
G 4"
G 4"
G 4"
G 4"
WV WV 11 LF 6" SDR 23.5 PIPE
SANITARY SERVICE PER
SUDAS @S=2.0%
VERITCAL DROP W/ 2 45° BENDS
FROM 1029.78 TO 1025.69
(REF DETAIL 16/C6.2)
**CRITICAL CROSSING**
BOTTOM OF STORM=1027.02±
TOP OF WATER=1025.52±
**CRITICAL CROSSING**
BOTTOM OF STORM=1027.04±
TOP OF WATER=1025.54±
**CRITICAL CROSSING**
BOTTOM OF STORM=1027.44±
TOP OF WATER=1025.94±
RELOCATE U/E IF NECESSARY
CONTRACTOR TO COORDINATE U/E
WITH UTILITY PROVIDER
STRUCTURE #10
SW-505 INTAKE
T/C=1031.27
FL(S)=1027.67
PIPE #10
113LF 15" RCP
@ S=0.50%
STRUCTURE #03
48" SW-401 MANHOLE
RIM=1034.62
FL(E)=1027.68
FL(SW)=1027.78
STRUCTURE #04
SW-501 INTAKE
T/C=1032.80
FL(NE)=1028.24
FL(SW)=1028.34
PIPE #4
91LF 15" RCP
@ S=0.50%
PIPE #5
72LF 15" RCP
@ S=0.50%
STRUCTURE #05
SW-501 INTAKE
T/C=1031.84
FL(NE)=1028.70
PIPE #2
140LF 18" RCP @ S=0.50%
STRUCTURE #01
48" SW-401 MANHOLE
RIM=1031.40
FL(W)=1026.30
FL(S)=1026.30
FL(N)=1026.20
PIPE #20
130LF 15" N-12
@ S=0.50%
STRUCTURE #20
30" NYLOPLAST BASIN
W/ SOLID LID
RIM=1034.00
FL(W)=1027.05
FL(N)=1026.95
PIPE #21
94LF 15" N-12
@ S=0.50%
STRUCTURE #21
15" NYLOPLAST BASIN
RIM=1032.13
FL(W)=1027.62
FL(E)=1027.52
PIPE #23
76LF 15" N-12
@ S=0.50%
STRUCTURE #23
18" NYLOPLAST BASIN
W/ SOLID LID
RIM=1034.50
FL(N)=1030.00
FL(E)=1028.48
PIPE #1
61LF 24" RCP
@ S=0.50%
130 LF 6" C900
WATER
INSTALL 6"
HYDRANT
ASSEMBLY
6" DOWNSPOUT
CONNECTION
REF MEP PLANS
FOR CONTINUATION
FDC
OUTLET STRUCTURE
SW-511
FL(N)=1024.40± EX
FL(SUB)=1024.40
3" OPENING IN SIDE AT 1026.65
8" OPENING IN SIDE AT 1028.25
RIM=1032.00
STRUCTURE #22
15" NYLOPLAST BASIN
RIM=1032.97
FL(W)=1028.10
FL(E)=1028.00
PIPE #22
76LF 15" N-12 @ S=0.50%
60 LF 6" SUBDRAIN
@0.25%
CLEANOUT
RIM=1025.80
FL=1024.55
81 LF 6" SUBDRAIN
@0.25%
CLEANOUT
RIM=1025.80
FL=1024.55
STRUCTURE #02
48" SW-401 MANHOLE
RIM=1034.71
FL(N)=1027.10
FL(E)=1027.00
FL(W)=1027.10
PIPE #3
116LF 15" RCP
@ S=0.50%
STRUCTURE #00
24" FES
FL(S)=1025.90
CLEANOUT
RIM=1025.90
FL=1024.60
60 LF 6" SUBDRAIN
@0.25%
NEW GAS SERVICE
COORDINATE WITH
CITY OF WAUKEE
FOR EXACT
LOCATION
GAS METER LOCATION
70 LF 6" C900
WATER
6" TEE
45° BEND
65 LF 6" C900
WATER
17 LF 6" FIRE SERVICE
(REF MEP FOR
CONTINUATION INTO
BUILDING)
20 LF 6" DOMESTIC SERVICE
(REF MEP FOR
CONTINUATION INTO
BUILDING)
45° BEND
6" DOWNSPOUT
CONNECTION
REF MEP PLANS FOR
CONNECTION
6" DOWNSPOUT
CONNECTION
REF MEP PLANS FOR
CONNECTION
6" DOWNSPOUT
CONNECTION
REF MEP PLANS
FOR CONTINUATION
19 LF 6"
HDPE
18 LF 6"
HDPE
16 LF 6"
HDPE
14 LF 6"
HDPE
6" DOWNSPOUT
CONNECTION
REF MEP PLANS
FOR CONTINUATION
6" DOWNSPOUT
CONNECTION
REF MEP PLANS
FOR CONTINUATION
6" DOWNSPOUT
CONNECTION
REF MEP PLANS
FOR CONTINUATION
6" DOWNSPOUT
CONNECTION
REF MEP PLANS
FOR CONTINUATION
15 LF 6"
HDPE
13 LF 6"
HDPE 13 LF 6"
HDPE
13 LF 6"
HDPE
6" VALVES
18 LF 6" SDR 23.5
PIPE SANITARY
SERVICE PER SUDAS
@S=4.0%
GM
CONNECT TO EX
6" WATER STUB
(FIELD VERIFY)
NW
1
7
T
H
S
T
R
E
E
T
NW VICKSBURG COURT
CP #9000
D
EX STORM MH
RIM=1029.75
EX INTAKE
T/C=1029.10
RIM=1029.27
CO
CO
EX INTAKE
T/C=1029.27
RIM=1028.78
EX INTAKE
T/C=1029.22
RIM=1028.77
D
EX STORM MH
RIM=1029.79
FL(S 42"RCP)=1024.54
FL(N 42"RCP)=1024.47
FL(SE 18"RCP)=1024.41
FL(W 18"RCP)=1024.39
S
EX SAN MH
RIM=1032.32
INV(E 8"PVC)=1021.50 S
EX SAN MH
RIM=1030.12
INV(W 8"PVC)=1019.57
INV(E 8"PVC)=1019.52
CO
EX SAN CO
RIM=1030.36
INV=1021.13
PER OLD PLAN
D
EX STORM MH
RIM=1030.93
FL(E 15"RCP)=1024.80
FL(NW 18"RCP)=1024.77
FL(S 15"RCP)=1024.73
EX 15"FES
EX INTAKE
T/C=1029.79
RIM=1029.27
CP #9001
D
EX STORM MH
RIM=1032.63
FL(N 42"RCP)=1023.38
FL(S 42"RCP)=1023.33
EX INTAKE
T/C=1029.27
RIM=1028.80
EX INTAKE
T/C=1029.26
RIM=1028.77
U/E
U/E
U/E
U/E U/E U/E U/E U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
ST
18"
S
T
1
5
"
S
T
1
5
"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
S
T
6"
ST 6"
ST 6"
ST
6"
ST
6"
ST
6"
ST
6"
ST
6"
ST 6"
ST 6"ST 6"ST 6"ST 6"ST 6"ST 6"
APPROX. LOCATION SUBDRAIN
PER CITY OF WAUKEE GIS
EX SUBDRAIN PER
CITY OF WAUKEE GIS
ST
42
"
ST
42
"
ST
42
"
ST
42
"
ST
18
"
ST 18"
ST 15"ST 15"ST 15"ST 15"ST 15"
SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"
SAN
6"
SAN
6"
70'
R
.
O
.
W
.
(
P
U
B
L
I
C
S
T
R
E
E
T
-
C
O
N
C
R
E
T
E
S
U
R
F
A
C
E
)
60' R.O.W.(PUBLIC STREET-CONCRETE SURFACE)
30' BUILDING SETBACK LINE
30'
B
U
I
L
D
I
N
G
S
E
T
B
A
C
K
L
I
N
E
20
'
P
R
I
V
A
T
E
S
T
O
R
M
S
E
W
E
R
EA
S
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
5
1
)
40
'
L
A
N
D
S
C
A
P
E
B
U
F
F
E
R
EA
S
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
4
7
)
10'
P
U
B
L
I
C
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
(B
K
2
0
2
1
,
P
G
2
4
5
)
15
'
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
(B
K
2
0
2
1
,
P
G
2
4
6
)
10
'
P
.
U
.
E
.
(B
K
.
2
0
2
1
,
P
G
.
2
4
5
)
F/O
LOT 12
LOT 13
LOT 17
EX
.
1
0
'
C
O
N
C
R
E
T
E
S
I
D
E
W
A
L
K
G4"
G4"
G4"
G4"
G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"
W8"
W8"
W8"
W8"
W8"W8"W8"W8"W8"W8"W8"
W6"
W6"
APPROX LOCATION PER CITY OF WAUKEE GIS
APPROX LOCATION PER
CITY OF WAUKEE GIS
LOT 18
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W8"
W8"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G4"
G4"
SA
N
8"
SA
N
8"
W
6"
20'
P
R
I
V
A
T
E
S
T
O
R
M
S
E
W
E
R
EAS
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
5
1
)
D
EX STORM MH
RIM=1031.16
FL(W 15"RCP)=1025.56
FL(S 15"RCP)=1025.54
D
EX STORM MH
RIM=1030.84
FL(NE 42"RCP)=1024.24
FL(SW 42"RCP)=1024.22
30' BUILDING SETBACK LINE
U/E
U/E
ST
O
R
M
W
A
T
E
R
E
A
S
E
M
E
N
T
(BO
O
K
2
0
2
1
P
A
G
E
2
5
0
)
WV
EX 8" VALVE PER
JAMES POINTE CDS
EX 6" SAN STUB
15"
UTILITY NOTES:
1.ALL PROPOSED UTILTIES SHALL BE PRIVATE, UNLESS NOTED OTHERWISE.
2.ALL WATER LINES SHALL HAVE A MINIMUM OF 5.5' OF COVER UNLESS NOTED OTHERWISE.
