Loading...
HomeMy WebLinkAbout2023-11-20 I07 MTG Sports Complex_Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: November 20, 2023 AGENDA ITEM: Consideration of approval of a resolution approving a site plan for MTG Sports Complex (1650 NW Vicksburg Court) FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: Re/Max Precision requests approval of a site plan to authorize the construction of a single-story building for sports practice facility. The building is 23,200 square feet in area and 22.5 feet in height. The building will also include storage space. A trash enclosure is shown to the northeast of the building. Two accesses will be provided into the site. One will be provided off of NW 17th Street and one will be provided off of NW Vicksburg Court. A total of 81 parking spaces are required and they are providing 83 spaces. The site will be serviced with all public utilities. Storm water detention will be provided with the detention basin located at the northeast corner of the site. The landscape plan meets the requirements of the Landscape and Open Space Ordinance. The elevations of the building are proposed to be constructed mainly of metal wall panels, fiber cement panels, stone, and storefront system. The trash enclosure will be constructed of split face CMU with a steel gate. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this project at the November 14, 2023, Commission Meeting and recommended approval subject to remaining staff comments: Item 8: Approval of a Site Plan for MTG Sports Complex (1650 NW Vicksburg Court) Bill Mettee, City Planner, introduced the request for approval of a site plan for a sports practice facility, as presented by the applicant, RE/Max Precision, represented by David Bentz PE-Bishop Engineering. The property is located north of Hickman Road and east of NW 17th Street, containing approximately 2.47-acres. The site plan identifies the construction of a 23,200 square foot building for a sports practice facility. The building is 22.5 feet in height and will also include storage space, with a trash enclosure shown to the northeast of the building. Two accesses will be provided into this site from the public streets. One access will be provided from NW 17th Street and one from NW Vicksburg Court. A total of 81 parking spaces are required for this project. The total amount of proposed parking is 83 parking spaces, including four (4) accessible spaces. A five-foot-wide sidewalk will be constructed on the south side of NW Vicksburg Court. A 10-foot-wide trail exists along the east side of NW 17th street. A pedestrian connection into the site is provided from the trail along the south side of the site. I7 The site will be serviced with all public utilities. Stormwater detention will be provided with the detention basin located at the northeast corner of the site. A minimum of 15% of the project area is required to be open space. The total amount of open space proposed is 42%. A 40-foot landscape buffer is provided along the south side of the site to provide buffering between the industrial and commercial zoning districts. The plantings shown on the landscape plan meet the minimum requirements of the Landscape & Open Space Ordinance. The elevations of the building are proposed to be constructed mostly of metal wall panels, fiber cement panels, stone, and storefront system. The trash enclosure will be constructed of split face CMU with a steel gate. A photometric plan for the site lighting complies with the requirements of the Site Plan Ordinance. The comprehensive plan classifies the subject property as Mixed Use, which provides flexibility and a variety of different uses within a neighborhood. The site plan is in general conformance with the Site Plan Ordinance and Comprehensive Plan. Staff recommends approval of the site plan for MTG Sports Complex, subject to remaining staff comments. Discussion as follows: • Zoning for the surrounding area • Matt Floden of Grace Architecture, Winterset, IA indicated facility use to be primarily baseball, softball, batting cages; to be rented by teams but may be open to the public as well for aerobics, boxing etc. and stated the Moonshots logo is branding for softball and a business name, not a specific team name. Motion by Commissioner Broderick for approval of a Site Plan for MTG Sports Complex, seconded by Commissioner Lohse. Ayes: Koelker, Beenken, Broderick, Lohse, Tessau. Nays: None. Motion carried. STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan subject to remaining staff comments. RECOMMENDATION: Approve the resolution subject to remaining staff comments. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan & Elevations PREPARED BY: Melissa DeBoer, Planning Coordinator REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 2023- APPROVING THE SITE PLAN FOR MTG SPORTS COMPLEX (1650 NW VICKSBURG COURT) IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for MTG Sports Complex, subject to remaining staff comments on November 14, 2023; AND, WHEREAS, the Site Plan for MTG Sports Complex is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for MTG Sports Complex is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 20th day of November, 2023 that the Site Plan for MTG Sports Complex is approved subject to remaining staff comments. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman Pierce R. Charles Bottenberg Chris Crone Larry R. Lyon Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: MTG Sports Complex – Site Plan PREPARED BY: Melissa DeBoer, AICP – Planning Coordinator REPORT DATE: November 8, 2023 MEETING DATE: November 14, 2023 GENERAL INFORMATION Applicant: Re/Max Precision Owner: TLM, LLC Engineer: David Bentz, PE – Bishop Engineering Request: The applicant is requesting approval of a site plan for a sports practice facility. Location and Size: Property is located north of Hickman Road and east of NW 17th Street, containing approximately 2.47-acres. Property Address: 1650 NW Vicksburg Court AREA MAP ABOVE: Aerial of subject property (outlined in RED) in relation to the surrounding area. November 8, 2023 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant – Undeveloped Mixed Use M-1 (Light Industrial District) North Vacant – Undeveloped Mixed Use M-1 (Light Industrial District) South Vacant – Undeveloped Mixed Use C-1 (Community and Highway Service Commercial District) East Vacant – Undeveloped Mixed Use M-1 (Light Industrial District) West Vacant – Undeveloped Mixed Use M-1 (Light Industrial District) PROJECT DESCRIPTION The site plan identifies the construction of a 23,200 square foot building for a sports practice facility. The building is 22.5 feet in height. The building will also include storage space. A trash enclosure is shown to the northeast of the building. ACCESS AND PARKING Two accesses will be provided into this site from the public streets. One access will be provided off of NW 17th Street and one access will be provided off of NW Vicksburg Court. A total of 81 parking spaces are required for this project. The total amount of parking proposed is 83 parking spaces, including 4 accessible spaces. SIDEWALKS/TRAILS A 5-foot-wide sidewalk will be constructed on the south side of NW Vicksburg Court. A 10-ft wide trail exists along the east side of NW 17th Street. A pedestrian connection into the site is provided from the trail along the south side of the site. UTILITIES The site will be serviced with all public utilities. Stormwater detention will be provided with the detention basin located at the northeast corner of the site. LANDSCAPING & OPEN SPACE A minimum of 15% of the project area is required to be open space. The total amount of open space proposed is 42%. A 40-foot landscape buffer is provided along the south side of the site to provide buffering between the industrial and commercial zoning districts. The plantings shown on the landscape plan meet the minimum requirements of the Landscape & Open Space Ordinance. ELEVATIONS The elevations of the building are proposed to be constructed mostly of metal wall panels, fiber cement panels, stone, and storefront system. The trash enclosure will be constructed of split face CMU with a steel gate. November 8, 2023 3 of 3 PHOTOMETRIC PLAN A photometric plan for the site lighting has been submitted and complies with the requirements of the Site Plan Ordinance. COMPREHENSIVE PLAN The comprehensive plan classifies the subject property as Mixed Use. The Mixed Use classification provides flexibility and variety of different uses within a neighborhood. STAFF RECOMMENDATION The site plan is in general conformance with the Site Plan Ordinance and Comprehensive Plan. Staff recommends approval of the site plan for MTG Sports Complex subject to remaining staff comments. SITE MTG SPORTS COMPLEX SITE PLAN IOWAONE CALL 1-800-292-8989 www.iowaonecall.com 811 Know what's below. Call before you dig. PROPERTY DESCRIPTION: LOT 12 IN JAMES POINTE PLAT 1, AN OFFICIAL PLAT, NOW INCLUDED IN AND FORMING A PART OF THE CITY OF WAUKEE, DALLAS COUNTY, IOWA ADDRESS: 1650 NW VICKSBURG COURT WAUKEE, IOWA 50263 OWNER: TLM, LLC. ATTN: TRAVIS MOULTON PH.: (515) 494-1066 EMAIL: TRAVIS@PRECISIONDSM.COM 14322 SHERIDAN AVE URBANDALE, IOWA, 50323 PREPARED FOR: RE/MAX PRECISION 2202 WOODLANDS PARKWAY CLIVE, IOWA 50325 ATTN:TRAVIS MOULTON PH.: (515) 494-1066 EMAIL: TRAVIS@PRECISIONDSM.COM PROPOSED USE: FACILITY WILL BE USED FOR SPORTS PRACTICE AS WELL AS STORAGE. FACILITY WILL NOT BE USED FOR SPORTING EVENTS. 3,200 SF OF GFA WILL BE DEDICATED STORAGE FOR OWNER'S VEHICLE AND FACILITY EQUIPMENT. ZONING: M-1 (LIGHT INDUSTRIAL DISTRICT) BULK REGULATIONS: FRONT: 30 FEET SIDE: NONE, 40 FEET ALONG R OR C-1 DISTRICTS REAR: 30 FEET MAX. BLDG. HEIGHT:40 FEET PROPOSED BUILDING HEIGHT: 22.5 FEET PARKING REQUIREMENTS: FITNESS CENTER / HEALTH CLUB REQUIREMENT: 4 SPACES PER 1,000 SF GROSS FLOOR AREA STALLS REQUIRED: 80 (20,000 SF FLOOR AREA) SELF STORAGE / MINI WAREHOUSE REQUIREMENT: 1 SPACE PER 20,000 SF GROSS FLOOR AREA STALLS REQUIRED: 1 (3,200 SF FLOOR AREA) TOTAL STALLS REQUIRED: 81 TOTAL STALLS PROPOSED: 83 (INCL. 4 ADA) OPEN SPACE REQUIREMENTS: LOT AREA:107,837 - 2.47 ACRES OPEN SPACE REQUIRED: 16,175 SF (15% OF LOT AREA) OPEN SPACE PROVIDED: 45,287 SF (42.00% OF LOT AREA) IMPERVIOUS SURFACE: EXISTING PERVIOUS SURFACE = 107,837 SF EXISTING IMPERVIOUS SURFACE = 0 SF PROPOSED IMPERVIOUS SURFACE = 62,550 SF (58.00%) PROPOSED PERVIOUS SURFACE = 45,287 SF (42.00%) BENCHMARK: BASIS OF BEARING OBTAINED FROM GPS OBSERVATIONS DATUM = NAD 83, IOWA SOUTH BENCHMARK DATUM = NAVD88, GEOID 18 VICINITY MAP SCALE: 1' = 1,000' COPYRIGHT 2023 BISHOP ENGINEERING. THIS DOCUMENT AND THE INFORMATION CONTAINED MAY NOT BE REPRODUCED OR EXCERPTED WITHOUT THE EXPRESS WRITTEN PERMISSION OF BISHOP ENGINEERING. UNAUTHORIZED COPYING OR DISCLOSURE OF CONSTRUCTION USE ARE PROHIBITED BY COPYRIGHT LAW. CO V E R S H E E T C0.1 SHEET INDEX: C0.1 COVER SHEET C1.1 EX CONDITIONS & DEMO PLAN C2.1 LAYOUT PLAN C3.1 GRADING PLAN C4.1 UTILITY PLAN C5.1 LANDSCAPE PLAN C6.1-C6.2 DETAILS SHEET C7.1 SWPPP UTILITY CONFLICT NOTES: 1.UTILITY CONFLICTS MAY EXIST ACROSS THE SITE WITH NEW UTILITIES, GRADING, PAVING ETC. MOST UTILITY CONFLICTS HAVE BEEN CALLED OUT FOR CONTRACTOR CONVENIENCE. 