HomeMy WebLinkAbout2023-11-20 I10A T Ave Corridor, W Hickman Rd to NW Douglas Pkwy_Change Order 1AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: November 20, 2023 AGENDA ITEM:Consideration of approval of Change Order No. 1 to All-Star Concrete, LLC for the T Avenue Corridor Improvements, W Hickman Road to NW Douglas Parkway Project increasing the contract amount by $53,927.00. FORMAT:Motion SYNOPSIS INCLUDING PRO & CON: Plan change 1 decreased the amount of 12” RCP by more than 20% so the contractor requested a bid item adjustment. Plan change 1 and 2 also changed the building outlet piping. In addition, trail signage was needed on the bike trail to increase safety and direct bikes/pedestrians to the detour. There was also a requested change from the city to the video detection and signage at the traffic signal at T Avenue (NW 20th) and Douglas. The remainder of adjustments are for quantity changes due to Plan Change 1 and 2 without price adjustments. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $53,927.00. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 1 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I10A 8191 Birchwood Court, Suite L Johnston, IA 50131 Phone: (515) 254-1393 November 13, 2023 Sara Kappos, P.E. Assistant Public Works Director 805 University Avenue Waukee, IA 50263 RE: Change Order #1 T Avenue Corridor Improvements – W Hickman Road to NW Douglas Parkway Dear Mrs. Kappos: Attached please find a detailed Change Order for City Council approval on November 20, 2023. Change Description: Plan change 1 decreased the amount of 12" RCP by more than 20% so the contractor requested a bid item adjustment. Plan change 1 and 2 also changed the building outlet piping. In addition, trail signage was needed on the bike trail to increase safety and direct bikes/pedestrians to the detour. There was also a r equested change from the city to the video detection and signage at the traffic signal at T Ave (NW 20th) and Douglas. The remainder of adjustments are for quantity changes due to Plan Change 1 and 2 without price adjustments. We have reviewed the submitted quotes from All - Star and they appear to be in order with current industry pricing. If City Staff concurs with this pricing, we recommend the City of Waukee Increase the contract price in the amount of $53,927.00 to complete the additional work associated with Change Order #1. If you have any questions, please contact me. Sincerely, Foth Infrastructure & Environment, LLC Rob Kline, P.E. Lead Civil Engineer Encl: Change Order #1 dated 11/13/2023 CHANGE ORDER 01 Distribution: Owner - Finance ____ Owner - Public Works ____ Engineer ____ Contractor ____ Contractor:All-Star Concrete LLC. 4989 NW Johnston Dr. Johnston, Iowa 50131 $10,683,619.98 August 7, 2023 2.10 Division 2 2010-J-1006 CY $62.00 3.00 $186.00 4.1 Division 2 4010-A-1004 LF $85.00 11.00 $935.00 4.2 Division 2 4010-A-1006 LF $87.00 39.00 $3,393.00 4.14 Division 2 4020-A-1512 LF $75.00 -1125.00 ($84,375.00) CO 4.14 Division 2 4020-A-1512 LF $85.00 752.00 $63,920.00 4.15 Division 2 4020-A-1515 LF $80.00 102.00 $8,160.00 4.24 Division 2 4030-B-1312 EA $2,320.00 -1.00 ($2,320.00) 4.25 Division 2 4030-B-1315 EA $2,430.00 1.00 $2,430.00 4.27 Division 2 4030-B-1324 EA $2,725.00 2.00 $5,450.00 4.31 Division 2 4040-A-1004 LF $18.00 -709.00 ($12,762.00) 4.33 Division 2 4040-C-1000 EA $1,455.00 -3.00 ($4,365.00) 4.34 Division 2 4040-D-1000 EA $550.00 -1.00 ($550.00) 4.39 Division 2 Special LF $85.00 91.00 $7,735.00 4.40 Division 2 Special LF $85.00 0.00 $0.00 4.41 Division 2 Special LF $90.00 0.00 $0.00 4.42 Division 2 Special LF $88.00 82.00 $7,216.00 5.8 Division 1 5010-C-1000 LF $19.00 1392.00 $26,448.00 6.3 Division 2 6010-A-1548 EA $3,600.00 1.00 $3,600.00 6.5 