3.FIRE HYDRANT ASSEMBLY SHALL INCLUDE THE TEE, BRANCH, VALVE AND HYDRANT.
4.PIPE LENGTHS CALLED OUT ON PLANS INCLUDE FLARED END SECTION, WHERE APPLICABLE.
5.STORM SEWER CALLED OUT AS RCP MUST BE CLASS III RCP.
6.STORM SEWER CALLED OUT AS N-12 MAY BE EITHER N-12 OR CLASS III RCP.
7.FOR RCP PIPE, ASSOCIATED F.E.S. MUST BE RCP. FOR N-12 PIPE, ASSOCIATED F.E.S. SHALL BE CMP.
8.ALL NYLOPLAST BASINS SHALL HAVE CASTINGS SECURELY FASTENED TO THE BASIN BODY, AND
ALL GRATES/LIDS SHALL BE BOLTED DOWN TO THE CASTINGS.
9.TRANSFORMER PAD IS SHOWN FOR REFERENCE ONLY AND MAY NOT BE DRAWN TO ACTUAL SIZE.
PAD SHALL CONFORM TO ALL UTILITY COMPANY DESIGN STANDARDS AND SPECIFICATIONS.
10.GREASE INTERCEPTOR AND ANY VENT LINES ARE SHOWN FOR REFERENCE ONLY AND MAY NOT BE
DRAWN TO ACTUAL SIZE. REFER TO PLUMBING PLANS FOR DETAILED DRAWINGS AND
SPECIFICATIONS. PLUMBING PLANS SHALL TIE INTO SANITARY SERVICE AT LOCATION AND
ELEVATION SHOWN ON PLANS.
UT
I
L
I
T
Y
P
L
A
N
C4.1
REFERENCE NUMBER:
35
0
1
1
0
4
t
h
S
t
r
e
e
t
De
s
M
o
i
n
e
s
,
I
o
w
a
5
0
3
2
2
-
3
8
2
5
Ph
o
n
e
:
(
5
1
5
)
2
7
6
-
0
4
6
7
F
a
x
:
(
5
1
5
)
2
7
6
-
0
2
1
7
"P
l
a
n
n
i
n
g
Y
o
u
r
S
u
c
c
e
s
s
f
u
l
D
e
v
e
l
o
p
m
e
n
t
"
Bi
s
h
o
p
E
n
g
i
n
e
e
r
i
n
g
Ci
v
i
l
E
n
g
i
n
e
e
r
i
n
g
&
L
a
n
d
S
u
r
v
e
y
i
n
g
E
s
t
a
b
l
i
s
h
e
d
1
9
5
9
DRAWN BY:
CHECKED BY:
REVISION DATE:
PROJECT NUMBER:
SHEET NUMBER:
MT
G
S
P
O
R
T
S
C
O
M
P
L
E
X
WA
U
K
E
E
,
I
O
W
A
DRL
DB
03/30/2023 1ST CITY SET
09/18/2023 2ND CITY SET
10/11/2023 3RD CITY SET
230051
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
L:
\
L
A
N
D
P
R
O
J
E
C
T
S
2
0
2
3
\
2
3
0
0
5
1
-
M
T
G
S
P
O
R
T
S
C
O
M
P
L
E
X
\
D
W
G
\
C
4
U
T
I
L
I
T
Y
.
D
W
G
10
/
2
6
/
2
0
2
3
2
:
1
1
:
2
4
P
M
GRAPHIC SCALE
020 10 20 40
NW
1
7
T
H
S
T
R
E
E
T
NW VICKSBURG COURT
D
CO
CO
S
CO
D
D
U/E
U/E
U/E
U/E U/E U/E U/E U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
S
T
6"
ST 6"
ST
6"
ST
6"
ST
6"
ST
6"
ST
6"
ST
6"
ST 6"
ST 6"ST 6"ST 6"ST 6"ST 6"ST 6"
ST
42
"
ST
42
"
ST
18
"
ST 15"ST 15"ST 15"ST 15"ST 15"
SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"
SAN
6"
SAN
6"
70'
R
.
O
.
W
.
(
P
U
B
L
I
C
S
T
R
E
E
T
-
C
O
N
C
R
E
T
E
S
U
R
F
A
C
E
)
60' R.O.W.(PUBLIC STREET-CONCRETE SURFACE)
30' BUILDING SETBACK LINE
30'
B
U
I
L
D
I
N
G
S
E
T
B
A
C
K
L
I
N
E
20
'
P
R
I
V
A
T
E
S
T
O
R
M
S
E
W
E
R
EA
S
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
5
1
)
40
'
L
A
N
D
S
C
A
P
E
B
U
F
F
E
R
EA
S
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
4
7
)
10'
P
U
B
L
I
C
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
(BK
2
0
2
1
,
P
G
2
4
5
)
15
'
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
(B
K
2
0
2
1
,
P
G
2
4
6
)
10
'
P
.
U
.
E
.
(B
K
.
2
0
2
1
,
P
G
.
2
4
5
)
20' PRIVATE STORM SEWER
EASEMENT(BK 2021, PG 251)
F/O
EX
.
1
0
'
C
O
N
C
R
E
T
E
S
I
D
E
W
A
L
K
4"
G4"
G4"
G4"
G 4"G 4"G 4"G 4"G 4"G 4"G 4"
W6"
W6"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
SA
N
8"
20'
P
R
I
V
A
T
E
S
T
O
R
M
S
E
W
E
R
EAS
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
5
1
)
D
D
30' BUILDING SETBACK LINE
U/E
ST
O
R
M
W
A
T
E
R
E
A
S
E
M
E
N
T
(BO
O
K
2
0
2
1
P
A
G
E
2
5
0
)
PROPOSED SPORTS COMPLEX
AREA = 23,200 SF
FF=1035.00'
D
D
D
D
SA
N
SA
N
SA
N
H Y D
CO
CO
CO
D
CO
G4"G4"G4"G4"
G
4"
G
4"
G
4"
G
4"
G
4"
G 4"
G 4"
G 4"
G 4"
WV WV
GM
GL
15
KF
24
STEEL EDGER
MULCH
MULCH
ST
2
WP
3
WP
3
ER
2
WO
1
KC
2
SH
2
SH
2
LP
2
GL
4GL
23
AH
1
AH
2
GB
1
DY
30
DY
47
GL
27
GB
1
HB
21
KF
26
KF
3
HB
22
OB
1
STEEL EDGER
MULCH
MULCH
MULCH
MULCH
MULCH
HB
3
MULCH
MULCH
GB
1
PF
3
BH
4
BP
3
LP
1
LP
1
TT
1
SS
1
KC
1
PF
2
ST
2
BP
1
KC
1
GB
1
BP
3
DK
12
OB
1
DY
4
SS
3
ER
1
NS
3
WP
3
SW
2
LP
1 RO
2
RO
1
AH
1
NS
3
AH
1
BH
3
WP
2
WO
2
SW
1
ST
3
SB
3
SB
5
DK
9
WO
1
NS
3
BP
2
AC
8
AH
1 PD
14
PD
23
PD
3
AC
3
STEEL EDGER
BX
6
BJ
6
LA
N
D
S
C
A
P
E
P
L
A
N
C5.1
GRAPHIC SCALE
020 10 20 40
L:
\
L
A
N
D
P
R
O
J
E
C
T
S
2
0
2
3
\
2
3
0
0
5
1
-
M
T
G
S
P
O
R
T
S
C
O
M
P
L
E
X
\
D
W
G
\
C
5
L
A
N
D
S
C
A
P
E
.
D
W
G
10
/
2
6
/
2
0
2
3
2
:
1
1
:
3
7
P
M
IRRIGATION NOTES:
·FOR BIDDING PURPOSES, THIS PROJECT DOES NOT INCLUDE A SITE IRRIGATION SYTEM.
·CONTRACTOR SHALL SUBMIT TO THE OWNER OR OWNER'S REPRESENTATIVE A SEPARATE
PROPOSAL FOR A SITE IRRIGATION SYSTEM. PROPOSAL SHALL BE DESIGN/BUILD FOR A COMPLETE
OPERATIONAL IRRIGATION SYSTEM APPROPRIATE FOR THE SITE. IRRIGATION CONTRACTOR SHALL
BE RESPONSIBLE FOR ALL DESIGN, COORDINATION, TESTING, PERMITS, INSPECTIONS, ETC.
LANDSCAPE NOTES:
1.ALL SEEDING & LANDSCAPE PLANTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE URBAN STANDARD
SPECIFICATIONS, UNLESS SPECIFIED OTHERWISE.
2.SOD ALL DISTURBED AREAS included in R.O.W. WITHIN THE CONTRACT LIMITS, UNLESS NOTED OTHERWISE.
SEED LIMITS SHOWN ON PLAN ARE FOR REFERENCE ONLY. FINAL LIMITS MAY CHANGE BASED ON
CONSTRUCTION ACTIVITIES.
3.STAKE SOD ON ALL SLOPES 3 : 1 OR GREATER.
4.PLANT QUANTITIES ARE FOR CONTRACTORS CONVENIENCE, THE DRAWING SHALL PREVAIL IF A CONFLICT
OCCURS.
5.ALL PLANT MATERIAL SHALL CONFORM TO THE LATEST EDITION OF THE AMERICAN STANDARD FOR
NURSERY STOCK (ANSI Z60.1).
6.CONTRACTOR SHALL WARRANTY ALL PLANT MATERIAL FOR A PERIOD OF ONE YEAR FROM THE DATE OF
INITIAL ACCEPTANCE.
7.FOR WARRANTY PURPOSES, THE DATE OF INITIAL ACCEPTANCE SHALL BE SUBMITTED IN WRITING TO THE
OWNER AND/OR OWNER'S REPRESENTATIVE AFTER ALL PLANT MATERIALS HAVE BEEN INSTALLED AND
REVIEWED BY OWNER OR OWNER'S REPRESENTATIVE. PLANT MATERIALS WILL ONLY BE ACCEPTED IF
THEY ARE IN AN ALIVE AND THRIVING CONDITION.