2.CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY CONFLICTS THAT ARE EITHER CALLED OUT ON THE PLANS OR THAT CAN BE SEEN ON THE PLANS BETWEEN AN EXISTING UTILITY AND PROPOSED CONSTRUCTION WETLAND NOTES: 1.BISHOP ENGINEERING DOES NOT PERFORM WETLAND STUDIES OR WETLAND MITIGATION. IT IS THE OWNER'S RESPONSIBILITY TO DETERMINE IF ANY WETLANDS ARE LOCATED ON THE PROJECT SITE AND PERFORM ANY NECESSARY MITIGATION PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITIES. SURVEY NOTES: 1.SURVEY WORK WAS COMPLETED BY BISHOP ENGINEERING ON 2-17-2023. SEE SITE SURVEY PROVIDED AS PART OF THIS SET OF PLANS FOR EXISTING SITE CONDITIONS AND BOUNDARY INFORMATION. GENERAL NOTES: 1.ALL WORK SHALL BE DONE IN ACCORDANCE WITH 2023 WAUKEE STANDARD SPECIFICATIONS, 2023 SUDAS STANDARD SPECIFICATIONS AND ANY AND ALL CITY/COUNTY SUPPLEMENTAL SPECIFICATIONS. THE CITY OF WAUKEE MUST BE NOTIFIED BY ALL CONTRACTORS 48 HOURS PRIOR TO COMMENCING WORK. 2.IN EVENT OF A DISCREPANCY BETWEEN THE QUANTITY ESTIMATES AND THE DETAILED PLANS, THE DETAILED PLANS SHALL GOVERN. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION OF ALL UTILITIES. ANY DAMAGE TO SAID UTILITIES SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE. 4.ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CURRENT O.S.H.A. CODES AND STANDARDS. NOTHING INDICATED ON THESE PLANS SHALL RELIEVE THE CONTRACTOR FROM COMPLYING WITH THE APPROPRIATE SAFETY REGULATIONS. 5.ALL NECESSARY CONSTRUCTION SIGNS, BARRICADES AND OTHER TRAFFIC CONTROL DEVICES REQUIRED DURING CONSTRUCTION WILL BE FURNISHED BY THE CONTRACTOR. SIGNS, BARRICADES AND OTHER TRAFFIC CONTROL DEVICES MUST BE IN CONFORMANCE WITH THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS." 6.BISHOP ENGINEERING SHALL NOT BE LIABLE FOR ANY INJURIES THAT HAPPEN ON SITE. THIS SHALL INCLUDE BUT NOT BE LIMITED TO TRENCH COLLAPSES FROM VARYING SOIL CONDITIONS OR INJURIES CAUSED BY UNDERGROUND UTILITIES INCLUDING UTILITIES THAT ARE NOT SHOWN ON PLAN. 7.THE CONTRACTOR IS LIABLE FOR ALL DAMAGES TO PUBLIC OR PRIVATE PROPERTY CAUSED BY THEIR ACTION OR INACTION IN PROVIDING FOR STORM WATER FLOW DURING CONSTRUCTION. DO NOT RESTRICT FLOWS IN EXISTING DRAINAGE CHANNELS, STORM SEWER, OR FACILITIES. 8.THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER A SCHEDULE FOR PERFORMANCE OF WORK ITEMS. THIS SCHEDULE SHALL BE PROVIDED BY THE CONTRACTOR AT THE PROJECT PRECONSTRUCTION CONFERENCE. NO WORK SHALL BEGIN UNTIL A SCHEDULE HAS BEEN SUBMITTED AND ACCEPTED. THE CONTRACTOR SHALL THEN PERFORM WORK TO CONFORM TO THE ACCEPTED SCHEDULE. 9.LABORATORY TESTS SHALL BE PERFORMED BY THE OWNER UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL PROVIDE SAMPLES OF MATERIAL REQUIRED FOR LABORATORY TESTS AND TESTING IN ACCORDANCE WITH THE URBAN STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS. 10.SOIL IMPORT OR EXPORT ON THIS PROJECT SHALL BE CONSIDERED INCIDENTAL AND WILL NOT BE MEASURED OR PAID FOR SEPARATELY. 11.THE CONTRACTOR SHALL PROTECT ALL STRUCTURES NOT SHOWN AS REMOVALS ON THE PLANS. 12.THE CONTRACTOR SHALL OBTAIN ANY AND ALL NECESSARY PERMITS PRIOR TO ANY CONSTRUCTION. CONTRACTOR SHALL WORK WITH OWNER OR OWNERS REPRESENTATIVE ON ALL REQUIRED STORM WATER DISCHARGE PERMITS FROM THE IOWA DEPARTMENT OF NATURAL RESOURCES AND THE CITY OF WAUKEE. 13.GRADING AND EROSION CONTROL SHALL BE DONE IN ACCORDANCE WITH THE APPROVED GRADING PLAN, SWPPP, NPDES DOCUMENTS, AND IOWA DEPARTMENT OF NATURAL RESOURCES REQUIREMENTS. 14.THE CONTRACTOR SHALL PICK UP ANY DEBRIS SPILLED ONTO THE ADJACENT RIGHT OF WAY OR ABUTTING PROPERTIES AS THE RESULT OF CONSTRUCTION, AT THE END OF EACH WORK DAY AND PRIOR TO A RAIN EVENT. 15.THE CONTRACTOR IS RESPONSIBLE FOR THE PROMPT REMOVAL OF ALL MUD THAT HAS BEEN TRACKED OR WASHED UNTO ADJACENT PROPERTY OR RIGHT OF WAY UNTIL SUCH TIME THAT PERMANENT VEGETATION HAS BEEN ESTABLISHED. 16.DISPOSE OF ALL EXCESS MATERIALS AND TRASH IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REQUIREMENTS. PROVIDE WASTE AREAS OR DISPOSAL SITES FOR EXCESS MATERIALS NOT DESIRABLE FOR INCORPORATION INTO THE PROJECT. 17.APPROVED FIRE APPARATUS ACCESS ROADS SHALL BE PROVIDED AS SOON AS CONSTRUCTION COMMENCES. IF PAVING IS NOT INSTALLED PRIOR TO BUILDING CONSTRUCTION COMMENCING AFTER FOOTING INSTALLED, AN APPROVED ROUTE AROUND THE EXTERIOR OF THE BUILDING TO EXTEND WITHIN 100 FEET OF ALL PORTIONS OF THE EXTERIOR WALLS SHALL BE PROVIDED AND COMPLY WITH THE REQUIREMENTS OF SECTION 503.2 OF THE IFC. PAVING NOTES: 1.THE PAVING/ GRADING CONTRACTOR SHALL BACKFILL THE PAVING SLAB AND FINE GRADE THE RIGHT OF WAY AS SOON AFTER THE PAVING AS POSSIBLE. ALL AREAS SHALL BE SEEDED IN ACCORDANCE WITH CITY OF WAUKEE STANDARD SPECIFICATIONS AND THE CURRENT VERSION OF SUDAS. 2.SUBGRADE PREPARATION AND PAVEMENTS WILL BE CONSTRUCTED FOLLOWING RECOMMENDATIONS IN THE SOILS REPORT. APPROVED SOILS ENGINEER MUST SIGN OFF ON SUB BASE PRIOR TO ANY PAVEMENT BEING PLACED. 3.SEE DETAILS FOR ALL PAVEMENT THICKNESS. 4.ALL PEDESTRIAN WALKWAYS THAT UNLOAD INTO A VEHICLES TRAVELED PATH MUST HAVE A.D.A. DETECTABLE WARNING PANEL(S) AS PER A.D.A. REGULATIONS. PANEL TYPE & COLOR SHALL BE PER CITY STANDARD. 5.ALL WALKS, PARKING LOTS, HANDICAP PARKING, RAMPS, ETC. SHALL COMPLY WITH ALL A.D.A. AND CITY CODES. HANDICAP PARKING SIGNAGE IS REQUIRED FOR ALL HANDICAP STALLS AND SHALL BE CONSIDERED INCIDENTAL. IN EVENT OF A DISCREPANCY BETWEEN THE PLANS AND THE A.D.A./CITY CODES THE A.D.A./CITY CODES SHALL GOVERN. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING A.D.A. CODES ARE MET. UTILITY NOTES: 1.QUANTITY CALLOUTS ON PIPE LENGTHS ARE APPROXIMATE AND SHOULD BE USED FOR REFERENCE ONLY. 2.THE CONTRACTOR SHALL PROVIDE AS-BUILTS OF ALL UTILITIES, INCLUDING DEPTH AND LOCATION OF ALL SERVICES. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION AND ALL COSTS ASSOCIATED WITH AS-BUILT TOPO OF DETENTION POND & DETENTION POND STORM SEWER. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING BISHOP ENGINEERING (DAVID BENTZ AT 515-276-0467) TO PERFORM SAID AS-BUILT SURVEY. IF DETENTION PONDS HAVE BEEN GRADED INCORRECTLY, CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SUBSEQUENT AS-BUILT TOPO SURVEYS UNTIL ISSUES HAVE BEEN RECTIFIED. 4.THE CONTRACTOR SHALL COORDINATE THE ADJUSTMENT OF ANY AND ALL EXISTING AND PROPOSED UTILITIES TO PROPOSED GRADES. EXISTING UTILITIES SHALL BE RAISED OR LOWERED IN ACCORDANCE WITH THE UTILITY OWNER REQUIREMENTS. ANY NECESSARY ADJUSTMENTS SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. 5.ACTIVE EXISTING FIELD TILES ENCOUNTERED DURING CONSTRUCTION SHALL BE REPAIRED, REROUTED, OR CONNECTED TO PUBLIC OR PRIVATE STORM SEWER TO REMAIN IN SERVICE. 6.ALL PROPOSED RCP STORM SEWER PIPE JOINTS SHALL BE FABRIC WRAPPED AND THE LAST 3 PIPE SECTIONS ON THE APRON SHALL BE TIED WITH RF-14 TYPE II CONNECTORS. ALL APRONS SHALL HAVE A STANDARD FOOTING AND TRASH GUARD. 7.ALL RIP RAP CALLED OUT ON PLANS SHALL BE UNDERLAIN WITH ENGINEERING FABRIC. 8.SANITARY SEWER SERVICE CONNECTIONS SHALL BE PLACED AT A SLOPE OF NO LESS THAN 2%. SERVICES SHALL MAINTAIN 18" OF VERTICAL SEPARATION FROM THE WATERMAIN WITH 18" OF COMPACTED LOW PERMEABILITY SOIL BETWEEN THE UTILITIES WITHIN 10' OF THE CROSSING. 9.MANDREL AND PRESSURE TESTS SHALL BE REQUIRED FOR ALL PROPOSED SANITARY LINES. TELEVISING OF THE SANITARY SEWER SYSTEM SHALL BE COMPLETED PRIOR TO PAVING UNLESS OTHERWISE APPROVED BY JURISDICTION. 10.WATERMAINS SHALL BE C-900. SIZE OF WATERMAIN AS SHOWN ON PLANS. 11.THRUST BLOCKS SHALL BE INSTALLED AS REQUIRED AND SHALL BE CONSIDERED INCIDENTAL TO WATERMAIN CONSTRUCTION. 12.PROPOSED WATERMAIN SHALL BE PRESSURE TESTED, BACTERIA TESTED AND CHLORINATED. THE FILLING OF THE WATER MAIN SHALL BE DONE BY THE CITY OF WAUKEE. 13.TRACER WIRE SHALL BE ADDED TO ALL WATER MAIN, AND BROUGHT TO THE SURFACE AT EVERY HYDRANT. 14.ALL HYDRANTS WILL IMMEDIATELY BE COVERED WITH A BLACK PLASTIC BAG (OR EQUIVALENT) ONCE THE HYDRANT IS INSTALLED. THE CITY OF WAUKEE WILL NOTIFY THE CONTRACTOR WHEN THE BAGS CAN BE REMOVED. 15.THE MINIMUM HYDRANT LEAD SHALL BE 3.5 FEET. REFERENCE NUMBER: 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 DRAWN BY: CHECKED BY: REVISION DATE: PROJECT NUMBER: SHEET NUMBER: MT G S P O R T S C O M P L E X WA U K E E , I O W A DRL DB 03/30/2023 1ST CITY SET 09/18/2023 2ND CITY SET 10/11/2023 3RD CITY SET 230051 PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N L: \ L A N D P R O J E C T S 2 0 2 3 \ 2 3 0 0 5 1 - M T G S P O R T S C O M P L E X \ D W G \ C 0 C O V E R . D W G 10 / 2 6 / 2 0 2 3 2 : 1 0 : 3 8 P M UTILITY NOTE: THE LOCATION OF THE UTILITIES INDICATED ON THE PLANS HAVE BEEN TAKEN FROM THE FIELD SURVEY, EXISTING PUBLIC RECORDS, AND PLANS PROVIDED BY OTHERS. SURFACE UTILITY LOCATIONS HAVE BEEN FIELD LOCATED BY BISHOP ENGINEERING, UNLESS OTHERWISE NOTED. ALL UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE LOCATIONS ONLY. BISHOP ENGINEERING DOES NOT GUARANTEE THE UNDERGROUND LOCATION OF ANY UTILITIES SHOWN. IT SHALL BE THE DUTY OF THE CONTRACTOR TO DETERMINE THE LOCATION AND DEPTH OF ANY UNDERGROUND UTILITIES SHOWN AND IF ANY ADDITIONAL UTILITIES, OTHER THAN THOSE SHOWN ON THE PLANS, MAY BE PRESENT. A REQUEST WAS MADE TO IOWA ONE CALL FOR UTILITY PROVIDERS TO VERIFY, LOCATE, AND MARK THEIR UTILITIES IN THE FIELD.C0.1 - C7.1 ABBREVIATIONS: AC ACRES ASPH ASPHALT BK BOOK CONC CONCRETE D DEEDED DISTANCE EX EXISTING ENCL ENCLOSURE FF FINISHED FLOOR FL FLOW LINE FRAC FRACTIONAL M MEASURED DISTANCE MH MANHOLE OPC ORANGE PLASTIC CAP P PLATTED DISTANCE PG PAGE POB POINT OF BEGINNING POC POINT OF COMMENCEMENT PRA PREVIOUSLY RECORDED AS PUE PUBLIC UTILITY EASEMENT ROW RIGHT OF WAY RPC RED PLASTIC CAP SF SQUARE FEET SAN SANITARY TYP TYPICAL YPC YELLOW PLASTIC CAP N NORTH S SOUTH E EAST W WEST ELECTRIC VAULT TRANSFORMER POLE TRANSFORMER POLE LIGHT POLE ELECTRIC JUNCTION BOX ELECTRIC PANEL TRANSFORMER GROUND LIGHT GUY WIRE ELECTRIC HANDHOLE GAS METER GAS VALVE AIR CONDITIONING UNIT TELEPHONE RISER TELEPHONE VAULT TELEPHONE MANHOLE TRAFFIC SIGNAL MANHOLE FIBER OPTIC MANHOLE FIBER OPTIC RISER FIBER OPTIC VAULT CABLE TV RISER SIGN BOLLARDS 7 DENOTES NUMBER OF PARKING STALLS PROPERTY CORNER - FOUND AS NOTED PROPERTY CORNER- PLACED 5/8" IRON ROD WITH YELLOW PLASTIC CAP ID # 14775 OR AS NOTED SECTION CORNER - FOUND AS NOTED SITE CONTROL POINT - MONUMENT AS NOTED ELEC EJ EP GM GV A/C T TEL T TS FO F/O TV F/O SAN SANITARY SEWER ST STORM SEWER W WATER LINE G GAS LINE U/E UNDERGROUND ELECTRIC O/E OVERHEAD ELECTRIC TELE TELEPHONE LINE F/O FIBER OPTIC CATV CABLE TV STORM MANHOLE CURB INTAKE SURFACE INTAKE FLARED END SECTION ROOF DRAIN DOWNSPOUT SANITARY MANHOLE CLEANOUT FIRE HYDRANT SPRINKLER IRRIGATION CONTROL VALVE WATER MANHOLE WELL WATER VALVE WATER SHUT OFF YARD HYDRANT FLAGPOLE ELECTRIC MANHOLE ELECTRIC METER ELECTRIC RISER D S CO H Y D I CV W WS O YA DR E EM