Loading...
HomeMy WebLinkAbout2023-12-04 I03 Brilliant Borders_Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: December 4, 2023 AGENDA ITEM: Consideration of approval of a resolution approving a site plan for Brilliant Borders (1585 NW Vicksburg Court) FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: KLM Property Investment requests approval of a site plan to authorize the construction of a single-story building for a landscaping company. The building is 12,000 square feet in area and 20 feet in height. The site includes a four bunker units for landscaping materials and a gravel area in the rear for exterior storage of materials. A trash receptacle will be located interior to the building. No monument sign is proposed One access will be provided into the site from NW Vicksburg Court. A pedestrian connection is provided into the site from the 5-foot public sidewalk that will be installed with the site improvements. A total of 19 parking spaces are required and they are providing 21 parking spaces including two that are accessible. The site will be serviced with public utilities that have been extended throughout the overall plat. Storm water detention is provided with the basin along the north side of the site. The landscape plan shows a 40-foot landscape buffer and the overall plan meets the requirements of the Landscape and Open Space Ordinance. The elevations of the building are proposed to be constructed mainly of gray composite metal siding and gray and black cut stone. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this project at the October 24, 2023, Commission Meeting and recommended approval subject to remaining staff comments: Item 6: Approval of a Site Plan for Brilliant Borders (1585 NW Vicksburg Court) Melissa DeBoer, Planning Coordinator, introduced the request for approval of a site plan for an industrial landscape building, as presented by Matt Palan, PLA, Creative Concepts Architecture. The property address is 1585 NW Vicksburg Court and is generally located south of NW Gettysburg Lane and east of NW 17th Street, containing approximately 2.62-acres. The site plan identifies the construction of one building that is 12,000 square feet in area on a 2.26- acre lot. The building will be 20-feet in height. No monument signs or trash enclosures are proposed. A security gate and additional fencing is proposed to restrict access to the rear of the site where exterior landscaping materials will be stored. The rear area includes CMU bunkers to assist with the storage. Additionally, the site plan demonstrates compliance with the bulk regulations for M-1 (Light Industrial). The lot is located in a cul-de-sac, therefore only one entrance has been provided. A total of 20 parking spaces are required for this project. The total amount of parking proposed is 21, including two I3 accessible spaces, which meets the parking requirements. A 5-foot-wide sidewalk will be constructed on the north side of NW Vicksburg Court, adjacent to the subject property. A pedestrian sidewalk is shown into the site from the public sidewalk. The site will be serviced with public utilities, which are installed in the immediate vicinity of NW Vicksburg Court. Stormwater detention will be provided with the regional detention basins in the vicinity. A minimum of 15% of the project area is required to be open space. The total amount of open space proposed is 62.89%. The plantings shown on the landscape plan meet the minimum requirements of the Landscape & Open Space Ordinance. A 40-foot landscape buffer is required along the east property line abutting the A-1 Agricultural Parcel. Colored building elevations are included for review. The building is proposed to be constructed predominantly of composite metal siding and stone. Windows and doors are shown on the north, south and west elevations. The site plan is in general conformance with the Zoning Ordinance, Site Plan Ordinance and Comprehensive Plan. Staff recommends approval of the site plan for Brilliant Borders, subject to remaining staff comments. Discussion as follows: None Motion by Commissioner Broderick for approval of a Site Plan for Brilliant Borders, seconded by Commissioner Tessau. Ayes: Beenken, Broderick, Streit, Lohse, Tessau and Bankole. Nays: None. Motion carried. STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan subject to remaining staff comments. RECOMMENDATION: Approve the resolution subject to remaining staff comments. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan & Elevations PREPARED BY: Bill Mettee, Planner REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 2023- APPROVING THE SITE PLAN FOR BRILLIANT BORDERS (1585 NW VICKSBURG COURT) IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Brilliant Borders, subject to remaining staff comments on October 24, 2023; AND, WHEREAS, the Site Plan for Brilliant Borders is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Brilliant Borders is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 4th day of December, 2023 that the Site Plan for Brilliant Borders is approved subject to remaining staff comments. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN Anna Bergman Pierce R. Charles Bottenberg Chris Crone Larry R. Lyon Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Brilliant Borders - Site Plan PREPARED BY: Bill Mettee – Planner REPORT DATE: October 20, 2023 MEETING DATE: October 24, 2023 GENERAL INFORMATION Applicant / Owner: KLM Property Investment Owner’s Representative: Matt Palan, PLA, Creative Concepts Architecture Request: The applicant is requesting approval of a site plan for an industrial landscaping building. Location and Size: Property is located south of NW Gettysburg Lane and east of NW 17th Street, containing approximately 2.62-acres. Property Address: 1585 NW Vicksburg Court AREA MAP ABOVE: Aerial of subject property (outlined in RED) in relation to the surrounding area. October 20, 2023 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant – Undeveloped Mixed Use M-1 (Light Industrial District) North James Pointe Plat 2 Lot 1 / Multi-Tenant Building Mixed Use M-1 (Light Industrial District) South Vacant / Undeveloped Mixed Use M-1 (Light Industrial District) East Vacant – Undeveloped / Paragon Performance Mixed Use M-1 (Light Industrial District) / A-1 (Agricultural District) West Vacant - Undeveloped Mixed Use M-1 (Light Industrial District) PROJECT DESCRIPTION The site plan identifies the construction of one building that is 12,000 square feet in area on a 2.62-acre lot. The building will be 20-feet in height. No monument signs or trash enclosures are proposed. A security gate and additional fencing is proposed to restrict access to the rear of site where exterior landscaping materials will be stored. The rear area includes CMU bunkers to assist with the storage. Table 1 below summarizes the bulk regulations that are applicable to the proposed development. The site plan demonstrates compliance with the bulk regulations. Table 1: Bulk Regulations for the M-1 District Category M-1 (minimum) Front Yard Setback 30 feet Rear Yard Setback 30 feet, unless the rear lot line adjoins a railroad right-of- way, in which case, none required. Side Yard Setback None required except when adjacent to R or C-1 Districts or street right-of-way line, a side yard of 40-feet shall be required. Maximum Height | Stories 40-feet and 3-stories ACCESS AND PARKING The lot is in a cul-de-sac, therefore only one entrance has been provided. A total of 20 parking spaces are required for this project. The total amount of parking proposed is 21, including two accessible spaces. The proposed site plan meets the parking requirements. SIDEWALKS/TRAILS A 5-foot-wide sidewalk will be constructed on the north side of NW Vicksburg Court, adjacent to the subject property. A pedestrian sidewalk is shown into the site from the public sidewalk. UTILITIES The site will be serviced with all public utilities, which are installed in the immediate vicinity of NW Vicksburg Court. Stormwater detention will be provided with the regional detention basins in the vicinity. October 20, 2023 3 of 3 LANDSCAPING & OPEN SPACE A minimum of 15% of the project area is required to be open space. The total amount of open space proposed is 62.89%. The plantings shown on the landscape plan meet the minimum