8.CONDITIONAL ACCEPTANCE OF PLANT MATERIAL MAY BE GIVEN FOR PLANTS INSTALLED IN A DORMANT
CONDITION WITH INITIAL ACCEPTANCE OCCURRING THE FOLLOWING SPRING ONCE THEY ARE SHOWN TO
BE ALIVE AND THRIVING.
9.IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE IDENTIFICATION TAGS AND CORDS ON ALL PLANT
MATERIAL PRIOR TO THE COMPLETION OF THE CONTRACT. IDENTIFICATION TAGS (INCLUDING SIZING
INFORMATION) MUST BE LEFT ON UNTIL AFTER ACCEPTANCE BY OWNER OR OWNER'S REPRESENTATIVE.
10.CONTRACTOR SHALL PLACE SHREDDED HARDWOOD MULCH AROUND ALL TREES, SHRUBS AND GROUND
COVER BEDS TO A DEPTH OF 4 INCHES, UNLESS NOTED.
11.STAKING AND GUYING OF TREES SHALL BE AT THE DISCRETION OF THE CONTRACTOR BASED ON CURRENT
ACCEPTED NURSERY STANDARDS. GENERALLY, TREES IN LARGE OPEN AREAS SUBJECT O SIGNIFICANT
WIND SHALL BE STAKED. STAKE AND WRAP TREES IMMEDIATELY AFTER PLANTING. CONTRACTOR SHALL
ADJUST AND MAINTAIN GUYING TENSION THROUGHOUT THE PLANT ESTABLISHMENT PERIOD. REMOVE ALL
STAKES AND GUY WIRES NO MORE THAN ONE YEAR AFTER INSTALLATION.
12.THE LANDSCAPING CONTRACTOR SHALL HAVE ALL UTILITIES LOCATED BEFORE STARTING ANY SITE WORK
OR PLANTING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING
UTILITIES.
13.NO LANDSCAPE MATERIAL SHALL BE SUBSTITUTED WITHOUT THE AUTHORIZATION OF THE LANDSCAPE
ARCHITECT.
14.ALL EDGING SHALL BE DURAEDGE 3/16" STEEL EDGING - COLOR BLACK, OR APPROVED EQUAL..
15.CONTRACTOR SHALL BE RESPONSIBLE MAINTAINING APPROPRIATE LEVEL OF WATERING FOR ALL NEW
PLANTS FOR A PERIOD OF 30 DAYS.
16.ALL SHRUB AND PERENNIAL PLANTING BEDS SHALL BE MULCHED WITH 4" THICK SHREDDED HARDWOOD
MULCH.
17.ALL BEDS TO RECEIVE GRANULAR PRE-EMERGENT WEED CONTROL BEFORE AND AFTER MULCH IS
INSTALLED.
SEED: SEED TYPE TO BE "RAIN GARDEN MIXTURE" SUPPLIED BY UNITED SEEDS (OR APPROVED EQUAL).
INSTALL WITH MECHANICAL DRILL TYPE SEEDER AT A RATE OF 15 LBS PER ACRE. SEEDING DATES, SITE
PREPARATION, SEEDING INSTALLATION, WATER REQUIREMENTS, FERTILIZING, AND MOWING PER UNITED
SEEDS TECH BULLETIN FOR SEED TYPE.
EROSION CONTROL: INSTALL ROLLMAX DS 150 EROSION CONTROL MATS (OR EQUIVALENT) THROUGHOUT
SEEDED AREAS. MAINTAIN DURING ESTABLISHMENT PERIOD
FERTILIZER: FERTILIZE ALL SEED TYPE I AREAS WITH PRODUCT SPECIFIED ABOVE AT RATE OF 250 LBS/
ACRE.
ESTABLISHMENT: SATISFACTORY SEEDED NATIVE STAND: AT END OF MAINTENANCE PERIOD, A HEALTHY,
UNIFORM, CLOSE STAND OF NATIVES HAS BEEN ESTABLISHED, FREE OF WEEDS AND SURFACE
IRREGULARITIES, WITH COVERAGE EXCEEDING 90 PERCENT OVER ANY 10 SQ. FT. (0.92 SQ. M) AND BARE
SPOTS NOT EXCEEDING 5 BY 5 INCHES.
REESTABLISH LAWNS THAT DO NOT COMPLY WITH REQUIREMENTS AND CONTINUE MAINTENANCE UNTIL
AREA IS SATISFACTORY.
COVER CROP: A COVER CROP OF ANNUAL OATS (OR AS RECOMMENDED BY SEED MANUFACTURER) MAY BE
NECESSARY FOR IOWA DNR NOD DEPENDING ON TIMING OF SEEDING PERMANENT RAIN GARDEN MIX.
SEED DATES: MARCH THROUGH MAY AND AUGUST THROUGH OCTOBER (DORMANT SEEDING DECEMBER
THROUGH FEBRUARY)
REFERENCE NUMBER:
35
0
1
1
0
4
t
h
S
t
r
e
e
t
De
s
M
o
i
n
e
s
,
I
o
w
a
5
0
3
2
2
-
3
8
2
5
Ph
o
n
e
:
(
5
1
5
)
2
7
6
-
0
4
6
7
F
a
x
:
(
5
1
5
)
2
7
6
-
0
2
1
7
"P
l
a
n
n
i
n
g
Y
o
u
r
S
u
c
c
e
s
s
f
u
l
D
e
v
e
l
o
p
m
e
n
t
"
Bi
s
h
o
p
E
n
g
i
n
e
e
r
i
n
g
Ci
v
i
l
E
n
g
i
n
e
e
r
i
n
g
&
L
a
n
d
S
u
r
v
e
y
i
n
g
E
s
t
a
b
l
i
s
h
e
d
1
9
5
9
DRAWN BY:
CHECKED BY:
REVISION DATE:
PROJECT NUMBER:
SHEET NUMBER:
MT
G
S
P
O
R
T
S
C
O
M
P
L
E
X
WA
U
K
E
E
,
I
O
W
A
DRL
DB
03/30/2023 1ST CITY SET
09/18/2023 2ND CITY SET
10/11/2023 3RD CITY SET
230051
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
DO NOT CUT CENTRAL LEADER
WRAP TRUNK WITH APPROVED
TREE WRAP TO FIRST BRANCH
4" DEEP HARDWOOD MULCH
CUT SYNTHETIC CORDS AROUND
ROOTBALL AND TRUNK -ENTIRELY
REMOVE WIRE BASKETS FROM BALL
SET ROOTBALL ON UNDISTURBED
SUBGRADE
DECIDUOUS TREE PLANTING (TYP.)
NOT TO SCALESCALE:
SCARIFY SIDES & BOTTOM OF
PLANTING PIT
3'-0"SET ROOTBALL FLUSH WITH
FINISHED GRADE
DO NOT PLACE MULCH IN
CONTACT WITH BASE OF TREE
PRUNE ANY DEAD/DAMAGED
BRANCHING FROM TREE.
MAINTAIN OVERALL APPEARANCE.
4" DEPTH SHREDDED HARDWOOD
MULCH
SCARIFY SIDES & BOTTOM OF
PLANTING PIT
EVERGREEN TREE PLANTING (B&B)
NOT TO SCALESCALE:
CUT SYNTHETIC CORDS AROUND
ROOTBALL AND TRUNK -ENTIRELY
REMOVE WIRE BASKETS FROM BALL
SET ROOTBALL ON UNDISTURBED
SUBGRADE
3'-0"
DO NOT PLACE MULCH IN
CONTACT WITH BASE OF TREE
DECIDUOUS SHRUB DETAIL EVERGREEN SHRUB DETAIL
PLANTING ON SLOPES
FIRMLY COMPACT SAUCER
(USE TOPSOIL)
ORIGINAL GROUND LINE
SUB-SOIL
4" MULCH
PLANTING PIT TWICE
THE WIDTH OF ROOTBALL
1
2
SHRUB PLANTING (TYP)
NOT TO SCALESCALE:
PLANTING SCHEDULE LEGEND
SOD: PROVIDE AND INSTALL SOD FROM LOCAL SUPPLIERS. AREAS TO BE SODDED MUST BE FREE OF ALL
CONSTRUCTION DEBRIS AND ANY DIRT CLUMPS OVER 1" IN DIAMETER. THOROUGHLY WATER SOD UPON
INSTALLATION. CONTRACTOR TO MAINTAIN WATERING UNTIL SOD IS ESTABLISHED (ROOTS KNITTED INTO
SUBSURFACE)
GENERAL LANDSCAPE REQUIREMENTS
TOTAL SQUARE FOOTAGE OF PROJECT AREA 107,837 SF
OPEN SPACE REQUIRED (15%)16,175 SF
OPEN SPACE PROVIDED 45,287 SF
GENERAL OPEN SPACE REQUIREMENT
TOTAL REQUIRED TREES (1 / 1,000 SF REQ. OPEN SPACE)17
TOTAL REQUIRED SHRUBS (1 / 1,000 SF REQ. OPEN SPACE)17
TOTAL PROPOSED OVERSTORY 37
TOTAL PROPOSED EVERGREEN 36
TOTAL PROPOSED SHRUBS 233
PARKING PERIMETER REQUIREMENTS
TOTAL LENGTH OF PARKING PERIMETER ADJACENT TO NW 17TH 190 LF
REQUIRED OVERSTORY TREES (1 / 40 LF)5 TREES
REQUIRED SHRUBS (3 / 30 LF)19 SHRUBS
TOTAL LENGTH OF PARKING PERIMETER ADJACENT TO VICKSBURG 117 LF
REQUIRED OVERSTORY TREES (1 / 40 LF)3 TREES
REQUIRED SHRUBS (3 / 30 LF)12 SHRUBS
INTERIOR PARKING LOT REQUIREMENTS
TOTAL PARKING STALLS ON SITE 80
REQUIRED OVERSTORY TREES (1 / 20 STALLS)4 TREES
REQUIRED SHRUBS (3 / 20 STALLS)12 SHRUBS
BUFFERYARD (40' WIDE - SOUTH PROPERTY LINE)
TOTAL LENGTH OF BUFFER 441 LF
REQUIRED OVERSTORY TREES (2 / 50 LF)18
REQUIRED EVERGREEN TREES (4 / 50 LF)36
REQUIRED UNDERSTORY TREES (3 / 50 LF)27
OVERSTORY TREES PROVIDED 18
EVERGREEN TREES PROVIDED 36
UNDERSTORY TREES PROVIDED 27
DE
T
A
I
L
S
S
H
E
E
T
C6.1
REFERENCE NUMBER:
35
0
1
1
0
4
t
h
S
t
r
e
e
t
De
s
M
o
i
n
e
s
,
I
o
w
a
5
0
3
2
2
-
3
8
2
5
Ph
o
n
e
:
(
5
1
5
)
2
7
6
-
0
4
6
7
F
a
x
:
(
5
1
5
)
2
7
6
-
0
2
1
7
"P
l
a
n
n
i
n
g
Y
o
u
r
S
u
c
c
e
s
s
f
u
l
D
e
v
e
l
o
p
m
e
n
t
"
Bi
s
h
o
p
E
n
g
i
n
e
e
r
i
n
g
Ci
v
i
l
E
n
g
i
n
e
e
r
i
n
g
&
L
a
n
d
S
u
r
v
e
y
i
n
g
E
s
t
a
b
l
i
s
h
e
d
1
9
5
9
DRAWN BY:
CHECKED BY:
REVISION DATE:
PROJECT NUMBER:
SHEET NUMBER:
MT
G
S
P
O
R
T
S
C
O
M
P
L
E
X
WA
U
K
E
E
,
I
O
W
A
DRL
DB
03/30/2023 1ST CITY SET
09/18/2023 2ND CITY SET
10/11/2023 3RD CITY SET
230051
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
L:
\
L
A
N
D
P
R
O
J
E
C
T
S
2
0
2
3
\
2
3
0
0
5
1
-
M
T
G
S
P
O
R
T
S
C
O
M
P
L
E
X
\
D
W
G
\
C
6
D
E
T
A
I
L
S
.