E W WV LEGEND UTILITY MAPS PROVIDED BY: 1. ELECTRIC (MID AMERICAN / 515-252-6972) 2. STORM AND SANITARY (CITY OF WAUKEE / 515-978-7920) 3. GAS (CITY OF WAUKEE / 515-978-7920) 4. WATER (CITY OF WAUKEE / 515-978-7920) FIRE SAFETY CONSTRUCTION: 1.APPROVED FIRE APPARATUS ACCESS ROADS SHALL BE PROVIDED AS SOON AS CONSTRUCTION COMMENCES. IF PAVING IS NOT INSTALLED PRIOR TO BUILDING CONSTRUCTION COMMENCING AFTER FOOTING INSTALLED, AN APPROVED ROUTE AROUND THE EXTERIOR OF THE BUILDING TO EXTEND WITHIN 100 FEET OF ALL PROTIONS OF THE EXTERIOR WALLS SHALL BE PROVIDED AND COMPLY WITH THE REQUIREMENTS OF SECTION 503.2 OF THE IFC. CONSTRUCTION SCHEDULE: 1.OCTOBER 2023 - BREAK GROUND 2.SPRING 2024 - UTILITY WORK COMPLETE 3.SUMMER 2024 - PAVING COMPLETE 4.FALL 2024 - FINAL LANDSCAPING NW 1 7 T H S T R E E T NW VICKSBURG COURT CP #9000 D EX STORM MH RIM=1029.75 EX INTAKE T/C=1029.10 RIM=1029.27 CO CO EX INTAKE T/C=1029.27 RIM=1028.78 EX INTAKE T/C=1029.22 RIM=1028.77 D EX STORM MH RIM=1029.79 FL(S 42"RCP)=1024.54 FL(N 42"RCP)=1024.47 FL(SE 18"RCP)=1024.41 FL(W 18"RCP)=1024.39 S EX SAN MH RIM=1032.32 INV(E 8"PVC)=1021.50 S EX SAN MH RIM=1030.12 INV(W 8"PVC)=1019.57 INV(E 8"PVC)=1019.52 EX 18"FES FL=1024.40 H Y D TBM: BURY BOLT ELEV=1032.70 CO EX SAN CO RIM=1030.36 INV=1021.13 PER OLD PLAN D EX STORM MH RIM=1030.93 FL(E 15"RCP)=1024.80 FL(NW 18"RCP)=1024.77 FL(S 15"RCP)=1024.73 EX 15" FES FL=1024.75 EX 15"FES FL=1025.84 EX INTAKE T/C=1029.79 RIM=1029.27 CP #9001 D EX STORM MH RIM=1032.63 FL(N 42"RCP)=1023.38 FL(S 42"RCP)=1023.33 EX INTAKE T/C=1029.27 RIM=1028.80 U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E ST 18" S T 1 5 " ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" S T 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6"ST 6"ST 6"ST 6"ST 6"ST 6" APPROX. LOCATION SUBDRAIN PER CITY OF WAUKEE GIS EX SUBDRAIN PER CITY OF WAUKEE GIS ST 42 " ST 42 " ST 42 " ST 18 " ST 18" ST 15"ST 15"ST 15"ST 15"ST 15" SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8" SAN 6" SAN 6" ST 42" 70' R . O . W . ( P U B L I C S T R E E T - C O N C R E T E S U R F A C E ) 60' R.O.W.(PUBLIC STREET-CONCRETE SURFACE) 30' BUILDING SETBACK LINE 30' B U I L D I N G S E T B A C K L I N E 20 ' P R I V A T E S T O R M S E W E R EA S E M E N T ( B K 2 0 2 1 , P G 2 5 1 ) 40 ' L A N D S C A P E B U F F E R EA S E M E N T ( B K 2 0 2 1 , P G 2 4 7 ) 10' P U B L I C U T I L I T Y E A S E M E N T (B K 2 0 2 1 , P G 2 4 5 ) 15 ' S A N I T A R Y S E W E R E A S E M E N T (B K 2 0 2 1 , P G 2 4 6 ) 10 ' P . U . E . (B K . 2 0 2 1 , P G . 2 4 5 ) 20' PRIVATE STORM SEWER EASEMENT(BK 2021, PG 251) F/O 10 3 4 1034 1030 1030 1033 1034 1032 1 0 3 2 1026 1030 1030 10 3 2 10 3 0 1030 1028 1028 1026 1026 1035 103 5 103 3 1030 1030 1031 1030 1029 LOT 12 AREA = 107,837 SF (2.47 ACRES) LOT 13 OWNER:TERRA INVESTMENTS LLC. ZONED:M-1 LOT 17 OWNER:SCOTT L. TEMPLE PROPERTY MANAGEMENT TRUST ZONED:M-1 EX . 1 0 ' C O N C R E T E S I D E W A L K G4" G4" G4" G4" G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4" W8" W8" W8" W8"W8"W8"W8"W8"W8"W8" W6" W6" APPROX LOCATION PER CITY OF WAUKEE GIS APPROX LOCATION PER CITY OF WAUKEE GIS LOT 18 OWNER:WAUKEE LAND INVESTMENT, LLC. ZONED:M-1 LOT 11 OWNER:DILEEP KUMAR PAYAWALA ET. ALL ZONED:C-1 LOT 10 OWNER:WAUKEE LAND INVESTEMENNTS LLC. ZONED:C-1 LOT 9 OWNER:WAUKEE LAND INVESTEMENNTS LLC. ZONED:C-1 (148.65' S89°53'57"W) W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W8" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G4" SA N 8" SA N 8" W 6" 20' P R I V A T E S T O R M S E W E R EAS E M E N T ( B K 2 0 2 1 , P G 2 5 1 ) (R=25' Δ=84°16'12" L=38.77' CH=33.54' S62°10'59"W) (R=363' Δ=14°25' 0 8 " L=91.35' CH=91.1 1 ' N82°53'29"W) (R=340' Δ=01°22'05" L=8.12' CH=8.12' S43°25'46"W) (R= 6 3 5 ' Δ = 2 4 ° 0 3 ' 5 5 " L = 2 6 6 . 7 1 ' CH = 2 6 4 . 7 6 ' S 3 2 ° 0 4 ' 5 1 " W ) (480.60' S89°53'57"W) (3 0 1 . 2 1 ' S 0 0 ° 0 6 ' 0 3 " E ) D EX STORM MH RIM=1031.16 FL(W 15"RCP)=1025.56 FL(S 15"RCP)=1025.54 D EX STORM MH RIM=1030.84 FL(NE 42"RCP)=1024.24 FL(SW 42"RCP)=1024.22 30' BUILDING SETBACK LINE 1032 1030 1028 1032 1028 1030 1032 1033 1030 1033 U/E U/E ST O R M W A T E R E A S E M E N T (BO O K 2 0 2 1 P A G E 2 5 0 ) 1033 1029 1027 1026 1029 1031 1034 WV EX 8" VALVE PER JAMES POINTE CDS EX 6" SAN STUB 15" 1029 1028 1027 10 3 1 SAW CUT 62.7 LF OF CURB AT PROPOSED DRIVE SAWCUT AND REMOVE PAVEMENT SAW CUT 64' LF OF CURB AT PROPOSED DRIVE REMOVE EX FES REMOVE & RELOCATE HYDRANT REMOVE APPROX 18' OF EX 18" STORM PROTECT REMAINDER OF EX PIPE SITESITE REFERENCE NUMBER: 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 DRAWN BY: CHECKED BY: REVISION DATE: PROJECT NUMBER: SHEET NUMBER: MT G S P O R T S C E N T E R WA U K E E , I O W A EX I S T I N G C O N D I T I O N S & D E M O . JPN MDH 230051 C1.1 MTG SPORTS COMPLEX EXISTING CONDITIONS & DEMO. L: \ L A N D P R O J E C T S 2 0 2 3 \ 2 3 0 0 5 1 - M T G S P O R T S C O M P L E X \ D W G \ C 1 E X I S T I N G C O N D I T I O N S & D E M O . D W G 10 / 2 6 / 2 0 2 3 2 : 1 0 : 4 7 P M IOWAONE CALL 1-800-292-8989 www.iowaonecall.com 811 Know what's below. Call before you dig. UTILITY NOTE: THE LOCATION OF THE UTILITIES INDICATED ON THE PLANS HAVE BEEN TAKEN FROM THE FIELD SURVEY, EXISTING PUBLIC RECORDS, AND PLANS PROVIDED BY OTHERS. SURFACE UTILITY LOCATIONS HAVE BEEN FIELD LOCATED BY BISHOP ENGINEERING, UNLESS OTHERWISE NOTED. ALL UNDERGROUND UTILITY LOCATIONS ARE APPROXIMATE LOCATIONS ONLY. BISHOP ENGINEERING DOES NOT GUARANTEE THE UNDERGROUND LOCATION OF ANY UTILITIES SHOWN. IT SHALL BE THE DUTY OF THE CONTRACTOR TO DETERMINE THE LOCATION AND DEPTH OF ANY UNDERGROUND UTILITIES SHOWN AND IF ANY ADDITIONAL UTILITIES, OTHER THAN THOSE SHOWN ON THE PLANS, MAY BE PRESENT. A REQUEST WAS MADE TO IOWA ONE CALL FOR UTILITY PROVIDERS TO VERIFY, LOCATE, AND MARK THEIR UTILITIES IN THE FIELD.FIELD WORK COMPLETED ON: 2-17-2023 COPYRIGHT 2023 BISHOP ENGINEERING. THIS DOCUMENT AND THE INFORMATION CONTAINED MAY NOT BE REPRODUCED OR EXCERPTED WITHOUT THE EXPRESS WRITTEN PERMISSION OF BISHOP ENGINEERING. UNAUTHORIZED COPYING OR DISCLOSURE OF CONSTRUCTION USE ARE PROHIBITED BY COPYRIGHT LAW. NOTES: 1. ADJACENT PROPERTY OWNER INFORMATION OBTAINED FROM DALLAS COUNTY ASSESSORS WEB PAGE 2. PARENTHESIS ( ) DENOTES PREVIOUSLY RECORDED BEARINGS AND DISTANCES C0.1 GRAPHIC SCALE 020 10 20 40 SCALE: 1" =20' VICINITY MAP (1" = 1,000') UTILITY MAPS PROVIDED BY: 1. ELECTRIC (MID AMERICAN / 515-252-6972) 2. STORM AND SANITARY (CITY OF WAUKEE / 515-978-7920) 3. GAS (CITY OF WAUKEE / 515-978-7920) 4. WATER (CITY OF WAUKEE / 515-978-7920) PROPOSED SPORTS COMPLEX AREA = 23,200 SF FF=1035.00' D D D D W 6" W 6" W 6" W 6" W 6" W 6" SA N SA N SA N H Y D CO R 3 'R7' 11 13 9 12 12 10 4 5" PCC WALK5" PCC WALK BEHIND CURB (REF DETAIL 17/C6.1) TURNED DOWN WALK (REF DETAIL 11/C6.2)5" PCC WALK 5" PCC W A L K 5" PCC WALK TYPE 1 PAVEMENT (REF DETAIL 4/C6.1) 6" PCC DRIVE 90°0'0" 90°0'0" 36.23' 117' 17 ' 9' 24 ' 19 ' 19 ' 9' 24' 24 ' 17 ' 8' 8' 7' 17' 9' 24' 17 ' 9' 17' 9' 24' 24 ' 17' 14' 14.5'7.96' 6' 41 ' 14 ' R 3 ' R 2 0 ' R20' R 2 0 ' R2 5 ' R4 9 ' R 2 5 ' R5' R5' R2 5 ' R4 ' R5' R 1 0 ' R20' R5 ' R 3 ' R45' R22 5 ' R5' R 1 2 ' R3' R1 2 . 5 ' R69' 12' x 14' TRASH ENCLOSURE (REF ARCH) 11.0 4 ' 11. 8 4 ' 24' 24' 24' CO CO D CO W6" W6" G4"G4"G4"G4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" R 5 ' R2'R 2 ' R 5 'R5' 230.4' 230.4' 10 0 . 4 ' 10 0 . 4 ' TYP E 2 P A V E M E N T (RE F D E T A I L 5 / C 6 . 1 ) TYPE 2 PAVEMENT (REF DETAIL 5/C6.1) WV WV 7 9' 8.33' 4. 7 9 ' 5' O/H DOOR ONLY FOR EQUIPMENT DURING CONSTRUCTION AND EQUIPMENT TRANSPORT TRANSITION TO 3" ROLLOVER CURB OVER 11' PCC TURNED DOWN WALK (REF DETAIL 11/C6.2) HANDICAP BOLLARD x4 (REF DETAIL 3/C6.1) ADA RAMP WITH 5'x5' LANDING ADA RAMP WITH 5'x5' LANDING ADA RAMP (EX WALK PROVIDES ADA LANDING) ADA RAMP (EX WALK PROVIDES ADA LANDING) ADA RAMP WITH 5'x5' LANDING ADA RAMP WITH LANDING 6" CURB (TYP) 6" CURB (TYP) STRUCTURAL STOOP (REF. ARCH.) STRUCTURAL STOOP (REF. ARCH.) STRUCTURAL STOOP (REF. ARCH.) 5'x5' LANDING MODULAR BLOCK RETAINING WALL WILL NEED TO BE DESIGNED BY IOWA LICENSED STRUCTURAL ENGINEER TRANSFORMER PAD COORDINATE WITH MIDAMERICAN FOR SIZING & LOCATION (REF DETAIL 9/C6.1) SUDAS TYPE A DRIVEWAY SUDAS TYPE A DRIVEWAY BOUNDARY OF BIORETENTION FILTER BED (REF DETAIL 8/C6.1) BOUNDARY OF BIORETENTION PRETREATMENT (REF DETAIL 8/C6.1) TRANSITION TO 3" ROLLOVER CURB OVER 8' TURNED DOWN WALK (REF DETAIL 11/C6.2) 6" CURB 3" ROLLOVER CURB 6" CURB 6" CURB TRANSITION FROM 6" CURB TO TURNED DOWN WALK 6" CURB 6" CURB 6" CURB PAVEMENT TRANSITION LINE PAVEMENT TRANSITION LINE TRUNCATED DOMES (TYP) TRUNCATED DOMES (TYP) 2. 3 ' 2. 5 1 ' 5' TYPE 1 PAVEMENT (REF DETAIL 4/C6.1) 9' 6' R 5 ' 41 ' 36.22' O/H DOOR STRUCTURAL STOOP (REF. ARCH.) 8' 9'8'8'5'8' TYPE 1 PAVEMENT (REF DETAIL 4/C6.1) TYPE 1 PAVEMENT (REF DETAIL 4/C6.1) TYPE 1 PAVEMENT (REF DETAIL 4/C6.1) TY P E 1 P A V E M E N T (R E F D E T A I L 4 / C 6 . 1 ) 5' 2. 6 8 ' 5' GM NW 1 7 T H S T R E E T NW VICKSBURG COURT CP #9000 D CO CO D S S CO D CP #9001 D U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E ST 18" S T 1 5 " ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" S T 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6"ST 6"ST 6"ST 6"ST 6"ST 6" ST 42 " ST 42 " ST 42 " ST 18 " ST 18" ST 15"ST 15"ST 15"ST 15"ST 15" SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8" SAN 6" SAN 6" ST 42" 70' R . O . W . ( P U B L I C S T R E E T - C O N C R E T E S U R F A C E ) 60' R.O.W.(PUBLIC STREET-CONCRETE SURFACE) 30' BUILDING SETBACK LINE 30' B U I L D I N G S E T B A C K L I N E 20 ' P R I V A T E S T O R M S E W E R EA S E M E N T ( B K 2 0 2 1 , P G 2 5 1 ) 40 ' L A N D S C A P E B U F F E R EA S E M E N T ( B K 2 0 2 1 , P G 2 4 7 ) 10' P U B L I C U T I L I T Y E A S E M E N T (B K 2 0 2 1 , P G 2 4 5 ) 15 ' S A N I T A R Y S E W E R E A S E M E N T (B K 2 0 2 1 , P G 2 4 6 ) 10 ' P . U . E . (B K . 2 0 2 1 , P G . 2 4 5 ) 20' PRIVATE STORM SEWER EASEMENT(BK 2021, PG 251) F/O LOT 12 AREA = 107,837 SF (2.47 ACRES) LOT 13 OWNER:TERRA INVESTMENTS LLC. ZONED:M-1 LOT 17 OWNER:SCOTT L. TEMPLE PROPERTY MANAGEMENT TRUST ZONED:M-1 EX . 1 0 ' C O N C R E T E S I D E W A L K G 4" G4" G4" G4" G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4" W8" W8" W8" W8" W8"W8"W8"W8"W8"W8"W8"W8" W6" W6" LOT 18 OWNER:WAUKEE LAND INVESTMENT, LLC. ZONED:M-1 LOT 11 OWNER:DILEEP KUMAR PAYAWALA ET. ALL ZONED:C-1 LOT 10 OWNER:WAUKEE LAND INVESTEMENNTS LLC. ZONED:C-1 LOT 9 OWNER:WAUKEE LAND INVESTEMENNTS LLC. ZONED:C-1 (148.65' S89°53'57"W) W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W8" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G4" SA N 8" SA N 8" W 6" 20' P R I V A T E S T O R M S E W E R EAS E M E N T ( B K 2 0 2 1 , P G 2 5 1 ) (R=25' Δ=84°16'12" L=38.77' CH=33.54' S62°10'59"W) (R=363' Δ=14°25' 0 8 " L=91.35' CH=91.1 1 ' N82°53'29"W) (R=340' Δ=01°22'05" L=8.12' CH=8.12' S43°25'46"W) (R= 6 3 5 ' Δ = 2 4 ° 0 3 ' 5 5 " L = 2 6 6 . 7 1 ' CH = 2 6 4 . 7 6 ' S 3 2 ° 0 4 ' 5 1 " W ) (480.60' S89°53'57"W) (3 0 1 . 