Division 1 6010-A-1560 EA $6,000.00 1.00 $6,000.00 6.5 Division 2 6010-A-1560 EA $6,000.00 -1.00 ($6,000.00) 6.13 Division 2 6010-B-1505 EA $6,100.00 -1.00 ($6,100.00) 6.14 Division 2 6010-B-1505 EA $10,000.00 1.00 $10,000.00 6.20 Division 2 6010-B-1512 EA $6,600.00 1.00 $6,600.00 8.1 Division 1 8010-A-1000 LS -$8,824.00 1.00 ($8,824.00) 8.19 Division 1 Special LS $4,400.00 1.00 $4,400.00 9.4 Division 1 9040-A-1500 AC $300.00 -9.10 ($2,730.00) 9.17 Division 1 Special AC $2,800.00 9.10 $25,480.00 $53,927.00 THE CONTRACT IS CHANGED AS FOLLOWS: Plan change 1 decreased the amount of 12" RCP by more than 20% so the contractor requested a bid item adjustment. Plan change 1 and 2 also changed the building outlet piping. In addition, trail signage was needed on the bike trail to increase safety and direct bikes/pedestrians to the detour. There was also a requested change from the city to the video detection and signage at the traffic signal at T Ave (NW 20th) and Douglas. The remainder of adjustments are for quantity changes due to Plan Change 1 and 2 without price adjustments. T Avenue Corridor Improvements W Hickman Rd to NW Douglas Pkwy 1 22W007.00 Waukee Project File Number November 13, 2023 Foth Project File Number Orig. Contract Amount & Date Date Change Order Number Project Title Department of Public Works 805 University Avenue Waukee, IA 50263 (515) 987-7920 Fax (515) 987-3979 Value AdjustmentQuantity AdjustmentUnit PriceDescriptionUnitItem No. TRAFFIC SIGNALIZATION STORM SEWER, TRENCHED, RCP, CLASS V, 12 IN. TRAFFIC CONTROL FOR TRAIL DETOUR CONVENTIONAL SEEDING, TYPE 5 (RURAL TEMPORARY EROSION CONTROL MIX) MULCHING FOR AREAS RETURNED TO FARM GROUND INTAKE, SW-505, DOUBLE GRATE INTAKE, SW-505, DOUBLE GRATE, MOD 1 INTAKE, SW-512, 36 IN. STORM SEWER, TRENCHED, RCP, CLASS V, 15 IN. PIPE APRON, CONCRETE, 12 IN. MODIFIED SUBBASE, 6 IN. SANITARY SEWER GRAVITY MAIN, TRENCHED, PVC, 4 IN. SANITARY SEWER GRAVITY MAIN, TRENCHED, PVC, 6 IN. Division Item Code MANHOLE, STORM SEWER, SW-401, 60 IN. WATER MAIN, TRENCHED, PVC C900, DR18, 6 IN. MANHOLE, STORM SEWER, SW-401, 48 IN. MANHOLE, STORM SEWER, SW-401, 60 IN. STORM SEWER, TRENCHED, PVC, 10 IN. - added in PC1 / omitted PC2 STORM SEWER, TRENCHED, PVC, 15 IN. - added in PC1 / omitted in PC2 STORM SEWER, TRENCHED, PVC, 12 IN. SUBDRAIN CLEANOUT, TYPE A-1 SUBDRAIN, OUTLET, CONNECTION TO INTAKE OR PIPE STORM SEWER, TRENCHED, PVC, 8 IN. PIPE APRON, CONCRETE, 15 IN. PIPE APRON, CONCRETE, 24 IN. SUBDRAIN, LONGITUDINAL, SHOULDER, PVC, 4 IN., (DR-303) STORM SEWER, TRENCHED, RCP, CLASS V, 12 IN. CO1-2023-1120-Waukee T Avenue.xlsx Change Order 1 Page 1 of 2 $10,683,619.98 $0.00 $10,683,619.98 $53,927.00 $10,737,546.98 0 Days Recommended By: All-Star Concrete LLC. Signature: Name: Bryan Sprigs Title: Project Manager Date: Owner:City of Waukee □ ≤$500 Department Director X_______________________________________Date___________________ □ $501 to $2,500 City Administrator X_______________________________________Date___________________ □ Date___________________ □ >$2,501 City Council approved or ratified at Council meeting on Date___________________ Date: Name: Brad Deets Checked By: Prepared By: Date: The Contract Time will be increased by CHANGE ORDER SUMMARY NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER The Original Contract Sum was The new Contract Sum including this Change Order will be Signature: City of Waukee Title: Lead Civil Engineer Signature: The Contract Sum will be increased by this Change Order in the amount of Net Change by previously authorized Change Orders Title: City Administrator Foth Infrastructure & Environment, LLC The Contract Sum prior to This Change Order was Name: Rob Kline, P.E. CO1-2023-1120-Waukee T Avenue.xlsx Change Order 1 Page 2 of 2