D
W
G
10
/
2
6
/
2
0
2
3
2
:
1
1
:
4
6
P
M
TRANSFORMER PAD MOAT DETAIL
NOT TO SCALE
9
C6.1
REINFORCED CONCRETE
TRANSFORMER PAD (PER
MID-AMERICAN
STANDARDS) REFERENCE
ELECTRICAL PLANS
TRANSFORMER
3'
3'
3'
3'
3" RIVER ROCK,
SCREENED
DURAEDGE 1/8"
STEEL EDGING,
COLOR GREEN
REINFORCED CONCRETE
TRANSFORMER PAD (PER
MID-AMERICAN STANDARDS)
3" RIVER ROCK,
SCREENED
3'
2'2'
3'LINE TRENCH WITH SILT
FENCE FABRIC (OR
OTHER SOIL FABRIC
WITH EQUAL OR LOWER
POROSITY)
DURAEDGE 1/8"
STEEL EDGING,
COLOR GREEN
48"
20"
6" DIA WEATHERED
(COR-TEN) STEEL PIPE
EMBEDDED IN CONC
FILL PIPE W/ CONCRETE
INSTALL BOLLARD 27" INTO SIDEWALK
MEASURED FROM EDGE OF PARKING
STALL TO CENTER OF BOLLARD
CLASS "A" CONC FOUNDATION
CENTERED ON BOLLARD
EDGE OF PARKING STALL
CONC WALK. SEE OTHER DETAILS
MUTCD R7-8 (RESERVED
PARKING) SIGN
2"x2" SQUARE BLACK POWDER
COATED STEEL POLE
MUTCD R7-8a OR R7-8b (VAN ACCESSIBLE)
SIGN AS CALLED OUT ON PLANS
STEEL POLE CEMENTED
INTO BOLLARD CENTER
NOTE: FOR HANDICAP STALLS
IN FRONT OF CURB, INSTALL
POLE 2' FROM BACK OF CURB.
DIRECT BURY POLE 4' MIN INTO
GROUND WITHOUT INSTALLING
BOLLARD
24"36"60"
1/2" FOAM AROUND BOLLARD
SEAL FOAM W/ GRAY MASTIC
JOINT SEALANT
6"
BOLLARD W/ PARKING SIGN DETAIL
SCALE NONE
5.75' TO EDGE OF SIDEWALK
3
C6.1
1
2
3
Locate 'DW' joint at a mid-panel location between future
'C' or 'CD' joints. Place no closer than 5 feet to a 'C' or
'CD' joint.
Place bars within the limits shown under dowel
assemblies.
'RT' joint may be used in lieu of 'DW' joint at the end of
the days work. Remove any pavement damaged due to
the drilling at no additional cost to the Contracting
Authority.
4 Saw 'C' joint to a depth of T/3.
6
7
5 Bar supports may be necessary for fixed form paving to
ensure the bar remains in a horizontal position in the
plastic concrete.
Sawing or sealing of joint not required.
The following joints are interchangeable, subject to the
pouring sequence:
'BT-1' and 'L-1'
'BT-2' and 'L-2'
'BT-3' and 'L-3'
1
2" to 3
4''Top of Pavement
Sealant
SECTION A-A
(Detail at Edge of Pavement)
DETAIL C
Joint Sealant Material
1
4'' ± 1
16'' Saw Cut
1 1
4'' ± 1
4'' Saw Cut
1
4'' ± 1
8''
Crack or
Joint Line
A
A
Pavement Edge See Detail C
T
Hole Diameter 1
8''
Larger than Dowel
8
18'' Long 3/4" Dowel
at 12'' Centers
9'' min.9'' min.
'RD'
ABUTTING PAVEMENT JOINT
8 Edge with 1/4 inch tool for length of joint indicated if
formed; edging not required when cut with diamond
blade saw. Remove header block and board when
second slab is placed.
T/2
T
See Detail A or B
T
30'' Long Tie Bar
at 12'' Centers
321
'C'
CONTRACTION JOINT
'DW'
DAY'S WORK JOINT (Non-working)
5 7
30'' Long #4 BarsSee Detail E
See Detail D-1 or D-2
7
6
'KT-1'
ABUTTING PAVEMENT JOINT - KEYWAY TIE
'L-1'
CONTRACTION JOINT
1
4'' ± 1
16'' Saw CutJoint Sealant Material
1
4'' ± 1
8''
Saw Cut 4
A
A
Crack or
Joint Line
1
8'' to 5
16'' Saw CutJoint Sealant Material
1
4'' ± 1
8''
1 1
4'' ± 1
4''
Crack or
Joint Line
A
A
DETAIL B
(Saw cut formed by approved early concrete sawing equipment.)
DETAIL A
(Saw cut formed by conventional concrete sawing equipment.)
at 30'' Centers
36'' Long #4 Bars
at 30'' Centers
T/2
1'' + 1
4'' or - 1
8''
1"2"
DETAIL E
Crack or
Joint Line
T/3 ± 1
4''
Crack or
Joint Line
T/3 ± 1
4''
Joint Sealant Material
1
8'' ± 1
16'' Saw Cut
1
4'' ± 1
16'' Saw Cut
DETAIL D-1
DETAIL D-2
13
(Required when the Department of Transportation
is not the Contracting Authority, or when
specified in the contract documents)
(Required when the Department of Transportation
is the Contracting Authority, or when
specified in the contract documents.)
JOINTING DETAILS
SCALE NONE
1
C6.1
BACK OF CURB
FACE OF CURB EDGE OF TURNED DOWN WALK
SIDEWALK PAVEMENT
GRASS/LANDSCAPING
ROADWAY PAVEMENT
PLAN VIEW
CURB & GUTTER / TURNED DOWN
WALK TRANSITION DETAIL
SCALE NONE
6
C6.1
24"
3"4.5"
6"
6"
R 1"
R 2"COMPACTED
BACKFILL
NOTES:
1.SLOPE GUTTER IN ACCORDANCE WITH GRADING PLAN.
2.INSTALL CURB & GUTTER INTERGRAL WITH PAVING.
3.PCC PAVEMENT SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 4,000 PSI.
TYPE 1 PAVEMENT SECTION
SCALE NONEC6.1
4
6" PCC
C4 MIX
12" SUBGRADE
PREPARATION
FINISHED GROUND GRADE
(INCLUDING SOD) SHALL BE
1/4" BELOW FINISHED PAVEMENT
GRADE ON DOWNHILL SIDE
WIDTH PER PLAN
5" PCC (UNLESS NOTED OTHERWISE)
NOTE: SLOPE SIDEWALK IN ACCORDANCE
WITH GRADING PLAN, 1.5% CROSS SLOPE
7 SIDEWALK DETAIL
SCALE NONEC6.1
REVISION
SHEET _1 of _1
7030.101
CONCRETE DRIVEWAY, TYPE A
FI
G
U
R
E
7
0
3
0
.
1
0
1
SH
E
E
T
1
O
F
1
5'-0" max
1'-0"
(Residential/Agricultural Only)
2022 Edition4
1
2
3
4
5
6
7
8
9
10
11
Curb
o
p
e
n
i
n
g
Drive
w
a
y
w
i
d
t
h
Drive
w
a
y
w
i
d
t
h
3'-0" min.
18"12"
Curb
o
p
e
n
i
n
g
1'-0"
m
i
n
.
1'-0"
m
i
n
.
1 R
1'-0"
4
6
7
2 3
11
Drop Curb Heights -
Residential: 0" to 2"
Commercial/Industrial:
112" to 3"
as sp
e
c
i
f
i
e
d
Pr
o
p
e
r
t
y
l
i
n
e
'B' joint
'E' joint
'C' or 'E'
joint 8
9
10 2
'C' joint10
Refer to
Detail A
Back of curb
as sp
e
c
i
f
i
e
d
'E' joint
'C' or 'E'
joint
Pr
o
p
e
r
t
y
l
i
n
e
'B' joint
10
29
8
10 'C' joint
Refer to
Detail B
Back of
curb
2
Back of curb
7
Driveway
Curb
Sidewalk
2#5 x 36"
reinforcing
bar
5
Back of curb 7
TYPE A WITH FLARES
DETAIL A
TYPICAL SECTION
TYPE A WITH RADII
DETAIL B
Driveway radius (R).