2 1 ' S 0 0 ° 0 6 ' 0 3 " E ) D D 30' BUILDING SETBACK LINE U/E U/E ST O R M W A T E R E A S E M E N T (BO O K 2 0 2 1 P A G E 2 5 0 ) WV Xref ..\Plans By Others\Architect\Builting layout (3-13-2023).dwg LA Y O U T P L A N C2.1 REFERENCE NUMBER: 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 DRAWN BY: CHECKED BY: REVISION DATE: PROJECT NUMBER: SHEET NUMBER: MT G S P O R T S C O M P L E X WA U K E E , I O W A DRL DB 03/30/2023 1ST CITY SET 09/18/2023 2ND CITY SET 10/11/2023 3RD CITY SET 230051 PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N L: \ L A N D P R O J E C T S 2 0 2 3 \ 2 3 0 0 5 1 - M T G S P O R T S C O M P L E X \ D W G \ C 2 L A Y O U T . D W G 10 / 2 6 / 2 0 2 3 2 : 1 1 : 0 1 P M GRAPHIC SCALE 020 10 20 40 PROPOSED SPORTS COMPLEX AREA = 23,200 SF FF=1035.00' 1033 EX 1030.10± EX 1030.20± EX 1030.74± EX 1030.64± 10 3 3 10 3 3 1033 1 0 3 3 D D D D 1 0 3 3 HI G H P O I N T W 6" W 6" W 6" W 6" W 6" W 6" SA N SA N SA N H Y D CO 103 3 103 2 1032 3.5% 16.4 % 7.2% HP HP 1.5% 1. 5 % 1. 5 % 0.6% 0.6% 1.2% 1.2% 1.7% 1. 5 % 0.7% 0.9% 1. 2 % 1. 5 % 1.5% 1.0% 1. 5 % 4. 2 % 1.0 % 1. 2 % 1. 3 % 1 . 0 % 1. 1 % 1. 2 % 3. 1 % 0.6%0.6% 1. 2 % 2 . 0 % 9. 2 % 10 . 3 % 7. 3 % 10.3% 14.4% 17.6% 6. 5 % 3. 6 % 3.3 % 3 . 0 % 4.5 % 17 . 2 % 9 . 9 % 25 . 1 % 8.8% 2 5 . 1 % 25 . 0 % 2 5 . 1 % 25 . 0 % 25 . 1 % 24 . 9 % 25. 0 % 25.0 % 24 . 9 % 25 . 0 % 9.2% 2.4% 3.2% 1.8% 1 . 6 % 2. 6 % 3. 6 % 2 . 9 % 2.5 % 3. 3 % 100-YR PONDING ELEVATION = 1031.61 100-YR PONDING ELEVATION = 1032.53 100-YR PONDING ELEVATION = 1031.62 100-YR PONDING ELEVATION = 1032.43 100-YR PONDING ELEVATION = 1033.26 1034.90 RIDGE 1034.90 RIDGE CO CO 1034 1 0 3 2 1033 103 1 103 0 10 3 1 1 0 3 3 1034 1032 1034 1032 1034 1032 1033 1034 10331034 10 3 4 1 0 3 3 1 0 3 4 1034 1033 103 3 1033 1032 1033 1032 1030 10 3 3 1026 10 2 6 1 0 3 1 1. 5 % 1. 0 % 1. 5 % 1. 0 % 1 . 0 % 1. 1 % 0. 0 % 1. 1 % 0.4% 0.0% D CO DETENTION BASIN TOP=1032.00 BOTTOM=1025.90 100-YEAR ELEV=1030.46 VOLUME=21,010 CF FOOTPRINT=3,103 SF PRETREATMENT AREA TOP=1026.65 BOTTOM=1025.90 CF FOOTPRINT=322 SF 0.0% 1. 5 % 1.5% 1. 6 % 1. 5 % 1. 5 % 0.0%6.3% 6.3% 1. 5 % 1. 5 % 1. 5 % 1. 5 % 1. 5 % 1. 5 % 1. 5 % 5.6% 5.6% 1. 5 % 1. 5 % 1. 5 % 1. 5 % 0.0% 1. 6 % 1. 6 % 1. 5 % EX 1029.73± G 1034.91T/C 1034.41G 1034.91T/C 1034.41G 1034.77 1034.78T/C 1034.28G 1034.78T/C 1034.28G 1035.00 1035.00 1032.30T/C 1031.80G 1034.49T/C 1033.99G 1034.37T/C 1033.87G 1034.17T/C 1033.67G 1033.42T/C 1032.92G 1034.93 1034.44T/C 1033.94G 1034.44T/C 1033.94G 1034.77T/C 1034.52G 1035.00 1034.17T/C 1033.67G 1034.13T/C 1033.63G 1033.90T/C 1033.40G 1034.10T/C 1033.60G EX 1030.14± 1029.78T/C 1029.28G 1030.69T/C 1030.19G 1031.91 1033.06T/C 1032.56G 1030.89T/C 1030.39G 1033.52T/C 1033.02G 1032.84T/C 1032.34G OVERFLOW 1033.86T/C 1033.36G 1031.01T/C 1030.51G EX 1030.59± EX 1030.71± OVERSPILL HP 1034.00 1034.63T/C 1034.13G 1035.00 1034.17T/C 1033.67G 1033.80T/C 1033.30G 1033.20T/C 1032.70G 1033.71T/C 1033.21G 1033.72T/C 1033.22G 1033.56T/C 1033.06G 1033.44T/C 1032.94G 1033.31T/C 1032.81G 1033.80T/C 1033.30G 1033.60T/C 1033.10G 1032.55T/C 1032.05G 1032.40T/C 1031.90G 1031.94T/C 1031.44G 1033.14T/C 1032.64G 1033.50T/C 1033.00G 1033.45T/C 1032.95G 1033.18T/C 1032.68G 1032.69T/C 1032.19G 1031.70T/C 1031.20G EX 1030.17± T/C EX 1029.65± GEX 1030.57± T/C EX 1030.09± G EX 1029.73± T/C EX 1029.21± G EX 1030.27± T/C EX 1029.85± G 1032.14T/C 1031.64G 1030.24T/C 1029.74G 1030.67T/C 1030.17G OVERFLOW 1031.80T/C 1031.30G 1031.06T/C 1030.56G 1031.00T/C 1030.50G 1030.45 1030.51 1030.00 1030.15 1031.37T/C 1030.87G 1031.32T/C 1030.82G EX 1031.48± EX 1031.41± 1030.85 1030.92 1034.28 1034.28 1035.03T/C 1034.53G 1034.40 1034.90 1034.90 1034.90 1030.93 1030.87 1030.49 1030.42 1031.12T/C 1030.62G 1033.36T/C 1032.86G 1034.77T/C 1034.40G 1035.00 1033.13 1034.51 1034.63T/C 1034.13G 1033.36T/C 1032.86G 1032.87T/C 1032.37G 1031.49T/C 1030.99G 1032.98T/C 1032.48G 1031.60T/C 1031.10G 1032.81T/C 1032.31G 1034.02T/C 1033.52G EX 1029.82± G EX 1029.46± G EX 1030.01± EX 1029.88±EX 1029.79± 1030.29 1031.88T/C 1031.38G 1030.40T/C 1029.90G 1032.37T/C 1031.87G 1031.94T/C 1031.44G 1031.79T/C 1031.29G 1031.44T/C 1030.94G 1031.30 1031.54 1031.23 1031.46 1033.50T/C 1033.00G 1032.77T/C 1032.27G 1032.37T/C 1031.87G 1031.84T/C 1031.34G 1031.47T/C 1030.97G 1035.02T/C 1034.52G 1034.75 1034.89 1035.00 1034.90 EX 1030.24± 1030.34 1030.31 1032.10 1032.02 1034.84 1035.00 1034.40 1031.29T/C 1030.79G 1033.87 1034.62 1034.89 1033.77 EX 1031.61± EX 1032.38± EX 1032.63± EX 1030.02± EX 1031.50± EX 1033.12± EX 1031.97± EX 1033.98± EX 1031.19± EX 1030.81± 1032.38T/C 1031.88G OVERFLOW 1032.12T/C 1031.62G EX 1030.79± EX 1030.99± EX 1031.37± EX 1030.17± 1031.34 1030.64 EX 1029.90± EX 1029.81± EX 1032.01± 1030.73 1031.82 EX 1031.15± EX 1029.83± 1030.27 EX 1032.08± EX 1031.95± 1031.60 1032.25 1032.80T/C 1032.30G 1031.27T/C 1030.77G 1033.73 1034.53 OVERSPILL 1034.50 1033.89T/C 1033.39G 1033.65T/C 1033.15G 1033.51T/C 1033.01G 1033.62T/C 1033.12G 1033.80T/C 1033.30G 1034.78 1034.84 1034.91 1034.50T/C 1034.00G 1034.00 1034.92 1035.00 1034.90 1034.90 1034.78T/C 1034.28G 1034.78T/C 1034.28G 1034.90 1034.90 1035.00 1034.781034.78 1034.52T/C 1034.02G 1034.52T/C 1034.02G 1034.61T/C 1034.11G 1034.64T/C 1034.14G1034.02 1034.021034.021034.02 1034.02 1034.02 1034.03 1034.71 1031.40 1. 5 % 1. 5 % W6" W6" G4"G4"G4"G4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" 1034.50 1034.50 3.9 % 4. 4 % 4.1 % 2. 7 % 1034 1030 1026 1026 1 7 . 2 % 17 . 7 % 6.7 % 6. 9 % 4 . 7 % 1.9% 3.6% 7.2% 3.4 % 3.2 % 3.1% 18 . 3 % 25 . 0 % 12 . 4 % 25 . 0 % 2 5 . 0 % 25 . 0 % 25.0% 27 . 2 % 2 5 . 0 % 2 5 . 0 % 25.1 % WV WV 1025.90 1025.90 1025.90 1025.90 1025.90 1025.90 1025.90 1025.90 1025.90 1026.65 1026.65 1026.65 1026.65 1025.90 1.7% 2. 0 % 2.9 % POND OVERFLOW 1030.50 1030.50 1025.90 1032.00T/W 1032.00T/W 1032.00T/W 1032.00T/W 1032.00T/W 1032.00T/W 1032.00T/W 1026.65B/W 1026.65B/W 1026.65B/W 1026.65B/W 1026.65B/W 1026.65B/W 3. 0 % 2.8 % 2.6% 2.7% 1.4% 2.4 % 2.5 % 13. 0 % 2.9% 16 . 0 % 1. 5 % 1. 5 % 9. 2 % 3.5% 1 . 6 % 3.0 % 1033.97 1033.97 1034.53 1034.53 0 . 7 % 0.6 % 0 . 5 % 0 . 8 % 1 . 2 % 0 . 8 % 1 . 0 % 1 . 1 % 1 . 2 % 1025.80 1025.90 1025.80 1025.80 1025.90 1025.80 1034.77T/C 1034.52G 100-YR PONDING ELEVATION = 1030.46 1034.90 1034.90 1035.001035.00 1034.92 1035.00 1035.00 1035.00 1035.00 1035.00 1035.00 1035.00 1035.00 103 2 1034 1032 1032 1032.25 1032.25 1032.25 10 3 2 1 0 3 2 10 3 2 1030.331030.37 1030.31 1030.26 1031.00T/W 1031.00T/W1032 1031 1031 POND OVERFLOW ROUTE 1032.25 1032.25 1032.25 1032.25 2.0%2.0%4.2%2.0% 2. 0 % 2. 0 % 0.4% 0.4%0.4%0.4% 1034 1033.33 1033.71 1033.93 GM NW 1 7 T H S T R E E T NW VICKSBURG COURT CP #9000 D CO CO D S S CO D CP #9001 D U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E ST 18" S T 1 5 " ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" S T 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6"ST 6"ST 6"ST 6"ST 6"ST 6" ST 42 " ST 42 " ST 42 " ST 18 " ST 18" ST 15"ST 15"ST 15"ST 15"ST 15" SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8" SAN 6" SAN 6" ST 42" 70' R . O . W . ( P U B L I C S T R E E T - C O N C R E T E S U R F A C E ) 60' R.O.W.(PUBLIC STREET-CONCRETE SURFACE) 30' BUILDING SETBACK LINE 30' B U I L D I N G S E T B A C K L I N E 20 ' P R I V A T E S T O R M S E W E R EA S E M E N T ( B K 2 0 2 1 , P G 2 5 1 ) 40 ' L A N D S C A P E B U F F E R EA S E M E N T ( B K 2 0 2 1 , P G 2 4 7 ) 10' P U B L I C U T I L I T Y E A S E M E N T (B K 2 0 2 1 , P G 2 4 5 ) 15 ' S A N I T A R Y S E W E R E A S E M E N T (B K 2 0 2 1 , P G 2 4 6 ) 10 ' P . U . E . (B K . 2 0 2 1 , P G . 2 4 5 ) 20' PRIVATE STORM SEWER EASEMENT(BK 2021, PG 251) F/O 10 3 4 1034 1030 1030 1033 1034 1032 1 0 3 2 1026 1030 1030 10 3 2 10 3 0 1028 1026 1026 1035 103 5 103 3 1030 1030 1031 1030 1029 LOT 12 LOT 13 LOT 17 EX . 1 0 ' C O N C R E T E S I D E W A L K G4" G4" G4" G4" G 4"G 4"G 4"G 4"G 4"G 4"G 4" W8" W8" W8" W8" W8"W8"W8"W8"W8"W8"W8" W6" W6" LOT 18 LOT 11 LOT 10 LOT 9 W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W8" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G4" SA N 8" SA N 8" W 6" 20' P R I V A T E S T O R M S E W E R EAS E M E N T ( B K 2 0 2 1 , P G 2 5 1 ) D D 30' BUILDING SETBACK LINE 1032 1030 1028 1032 1028 1030 1032 1033 1030 1033 U/E U/E ST O R M W A T E R E A S E M E N T (BO O K 2 0 2 1 P A G E 2 5 0 ) 1033 1029 1027 1026 1029 1031 1034 WV 1029 1028 1027 10 3 1 TOPSOIL NOTES: 1.STRIP AND STOCKPILE THE TOP 8" OF SOIL ON ALL DISTURBED AREAS. 2.RESPREAD TOPSOIL TO A MINIMUM DEPTH OF 8" ON ALL GREEN (NON PAVED) AREAS. IMPORT TOPSOIL AS NECESSARY TO ACHIEVE A MINIMUM DEPTH OF 6". 3.TOPSOIL SHALL BE FREE OF ALL ROCK AND DEBRIS LARGER THAN 3/4" IN SIZE. 4.TOPSOIL IS DEFINED AS: FERTILE, FRIABLE LOAM, CAPABLE OF SUSTAINING VIGOROUS PLANT GROWTH, FROM WELL DRAINED SITE FREE FROM FLOODING, NOT IN FROZEN OR MUDDY CONDITIONS; REASONABLE FREE FROM SUBSOIL, CLAY LUMPS, ROOTS, GRASS, WEEDS, STONES LARGER THAN 3/4 INCH IN DIAMETER, AND FOREIGN MATTER; ACIDITY RANGE (PH) OF 5.5 TO 7.5; CONTAINING MINIMUM 4 PERCENT AND MAXIMUM 20 PERCENT ORGANIC MATTER. 5.CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL TOPSOIL REQUIREMENTS OF NPDES GENERAL PERMIT NO. 2 ARE MET. GR A D I N G P L A N C3.1 REFERENCE NUMBER: 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 DRAWN BY: CHECKED BY: REVISION DATE: PROJECT NUMBER: SHEET NUMBER: MT G S P O R T S C O M P L E X WA U K E E , I O W A DRL DB 03/30/2023 1ST CITY SET 09/18/2023 2ND CITY SET 10/11/2023 3RD CITY SET 230051 PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N GRADING LEGEND: EXISTING CONTOUR PROPOSED CONTOUR FINISHED GROUND ELEVATION TOP OF CURB ELEVATION GUTTER ELEVATION TOP OF WALL ELEVATION BOTTOM OF WALL ELEVATION EDGE OF WALK ELEVATION TOP OF STAIR ELEVATION BOTTOM OF STAIR ELEVATION NOTE: WALL ELEVATIONS SHOWN ON PLAN ARE FINISHED GROUND GRADES AT THE TOP AND BOTTOM OF THE WALL. 150.50E/W 150.50B/W 150.50T/W 150.50G 150.50T/C 150.50 150 150 150.50T/S 150.50B/S L: \ L A N D P R O J E C T S 2 0 2 3 \ 2 3 0 0 5 1 - M T G S P O R T S C O M P L E X \ D W G \ C 3 G R A D I N G . D W G 10 / 2 6 / 2 0 2 3 2 : 1 1 : 1 2 P M GRAPHIC SCALE 020 10 20 40 PROPOSED SPORTS COMPLEX AREA = 23,200 SF FF=1035.00' D D D D CONTRACTOR TO COORDINATE WITH UTILITY PROVIDER, LOWER IF NEEDED CONTRACTOR TO COORDINATE WITH UTILITY PROVIDER, LOWER IF NEEDED W 6" W 6" W 6" W 6" W 6" W 6" SA N SA N SA N 96 LF 6" SDR 23.5 PIPE SANITARY SERVICE PER SUDAS @S=4.0% H Y D SANITARY SERVICE INV(N)=1030.00 CO SANITARY CLEANOUT RIM=1033.83 ADJUST RIM TO GRADE - CONTRACTOR TO VERIFY INVERT ELEVATION PRIOR TO CONSTRUCTION **CRITICAL CROSSING** BOTTOM OF STORM=1028.70± TOP OF SAN=1026.28± **CRITICAL CROSSING** TOP OF STORM=1028.78± BOTTOM OF STORM=1027.45± ENSURE 18" CLEANANCE BETWEEN STORM AND WATER 150 ' H Y D R A N T RA D I U S CO CO D CO A101.1 A4 A101.1 C4 W6" W6" G4"G4"G4"G4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" WV WV 11 LF 6" SDR 23.5 PIPE SANITARY SERVICE PER SUDAS @S=2.0% VERITCAL DROP W/ 2 45° BENDS FROM 1029.78 TO 1025.69 (REF DETAIL 16/C6.2) **CRITICAL