requirements of the Landscape & Open Space Ordinance. A 40-foot landscape buffer is required along the east property line abutting the A-1 Agricultural parcel. ELEVATIONS Colored building elevations are included for review. The building is proposed to be constructed predominantly of composite metal siding and stone. Windows and doors are shown on the north, south and west elevations. STAFF RECOMMENDATION The site plan is in general conformance with the Zoning Ordinance, Site Plan Ordinance, and Comprehensive Plan. Staff recommends approval of the site plan for Brilliant Borders subject to remaining staff comments. xp xp xp xp xp xp xp xp xp xp xc xc xc xc xc xc xc xc xc xc xc xc xpxp xp xp xc xcxc xpxpxpxpxpxpxpxpxp Existing 25' Overland Flowage Easement BK 2021 PG 248 Existing Private 20 Storm Sewer Easement BK 2021 PG 251 Ex i s t i n g 3 3 ' S a n i t a r y S e w e r E a s e m e n t B K 2 0 2 1 P G 2 4 6 Ex i s t i n g 4 0 ' L a n d s c a p e B u f f e r E a s e m e n t B K 2 0 2 1 P G 24 7 20 ' P r i v a t e S t o r m S e w e r a n d O v e r l a n d F l o w a g e E a s e m e nt B K 2 0 2 1 P G 2 5 1 Existing 10' Public Utility Easement BK 2021 PG 245 Existing 10' Snow Storage Easement BK 2021 PG 249 89° 53' 57"S W 302.29' 0° 06' 03" S E 325.07' 45° 34' 09"79.13' N W 0° 06' 03" N W 269.58' 89° 53' 57"N E 358.70' 30' Building Setback Line 30' Building Setback Line 30 ' B u i l d i n g S e t b a c k L i n e 16 2 . 0 0 ' 97.00' 80 . 0 0 ' 150.00' 26.00' 8.67' OHD OHD Ga s OHD OHD OHD Bunker Bunker Bunker w w w w w w w Office Bunker 61.97' 102.00' Existing Intake Ga s Se c u r i t y G a t e 25532 SF Concrete 12000 SF Bldg Boysen Properties, LLC, Nadarevic Investments, LLC, James Pointe Plat 2, Lot 1 M-1 Bo y s e n P r o p e r t i e s , L L C . N a d a r e v i c I n v e s t m e n t s , L L C , St r a t f o r d C r o s s i n g P l a t 4 L o t 4 M- 1 Sa n e m a h E n t e r p r i s e s , I n c . , SW S E / E X R R / S e c : 2 9 T w p : 7 9 R n g : 2 6 A - A g r i c u l t u r e Waukee Land Investment, James Pointe Plat 1, Lot 14, 1550 NE Vicksburg Court Waukee, Iowa 50263 M-1 Sc o t t T e m p l e P r o p e r t y M a n a g e m e n t , Ja m e s P o i n t e P l a t 1 , L o t 1 6 , 1 6 3 5 N E V i c k s b u r g C o u r t, W a u k e e , I o w a 5 0 2 6 3 M- 1 5' wide 4" thick Concrete sidewalk 1'-0" inside property line 9. 0 0 ' 9. 0 0 ' 9. 0 0 ' 9. 0 0 ' 9. 0 0 ' 9. 0 0 ' 9. 0 0 ' 9. 0 0 ' 9. 0 0 ' 9. 0 0 ' 9. 0 0 ' 9. 0 0 ' 17.00'24.00'17.00' 30.07' 10 8 . 0 0 ' Building Floor elevation 100'-0" = site elevation 1028.66' Building height. 20' Existing Use: Farm Field New Use: Business light pole light pole 24 . 0 0 ' 95 . 5 0 ' 101.00' 6328 SF Gravel 60 . 0 0 ' 75 . 0 0 ' w 15.00' 25.00' Privacy fence see legend for detail 3.00' NW Vicksburg Court Concrete Blocks Stacked 24 . 0 0 ' Dashed line indicates curb see detail 3 on sheet C106 Gas Meter Property line Pr o p e r t y l i n e Pr o p e r t y l i n e Property line Property line SUDAS Type A Driveway Existing 30' Sanitary Sewer Easement BK 2021 PG 246 w De m o l i s h e x i s t i n g f e n c e Large Dumpster will be stored inside the building. 30.00' 33.00' 15.00' 10.00' 30.00' 10.00' 10.00' 30.00' 40.00' No Sun Shade to be provided 18 . 0 0 ' 18 . 0 0 ' 18 . 0 0 ' 18 . 0 0 ' 18.00' See notes for paving thickness See notes for paving thickness Se e n o t e s f o r pa v i n g t h i c k n e s s Pedestrian connection to sidewalk see detail on Sheet C106 This is a Walk door - see legend 10.00' 20.00' R 1 2'-0 " R 12'-0" R 6'-0" R 6 '-0 " R 8'-0" R 6'-0" Ob t a i n p e r m i s s i o n f r o m p r o p e r t y ow n e r p r i o r t o d e m o l i t i o n w 2 8'- 7 " R 6'-0" R 6'- 0 " R 2 4 ' - 0 " R 1 0 ' - 0 " R 10'-0" 1. All work shall be done in accordance with 2023 SUDAS and the 2023 City of Waukee General Standard Specifications for public improvements effective at the time of plan approval. 2. The required landscaping new and existing shall be maintained for the life of the certificate of occupancy or certificate of zoning. 3. It is the responsibility of the owner and or the contractor to follow all applicable codes and ordinances whether or not contained on these documents. 