Residential: 10 foot minimum,15 foot
maximum.
Commercial and industrial: As
specified in the contract documents.
Transition the curb height to 0 inches at end of
taper/radius or at the front edge of sidewalk.
Do not extend raised curb across sidewalk.
Pavement thickness.
Residential: 6 inches minimum.
Commercial and industrial: 7 inches
minimum.
Sidewalk thickness through driveway to match
thickness of driveway.
Center reinforcing bar vertically in the
pavement.
Match thickness of adjacent roadway,
8 inches minimum.
Provide 'E' joint at back of curb unless 'B'
joint is specified.
For alleys, invert the pavement crown
2% toward center of alley.
Target cross slope of 1.5% with a
maximum cross slope of 2.0%. If specified in
the contract documents, construct the sidewalk
through the driveway 5 feet wide to serve as a
passing space.
If cross slope of adjacent sidewalk panel
exceeds 2.0%, remove and replace to transition
from existing sidewalk to sidewalk through
driveway. If elevation change requires a curb
ramp, comply with Figure 7030.205; verify need
for detectable warning panel with Engineer.
Transition street curb at minimum 1:1 slope to
meet driveway curb.
CONCRETE DRIVEWAY, TYPE A DETAIL
NOT TO SCALE
2
C6.1
*NOT TO BE CONSTRUCTED UNTIL ALL UPSTREAM AREAS ARE STABILIZED*
BIORETENTION MAINTENANCE NOTES (I.S.W.M. CH. 5 SEC 4)
GENERAL NOTES:
1.FURTHER DETAILS AND DESCRIPTIONS OF BIORETENTION SYSTEMS CAN BE FOUND
IN THE IOWA STORM WATER MANAGEMENT MANUAL, CHAPTER 5, SECTION 4.
2.CONTRACTOR TO CONTACT BISHOP ENGINEERING (515-276-0467) WITH 10 BUSINESS
DAY LEAD TIME FOR THE AS-BUILT SURVEY OF THE ABOVE GROUND BIORETENTION
AREA. THE CONTRACTOR IS TO VERIFY WITH THE CITY THAT THE BIORETENTION
CELL WAS INSTALLED PER REQUIREMENTS LAID OUT IN THE IOWA STORM WATER
MANAGEMENT MANUAL, CHAPTER 5 SECTION 4.
6"
P
O
N
D
E
D
D
E
P
T
H
SHEET FLOWSHEET FLOW
8
C6.1
POND BOTTOM
POND TOP TURF GRASS
UNDISTURBED
SOIL
NORTH AMERICAN
GREEN P300 TRM
AMENDED SOIL
(75-90% CONCRETE SAND, 0-10%
ORGANIC COMPOST, 0-25% SOIL
A-HORIZON
3/8" CHIP LIMESTONE (CHOKER LAYER)
1" LIMESTONE (CLEAN)
NOT TO SCALE
6" PERFORATED PVC SUBDRAIN
21
"
SO
I
L
D
E
P
T
H
2"
10
"
BIORETENTION DETAIL
NOTE:
REFER TO IOWA STORMWATER
MANAGEMENT MANUAL, CHAPTER 5
SECTION 4 (C5-S4-BIORETENTION
SYSTEMS) FOR FURTHER DETAILS
24"
3"4.5"
6"
6"
R 1"
R 2"COMPACTED
BACKFILL
NOTES:
1.SLOPE GUTTER IN ACCORDANCE WITH GRADING PLAN.
2.INSTALL CURB & GUTTER INTERGRAL WITH PAVING.
3.PCC PAVEMENT SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 4,000 PSI.
TYPE 2 PAVEMENT SECTION
SCALE NONEC6.1
5
7" PCC
C4 MIX
12" SUBGRADE
PREPARATION
DE
T
A
I
L
S
S
H
E
E
T
C6.2
REFERENCE NUMBER:
35
0
1
1
0
4
t
h
S
t
r
e
e
t
De
s
M
o
i
n
e
s
,
I
o
w
a
5
0
3
2
2
-
3
8
2
5
Ph
o
n
e
:
(
5
1
5
)
2
7
6
-
0
4
6
7
F
a
x
:
(
5
1
5
)
2
7
6
-
0
2
1
7
"P
l
a
n
n
i
n
g
Y
o
u
r
S
u
c
c
e
s
s
f
u
l
D
e
v
e
l
o
p
m
e
n
t
"
Bi
s
h
o
p
E
n
g
i
n
e
e
r
i
n
g
Ci
v
i
l
E
n
g
i
n
e
e
r
i
n
g
&
L
a
n
d
S
u
r
v
e
y
i
n
g
E
s
t
a
b
l
i
s
h
e
d
1
9
5
9
DRAWN BY:
CHECKED BY:
REVISION DATE:
PROJECT NUMBER:
SHEET NUMBER:
MT
G
S
P
O
R
T
S
C
O
M
P
L
E
X
WA
U
K
E
E
,
I
O
W
A
DRL
DB
03/30/2023 1ST CITY SET
09/18/2023 2ND CITY SET
10/11/2023 3RD CITY SET
230051
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
L:
\
L
A
N
D
P
R
O
J
E
C
T
S
2
0
2
3
\
2
3
0
0
5
1
-
M
T
G
S
P
O
R
T
S
C
O
M
P
L
E
X
\
D
W
G
\
C
6
D
E
T
A
I
L
S
.
D
W
G
10
/
2
6
/
2
0
2
3
2
:
1
1
:
5
2
P
M
5" PCC WALK
12"
SLOPE 1.5% (DESIRED - 2% MAX)
FINISH WITH 3/4" RADIUS TOOL
PARKING LOT PAVEMENT
18"
(DIRECTION SHOWN ON GRADING PLANS)
VARIES
SEALED 'E' JOINT
SEE DETAIL A
12" SUBGRADE
PREP.
1" NOMINAL
5/8"RESILIENT JOINT FILLER
DETAIL A: NOT TO SCALE
TURNED DOWN WALK DETAIL
(SIDEWALK INTEGRAL WITH CURB)
NOT TO SCALE
11
C6.2
VARIES, 6" TYP
NOTE:
IN ADA ZONES, SIDEWALK SHALL
BE FLUSH WITH PARKING LOT
PAVEMENT. SEE SHEET C2.11/2" GRAY MASTIC JOINT
SEALANT MATERIAL
EDGE WITH 1/4 INCH TOOL FOR LENGTH OF JOINT
INDICATED IF FORMED; EDGING NOT REQUIRED
WHEN CUT WITH DIAMOND BLADE SAW
STRUCTURAL STOOP / SIDEWALK TRANSITION DETAIL
SCALE NONE
12
C6.2
XXX
#4 @ 12" O.C.
THUS:60"
36"
#4 @ 12" O.C.
STRUCTURAL
STOOP-
SEE STRUCTURAL
KEYED
JOINT
4" VOID FORMS
X WIDTH OF
SIDEWALK
2"
5'-0"
SIDEWALK
3/8" EXPANSION JOINT
FILLED W/ GRAY
MASTIC JOINT SEALANT
12"
6" PCC
12"5"
10
C6.2
NOT TO SCALE
SEE SECTION DETAIL 'A'
AT RIGHT
SECTION DETAIL 'A'
CASTING SUPPORT PAD
6"X45 DEGREE
BEND
10'-0" MIN.
18"X18"X6" THICK
SQUARE CONCRETE PAD
PVC PIPE STUB
FITTING CLEANOUT
ADADPTER
THREADED PLUG
TERMINATION OF SERVICE LINE
WYE FITTING
13
C6.2
CLEANOUT DETAIL
MODIFIED OUTLET STRUCTURE
NOT TO SCALE
14
C6.2
3" ORIFICE
ELEV=1026.65
RIM=1032.00
SW-511
6" SUBDRAIN
ELEV=1024.40
CAP BLOCK
COMPACTED GRANULAR
WALL FOUNDATION
STANDARD CONCRETE
MASONRY MODULAR
BLOCK
MODULAR BLOCK WALL DETAIL
NOT TO SCALE
1/2" DIA. NYLON/FIBERGLASS
CONNECTION PIN OR ANCHOR BAR
OR INTEGRAL CONCRETE SLEAVE
CONNECTION
12" MIN. WIDTH
COMPACTED
GRANULAR MATERIAL
GEOGRID
WHEN REQ'D
SAFETY RAILING OR FENCE.
MATERIALS, LOCATION, AND
HEIGHT TO BE DETERMINED
BY THE DEVELOPER AND THE
CITY BUILDING DEPARTMENT.
COMPACTED FILL
4"
4'
M
A
X
.
HE
I
G
H
T
15
C6.2
8" ORIFICE
ELEV=1028.25
22.5oto 45o
CLASS 1 BEDDING
MATERIALTEE OR WYE
SERVICE LINE
SERVICE RISER
SERVICE LINE
CAP OR PLUG
LOCATION POST
1
2
3
SANITARY SEWER SERVICE STUB WITH RISER DETAIL
NOT TO SCALE
10'
10
'
t
o
1
2
'
SANITARY SEWER MAIN
TRENCH WALL
SANITARY
SEWER MAIN
NOTES:
1.PLACE BEDDING AND BACKFILL MATERIAL AS REQUIRED
FOR SEWER MAIN.
2.SERVICE LINE SLOPE:
4 INCH: 2% TO 5%
6 INCH: 1% TO 5%
3.IF SERVICE RISER SLOPE IS STEEPER THAN 1:1,
CONSTRUCT RISER OF ENTIRE SERVICE LINE WITH
SCHEDULE 40 PVC (ASTM D 1785) OR DUCTILE IRON (AWWA
C151, CLASS 52). USE SINGLE LENGTH OF PIPE FOR RISER,
IF POSSIBLE.