CROSSING** BOTTOM OF STORM=1027.02± TOP OF WATER=1025.52± **CRITICAL CROSSING** BOTTOM OF STORM=1027.04± TOP OF WATER=1025.54± **CRITICAL CROSSING** BOTTOM OF STORM=1027.44± TOP OF WATER=1025.94± RELOCATE U/E IF NECESSARY CONTRACTOR TO COORDINATE U/E WITH UTILITY PROVIDER STRUCTURE #10 SW-505 INTAKE T/C=1031.27 FL(S)=1027.67 PIPE #10 113LF 15" RCP @ S=0.50% STRUCTURE #03 48" SW-401 MANHOLE RIM=1034.62 FL(E)=1027.68 FL(SW)=1027.78 STRUCTURE #04 SW-501 INTAKE T/C=1032.80 FL(NE)=1028.24 FL(SW)=1028.34 PIPE #4 91LF 15" RCP @ S=0.50% PIPE #5 72LF 15" RCP @ S=0.50% STRUCTURE #05 SW-501 INTAKE T/C=1031.84 FL(NE)=1028.70 PIPE #2 140LF 18" RCP @ S=0.50% STRUCTURE #01 48" SW-401 MANHOLE RIM=1031.40 FL(W)=1026.30 FL(S)=1026.30 FL(N)=1026.20 PIPE #20 130LF 15" N-12 @ S=0.50% STRUCTURE #20 30" NYLOPLAST BASIN W/ SOLID LID RIM=1034.00 FL(W)=1027.05 FL(N)=1026.95 PIPE #21 94LF 15" N-12 @ S=0.50% STRUCTURE #21 15" NYLOPLAST BASIN RIM=1032.13 FL(W)=1027.62 FL(E)=1027.52 PIPE #23 76LF 15" N-12 @ S=0.50% STRUCTURE #23 18" NYLOPLAST BASIN W/ SOLID LID RIM=1034.50 FL(N)=1030.00 FL(E)=1028.48 PIPE #1 61LF 24" RCP @ S=0.50% 130 LF 6" C900 WATER INSTALL 6" HYDRANT ASSEMBLY 6" DOWNSPOUT CONNECTION REF MEP PLANS FOR CONTINUATION FDC OUTLET STRUCTURE SW-511 FL(N)=1024.40± EX FL(SUB)=1024.40 3" OPENING IN SIDE AT 1026.65 8" OPENING IN SIDE AT 1028.25 RIM=1032.00 STRUCTURE #22 15" NYLOPLAST BASIN RIM=1032.97 FL(W)=1028.10 FL(E)=1028.00 PIPE #22 76LF 15" N-12 @ S=0.50% 60 LF 6" SUBDRAIN @0.25% CLEANOUT RIM=1025.80 FL=1024.55 81 LF 6" SUBDRAIN @0.25% CLEANOUT RIM=1025.80 FL=1024.55 STRUCTURE #02 48" SW-401 MANHOLE RIM=1034.71 FL(N)=1027.10 FL(E)=1027.00 FL(W)=1027.10 PIPE #3 116LF 15" RCP @ S=0.50% STRUCTURE #00 24" FES FL(S)=1025.90 CLEANOUT RIM=1025.90 FL=1024.60 60 LF 6" SUBDRAIN @0.25% NEW GAS SERVICE COORDINATE WITH CITY OF WAUKEE FOR EXACT LOCATION GAS METER LOCATION 70 LF 6" C900 WATER 6" TEE 45° BEND 65 LF 6" C900 WATER 17 LF 6" FIRE SERVICE (REF MEP FOR CONTINUATION INTO BUILDING) 20 LF 6" DOMESTIC SERVICE (REF MEP FOR CONTINUATION INTO BUILDING) 45° BEND 6" DOWNSPOUT CONNECTION REF MEP PLANS FOR CONNECTION 6" DOWNSPOUT CONNECTION REF MEP PLANS FOR CONNECTION 6" DOWNSPOUT CONNECTION REF MEP PLANS FOR CONTINUATION 19 LF 6" HDPE 18 LF 6" HDPE 16 LF 6" HDPE 14 LF 6" HDPE 6" DOWNSPOUT CONNECTION REF MEP PLANS FOR CONTINUATION 6" DOWNSPOUT CONNECTION REF MEP PLANS FOR CONTINUATION 6" DOWNSPOUT CONNECTION REF MEP PLANS FOR CONTINUATION 6" DOWNSPOUT CONNECTION REF MEP PLANS FOR CONTINUATION 15 LF 6" HDPE 13 LF 6" HDPE 13 LF 6" HDPE 13 LF 6" HDPE 6" VALVES 18 LF 6" SDR 23.5 PIPE SANITARY SERVICE PER SUDAS @S=4.0% GM CONNECT TO EX 6" WATER STUB (FIELD VERIFY) NW 1 7 T H S T R E E T NW VICKSBURG COURT CP #9000 D EX STORM MH RIM=1029.75 EX INTAKE T/C=1029.10 RIM=1029.27 CO CO EX INTAKE T/C=1029.27 RIM=1028.78 EX INTAKE T/C=1029.22 RIM=1028.77 D EX STORM MH RIM=1029.79 FL(S 42"RCP)=1024.54 FL(N 42"RCP)=1024.47 FL(SE 18"RCP)=1024.41 FL(W 18"RCP)=1024.39 S EX SAN MH RIM=1032.32 INV(E 8"PVC)=1021.50 S EX SAN MH RIM=1030.12 INV(W 8"PVC)=1019.57 INV(E 8"PVC)=1019.52 CO EX SAN CO RIM=1030.36 INV=1021.13 PER OLD PLAN D EX STORM MH RIM=1030.93 FL(E 15"RCP)=1024.80 FL(NW 18"RCP)=1024.77 FL(S 15"RCP)=1024.73 EX 15"FES EX INTAKE T/C=1029.79 RIM=1029.27 CP #9001 D EX STORM MH RIM=1032.63 FL(N 42"RCP)=1023.38 FL(S 42"RCP)=1023.33 EX INTAKE T/C=1029.27 RIM=1028.80 EX INTAKE T/C=1029.26 RIM=1028.77 U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E ST 18" S T 1 5 " S T 1 5 " ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" S T 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6"ST 6"ST 6"ST 6"ST 6"ST 6" APPROX. LOCATION SUBDRAIN PER CITY OF WAUKEE GIS EX SUBDRAIN PER CITY OF WAUKEE GIS ST 42 " ST 42 " ST 42 " ST 42 " ST 18 " ST 18" ST 15"ST 15"ST 15"ST 15"ST 15" SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8" SAN 6" SAN 6" 70' R . O . W . ( P U B L I C S T R E E T - C O N C R E T E S U R F A C E ) 60' R.O.W.(PUBLIC STREET-CONCRETE SURFACE) 30' BUILDING SETBACK LINE 30' B U I L D I N G S E T B A C K L I N E 20 ' P R I V A T E S T O R M S E W E R EA S E M E N T ( B K 2 0 2 1 , P G 2 5 1 ) 40 ' L A N D S C A P E B U F F E R EA S E M E N T ( B K 2 0 2 1 , P G 2 4 7 ) 10' P U B L I C U T I L I T Y E A S E M E N T (B K 2 0 2 1 , P G 2 4 5 ) 15 ' S A N I T A R Y S E W E R E A S E M E N T (B K 2 0 2 1 , P G 2 4 6 ) 10 ' P . U . E . (B K . 2 0 2 1 , P G . 2 4 5 ) F/O LOT 12 LOT 13 LOT 17 EX . 1 0 ' C O N C R E T E S I D E W A L K G4" G4" G4" G4" G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4" W8" W8" W8" W8" W8"W8"W8"W8"W8"W8"W8" W6" W6" APPROX LOCATION PER CITY OF WAUKEE GIS APPROX LOCATION PER CITY OF WAUKEE GIS LOT 18 W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W8" W8" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G4" G4" SA N 8" SA N 8" W 6" 20' P R I V A T E S T O R M S E W E R EAS E M E N T ( B K 2 0 2 1 , P G 2 5 1 ) D EX STORM MH RIM=1031.16 FL(W 15"RCP)=1025.56 FL(S 15"RCP)=1025.54 D EX STORM MH RIM=1030.84 FL(NE 42"RCP)=1024.24 FL(SW 42"RCP)=1024.22 30' BUILDING SETBACK LINE U/E U/E ST O R M W A T E R E A S E M E N T (BO O K 2 0 2 1 P A G E 2 5 0 ) WV EX 8" VALVE PER JAMES POINTE CDS EX 6" SAN STUB 15" UTILITY NOTES: 1.ALL PROPOSED UTILTIES SHALL BE PRIVATE, UNLESS NOTED OTHERWISE. 2.ALL WATER LINES SHALL HAVE A MINIMUM OF 5.5' OF COVER UNLESS NOTED OTHERWISE. 3.FIRE HYDRANT ASSEMBLY SHALL INCLUDE THE TEE, BRANCH, VALVE AND HYDRANT. 4.PIPE LENGTHS CALLED OUT ON PLANS INCLUDE FLARED END SECTION, WHERE APPLICABLE. 5.STORM SEWER CALLED OUT AS RCP MUST BE CLASS III RCP. 6.STORM SEWER CALLED OUT AS N-12 MAY BE EITHER N-12 OR CLASS III RCP. 7.FOR RCP PIPE, ASSOCIATED F.E.S. MUST BE RCP. FOR N-12 PIPE, ASSOCIATED F.E.S. SHALL BE CMP. 8.ALL NYLOPLAST BASINS SHALL HAVE CASTINGS SECURELY FASTENED TO THE BASIN BODY, AND ALL GRATES/LIDS SHALL BE BOLTED DOWN TO THE CASTINGS. 9.TRANSFORMER PAD IS SHOWN FOR REFERENCE ONLY AND MAY NOT BE DRAWN TO ACTUAL SIZE. PAD SHALL CONFORM TO ALL UTILITY COMPANY DESIGN STANDARDS AND SPECIFICATIONS. 10.GREASE INTERCEPTOR AND ANY VENT LINES ARE SHOWN FOR REFERENCE ONLY AND MAY NOT BE DRAWN TO ACTUAL SIZE. REFER TO PLUMBING PLANS FOR DETAILED DRAWINGS AND SPECIFICATIONS. PLUMBING PLANS SHALL TIE INTO SANITARY SERVICE AT LOCATION AND ELEVATION SHOWN ON PLANS. UT I L I T Y P L A N C4.1 REFERENCE NUMBER: 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 DRAWN BY: CHECKED BY: REVISION DATE: PROJECT NUMBER: SHEET NUMBER: MT G S P O R T S C O M P L E X WA U K E E , I O W A DRL DB 03/30/2023 1ST CITY SET 09/18/2023 2ND CITY SET 10/11/2023 3RD CITY SET 230051 PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N L: \ L A N D P R O J E C T S 2 0 2 3 \ 2 3 0 0 5 1 - M T G S P O R T S C O M P L E X \ D W G \ C 4 U T I L I T Y . D W G 10 / 2 6 / 2 0 2 3 2 : 1 1 : 2 4 P M GRAPHIC SCALE 020 10 20 40 NW 1 7 T H S T R E E T NW VICKSBURG COURT D CO CO S CO D D U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" S T 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6"ST 6"ST 6"ST 6"ST 6"ST 6" ST 42 " ST 42 " ST 18 " ST 15"ST 15"ST 15"ST 15"ST 15" SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8" SAN 6" SAN 6" 70' R . O . W . ( P U B L I C S T R E E T - C O N C R E T E S U R F A C E ) 60' R.O.W.(PUBLIC STREET-CONCRETE SURFACE) 30' BUILDING SETBACK LINE 30' B U I L D I N G S E T B A C K L I N E 20 ' P R I V A T E S T O R M S E W E R EA S E M E N T ( B K 2 0 2 1 , P G 2 5 1 ) 40 ' L A N D S C A P E B U F F E R EA S E M E N T ( B K 2 0 2 1 , P G 2 4 7 ) 10' P U B L I C U T I L I T Y E A S E M E N T (BK 2 0 2 1 , P G 2 4 5 ) 15 ' S A N I T A R Y S E W E R E A S E M E N T (B K 2 0 2 1 , P G 2 4 6 ) 10 ' P . U . E . (B K . 2 0 2 1 , P G . 2 4 5 ) 20' PRIVATE STORM SEWER EASEMENT(BK 2021, PG 251) F/O EX . 1 0 ' C O N C R E T E S I D E W A L K 4" G4" G4" G4" G 4"G 4"G 4"G 4"G 4"G 4"G 4" W6" W6" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" SA N 8" 20' P R I V A T E S T O R M S E W E R EAS E M E N T ( B K 2 0 2 1 , P G 2 5 1 ) D D 30' BUILDING SETBACK LINE U/E ST O R M W A T E R E A S E M E N T (BO O K 2 0 2 1 P A G E 2 5 0 ) PROPOSED SPORTS COMPLEX AREA = 23,200 SF FF=1035.00' D D D D SA N SA N SA N H Y D CO CO CO D CO G4"G4"G4"G4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" WV WV GM GL 15 KF 24 STEEL EDGER MULCH MULCH ST 2 WP 3 WP 3 ER 2 WO 1 KC 2 SH 2 SH 2 LP 2 GL 4GL 23 AH 1 AH 2 GB 1 DY 30 DY 47 GL 27 GB 1 HB 21 KF 26 KF 3 HB 22 OB 1 STEEL EDGER MULCH MULCH MULCH MULCH MULCH HB 3 MULCH MULCH GB 1 PF 3 BH 4 BP 3 LP 1 LP 1 TT 1 SS 1 KC 1 PF 2 ST 2 BP 1 KC 1 GB 1 BP 3 DK 12 OB 1 DY 4 SS 3 ER 1 NS 3 WP 3 SW 2 LP 1 RO 2 RO 1 AH 1 NS 3 AH 1 BH 3 WP 2 WO 2 SW 1 ST 3 SB 3 SB 5 DK 9 WO 1 NS 3 BP 2 AC 8 AH 1 PD 14 PD 23 PD 3 AC 3 STEEL EDGER BX 6 BJ 6 LA N D S C A P E P L A N C5.1 GRAPHIC SCALE 020 10 20 40 L: \ L A N D P R O J E C T S 2 0 2 3 \ 2 3 0 0 5 1 - M T G S P O R T S C O M P L E X \ D W G \ C 5 L A N D S C A P E . D W G 10 / 2 6 / 2 0 2 3 2 : 1 1 : 3 7 P M IRRIGATION NOTES: ·FOR BIDDING PURPOSES, THIS PROJECT DOES NOT INCLUDE A SITE IRRIGATION SYTEM. ·CONTRACTOR SHALL SUBMIT TO THE OWNER OR OWNER'S REPRESENTATIVE A SEPARATE PROPOSAL FOR A SITE IRRIGATION SYSTEM. PROPOSAL SHALL BE DESIGN/BUILD FOR A COMPLETE OPERATIONAL IRRIGATION SYSTEM APPROPRIATE FOR THE SITE. IRRIGATION CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DESIGN, COORDINATION, TESTING, PERMITS, INSPECTIONS, ETC. LANDSCAPE NOTES: 1.ALL SEEDING & LANDSCAPE PLANTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE URBAN STANDARD SPECIFICATIONS, UNLESS SPECIFIED OTHERWISE. 2.SOD ALL DISTURBED AREAS included in R.O.W. WITHIN THE CONTRACT LIMITS, UNLESS NOTED OTHERWISE. SEED LIMITS SHOWN ON PLAN ARE FOR REFERENCE ONLY. FINAL LIMITS MAY CHANGE BASED ON CONSTRUCTION ACTIVITIES. 3.STAKE SOD ON ALL SLOPES 3 : 1 OR GREATER. 4.PLANT QUANTITIES ARE FOR CONTRACTORS CONVENIENCE, THE DRAWING SHALL PREVAIL IF A CONFLICT OCCURS. 5.ALL PLANT MATERIAL SHALL CONFORM TO THE LATEST EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1). 6.CONTRACTOR SHALL WARRANTY ALL PLANT MATERIAL FOR A PERIOD OF ONE YEAR FROM THE DATE OF INITIAL ACCEPTANCE. 7.FOR WARRANTY PURPOSES, THE DATE OF INITIAL ACCEPTANCE SHALL BE SUBMITTED IN WRITING TO THE OWNER AND/OR OWNER'S REPRESENTATIVE AFTER ALL PLANT MATERIALS HAVE BEEN INSTALLED AND REVIEWED BY OWNER OR OWNER'S REPRESENTATIVE. PLANT MATERIALS WILL ONLY BE ACCEPTED IF THEY ARE IN AN ALIVE AND THRIVING CONDITION. 8.CONDITIONAL ACCEPTANCE OF PLANT MATERIAL MAY BE GIVEN FOR PLANTS INSTALLED IN A DORMANT CONDITION WITH INITIAL ACCEPTANCE OCCURRING THE FOLLOWING SPRING ONCE THEY ARE SHOWN TO BE ALIVE AND THRIVING. 9.IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE IDENTIFICATION TAGS AND CORDS ON ALL PLANT MATERIAL PRIOR TO THE COMPLETION OF THE CONTRACT. IDENTIFICATION TAGS (INCLUDING SIZING INFORMATION) MUST BE LEFT ON UNTIL AFTER ACCEPTANCE BY OWNER OR OWNER'S REPRESENTATIVE. 10.CONTRACTOR SHALL PLACE SHREDDED HARDWOOD MULCH AROUND ALL TREES, SHRUBS AND GROUND COVER BEDS TO A DEPTH OF 4 INCHES, UNLESS NOTED. 