4. All lighting shall consist of low glare cut-off type fixtures to reduce the glare of light pollution on surrounding properties. 5. All disturbed areas will be restored by sodding including including Right of way 6. Locations of elements traced from Dallas County, Iowa Assessor's website imagery accessed on June 30, 2023. 7. Curb to be restored at the location of the removed drive approach. 8. All new approaches to be 7" thick concrete from back of curb to the sidewalk 9. Please see the title block for the architects contact information. 10. This site shall be maintained in compliance with all city code applicable on the date of site plan approval. 11. All rooftop mechanical equipment must be screened on all sides with architectural screening equal to the height of the equipment. 12. Mechanical equipment shall not be located in the front yard or street side yard, and shall be screened from view from any public way with landscaping, fencing, or walls consistent with the building design, colors, and materials. Ideally 13. Any changes to the site plan shall be approved in writing from the Community Development Department. Contractor shall be responsible for any changes not approved by the Community Development Department. 14. Approved fire apparatus access roads shall be provided as soon as construction commences. If paving is not installed prior to building construction commencing after footing installed, an approved route around the exterior of the building to extend within 100 feet of all portions of the exterior walls shall be provided and comply with the requirements of section 503.2 of the IFC. 15. All debris spilled into the ROW shall be cleaned at the end of each work day and prior to a rain event. 16. All signage is to be reviewed under separate sign permit process. 17. All drivable paving to be 6" Portland Concrete Cement. 18. No exterior dumpster will be provided. Trash will be kept inside the building and placed outside for collection at the time of pickup. 19. Site irrigation will be provided. 20. No monument sign will be provided Property Line Building Setback Line Easement Line Road Centerline Paving Tree Sanitary Sewer LineEX SA Water LineEX Ww Topography100' SA Demo Existing Barbed wire fencexcxc New 6'-0" Tall privacy fence 80% opaque - see detail 4 on sheet C106 xpxp Indicates Existing utility line Walk Door or Sectional uplifting door see plan for indication 1. Waukee Public Works, shall inspect sidewalk and drive approach installations. Provide minimum 24-hour notice. 2. Parking lot pavement and drives shall be 6-inch thick non-reinforced PCC pavement. The truck lanes, shall be 7-inch wide non-reinforced PCC pavement. 3. Replacement pavement shall match the thickness of the existing street out to the curb line. 4. The contractor shall be responsible for all pavement markings and directional signs, including any required stop signs. Directional signs shall not include any corporate logos. 5. All subgrade under the slab to be compacted to 95% standard proctor density for a minimum of 12". 6. Moisten subgrade before placing concrete. 7. Concrete shall have a minimum 28-day compressive strength of 4000 psi. 8. The aggregate shall be class 3. 9. Concrete surfaces shall be burlap finish. No deviation over 1/8" in 10’-0" is permitted. All concrete shall slope to drain. 10. All concrete shall be cured with an ASTM C309 Type 2. Water-based white pigmented curing compound per IDOT sec. 4105 11. Saw cut joints as soon as the concrete has set enough to prevent raveling and before any cracking. 12. The saw cuts to be 1/8" wide; Depth: longitudinal thickness/3, transverse thickness/4. 13. Longitudinal joint spacing shall not be greater than 12’-0". Transverse spacing shall not be greater than 15’-0". 14. Bars at longitudinal joints to be 1/2" x 30" deformed at 30" on center. 15. All joints shall be filled. 16. The contractor to barricade the slab for 14 days after placing. 17. Submit design mix as proposed by an independent testing laboratory before placing any concrete. 18. All work to comply with current ACI standards. 19. The contractor shall paint parking stalls and provide and install HC parking signs. 