SLOPE
SL
O
P
E
SLOPE
SUPPORT BENCH
18" MIN.
ROW LINE
16
C6.2
1/4" FALL PER FOOT SIDESLOPE ON
ALL SIDEWALKS
6" SIDEWALK
12" MIN.18"
PCC SIDEWALK BEHIND CURB DETAIL
SCALE NONE
17
C6.1
ROADWAY PAVEMENT
12" SUBGRADE
PREPARATION
PROPOSED SPORTS COMPLEX
AREA = 23,200 SF
FF=1035.00'
1033
10
3
3
10
3
3
1033
1
0
3
3
D
D
D
D
1
0
3
3
W 6"
W 6"
W 6"
W 6"
W 6"
W 6"
SA
N
SA
N
SA
N
H Y D
CO
103
3
103
2
1032
CO
CO
1034
1
0
3
2
1033
103
1
103
0
10
3
1
1
0
3
3
1034
1032
1034
1032
1034
1032 1033
1034
10331034
10
3
4
1
0
3
3
1
0
3
4
1034
1033
103
3
1033
1032
1033
1032
1030
10
3
3
1026
10
2
6
1
0
3
1
D
CO
6.75 TONS OF
CLASS D RIP RAP
1' THICK
W6"
W6"
G4"G4"G4"G4"
G
4"
G
4"
G
4"
G
4"
G
4"
G 4"
G 4"
G 4"
G 4"
1034
1030
1026
1026
WV WV
103
2
1034
1032
1032
10
3
2
1
0
3
2
10
3
2
1032
1031 1031
1034
GM
NW
1
7
T
H
S
T
R
E
E
T
NW VICKSBURG COURT
D
CO
CO
D
S
S
CO
D
D
U/E
U/E
U/E
U/E U/E U/E U/E U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
U/E
ST
18"
S
T
1
5
"
ST 42"
ST 42
"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
ST 42"
S
T
6"
ST 6"
ST
6"
ST
6"
ST
6"
ST
6"
ST
6"
ST
6"
ST 6"
ST 6"ST 6"ST 6"ST 6"ST 6"ST 6"
ST
42
"
ST
42
"
ST
42
"
ST
18
"
ST 18"
ST 15"ST 15"ST 15"ST 15"ST 15"
SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN
SAN
6"
SAN
6"
42"
70'
R
.
O
.
W
.
(
P
U
B
L
I
C
S
T
R
E
E
T
-
C
O
N
C
R
E
T
E
S
U
R
F
A
C
E
)
60' R.O.W.(PUBLIC STREET-CONCRETE SURFACE)
20
'
P
R
I
V
A
T
E
S
T
O
R
M
S
E
W
E
R
EA
S
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
5
1
)
40
'
L
A
N
D
S
C
A
P
E
B
U
F
F
E
R
EA
S
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
4
7
)
10'
P
U
B
L
I
C
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
(B
K
2
0
2
1
,
P
G
2
4
5
)
15
'
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
(B
K
2
0
2
1
,
P
G
2
4
6
)
10
'
P
.
U
.
E
.
(B
K
.
2
0
2
1
,
P
G
.
2
4
5
)
F/O
10
3
4
1034
1030
1030
1033
1034
1032
1
0
3
2
1026
1030
1030
10
3
2
10
3
0
1028
103
5
103
5
103
3
1030
1030
1031
1030
1029
LOT 12
LOT 13
G4"
G4"
G4"
G4"
G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"
8"
W8"
W8"
W8"W8"W8"W8"W8"W8"W8"
W6"
W6"
LOT 18
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W 8"
W8"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G 4"
G4"
SA
N
8"
SA
N
8"
W6"
20'
P
R
I
V
A
T
E
S
T
O
R
M
S
E
W
E
R
EAS
E
M
E
N
T
(
B
K
2
0
2
1
,
P
G
2
5
1
)
D
D
1032
1030
1028
1032
1028
1030
1032
1033
1030
1033
U/E
U/E
ST
O
R
M
W
A
T
E
R
E
A
S
E
M
E
N
T
(BO
O
K
2
0
2
1
P
A
G
E
2
5
0
)
1033
1029
1027
1026
1029
1031
1034
WV
1029
1028
1027
10
3
1
SF
S
F
SF
INLET
PROTECTION
SF
S
F
SF
INLET
PROTECTION
SF
SF
SF
SF
INLET
PROTECTION
SF
SF
INLET
PROTECTION
SF
SF
INLET
PROTECTION
SF
SF
INLET
PROTECTION
ROCK CONSTRUCTION
ENTRANCE
CONCRETE
WASHOUT
OUTHOUSE
& MATERIAL
STORAGE
POSSIBLE TOPSOIL
STOCKPILE LOCAITON
SF
SF
SF
SF
INLET
PROTECTION
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
SF
SF
SF
SF
SF
SF
SILT FENCE
ULTIMATE DISCHARGE
FROM SITE TO LITTLE
WALNUT CREEK
12'
1
2
'
6'
BIORETENTION AREA
POST-CONSTRUCTION
FACILITY
PRE-TREATMENT
BIORETENTION AREA
33" DEPTH FROM TOP OF SOIL
TO BOTTOM OF SUBDRAIN
POST-CONSTRUCTION FACILITY
POND OUTLET STANDPIPE
POST-CONSTRUCTION FACILITY
SF
SILT FENCE
SILT FENCE
SW
P
P
P
C7.1
REFERENCE NUMBER:
35
0
1
1
0
4
t
h
S
t
r
e
e
t
De
s
M
o
i
n
e
s
,
I
o
w
a
5
0
3
2
2
-
3
8
2
5
Ph
o
n
e
:
(
5
1
5
)
2
7
6
-
0
4
6
7
F
a
x
:
(
5
1
5
)
2
7
6
-
0
2
1
7
"P
l
a
n
n
i
n
g
Y
o
u
r
S
u
c
c
e
s
s
f
u
l
D
e
v
e
l
o
p
m
e
n
t
"
Bi
s
h
o
p
E
n
g
i
n
e
e
r
i
n
g
Ci
v
i
l
E
n
g
i
n
e
e
r
i
n
g
&
L
a
n
d
S
u
r
v
e
y
i
n
g
E
s
t
a
b
l
i
s
h
e
d
1
9
5
9
DRAWN BY:
CHECKED BY:
REVISION DATE:
PROJECT NUMBER:
SHEET NUMBER:
MT
G
S
P
O
R
T
S
C
O
M
P
L
E
X
WA
U
K
E
E
,
I
O
W
A
DRL
DB
03/30/2023 1ST CITY SET
09/18/2023 2ND CITY SET
10/11/2023 3RD CITY SET
230051
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
STORM WATER POLLUTION PREVENTION PLAN
IOWAONE CALL
1-800-292-8989
www.iowaonecall.com
811
Know what's below.
Call before you dig.
UTILITY NOTE:
THE LOCATION OF THE UTILITIES INDICATED ON THE PLANS ARE TAKEN FROM
EXISTING PUBLIC RECORDS AND ARE APPROXIMATE LOCATIONS. THE EXACT
LOCATIONS OF ALL UTILITIES MUST BE ASCERTAINED IN THE FIELD. IT SHALL BE
THE DUTY OF THE CONTRACTOR TO DETERMINE WHETHER ANY ADDITIONAL
FACILITIES OTHER THAN THOSE SHOWN ON THE PLANS MAY BE PRESENT.
EROSION CONTROL NOTES:
1.SEE SUPPLEMENTAL DETAIL STORM WATER POLLUTION PLAN NARRATIVE
FOR ALL EROSION CONTROL MEASURES, ADDITIONAL DETAILS AND NOTE.
ADDITIONAL NOTES AND MEASURES IN NARRATIVE SHALL BE CONSIDERED
INCIDENTAL AND SHALL BE INCLUDED IN THE ORIGINAL BID.
2.SWPPP PLAN AND NARRATIVE ARE CONSIDERED A LIVING DOCUMENT AND
WILL NEED PERIODIC UPDATES AND ADJUSTMENTS AS NECESSARY
DEPENDING ON SITE CONDITIONS TO ASSURE COMPLIANCE WITH NPDES
GENERAL PERMIT NO. 2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
UPDATE THE SWPPP AND IMPLEMENT ANY AND ALL MEASURES NECESSARY
TO COMPLY WITH SAID PERMIT NO. 2.
3.INSTALL PERIMETER SILT FENCE AS SHOWN ON PLANS PRIOR TO
CONSTRUCTION.
4.INSTALL INTAKE PROTECTION WITH SILT FENCE IMMEDIATELY AFTER STORM
SEWER CONSTRUCTION.
5.INSTALL FINISHED PAVING INLET PROTECTION IMMEDIATELY AFTER PAVING
IS COMPLETED AROUND INTAKE.
6.OTHER EROSION CONTROL TYPES MAY NOT BE SUBSTITUTED FOR SILT
FENCE.
7.CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING A CONCRETE
WASHOUT IN ACCORDANCE WITH SUDAS SPEC 11,050 & NPDES GENERAL
PERMIT NO. 2 DURING ALL CONCRETE WORK.
8.CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING TEMPORARY
RESTROOM FACILITIES. SANITARY WASTE SHALL BE DISPOSED OF PER ALL
FEDERAL, STATE AND LOCAL REGULATIONS.
9.CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL TOPSOIL
REQUIREMENTS OF NPDES GENERAL PERMIT NO. 2 ARE MET.
10.OWNER SHALL BE RESPONSIBLE FOR MAINTENANCE OF PRIVATE DETENTION
FACILITIES AND PRIVATE UTILITIES.
11.CONTRACTOR IS RESPONSIBLE FOR INSTALLING AND PHASING EROSION
CONTROLS AND SILT FENCE, PER SWPPP INSPECTORS RECOMMENDATIONS,
TO MAINTAIN EROSION PROTECTION AND ACCOMMODATE CONSTRUCTION
ACTIVITIES AND PHASING. ANY ADDITIONAL EROSION CONTROLS OR
ADJUSTMENTS SHALL BE INCIDENTAL.