11.STAKING AND GUYING OF TREES SHALL BE AT THE DISCRETION OF THE CONTRACTOR BASED ON CURRENT ACCEPTED NURSERY STANDARDS. GENERALLY, TREES IN LARGE OPEN AREAS SUBJECT O SIGNIFICANT WIND SHALL BE STAKED. STAKE AND WRAP TREES IMMEDIATELY AFTER PLANTING. CONTRACTOR SHALL ADJUST AND MAINTAIN GUYING TENSION THROUGHOUT THE PLANT ESTABLISHMENT PERIOD. REMOVE ALL STAKES AND GUY WIRES NO MORE THAN ONE YEAR AFTER INSTALLATION. 12.THE LANDSCAPING CONTRACTOR SHALL HAVE ALL UTILITIES LOCATED BEFORE STARTING ANY SITE WORK OR PLANTING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING UTILITIES. 13.NO LANDSCAPE MATERIAL SHALL BE SUBSTITUTED WITHOUT THE AUTHORIZATION OF THE LANDSCAPE ARCHITECT. 14.ALL EDGING SHALL BE DURAEDGE 3/16" STEEL EDGING - COLOR BLACK, OR APPROVED EQUAL.. 15.CONTRACTOR SHALL BE RESPONSIBLE MAINTAINING APPROPRIATE LEVEL OF WATERING FOR ALL NEW PLANTS FOR A PERIOD OF 30 DAYS. 16.ALL SHRUB AND PERENNIAL PLANTING BEDS SHALL BE MULCHED WITH 4" THICK SHREDDED HARDWOOD MULCH. 17.ALL BEDS TO RECEIVE GRANULAR PRE-EMERGENT WEED CONTROL BEFORE AND AFTER MULCH IS INSTALLED. SEED: SEED TYPE TO BE "RAIN GARDEN MIXTURE" SUPPLIED BY UNITED SEEDS (OR APPROVED EQUAL). INSTALL WITH MECHANICAL DRILL TYPE SEEDER AT A RATE OF 15 LBS PER ACRE. SEEDING DATES, SITE PREPARATION, SEEDING INSTALLATION, WATER REQUIREMENTS, FERTILIZING, AND MOWING PER UNITED SEEDS TECH BULLETIN FOR SEED TYPE. EROSION CONTROL: INSTALL ROLLMAX DS 150 EROSION CONTROL MATS (OR EQUIVALENT) THROUGHOUT SEEDED AREAS. MAINTAIN DURING ESTABLISHMENT PERIOD FERTILIZER: FERTILIZE ALL SEED TYPE I AREAS WITH PRODUCT SPECIFIED ABOVE AT RATE OF 250 LBS/ ACRE. ESTABLISHMENT: SATISFACTORY SEEDED NATIVE STAND: AT END OF MAINTENANCE PERIOD, A HEALTHY, UNIFORM, CLOSE STAND OF NATIVES HAS BEEN ESTABLISHED, FREE OF WEEDS AND SURFACE IRREGULARITIES, WITH COVERAGE EXCEEDING 90 PERCENT OVER ANY 10 SQ. FT. (0.92 SQ. M) AND BARE SPOTS NOT EXCEEDING 5 BY 5 INCHES. REESTABLISH LAWNS THAT DO NOT COMPLY WITH REQUIREMENTS AND CONTINUE MAINTENANCE UNTIL AREA IS SATISFACTORY. COVER CROP: A COVER CROP OF ANNUAL OATS (OR AS RECOMMENDED BY SEED MANUFACTURER) MAY BE NECESSARY FOR IOWA DNR NOD DEPENDING ON TIMING OF SEEDING PERMANENT RAIN GARDEN MIX. SEED DATES: MARCH THROUGH MAY AND AUGUST THROUGH OCTOBER (DORMANT SEEDING DECEMBER THROUGH FEBRUARY) REFERENCE NUMBER: 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 DRAWN BY: CHECKED BY: REVISION DATE: PROJECT NUMBER: SHEET NUMBER: MT G S P O R T S C O M P L E X WA U K E E , I O W A DRL DB 03/30/2023 1ST CITY SET 09/18/2023 2ND CITY SET 10/11/2023 3RD CITY SET 230051 PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N DO NOT CUT CENTRAL LEADER WRAP TRUNK WITH APPROVED TREE WRAP TO FIRST BRANCH 4" DEEP HARDWOOD MULCH CUT SYNTHETIC CORDS AROUND ROOTBALL AND TRUNK -ENTIRELY REMOVE WIRE BASKETS FROM BALL SET ROOTBALL ON UNDISTURBED SUBGRADE DECIDUOUS TREE PLANTING (TYP.) NOT TO SCALESCALE: SCARIFY SIDES & BOTTOM OF PLANTING PIT 3'-0"SET ROOTBALL FLUSH WITH FINISHED GRADE DO NOT PLACE MULCH IN CONTACT WITH BASE OF TREE PRUNE ANY DEAD/DAMAGED BRANCHING FROM TREE. MAINTAIN OVERALL APPEARANCE. 4" DEPTH SHREDDED HARDWOOD MULCH SCARIFY SIDES & BOTTOM OF PLANTING PIT EVERGREEN TREE PLANTING (B&B) NOT TO SCALESCALE: CUT SYNTHETIC CORDS AROUND ROOTBALL AND TRUNK -ENTIRELY REMOVE WIRE BASKETS FROM BALL SET ROOTBALL ON UNDISTURBED SUBGRADE 3'-0" DO NOT PLACE MULCH IN CONTACT WITH BASE OF TREE DECIDUOUS SHRUB DETAIL EVERGREEN SHRUB DETAIL PLANTING ON SLOPES FIRMLY COMPACT SAUCER (USE TOPSOIL) ORIGINAL GROUND LINE SUB-SOIL 4" MULCH PLANTING PIT TWICE THE WIDTH OF ROOTBALL 1 2 SHRUB PLANTING (TYP) NOT TO SCALESCALE: PLANTING SCHEDULE LEGEND SOD: PROVIDE AND INSTALL SOD FROM LOCAL SUPPLIERS. AREAS TO BE SODDED MUST BE FREE OF ALL CONSTRUCTION DEBRIS AND ANY DIRT CLUMPS OVER 1" IN DIAMETER. THOROUGHLY WATER SOD UPON INSTALLATION. CONTRACTOR TO MAINTAIN WATERING UNTIL SOD IS ESTABLISHED (ROOTS KNITTED INTO SUBSURFACE) GENERAL LANDSCAPE REQUIREMENTS TOTAL SQUARE FOOTAGE OF PROJECT AREA 107,837 SF OPEN SPACE REQUIRED (15%)16,175 SF OPEN SPACE PROVIDED 45,287 SF GENERAL OPEN SPACE REQUIREMENT TOTAL REQUIRED TREES (1 / 1,000 SF REQ. OPEN SPACE)17 TOTAL REQUIRED SHRUBS (1 / 1,000 SF REQ. OPEN SPACE)17 TOTAL PROPOSED OVERSTORY 37 TOTAL PROPOSED EVERGREEN 36 TOTAL PROPOSED SHRUBS 233 PARKING PERIMETER REQUIREMENTS TOTAL LENGTH OF PARKING PERIMETER ADJACENT TO NW 17TH 190 LF REQUIRED OVERSTORY TREES (1 / 40 LF)5 TREES REQUIRED SHRUBS (3 / 30 LF)19 SHRUBS TOTAL LENGTH OF PARKING PERIMETER ADJACENT TO VICKSBURG 117 LF REQUIRED OVERSTORY TREES (1 / 40 LF)3 TREES REQUIRED SHRUBS (3 / 30 LF)12 SHRUBS INTERIOR PARKING LOT REQUIREMENTS TOTAL PARKING STALLS ON SITE 80 REQUIRED OVERSTORY TREES (1 / 20 STALLS)4 TREES REQUIRED SHRUBS (3 / 20 STALLS)12 SHRUBS BUFFERYARD (40' WIDE - SOUTH PROPERTY LINE) TOTAL LENGTH OF BUFFER 441 LF REQUIRED OVERSTORY TREES (2 / 50 LF)18 REQUIRED EVERGREEN TREES (4 / 50 LF)36 REQUIRED UNDERSTORY TREES (3 / 50 LF)27 OVERSTORY TREES PROVIDED 18 EVERGREEN TREES PROVIDED 36 UNDERSTORY TREES PROVIDED 27 DE T A I L S S H E E T C6.1 REFERENCE NUMBER: 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 DRAWN BY: CHECKED BY: REVISION DATE: PROJECT NUMBER: SHEET NUMBER: MT G S P O R T S C O M P L E X WA U K E E , I O W A DRL DB 03/30/2023 1ST CITY SET 09/18/2023 2ND CITY SET 10/11/2023 3RD CITY SET 230051 PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N L: \ L A N D P R O J E C T S 2 0 2 3 \ 2 3 0 0 5 1 - M T G S P O R T S C O M P L E X \ D W G \ C 6 D E T A I L S . D W G 10 / 2 6 / 2 0 2 3 2 : 1 1 : 4 6 P M TRANSFORMER PAD MOAT DETAIL NOT TO SCALE 9 C6.1 REINFORCED CONCRETE TRANSFORMER PAD (PER MID-AMERICAN STANDARDS) REFERENCE ELECTRICAL PLANS TRANSFORMER 3' 3' 3' 3' 3" RIVER ROCK, SCREENED DURAEDGE 1/8" STEEL EDGING, COLOR GREEN REINFORCED CONCRETE TRANSFORMER PAD (PER MID-AMERICAN STANDARDS) 3" RIVER ROCK, SCREENED 3' 2'2' 3'LINE TRENCH WITH SILT FENCE FABRIC (OR OTHER SOIL FABRIC WITH EQUAL OR LOWER POROSITY) DURAEDGE 1/8" STEEL EDGING, COLOR GREEN 48" 20" 6" DIA WEATHERED (COR-TEN) STEEL PIPE EMBEDDED IN CONC FILL PIPE W/ CONCRETE INSTALL BOLLARD 27" INTO SIDEWALK MEASURED FROM EDGE OF PARKING STALL TO CENTER OF BOLLARD CLASS "A" CONC FOUNDATION CENTERED ON BOLLARD EDGE OF PARKING STALL CONC WALK. SEE OTHER DETAILS MUTCD R7-8 (RESERVED PARKING) SIGN 2"x2" SQUARE BLACK POWDER COATED STEEL POLE MUTCD R7-8a OR R7-8b (VAN ACCESSIBLE) SIGN AS CALLED OUT ON PLANS STEEL POLE CEMENTED INTO BOLLARD CENTER NOTE: FOR HANDICAP STALLS IN FRONT OF CURB, INSTALL POLE 2' FROM BACK OF CURB. DIRECT BURY POLE 4' MIN INTO GROUND WITHOUT INSTALLING BOLLARD 24"36"60" 1/2" FOAM AROUND BOLLARD SEAL FOAM W/ GRAY MASTIC JOINT SEALANT 6" BOLLARD W/ PARKING SIGN DETAIL SCALE NONE 5.75' TO EDGE OF SIDEWALK 3 C6.1 1 2 3 Locate 'DW' joint at a mid-panel location between future 'C' or 'CD' joints. Place no closer than 5 feet to a 'C' or 'CD' joint. Place bars within the limits shown under dowel assemblies. 'RT' joint may be used in lieu of 'DW' joint at the end of the days work. Remove any pavement damaged due to the drilling at no additional cost to the Contracting Authority. 4 Saw 'C' joint to a depth of T/3. 6 7 5 Bar supports may be necessary for fixed form paving to ensure the bar remains in a horizontal position in the plastic concrete. Sawing or sealing of joint not required. The following joints are interchangeable, subject to the pouring sequence: 'BT-1' and 'L-1' 'BT-2' and 'L-2' 'BT-3' and 'L-3' 1 2" to 3 4''Top of Pavement Sealant SECTION A-A (Detail at Edge of Pavement) DETAIL C Joint Sealant Material 1 4'' ± 1 16'' Saw Cut 1 1 4'' ± 1 4'' Saw Cut 1 4'' ± 1 8'' Crack or Joint Line A A Pavement Edge See Detail C T Hole Diameter 1 8'' Larger than Dowel 8 18'' Long 3/4" Dowel at 12'' Centers 9'' min.9'' min. 'RD' ABUTTING PAVEMENT JOINT 8 Edge with 1/4 inch tool for length of joint indicated if formed; edging not required when cut with diamond blade saw. Remove header block and board when second slab is placed. T/2 T See Detail A or B T 30'' Long Tie Bar at 12'' Centers 321 'C' CONTRACTION JOINT 'DW' DAY'S WORK JOINT (Non-working) 5 7 30'' Long #4 BarsSee Detail E See Detail D-1 or D-2 7 6 'KT-1' ABUTTING PAVEMENT JOINT - KEYWAY TIE 'L-1' CONTRACTION JOINT 1 4'' ± 1 16'' Saw CutJoint Sealant Material 1 4'' ± 1 8'' Saw Cut 4 A A Crack or Joint Line 1 8'' to 5 16'' Saw CutJoint Sealant Material 1 4'' ± 1 8'' 1 1 4'' ± 1 4'' Crack or Joint Line A A DETAIL B (Saw cut formed by approved early concrete sawing equipment.) DETAIL A (Saw cut formed by conventional concrete sawing equipment.) at 30'' Centers 36'' Long #4 Bars at 30'' Centers T/2 1'' + 1 4'' or - 1 8'' 1"2" DETAIL E Crack or Joint Line T/3 ± 1 4'' Crack or Joint Line T/3 ± 1 4'' Joint Sealant Material 1 8'' ± 1 16'' Saw Cut 1 4'' ± 1 16'' Saw Cut DETAIL D-1 DETAIL D-2 13 (Required when the Department of Transportation is not the Contracting Authority, or when specified in the contract documents) (Required when the Department of Transportation is the Contracting Authority, or when specified in the contract documents.) JOINTING DETAILS SCALE NONE 1 C6.1 BACK OF CURB FACE OF CURB EDGE OF TURNED DOWN WALK SIDEWALK PAVEMENT GRASS/LANDSCAPING ROADWAY PAVEMENT PLAN VIEW CURB & GUTTER / TURNED DOWN WALK TRANSITION DETAIL SCALE NONE 6 C6.1 24" 3"4.5" 6" 6" R 1" R 2"COMPACTED BACKFILL NOTES: 1.SLOPE GUTTER IN ACCORDANCE WITH GRADING PLAN. 2.INSTALL CURB & GUTTER INTERGRAL WITH PAVING. 3.PCC PAVEMENT SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 4,000 PSI. TYPE 1 PAVEMENT SECTION SCALE NONEC6.1 4 6" PCC C4 MIX 12" SUBGRADE PREPARATION FINISHED GROUND GRADE (INCLUDING SOD) SHALL BE 1/4" BELOW FINISHED PAVEMENT GRADE ON DOWNHILL SIDE WIDTH PER PLAN 5" PCC (UNLESS NOTED OTHERWISE) NOTE: SLOPE SIDEWALK IN ACCORDANCE WITH GRADING PLAN, 1.5% CROSS SLOPE 7 SIDEWALK DETAIL SCALE NONEC6.1 REVISION SHEET _1 of _1 7030.101 CONCRETE DRIVEWAY, TYPE A FI G U R E 7 0 3 0 . 1 0 1 SH E E T 1 O F 1 5'-0" max 1'-0" (Residential/Agricultural Only) 2022 Edition4 1 2 3 4 5 6 7 8 9 10 11 Curb o p e n i n g Drive w a y w i d t h Drive w a y w i d t h 3'-0" min. 18"12" Curb o p e n i n g 1'-0" m i n . 1'-0" m i n . 