20. The contractor shall promptly remove all debris spilled on the city streets, or the adjacent property. Cr e a t i v e C o n c e p t s Ar c h i t e c t u r e , P L C 30 1 3 N E 1 5 8 t h A v e n u e | C a m b r i d g e , I o w a 5 0 0 4 6 51 5 2 3 0 1 3 5 8 m a t t @ c r e a t i v e c o n c e p t s a r c h . c o m SHEET: TITLE: PROJECT NUMBER: Th i s d r a w i n g i s p r o v i d e d a s a n i n s t r u m e n t o f s e r v i c e b y t h e A r c h i t e c t a n d i s i n t e n d e d f o r u s e o n t h i s pr o j e c t o n l y . A n y r e p r o du c t i o n , u s e , o r d i s c l o s u r e o f i n f o r m a t i o n c o n t a i n e d h e r e i n w i t h o u t t h e p r i o r w r i t t e n c o n s e n t o f t h e A rc h i t e c t i s s t r i c t l y p r oh i b i te d . ( C ) C o p y r i g h t 2 0 2 2 b y C r e a t i v e C o n c e p t s A r c h i t ec t u r e , P L C . 11/23/2023 10:24:11 AM C101 Site Plan 2306Q KL M P r o p e r t y I n v e s t m e n t s 15 8 5 N W V i c k s b u r g C o u r t | W a u k e e , I o w a 5 0 2 6 3 Ne w F a c i l i t y 1" = 30'-0"C101 Site Plan1 Property Owner: KLM Property Investment PO Box 71368 Clive, Iowa 50325 Legal Description: James Pointe Plat 1 Lot 15, City of Waukee, Dallas County, Iowa Property Address: 1585 NW Vicksburg Court Waukee, Iowa 50263 Zoning: M-1 - Light Industrial District Zoning Setbacks: 30' Front setback 30' Rear setback 0' Side Yard 40' Max Height 3 Stories Max No r t h 0 15 30 60 1" = 3 0 ' - 0 " S c a l e i n F e e t Site Notes Site Legend City of Waukee Benchmarks: survey and coordinate system: State Plane Iowa South Zone (1402) NAD 83. Parking Requirement: 3 Space per 1,000 office area 1 Space per 1,000 warehouse area 2,100 / 1,000 = 2.1 * 3 = 7 Spaces 12,320 / 1,000 = 12.3 * 1 = 13 Spaces 19 Total spaces required 21 Spaces provided +2 accessible space provided. Impervious Area: 27,790 sf Paving 14,560 sf Building 42,350 Total Impervious surface Open Space: 114,135 Square Feet = 2.62 Acres 42,350 sf Impervious surface 37.10% 71,785 sf Open Space 62.89% 15% = 17,120 sf Minimum Open Space Required L TI C E NSED P R O F E SSIONA L A R C H I T E C IOWA MATTHEW J. PALAN 06600  I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and responsible charge. I am a duly-licensed architect under the laws of the State of Iowa.Matthew J. Palan June 30, 2025Registration Expires: Signature Sheets covered by this seal: Date Issued: October 29, 2023 C101, C103, C104, C106, C202 Image courtesy of Google Earth Mapping Service Vicinity Map NOT TO SCALE Pr o j e c t S i t e Property Applicant: KLM Property Investment PO Box 71368 Clive, Iowa 50325 Leroy Mains : 515-664-6205 US Highway 6 Hickman Road NW 1 0 t h S t r e e t NW Venture Drive NW Vicksburg Court NW Gettysburg Lane T A v e n u e Paving Notes # D a t e D e s c r i p t i o n 6 1 1 / 0 8 / 2 3 R e v i s i o n 6 5 1 0 / 2 7 / 2 3 R e v i s i o n 5 4 0 9 / 2 9 / 2 3 R e v i s i o n 3 3 0 9 / 1 8 / 2 3 R e v i s i o n 2 2 0 8 / 2 4 / 2 3 R e v i s i o n 1 Su b m i t t a l D a t e s Civil Drawing Index Sheet No. Sheet Name Civil C101 Site Plan C103 Landscape plan C104 Utility Plan C106 Site Details C202 Exterior Elevations xp xp xp xp xp xp xp xp xp xp xp xpxp xp xp xp xp xc xcxc xpxpxpxpxpxpxpxpxp 89° 53' 57"S W 302.29' 0° 06' 03" S E 325.07' 0° 06' 03" N W 269.58' 89° 53' 57"N E 358.70' Ga s Bunker Bunker Bunker Bunker 101.00' 102.00' Ga s Se c u r i t y G a t e CA GB CA CAGB BH CH NPO NPO WP CH BH KC AS KC SL AS SL KC SL GB RO NPO 6328 SF Gravel 18'-0" Trees to be 10' off Sanitary sewer line Line provided for reference only -verify actual line location on site 50 ' - 0 " 50 ' - 0 " 50 ' - 0 " 50 ' - 0 " 50 ' - 0 " RO NPO CH BH SL NPO DP RE SW RE SW RE 18 ' - 0 " 3'-0" Existing tree Existing tree Existing tree PP MA BW PP PP MA BW CAGB NPO SL RO Ensure fire department connection has clear space of not less than 3' in width and in front of connection. No shrubs allowed within clear space. In accordance with IFC 912.4.2 1. Tree or shrub shall stand plumb 2. Plants shall be true to species, size and variety specified 3. Do not allow air pockets to form when backfilling – Soil should never be placed over the root ball. 4. Contractor shall guarantee all plant material for one year from date of project Completion. 