12.CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY SILTING, REELING OR
SCOURING TO DESIGN GRADE BEFORE CLOSE OF PROJECT PER SWPPP
INSPECTOR AND OWNER RECOMMENDATIONS.
13.CONTRACTOR TO PROTECT PROPOSED PONDS DURING CONSTURCITON
FROM EROSION AND SILTING. ANY CORRECTIVE WORK TO RESTORE POND
BOTTOM SHALL BE INCIDENTAL.
EROSION CONTROL REMOVAL NOTES:
1.AFTER FINAL STABILIZATION HAS OCCURED, AS DEFINED IN NPDES GENERAL
PERMIT NO. 2, CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF
ALL TEMPORARY EROSION CONTROL DEVICES INCLUDING, BUT NOT LIMITED
TO: SILT FENCE, INLET PROTECTION, AND TEMPORARY STANDPIPES.
L:
\
L
A
N
D
P
R
O
J
E
C
T
S
2
0
2
3
\
2
3
0
0
5
1
-
M
T
G
S
P
O
R
T
S
C
O
M
P
L
E
X
\
D
W
G
\
C
7
S
W
P
P
P
.
D
W
G
10
/
2
6
/
2
0
2
3
2
:
1
6
:
1
4
P
M
GRAPHIC SCALE
020 10 20 40
SF
SF
SF
SF
SF SF SF
SILT FENCE
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SILT FENCE
SF
SF
SF
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF
SFSILT FENCE
SF SF SF SF
SF
SF
SF
SF
SF
SILT FENCE
SILT FENCE
SILT FENCE
GENERAL NOTES:
1.ALL BIORETENTION CELLS ARE TO BE CONSTRUCTED ONLY AFTER ALL
OTHER CONSTRUCTION ITEMS AREA COMPLETE. SEDIMENT PROTECTION
WILL BE REQUIRED IF IMMEDIATE UPSTREAM PROTECTION IS NOT ABLE TO
BE COMPLETED.
A B C D E
4
3
2
1
Grace A&D Job #
Project:
10/10/2023 COORDINATION SET
THIS DESIGN AND PLANS ARE THE SOLE
RESPONSIBILITY OF GRACE ARCHITECTURE & DESIGN,
LLC., AND HAVE BEEN GENERATED FOR THE CLIENTS
LISTED IN THE PROJECT NAME AND ARE NOT TO BE
USED, REPRODUCED, COPIED, OR DISTRIBUTED FOR ANY
OTHER PROJECT WITHOUT WRITTEN PERMISSION FROM
AND OR COMPENSATION DUE GRACE ARCHITECTURE &
DESIGN, LLC.
UTILIZATION OF THESE DOCUMENTS AND SUBSEQUENT
FABRICATION-CONSTRUCTION ARE THE SOLE
RESPONSIBILITY OF THE CONTRACTOR. BEFORE
STARTING CONSTRUCTION THE CONTRACTOR SHALL
REVIEW AND VERIFY ON SITE ALL DIMENSIONS,
DETAILS AND THEIR CORRELATION TO ATTACHED
ENGINEERING. ANY DISCREPANCIES IN PLANS,
DIMENSIONS, NOTES, OR DETAILS SHALL BE BROUGHT
TO THE IMMEDIATE ATTENTION OF THE DESIGNER
PRIOR TO COMMENCING ASSOCIATED WORK, ALLOWING
REQUIRED CORRECTIONS TO BE PERFORMED. ANY
ATTACHED ENGINEERING OR LOCAL BUILDING
AUTHORITY NOTATIONS SUPERSEDE AND OVERRIDE
MATERIALS, FASTENING, NAILING SCHEDULES AND
CONSTRUCTION PROCEDURES PRESENTED IN PLAN,
SECTION OR DETAIL VIEWS AND SHALL TAKE
PRECEDENCE OVER ANYTHING SHOWN, DESCRIBED OR
IMPLIED. THE CONTRACTOR ASSUMES LIABILITY FOR
ANY PROBLEMS THAT MAY ARISE DUE TO NON-
COMPLIANCE. USE OF THESE PLANS CONSTITUTES
COMPLIANCE WITH THE ABOVE TERMS.
Project
Sports Complex
1650 NW Vicksburg Ct
Waukee, IA 50263
JAMES POINTE PLAT 1 LOT 12
Client
TLM, LLC - Travis Moulton
14322 Sheridan Ave
Urbandale, IA 50323
Architect
Grace Architecture & Design
113 East Court Avenue
Winterset, IA 50273
matt@gracearch.com
515 979-9824
PRELIMINARY
10
/
1
0
/
2
0
2
3
1
:
3
5
:
4
5
P
M
ILLUSTRATIVE
RENDERINGS
A0-IR
20230207
SPORTS COMPLEX
WAUKEE, IA
Date Description
RAIN CAP TO MATCH BLDG
SPLIT FACE CMU -PAINTED TO MATCH
FIBER CEMENT PANELS AT BLDG.
6"
6'
-
0
"
4"5' - 5 1/2"1"5' - 5 1/2"4"
4"
6'
-
2
"
14' - 0"
RAIN CAP TO MATCH BLDG
SPLIT FACE CMU -PAINTED TO MATCH
FIBER CEMENT PANELS AT BLDG.
10
'
-
2
1
/
4
"
4'
-
9
1
/
4
"
3
1
/
4
"
4'
-
3
1
/
4
"
3
1
/
4
"
7
1
/
4
"
1
1
/
2
"
2"
2"
1"
2
1
/
2
"
1/4" PL
GALV
3/16" CHAMFER
ALL AROUND
4'
-
6
1
/
2
"
3/16
3"
1
1
/
2
"
1/
8
"
6"
3/4
"
4
1
/
2
"
3/
4
"
13/16 ⌀
BACKER BAR
1 1/8"2"
3/8"
2
1
/
2
"
1
1
/
4
"
1
1
/
4
"
9/16 ⌀
3/16
6"
1 1/4"1 1/4"
HINGE ELEVATION
HINGE PLAN
BAR 2-1/2x1/4
4
1
/
2
"
9/16⌀
BACKER BAR
HINGE
7
1
/
2
"
4
1
/
2
"
4'
-
2
"
4
1
/
2
"
7
1
/
2
"
1"
1/8 0
1/8 0
GALV
TYP
1/8
1/8
GALV
TYP
9/16 ⌀THRU HOLE
CENTER ON TUBE
HSS 3x2x3/16
2"
5' - 5 1/2"
6'
-
2
"
GALV
TYP
1/8
1/8
GALV
TYP
HSS 3x2x3/16
HSS 3x2x3/16
HSS 3x2x3/16
HSS 3x2x3/16
1'
-
0
"
8
1
/
2
"
1 3/4"2"
BAR 2x1/4 5/16 ⌀
11/16 ⌀
1 3/8"
1"1"
7/8"7/8"
4 3/8"
ROD 5/8 ⌀
ADJUSTABLE COLLARS
2'
-
0
"
14
'
-
0
"
7
5
/
8
"
12
'
-
8
3
/
4
"
7
5
/
8
"
A1-DE
B1
A1-DE C1
A1-DE
D1
A1-DEA1
6"
4"
5'
-
5
1
/
2
"
1"
5'
-
5
1
/
2
"
4"
6"
DUMPSTER
12' - 0"
A B C D E
4
3
2
1
Grace A&D Job #
Project:
10/10/2023 COORDINATION SET
THIS DESIGN AND PLANS ARE THE SOLE
RESPONSIBILITY OF GRACE ARCHITECTURE & DESIGN,
LLC., AND HAVE BEEN GENERATED FOR THE CLIENTS
LISTED IN THE PROJECT NAME AND ARE NOT TO BE
USED, REPRODUCED, COPIED, OR DISTRIBUTED FOR ANY
OTHER PROJECT WITHOUT WRITTEN PERMISSION FROM
AND OR COMPENSATION DUE GRACE ARCHITECTURE &
DESIGN, LLC.
UTILIZATION OF THESE DOCUMENTS AND SUBSEQUENT
FABRICATION-CONSTRUCTION ARE THE SOLE
RESPONSIBILITY OF THE CONTRACTOR. BEFORE
STARTING CONSTRUCTION THE CONTRACTOR SHALL
REVIEW AND VERIFY ON SITE ALL DIMENSIONS,
DETAILS AND THEIR CORRELATION TO ATTACHED
ENGINEERING. ANY DISCREPANCIES IN PLANS,
DIMENSIONS, NOTES, OR DETAILS SHALL BE BROUGHT
TO THE IMMEDIATE ATTENTION OF THE DESIGNER
PRIOR TO COMMENCING ASSOCIATED WORK, ALLOWING
REQUIRED CORRECTIONS TO BE PERFORMED. ANY
ATTACHED ENGINEERING OR LOCAL BUILDING
AUTHORITY NOTATIONS SUPERSEDE AND OVERRIDE
MATERIALS, FASTENING, NAILING SCHEDULES AND
CONSTRUCTION PROCEDURES PRESENTED IN PLAN,
SECTION OR DETAIL VIEWS AND SHALL TAKE
PRECEDENCE OVER ANYTHING SHOWN, DESCRIBED OR
IMPLIED. THE CONTRACTOR ASSUMES LIABILITY FOR
ANY PROBLEMS THAT MAY ARISE DUE TO NON-
COMPLIANCE. USE OF THESE PLANS CONSTITUTES
COMPLIANCE WITH THE ABOVE TERMS.