1 R 1'-0" 4 6 7 2 3 11 Drop Curb Heights - Residential: 0" to 2" Commercial/Industrial: 112" to 3" as sp e c i f i e d Pr o p e r t y l i n e 'B' joint 'E' joint 'C' or 'E' joint 8 9 10 2 'C' joint10 Refer to Detail A Back of curb as sp e c i f i e d 'E' joint 'C' or 'E' joint Pr o p e r t y l i n e 'B' joint 10 29 8 10 'C' joint Refer to Detail B Back of curb 2 Back of curb 7 Driveway Curb Sidewalk 2#5 x 36" reinforcing bar 5 Back of curb 7 TYPE A WITH FLARES DETAIL A TYPICAL SECTION TYPE A WITH RADII DETAIL B Driveway radius (R). Residential: 10 foot minimum,15 foot maximum. Commercial and industrial: As specified in the contract documents. Transition the curb height to 0 inches at end of taper/radius or at the front edge of sidewalk. Do not extend raised curb across sidewalk. Pavement thickness. Residential: 6 inches minimum. Commercial and industrial: 7 inches minimum. Sidewalk thickness through driveway to match thickness of driveway. Center reinforcing bar vertically in the pavement. Match thickness of adjacent roadway, 8 inches minimum. Provide 'E' joint at back of curb unless 'B' joint is specified. For alleys, invert the pavement crown 2% toward center of alley. Target cross slope of 1.5% with a maximum cross slope of 2.0%. If specified in the contract documents, construct the sidewalk through the driveway 5 feet wide to serve as a passing space. If cross slope of adjacent sidewalk panel exceeds 2.0%, remove and replace to transition from existing sidewalk to sidewalk through driveway. If elevation change requires a curb ramp, comply with Figure 7030.205; verify need for detectable warning panel with Engineer. Transition street curb at minimum 1:1 slope to meet driveway curb. CONCRETE DRIVEWAY, TYPE A DETAIL NOT TO SCALE 2 C6.1 *NOT TO BE CONSTRUCTED UNTIL ALL UPSTREAM AREAS ARE STABILIZED* BIORETENTION MAINTENANCE NOTES (I.S.W.M. CH. 5 SEC 4) GENERAL NOTES: 1.FURTHER DETAILS AND DESCRIPTIONS OF BIORETENTION SYSTEMS CAN BE FOUND IN THE IOWA STORM WATER MANAGEMENT MANUAL, CHAPTER 5, SECTION 4. 2.CONTRACTOR TO CONTACT BISHOP ENGINEERING (515-276-0467) WITH 10 BUSINESS DAY LEAD TIME FOR THE AS-BUILT SURVEY OF THE ABOVE GROUND BIORETENTION AREA. THE CONTRACTOR IS TO VERIFY WITH THE CITY THAT THE BIORETENTION CELL WAS INSTALLED PER REQUIREMENTS LAID OUT IN THE IOWA STORM WATER MANAGEMENT MANUAL, CHAPTER 5 SECTION 4. 6" P O N D E D D E P T H SHEET FLOWSHEET FLOW 8 C6.1 POND BOTTOM POND TOP TURF GRASS UNDISTURBED SOIL NORTH AMERICAN GREEN P300 TRM AMENDED SOIL (75-90% CONCRETE SAND, 0-10% ORGANIC COMPOST, 0-25% SOIL A-HORIZON 3/8" CHIP LIMESTONE (CHOKER LAYER) 1" LIMESTONE (CLEAN) NOT TO SCALE 6" PERFORATED PVC SUBDRAIN 21 " SO I L D E P T H 2" 10 " BIORETENTION DETAIL NOTE: REFER TO IOWA STORMWATER MANAGEMENT MANUAL, CHAPTER 5 SECTION 4 (C5-S4-BIORETENTION SYSTEMS) FOR FURTHER DETAILS 24" 3"4.5" 6" 6" R 1" R 2"COMPACTED BACKFILL NOTES: 1.SLOPE GUTTER IN ACCORDANCE WITH GRADING PLAN. 2.INSTALL CURB & GUTTER INTERGRAL WITH PAVING. 3.PCC PAVEMENT SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 4,000 PSI. TYPE 2 PAVEMENT SECTION SCALE NONEC6.1 5 7" PCC C4 MIX 12" SUBGRADE PREPARATION DE T A I L S S H E E T C6.2 REFERENCE NUMBER: 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 DRAWN BY: CHECKED BY: REVISION DATE: PROJECT NUMBER: SHEET NUMBER: MT G S P O R T S C O M P L E X WA U K E E , I O W A DRL DB 03/30/2023 1ST CITY SET 09/18/2023 2ND CITY SET 10/11/2023 3RD CITY SET 230051 PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N L: \ L A N D P R O J E C T S 2 0 2 3 \ 2 3 0 0 5 1 - M T G S P O R T S C O M P L E X \ D W G \ C 6 D E T A I L S . D W G 10 / 2 6 / 2 0 2 3 2 : 1 1 : 5 2 P M 5" PCC WALK 12" SLOPE 1.5% (DESIRED - 2% MAX) FINISH WITH 3/4" RADIUS TOOL PARKING LOT PAVEMENT 18" (DIRECTION SHOWN ON GRADING PLANS) VARIES SEALED 'E' JOINT SEE DETAIL A 12" SUBGRADE PREP. 1" NOMINAL 5/8"RESILIENT JOINT FILLER DETAIL A: NOT TO SCALE TURNED DOWN WALK DETAIL (SIDEWALK INTEGRAL WITH CURB) NOT TO SCALE 11 C6.2 VARIES, 6" TYP NOTE: IN ADA ZONES, SIDEWALK SHALL BE FLUSH WITH PARKING LOT PAVEMENT. SEE SHEET C2.11/2" GRAY MASTIC JOINT SEALANT MATERIAL EDGE WITH 1/4 INCH TOOL FOR LENGTH OF JOINT INDICATED IF FORMED; EDGING NOT REQUIRED WHEN CUT WITH DIAMOND BLADE SAW STRUCTURAL STOOP / SIDEWALK TRANSITION DETAIL SCALE NONE 12 C6.2 XXX #4 @ 12" O.C. THUS:60" 36" #4 @ 12" O.C. STRUCTURAL STOOP- SEE STRUCTURAL KEYED JOINT 4" VOID FORMS X WIDTH OF SIDEWALK 2" 5'-0" SIDEWALK 3/8" EXPANSION JOINT FILLED W/ GRAY MASTIC JOINT SEALANT 12" 6" PCC 12"5" 10 C6.2 NOT TO SCALE SEE SECTION DETAIL 'A' AT RIGHT SECTION DETAIL 'A' CASTING SUPPORT PAD 6"X45 DEGREE BEND 10'-0" MIN. 18"X18"X6" THICK SQUARE CONCRETE PAD PVC PIPE STUB FITTING CLEANOUT ADADPTER THREADED PLUG TERMINATION OF SERVICE LINE WYE FITTING 13 C6.2 CLEANOUT DETAIL MODIFIED OUTLET STRUCTURE NOT TO SCALE 14 C6.2 3" ORIFICE ELEV=1026.65 RIM=1032.00 SW-511 6" SUBDRAIN ELEV=1024.40 CAP BLOCK COMPACTED GRANULAR WALL FOUNDATION STANDARD CONCRETE MASONRY MODULAR BLOCK MODULAR BLOCK WALL DETAIL NOT TO SCALE 1/2" DIA. NYLON/FIBERGLASS CONNECTION PIN OR ANCHOR BAR OR INTEGRAL CONCRETE SLEAVE CONNECTION 12" MIN. WIDTH COMPACTED GRANULAR MATERIAL GEOGRID WHEN REQ'D SAFETY RAILING OR FENCE. MATERIALS, LOCATION, AND HEIGHT TO BE DETERMINED BY THE DEVELOPER AND THE CITY BUILDING DEPARTMENT. COMPACTED FILL 4" 4' M A X . HE I G H T 15 C6.2 8" ORIFICE ELEV=1028.25 22.5oto 45o CLASS 1 BEDDING MATERIALTEE OR WYE SERVICE LINE SERVICE RISER SERVICE LINE CAP OR PLUG LOCATION POST 1 2 3 SANITARY SEWER SERVICE STUB WITH RISER DETAIL NOT TO SCALE 10' 10 ' t o 1 2 ' SANITARY SEWER MAIN TRENCH WALL SANITARY SEWER MAIN NOTES: 1.PLACE BEDDING AND BACKFILL MATERIAL AS REQUIRED FOR SEWER MAIN. 2.SERVICE LINE SLOPE: 4 INCH: 2% TO 5% 6 INCH: 1% TO 5% 3.IF SERVICE RISER SLOPE IS STEEPER THAN 1:1, CONSTRUCT RISER OF ENTIRE SERVICE LINE WITH SCHEDULE 40 PVC (ASTM D 1785) OR DUCTILE IRON (AWWA C151, CLASS 52). USE SINGLE LENGTH OF PIPE FOR RISER, IF POSSIBLE. SLOPE SL O P E SLOPE SUPPORT BENCH 18" MIN. ROW LINE 16 C6.2 1/4" FALL PER FOOT SIDESLOPE ON ALL SIDEWALKS 6" SIDEWALK 12" MIN.18" PCC SIDEWALK BEHIND CURB DETAIL SCALE NONE 17 C6.1 ROADWAY PAVEMENT 12" SUBGRADE PREPARATION PROPOSED SPORTS COMPLEX AREA = 23,200 SF FF=1035.00' 1033 10 3 3 10 3 3 1033 1 0 3 3 D D D D 1 0 3 3 W 6" W 6" W 6" W 6" W 6" W 6" SA N SA N SA N H Y D CO 103 3 103 2 1032 CO CO 1034 1 0 3 2 1033 103 1 103 0 10 3 1 1 0 3 3 1034 1032 1034 1032 1034 1032 1033 1034 10331034 10 3 4 1 0 3 3 1 0 3 4 1034 1033 103 3 1033 1032 1033 1032 1030 10 3 3 1026 10 2 6 1 0 3 1 D CO 6.75 TONS OF CLASS D RIP RAP 1' THICK W6" W6" G4"G4"G4"G4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" 1034 1030 1026 1026 WV WV 103 2 1034 1032 1032 10 3 2 1 0 3 2 10 3 2 1032 1031 1031 1034 GM NW 1 7 T H S T R E E T NW VICKSBURG COURT D CO CO D S S CO D D U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E ST 18" S T 1 5 " ST 42" ST 42 " ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" ST 42" S T 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6" ST 6"ST 6"ST 6"ST 6"ST 6"ST 6" ST 42 " ST 42 " ST 42 " ST 18 " ST 18" ST 15"ST 15"ST 15"ST 15"ST 15" SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN 8"SAN SAN 6" SAN 6" 42" 70' R . O . W . ( P U B L I C S T R E E T - C O N C R E T E S U R F A C E ) 60' R.O.W.(PUBLIC STREET-CONCRETE SURFACE) 20 ' P R I V A T E S T O R M S E W E R EA S E M E N T ( B K 2 0 2 1 , P G 2 5 1 ) 40 ' L A N D S C A P E B U F F E R EA S E M E N T ( B K 2 0 2 1 , P G 2 4 7 ) 10' P U B L I C U T I L I T Y E A S E M E N T (B K 2 0 2 1 , P G 2 4 5 ) 15 ' S A N I T A R Y S E W E R E A S E M E N T (B K 2 0 2 1 , P G 2 4 6 ) 10 ' P . U . E . (B K . 2 0 2 1 , P G . 2 4 5 ) F/O 10 3 4 1034 1030 1030 1033 1034 1032 1 0 3 2 1026 1030 1030 10 3 2 10 3 0 1028 103 5 103 5 103 3 1030 1030 1031 1030 1029 LOT 12 LOT 13 G4" G4" G4" G4" G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4" 8" W8" W8" W8"W8"W8"W8"W8"W8"W8" W6" W6" LOT 18 W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W8" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G 4" G4" SA N 8" SA N 8" W6" 20' P R I V A T E S T O R M S E W E R EAS E M E N T ( B K 2 0 2 1 , P G 2 5 1 ) D D 1032 1030 1028 1032 1028 1030 1032 1033 1030 1033 U/E U/E ST O R M W A T E R E A S E M E N T (BO O K 2 0 2 1 P A G E 2 5 0 ) 1033 1029 1027 1026 1029 1031 1034 WV 1029 1028 1027 10 3 1 SF S F SF INLET PROTECTION SF S F SF INLET PROTECTION SF SF SF SF INLET PROTECTION SF SF INLET PROTECTION SF SF INLET PROTECTION SF SF INLET PROTECTION ROCK CONSTRUCTION ENTRANCE CONCRETE WASHOUT OUTHOUSE & MATERIAL STORAGE POSSIBLE TOPSOIL STOCKPILE LOCAITON SF SF SF SF INLET PROTECTION LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE SF SF SF SF SF SF SILT FENCE ULTIMATE DISCHARGE FROM SITE TO LITTLE WALNUT CREEK 12' 1 2 ' 6' BIORETENTION AREA POST-CONSTRUCTION FACILITY PRE-TREATMENT BIORETENTION AREA 33" DEPTH FROM TOP OF SOIL TO BOTTOM OF SUBDRAIN POST-CONSTRUCTION FACILITY POND OUTLET STANDPIPE POST-CONSTRUCTION FACILITY SF SILT FENCE SILT FENCE SW P P P C7.1 REFERENCE NUMBER: 35 0 1 1 0 4 t h S t r e e t De s M o i n e s , I o w a 5 0 3 2 2 - 3 8 2 5 Ph o n e : ( 5 1 5 ) 2 7 6 - 0 4 6 7 F a x : ( 5 1 5 ) 2 7 6 - 0 2 1 7 "P l a n n i n g Y o u r S u c c e s s f u l D e v e l o p m e n t " Bi s h o p E n g i n e e r i n g Ci v i l E n g i n e e r i n g & L a n d S u r v e y i n g E s t a b l i s h e d 1 9 5 9 DRAWN BY: CHECKED BY: REVISION DATE: PROJECT NUMBER: SHEET NUMBER: MT G S P O R T S C O M P L E X WA U K E E , I O W A DRL DB 03/30/2023 1ST CITY SET 09/18/2023 2ND CITY SET 10/11/2023 3RD CITY SET 230051 PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N STORM WATER POLLUTION PREVENTION PLAN IOWAONE CALL 1-800-292-8989 www.iowaonecall.com 811 Know what's below. Call before you dig. UTILITY NOTE: THE LOCATION OF THE UTILITIES INDICATED ON THE PLANS ARE TAKEN FROM EXISTING PUBLIC RECORDS AND ARE APPROXIMATE LOCATIONS. THE EXACT LOCATIONS OF ALL UTILITIES MUST BE ASCERTAINED IN THE FIELD. IT SHALL BE THE DUTY OF THE CONTRACTOR TO DETERMINE WHETHER ANY ADDITIONAL FACILITIES OTHER THAN THOSE SHOWN ON THE PLANS MAY BE PRESENT. EROSION CONTROL NOTES: 1.SEE SUPPLEMENTAL DETAIL STORM WATER POLLUTION PLAN NARRATIVE FOR ALL EROSION CONTROL MEASURES, ADDITIONAL DETAILS AND NOTE. ADDITIONAL NOTES AND MEASURES IN NARRATIVE SHALL BE CONSIDERED INCIDENTAL AND SHALL BE INCLUDED IN THE ORIGINAL BID. 2.SWPPP PLAN AND NARRATIVE ARE CONSIDERED A LIVING DOCUMENT AND WILL NEED PERIODIC UPDATES AND ADJUSTMENTS AS NECESSARY DEPENDING ON SITE CONDITIONS TO ASSURE COMPLIANCE WITH NPDES GENERAL PERMIT NO. 2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO UPDATE THE SWPPP AND IMPLEMENT ANY AND ALL MEASURES NECESSARY TO COMPLY WITH SAID PERMIT NO. 2. 3.INSTALL PERIMETER SILT FENCE AS SHOWN ON PLANS PRIOR TO CONSTRUCTION. 4.INSTALL INTAKE PROTECTION WITH SILT FENCE IMMEDIATELY AFTER STORM SEWER CONSTRUCTION. 5.INSTALL FINISHED PAVING INLET PROTECTION IMMEDIATELY AFTER PAVING IS COMPLETED AROUND INTAKE. 6.OTHER EROSION CONTROL TYPES MAY NOT BE SUBSTITUTED FOR SILT FENCE. 7.CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING A CONCRETE WASHOUT IN ACCORDANCE WITH SUDAS SPEC 11,050 & NPDES GENERAL PERMIT NO. 2 DURING ALL CONCRETE WORK. 8.CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING TEMPORARY RESTROOM FACILITIES. SANITARY WASTE SHALL BE DISPOSED OF PER ALL FEDERAL, STATE AND LOCAL REGULATIONS. 9.CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL TOPSOIL REQUIREMENTS OF NPDES GENERAL PERMIT NO. 2 ARE MET. 10.OWNER SHALL BE RESPONSIBLE FOR MAINTENANCE OF PRIVATE DETENTION FACILITIES AND PRIVATE UTILITIES. 11.CONTRACTOR IS RESPONSIBLE FOR INSTALLING AND PHASING EROSION CONTROLS AND SILT FENCE, PER SWPPP INSPECTORS RECOMMENDATIONS, TO MAINTAIN EROSION PROTECTION AND ACCOMMODATE CONSTRUCTION ACTIVITIES AND PHASING. ANY ADDITIONAL EROSION CONTROLS OR ADJUSTMENTS SHALL BE INCIDENTAL. 