Project
Sports Complex
1650 NW Vicksburg Ct
Waukee, IA 50263
JAMES POINTE PLAT 1 LOT 12
Client
TLM, LLC - Travis Moulton
14322 Sheridan Ave
Urbandale, IA 50323
Architect
Grace Architecture & Design
113 East Court Avenue
Winterset, IA 50273
matt@gracearch.com
515 979-9824
PRELIMINARY
10
/
1
0
/
2
0
2
3
1
:
3
5
:
4
7
P
M
DUMPSTER ENCLOSURE
A1-DE
20230207
SPORTS COMPLEX
WAUKEE, IA
3/8" = 1'-0"A1-DE
A1 DUMPSTER ENCLOSURE - EAST ELEVATION
3/8" = 1'-0"A1-DE
C1 DUMPSTER ENCLOSURE - WEST ELAVATION
3/8" = 1'-0"A1-DE
D1 DUMPSTER ENCLOSURE - SOUTH ELEVATION
3/8" = 1'-0"A1-DE
B1 DUMPSTER ENCLOSURE - NORTH ELEVATION
REF'D FRM:1/2" = 1'-0"A1-DE
A3 DUMPSTER ENCLOSURE COLUMN FRONT ELEVATION
REF'D FRM:3" = 1'-0"A1-DE
B3 DUMPSTER ENCLOSURE GATE DETAILS
REF'D FRM:3/4" = 1'-0"A1-DE
A4 DUMPSTER ENCLOSURE GATE ELEVATION
REF'D FRM:1 1/2" = 1'-0"A1-DE
C4 DUMPSTER ENCLOSURE GATE LATCH DETAILS
REF'D FRM:1/4" = 1'-0"A200A1-DE
D3 DUMPSTER ENCLOSURE PLAN
RAIN CAP TO MATCH BLDG
SPLIT FACE CMU -PAINTED TO MATCH
FIBER CEMENT PANELS AT BLDG.
Date Description
1ST FLOOR FFE
0' -0"
T.O. EAVE
20' -0"
1
T.O.W.
10' -0"
2345678910
T.O. PEAK
22' -6"
EXTERIOR FINISH PERCENTAGES: 4600 SF TOTAL
DOES NOT FACE PUBLIC ROW
FIBER CEMENT PANELS: 66 SF (1.4%)
STONE: 606 SF (13.2%)
DOORS: 24 SF (.5 %)
METAL PANELS: 3904 SF (84.9 %)
B.O. WINDOW
2' -8"
STN-S1
MTL-V1FBR-CP
R-SS
DNSPTDNSPT DNSPT DNSPT
MTL-1
1ST FLOOR FFE
0' -0"
BFE
-4' -0"
T.O. EAVE
20' -0"
1
T.O.W.
10' -0"
2 3 4 5 6 7 8 9 10 T.O. PEAK
22' -6"
2'
-
8
"
4'
-
4
"
3'
-
0
"
14
'
-
0
"
14' - 0"14' - 0"
14
'
-
0
"
EXTERIOR FINISH PERCENTAGES: 4600 SF TOTAL
FACES PUBLIC ROW
FIBER CEMENT PANELS: 2384 SF (51.8%)
STONE: 491 SF (10.7%)
GLASS: 142 SF (3.1%)
DOORS (& OHD'S): 464 SF (10.1 %)
METAL PANELS: 1119 SF (24.3 %)
CANOPY
12' -0"
B.O. WINDOW
2' -8"
20' - 0"
5'
-
0
"
SIGN
STN-S1
MTL-V1
FBR-CP
MTL-V1
STN-S1
FBR-CP
FBR-CP
ALUM-SF
ALUM-SF
R-SS
DNSPT DNSPTDNSPT
MTL-1
SIGN AREA ALLOWED. THE FOLLOWING SIGN AREAS SHALL BE ALLOWED.
A. PUBLIC STREET FACING TENANT:
I. ONE AND A HALF SQUARE FEET OF SIGN AREA MAY BE ERECTED FOR
EVERY LINEAR FOOT OF TENANT FRONTAGE TO A MAXIMUM OF ONE
HUNDRED (100) SQUARE FEET.
MTL WIND BREAK
1ST FLOOR FFE
0' -0"
BFE
-4' -0"
T.O. EAVE
20' -0"
A
T.O.W.
10' -0"
BDEC
T.O. PEAK
22' -6"
EXTERIOR FINISH PERCENTAGES: 2040 SF TOTAL
FACES PUBLIC ROW
FIBER CEMENT PANELS: 1073 SF (52.6%)
STONE: 259 SF (12.7%)
DOORS: 24 SF (1.2%)
METAL PANELS: 684 SF (33.5 %)
20' - 0"
5'
-
0
"
SIGN 100 SF MAX
STN-S1
FBR-CP
MTL-V1
FBR-CP
MTL-1
SIGN AREA ALLOWED. THE FOLLOWING SIGN AREAS SHALL BE ALLOWED.
A. PUBLIC STREET FACING TENANT:
I. ONE AND A HALF SQUARE FEET OF SIGN AREA MAY BE ERECTED FOR
EVERY LINEAR FOOT OF TENANT FRONTAGE TO A MAXIMUM OF ONE
HUNDRED (100) SQUARE FEET.
1ST FLOOR FFE
0' -0"
BFE
-4' -0"
T.O. EAVE
20' -0"
A B D EC
T.O. PEAK
22' -6"
EXTERIOR FINISH PERCENTAGES: 2040 SF TOTAL
DOES NOT FACE PUBLIC ROW
FIBER CEMENT PANELS: 66 SF (3.2%)
STONE: 267 SF (13.1%)
METAL PANELS: 1707 SF (83.7 %)
CANOPY
12' -0"
STN-S1
FBR-CPMTL-V1
MTL-1
ABBR PRODUCT
EXTERIOR FINISH MATERIALS SCHEDULE
EXTERIOR -METAL WALL PANEL (VERTICAL)MTL-V1
COMMENTSCOLOR/STYLEMANUFACTURER/SUPPLIER
ROOFING -DOWNSPOUTDNSPT
EXTERIOR -CULTURED STONESTN-S1
MTL-1 ROOFING -GUTTER APRON/RAKE MTL/DRIP EDGE
AMERICAN BUILDINGS (NUCOR)
CENTURION STONE
SLATE GRAY
LEDGE: DOVE
ROOFING -STANDING SEAMR-SS
ALUMINUM STOREFRONTALUM-SF TBD
AMERICAN BUILDINGS (NUCOR)GALVALUME
DARK BRONZE
TBD DARK BRONZE/BLACK
TBD DARK BRONZE/BLACK
OR APPROVED EQUAL
FIBER CEMENT PANELSFBR-CP JAMES HARDIE ARCHITECTURAL COLLECTION FINE SAND (SHERWIN WILLIAMS -DARK GRAY)OR APPROVED EQUAL
OR APPROVED EQUAL
A B C D E
4
3
2
1
Grace A&D Job #
Project:
10/10/2023 COORDINATION SET
THIS DESIGN AND PLANS ARE THE SOLE
RESPONSIBILITY OF GRACE ARCHITECTURE & DESIGN,
LLC., AND HAVE BEEN GENERATED FOR THE CLIENTS
LISTED IN THE PROJECT NAME AND ARE NOT TO BE
USED, REPRODUCED, COPIED, OR DISTRIBUTED FOR ANY
OTHER PROJECT WITHOUT WRITTEN PERMISSION FROM
AND OR COMPENSATION DUE GRACE ARCHITECTURE &
DESIGN, LLC.
UTILIZATION OF THESE DOCUMENTS AND SUBSEQUENT
FABRICATION-CONSTRUCTION ARE THE SOLE
RESPONSIBILITY OF THE CONTRACTOR. BEFORE
STARTING CONSTRUCTION THE CONTRACTOR SHALL
REVIEW AND VERIFY ON SITE ALL DIMENSIONS,
DETAILS AND THEIR CORRELATION TO ATTACHED
ENGINEERING. ANY DISCREPANCIES IN PLANS,
DIMENSIONS, NOTES, OR DETAILS SHALL BE BROUGHT
TO THE IMMEDIATE ATTENTION OF THE DESIGNER
PRIOR TO COMMENCING ASSOCIATED WORK, ALLOWING
REQUIRED CORRECTIONS TO BE PERFORMED. ANY
ATTACHED ENGINEERING OR LOCAL BUILDING
AUTHORITY NOTATIONS SUPERSEDE AND OVERRIDE
MATERIALS, FASTENING, NAILING SCHEDULES AND
CONSTRUCTION PROCEDURES PRESENTED IN PLAN,
SECTION OR DETAIL VIEWS AND SHALL TAKE
PRECEDENCE OVER ANYTHING SHOWN, DESCRIBED OR
IMPLIED. THE CONTRACTOR ASSUMES LIABILITY FOR
ANY PROBLEMS THAT MAY ARISE DUE TO NON-
COMPLIANCE. USE OF THESE PLANS CONSTITUTES
COMPLIANCE WITH THE ABOVE TERMS.
Project
Sports Complex
1650 NW Vicksburg Ct
Waukee, IA 50263
JAMES POINTE PLAT 1 LOT 12
Client
TLM, LLC - Travis Moulton
14322 Sheridan Ave
Urbandale, IA 50323
Architect
Grace Architecture & Design
113 East Court Avenue
Winterset, IA 50273
matt@gracearch.com
515 979-9824
PRELIMINARY
10
/
1
0
/
2
0
2
3
1
:
3
5
:
5
0
P
M
ELEVATIONS
A200
20230207
SPORTS COMPLEX
WAUKEE, IA
3/32" = 1'-0"A200
B3 SOUTH ELEVATION (BACK)
3/32" = 1'-0"A200
B4 NORTH ELEVATION (FRONT)
3/32" = 1'-0"A200
D2 WEST ELEVATION (SIDE)
3/32" = 1'-0"A200
A2 EAST ELEVATION (SIDE)
NOT TO SCALEA200
A1 PERSPECTIVE
TOTAL EXTERIOR FINISH PERCENTAGES
13,280 SF TOTAL
FIBER CEMENT PANELS: 3589 SF (27.0%)
STONE: 1623 SF (12.2%)
DOORS: 512 SF (3.9%)
GLASS: 142 SF (1.1%)
METAL PANELS: 7414 SF (55.8 %)