12.CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY SILTING, REELING OR SCOURING TO DESIGN GRADE BEFORE CLOSE OF PROJECT PER SWPPP INSPECTOR AND OWNER RECOMMENDATIONS. 13.CONTRACTOR TO PROTECT PROPOSED PONDS DURING CONSTURCITON FROM EROSION AND SILTING. ANY CORRECTIVE WORK TO RESTORE POND BOTTOM SHALL BE INCIDENTAL. EROSION CONTROL REMOVAL NOTES: 1.AFTER FINAL STABILIZATION HAS OCCURED, AS DEFINED IN NPDES GENERAL PERMIT NO. 2, CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL TEMPORARY EROSION CONTROL DEVICES INCLUDING, BUT NOT LIMITED TO: SILT FENCE, INLET PROTECTION, AND TEMPORARY STANDPIPES. L: \ L A N D P R O J E C T S 2 0 2 3 \ 2 3 0 0 5 1 - M T G S P O R T S C O M P L E X \ D W G \ C 7 S W P P P . D W G 10 / 2 6 / 2 0 2 3 2 : 1 6 : 1 4 P M GRAPHIC SCALE 020 10 20 40 SF SF SF SF SF SF SF SILT FENCE SF SF SF SF SF SF SF SF SF SF SF SF SILT FENCE SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSILT FENCE SF SF SF SF SF SF SF SF SF SILT FENCE SILT FENCE SILT FENCE GENERAL NOTES: 1.ALL BIORETENTION CELLS ARE TO BE CONSTRUCTED ONLY AFTER ALL OTHER CONSTRUCTION ITEMS AREA COMPLETE. SEDIMENT PROTECTION WILL BE REQUIRED IF IMMEDIATE UPSTREAM PROTECTION IS NOT ABLE TO BE COMPLETED. A B C D E 4 3 2 1 Grace A&D Job # Project: 10/10/2023 COORDINATION SET THIS DESIGN AND PLANS ARE THE SOLE RESPONSIBILITY OF GRACE ARCHITECTURE & DESIGN, LLC., AND HAVE BEEN GENERATED FOR THE CLIENTS LISTED IN THE PROJECT NAME AND ARE NOT TO BE USED, REPRODUCED, COPIED, OR DISTRIBUTED FOR ANY OTHER PROJECT WITHOUT WRITTEN PERMISSION FROM AND OR COMPENSATION DUE GRACE ARCHITECTURE & DESIGN, LLC. UTILIZATION OF THESE DOCUMENTS AND SUBSEQUENT FABRICATION-CONSTRUCTION ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. BEFORE STARTING CONSTRUCTION THE CONTRACTOR SHALL REVIEW AND VERIFY ON SITE ALL DIMENSIONS, DETAILS AND THEIR CORRELATION TO ATTACHED ENGINEERING. ANY DISCREPANCIES IN PLANS, DIMENSIONS, NOTES, OR DETAILS SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE DESIGNER PRIOR TO COMMENCING ASSOCIATED WORK, ALLOWING REQUIRED CORRECTIONS TO BE PERFORMED. ANY ATTACHED ENGINEERING OR LOCAL BUILDING AUTHORITY NOTATIONS SUPERSEDE AND OVERRIDE MATERIALS, FASTENING, NAILING SCHEDULES AND CONSTRUCTION PROCEDURES PRESENTED IN PLAN, SECTION OR DETAIL VIEWS AND SHALL TAKE PRECEDENCE OVER ANYTHING SHOWN, DESCRIBED OR IMPLIED. THE CONTRACTOR ASSUMES LIABILITY FOR ANY PROBLEMS THAT MAY ARISE DUE TO NON- COMPLIANCE. USE OF THESE PLANS CONSTITUTES COMPLIANCE WITH THE ABOVE TERMS. Project Sports Complex 1650 NW Vicksburg Ct Waukee, IA 50263 JAMES POINTE PLAT 1 LOT 12 Client TLM, LLC - Travis Moulton 14322 Sheridan Ave Urbandale, IA 50323 Architect Grace Architecture & Design 113 East Court Avenue Winterset, IA 50273 matt@gracearch.com 515 979-9824 PRELIMINARY 10 / 1 0 / 2 0 2 3 1 : 3 5 : 4 5 P M ILLUSTRATIVE RENDERINGS A0-IR 20230207 SPORTS COMPLEX WAUKEE, IA Date Description RAIN CAP TO MATCH BLDG SPLIT FACE CMU -PAINTED TO MATCH FIBER CEMENT PANELS AT BLDG. 6" 6' - 0 " 4"5' - 5 1/2"1"5' - 5 1/2"4" 4" 6' - 2 " 14' - 0" RAIN CAP TO MATCH BLDG SPLIT FACE CMU -PAINTED TO MATCH FIBER CEMENT PANELS AT BLDG. 10 ' - 2 1 / 4 " 4' - 9 1 / 4 " 3 1 / 4 " 4' - 3 1 / 4 " 3 1 / 4 " 7 1 / 4 " 1 1 / 2 " 2" 2" 1" 2 1 / 2 " 1/4" PL GALV 3/16" CHAMFER ALL AROUND 4' - 6 1 / 2 " 3/16 3" 1 1 / 2 " 1/ 8 " 6" 3/4 " 4 1 / 2 " 3/ 4 " 13/16 ⌀ BACKER BAR 1 1/8"2" 3/8" 2 1 / 2 " 1 1 / 4 " 1 1 / 4 " 9/16 ⌀ 3/16 6" 1 1/4"1 1/4" HINGE ELEVATION HINGE PLAN BAR 2-1/2x1/4 4 1 / 2 " 9/16⌀ BACKER BAR HINGE 7 1 / 2 " 4 1 / 2 " 4' - 2 " 4 1 / 2 " 7 1 / 2 " 1" 1/8 0 1/8 0 GALV TYP 1/8 1/8 GALV TYP 9/16 ⌀THRU HOLE CENTER ON TUBE HSS 3x2x3/16 2" 5' - 5 1/2" 6' - 2 " GALV TYP 1/8 1/8 GALV TYP HSS 3x2x3/16 HSS 3x2x3/16 HSS 3x2x3/16 HSS 3x2x3/16 1' - 0 " 8 1 / 2 " 1 3/4"2" BAR 2x1/4 5/16 ⌀ 11/16 ⌀ 1 3/8" 1"1" 7/8"7/8" 4 3/8" ROD 5/8 ⌀ ADJUSTABLE COLLARS 2' - 0 " 14 ' - 0 " 7 5 / 8 " 12 ' - 8 3 / 4 " 7 5 / 8 " A1-DE B1 A1-DE C1 A1-DE D1 A1-DEA1 6" 4" 5' - 5 1 / 2 " 1" 5' - 5 1 / 2 " 4" 6" DUMPSTER 12' - 0" A B C D E 4 3 2 1 Grace A&D Job # Project: 10/10/2023 COORDINATION SET THIS DESIGN AND PLANS ARE THE SOLE RESPONSIBILITY OF GRACE ARCHITECTURE & DESIGN, LLC., AND HAVE BEEN GENERATED FOR THE CLIENTS LISTED IN THE PROJECT NAME AND ARE NOT TO BE USED, REPRODUCED, COPIED, OR DISTRIBUTED FOR ANY OTHER PROJECT WITHOUT WRITTEN PERMISSION FROM AND OR COMPENSATION DUE GRACE ARCHITECTURE & DESIGN, LLC. UTILIZATION OF THESE DOCUMENTS AND SUBSEQUENT FABRICATION-CONSTRUCTION ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. BEFORE STARTING CONSTRUCTION THE CONTRACTOR SHALL REVIEW AND VERIFY ON SITE ALL DIMENSIONS, DETAILS AND THEIR CORRELATION TO ATTACHED ENGINEERING. ANY DISCREPANCIES IN PLANS, DIMENSIONS, NOTES, OR DETAILS SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE DESIGNER PRIOR TO COMMENCING ASSOCIATED WORK, ALLOWING REQUIRED CORRECTIONS TO BE PERFORMED. ANY ATTACHED ENGINEERING OR LOCAL BUILDING AUTHORITY NOTATIONS SUPERSEDE AND OVERRIDE MATERIALS, FASTENING, NAILING SCHEDULES AND CONSTRUCTION PROCEDURES PRESENTED IN PLAN, SECTION OR DETAIL VIEWS AND SHALL TAKE PRECEDENCE OVER ANYTHING SHOWN, DESCRIBED OR IMPLIED. THE CONTRACTOR ASSUMES LIABILITY FOR ANY PROBLEMS THAT MAY ARISE DUE TO NON- COMPLIANCE. USE OF THESE PLANS CONSTITUTES COMPLIANCE WITH THE ABOVE TERMS. Project Sports Complex 1650 NW Vicksburg Ct Waukee, IA 50263 JAMES POINTE PLAT 1 LOT 12 Client TLM, LLC - Travis Moulton 14322 Sheridan Ave Urbandale, IA 50323 Architect Grace Architecture & Design 113 East Court Avenue Winterset, IA 50273 matt@gracearch.com 515 979-9824 PRELIMINARY 10 / 1 0 / 2 0 2 3 1 : 3 5 : 4 7 P M DUMPSTER ENCLOSURE A1-DE 20230207 SPORTS COMPLEX WAUKEE, IA 3/8" = 1'-0"A1-DE A1 DUMPSTER ENCLOSURE - EAST ELEVATION 3/8" = 1'-0"A1-DE C1 DUMPSTER ENCLOSURE - WEST ELAVATION 3/8" = 1'-0"A1-DE D1 DUMPSTER ENCLOSURE - SOUTH ELEVATION 3/8" = 1'-0"A1-DE B1 DUMPSTER ENCLOSURE - NORTH ELEVATION REF'D FRM:1/2" = 1'-0"A1-DE A3 DUMPSTER ENCLOSURE COLUMN FRONT ELEVATION REF'D FRM:3" = 1'-0"A1-DE B3 DUMPSTER ENCLOSURE GATE DETAILS REF'D FRM:3/4" = 1'-0"A1-DE A4 DUMPSTER ENCLOSURE GATE ELEVATION REF'D FRM:1 1/2" = 1'-0"A1-DE C4 DUMPSTER ENCLOSURE GATE LATCH DETAILS REF'D FRM:1/4" = 1'-0"A200A1-DE D3 DUMPSTER ENCLOSURE PLAN RAIN CAP TO MATCH BLDG SPLIT FACE CMU -PAINTED TO MATCH FIBER CEMENT PANELS AT BLDG. Date Description 1ST FLOOR FFE 0' -0" T.O. EAVE 20' -0" 1 T.O.W. 10' -0" 2345678910 T.O. PEAK 22' -6" EXTERIOR FINISH PERCENTAGES: 4600 SF TOTAL DOES NOT FACE PUBLIC ROW FIBER CEMENT PANELS: 66 SF (1.4%) STONE: 606 SF (13.2%) DOORS: 24 SF (.5 %) METAL PANELS: 3904 SF (84.9 %) B.O. WINDOW 2' -8" STN-S1 MTL-V1FBR-CP R-SS DNSPTDNSPT DNSPT DNSPT MTL-1 1ST FLOOR FFE 0' -0" BFE -4' -0" T.O. EAVE 20' -0" 1 T.O.W. 10' -0" 2 3 4 5 6 7 8 9 10 T.O. PEAK 22' -6" 2' - 8 " 4' - 4 " 3' - 0 " 14 ' - 0 " 14' - 0"14' - 0" 14 ' - 0 " EXTERIOR FINISH PERCENTAGES: 4600 SF TOTAL FACES PUBLIC ROW FIBER CEMENT PANELS: 2384 SF (51.8%) STONE: 491 SF (10.7%) GLASS: 142 SF (3.1%) DOORS (& OHD'S): 464 SF (10.1 %) METAL PANELS: 1119 SF (24.3 %) CANOPY 12' -0" B.O. WINDOW 2' -8" 20' - 0" 5' - 0 " SIGN STN-S1 MTL-V1 FBR-CP MTL-V1 STN-S1 FBR-CP FBR-CP ALUM-SF ALUM-SF R-SS DNSPT DNSPTDNSPT MTL-1 SIGN AREA ALLOWED. THE FOLLOWING SIGN AREAS SHALL BE ALLOWED. A. PUBLIC STREET FACING TENANT: I. ONE AND A HALF SQUARE FEET OF SIGN AREA MAY BE ERECTED FOR EVERY LINEAR FOOT OF TENANT FRONTAGE TO A MAXIMUM OF ONE HUNDRED (100) SQUARE FEET. MTL WIND BREAK 1ST FLOOR FFE 0' -0" BFE -4' -0" T.O. EAVE 20' -0" A T.O.W. 10' -0" BDEC T.O. PEAK 22' -6" EXTERIOR FINISH PERCENTAGES: 2040 SF TOTAL FACES PUBLIC ROW FIBER CEMENT PANELS: 1073 SF (52.6%) STONE: 259 SF (12.7%) DOORS: 24 SF (1.2%) METAL PANELS: 684 SF (33.5 %) 20' - 0" 5' - 0 " SIGN 100 SF MAX STN-S1 FBR-CP MTL-V1 FBR-CP MTL-1 SIGN AREA ALLOWED. THE FOLLOWING SIGN AREAS SHALL BE ALLOWED. A. PUBLIC STREET FACING TENANT: I. ONE AND A HALF SQUARE FEET OF SIGN AREA MAY BE ERECTED FOR EVERY LINEAR FOOT OF TENANT FRONTAGE TO A MAXIMUM OF ONE HUNDRED (100) SQUARE FEET. 1ST FLOOR FFE 0' -0" BFE -4' -0" T.O. EAVE 20' -0" A B D EC T.O. PEAK 22' -6" EXTERIOR FINISH PERCENTAGES: 2040 SF TOTAL DOES NOT FACE PUBLIC ROW FIBER CEMENT PANELS: 66 SF (3.2%) STONE: 267 SF (13.1%) METAL PANELS: 1707 SF (83.7 %) CANOPY 12' -0" STN-S1 FBR-CPMTL-V1 MTL-1 ABBR PRODUCT EXTERIOR FINISH MATERIALS SCHEDULE EXTERIOR -METAL WALL PANEL (VERTICAL)MTL-V1 COMMENTSCOLOR/STYLEMANUFACTURER/SUPPLIER ROOFING -DOWNSPOUTDNSPT EXTERIOR -CULTURED STONESTN-S1 MTL-1 ROOFING -GUTTER APRON/RAKE MTL/DRIP EDGE AMERICAN BUILDINGS (NUCOR) CENTURION STONE SLATE GRAY LEDGE: DOVE ROOFING -STANDING SEAMR-SS ALUMINUM STOREFRONTALUM-SF TBD AMERICAN BUILDINGS (NUCOR)GALVALUME DARK BRONZE TBD DARK BRONZE/BLACK TBD DARK BRONZE/BLACK OR APPROVED EQUAL FIBER CEMENT PANELSFBR-CP JAMES HARDIE ARCHITECTURAL COLLECTION FINE SAND (SHERWIN WILLIAMS -DARK GRAY)OR APPROVED EQUAL OR APPROVED EQUAL A B C D E 4 3 2 1 Grace A&D Job # Project: 10/10/2023 COORDINATION SET THIS DESIGN AND PLANS ARE THE SOLE RESPONSIBILITY OF GRACE ARCHITECTURE & DESIGN, LLC., AND HAVE BEEN GENERATED FOR THE CLIENTS LISTED IN THE PROJECT NAME AND ARE NOT TO BE USED, REPRODUCED, COPIED, OR DISTRIBUTED FOR ANY OTHER PROJECT WITHOUT WRITTEN PERMISSION FROM AND OR COMPENSATION DUE GRACE ARCHITECTURE & DESIGN, LLC. UTILIZATION OF THESE DOCUMENTS AND SUBSEQUENT FABRICATION-CONSTRUCTION ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. BEFORE STARTING CONSTRUCTION THE CONTRACTOR SHALL REVIEW AND VERIFY ON SITE ALL DIMENSIONS, DETAILS AND THEIR CORRELATION TO ATTACHED ENGINEERING. ANY DISCREPANCIES IN PLANS, DIMENSIONS, NOTES, OR DETAILS SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE DESIGNER PRIOR TO COMMENCING ASSOCIATED WORK, ALLOWING REQUIRED CORRECTIONS TO BE PERFORMED. ANY ATTACHED ENGINEERING OR LOCAL BUILDING AUTHORITY NOTATIONS SUPERSEDE AND OVERRIDE MATERIALS, FASTENING, NAILING SCHEDULES AND CONSTRUCTION PROCEDURES PRESENTED IN PLAN, SECTION OR DETAIL VIEWS AND SHALL TAKE PRECEDENCE OVER ANYTHING SHOWN, DESCRIBED OR IMPLIED. THE CONTRACTOR ASSUMES LIABILITY FOR ANY PROBLEMS THAT MAY ARISE DUE TO NON- COMPLIANCE. USE OF THESE PLANS CONSTITUTES COMPLIANCE WITH THE ABOVE TERMS. Project Sports Complex 1650 NW Vicksburg Ct Waukee, IA 50263 JAMES POINTE PLAT 1 LOT 12 Client TLM, LLC - Travis Moulton 14322 Sheridan Ave Urbandale, IA 50323 Architect Grace Architecture & Design 113 East Court Avenue Winterset, IA 50273 matt@gracearch.com 515 979-9824 PRELIMINARY 10 / 1 0 / 2 0 2 3 1 : 3 5 : 5 0 P M ELEVATIONS A200 20230207 SPORTS COMPLEX WAUKEE, IA 3/32" = 1'-0"A200 B3 SOUTH ELEVATION (BACK) 3/32" = 1'-0"A200 B4 NORTH ELEVATION (FRONT) 3/32" = 1'-0"A200 D2 WEST ELEVATION (SIDE) 3/32" = 1'-0"A200 A2 EAST ELEVATION (SIDE) NOT TO SCALEA200 A1 PERSPECTIVE TOTAL EXTERIOR FINISH PERCENTAGES 13,280 SF TOTAL FIBER CEMENT PANELS: 3589 SF (27.0%) STONE: 1623 SF (12.2%) DOORS: 512 SF (3.9%) GLASS: 142 SF (1.1%) METAL PANELS: 7414 SF (55.8 %) Date Description