5. Contractor to provide a 4" depth clean vertical cut edge to define mulch planting bed limits. 6. All trees to be planted a minimum distance of 5 feet from fire hydrants and pavements. 7. The contractor is responsible for plants awaiting installation and shall protect them from injury. 8. Trees should have their North side marked at the nursery and be planted at the site with the same orientation. 9. All plant material shall be handled by the balled and bur lapped (b&b) root ball, container or root mass. 10. Remove all twine, rope, and wire from the root ball. Remove wire basket completely, cut the bottom third prior to planting. Set the plant or tree in pit an backfill to stabilize root ball. 11. All plant material shall at least meet minimum requirements shown in the "American Standards for Nursery Stock" (ANSI Z60,1-latest edition). 12. Plant material shall be specimen quality, healthy, free of disease and insects and shall have healthy, well-developed root systems; plants shall also be free from physical damage or other conditions that would prevent vigorous growth. 13. Pruning of trees and shrubs at time of planting should be kept at a minimal; the contractor shall prune to remove broken, damaged or diseased branches, no pruning paint or sealer is allowed. All other pruning shall be approved by the landscape architect. 14. Provide 3-inch depth shredded hardwood mulch around all plantings to a min. 3-foot perimeter, provide continuous mulch beds in areas indicated on the plan do not place mulch within 2-inches of root collar or trunk. 15. Contractor to cover all areas disturbed by construction including Right of way with sod, unless noted otherwise . 16. All plant material to be approved by owner before planting, substitutions of plant materials will not be permitted unless authorized in writing by the community development department. 17. All wire, twine and burlap shall be removed from the rootball of street trees prior to planting. 18. No staking of trees is allowed. 19. If areas beyond the property line are used for staging, they will need to be seeded back - mix information to be provided when applicable. Cr e a t i v e C o n c e p t s Ar c h i t e c t u r e , P L C 30 1 3 N E 1 5 8 t h A v e n u e | C a m b r i d g e , I o w a 5 0 0 4 6 51 5 2 3 0 1 3 5 8 m a t t @ c r e a t i v e c o n c e p t s a r c h . c o m SHEET: TITLE: PROJECT NUMBER: Th i s d r a w i n g i s p r o v i d e d a s a n i n s t r u m e n t o f s e r v i c e b y t h e A r c h i t e c t a n d i s i n t e n d e d f o r u s e o n t h i s pr o j e c t o n l y . A n y r e p r o du c t i o n , u s e , o r d i s c l o s u r e o f i n f o r m a t i o n c o n t a i n e d h e r e i n w i t h o u t t h e p r i o r w r i t t e n c o n s e n t o f t h e A rc h i t e c t i s s t r i c t l y p r oh i b i te d . ( C ) C o p y r i g h t 2 0 2 2 b y C r e a t i v e C o n c e p t s A r c h i t ec t u r e , P L C . 11/23/2023 10:24:12 AM C103 Landscape plan 2306Q KL M P r o p e r t y I n v e s t m e n t s 15 8 5 N W V i c k s b u r g C o u r t | W a u k e e , I o w a 5 0 2 6 3 Ne w F a c i l i t y 1" = 30'-0"C103 Site - Landscape Plan 1 No r t h 0 15 30 60 1" = 3 0 ' - 0 " S c a l e i n F e e t Proposed Planting Schedule Mark Common Name Latin Name Size Comments Type Count BH Black Hills Spruce Picea glauca 2" - 2 1/2" Evergreen 12 CH Canadian Hemlock Tsuga canadensis 2" - 2 1/2" Evergreen 9 WP Eastern White Pine Pinus Strobus 2" - 2 1/2" Evergreen 1 AS American Sycamore Platanus occidentalis 1 1/2" - 2"Overstory 2 KC Kentucky Coffee Tree Gymnocladus Dioicus 1 1/2" - 2" Overstory 3 NPO Northern Pin Oak Quercus Ellipsoidalis 2" - 2 1/2" Cal Overstory 6 GB Presidential Gold Ginkgo Ginkgo biloba ‘The President’ 2" - 2 1/2" Cal Overstory 4 RO Red Oak Quercus Rubra 1 1/2" - 2" Overstory 3 SL Shademaster Locust Gleditsia triacanthos 1 1/2" - 2" Overstory 5 BW Bridal Wreath Spiraea 60"-96" Shrub 8 MA Manzanita Arctostaphylos 6"-18" Shrub 6 PP Paperbush Plant Edgeworthia chrysantha 48"-72" Shrub 8 CA Crab Apple Malus Rosaceae 2" - 2 1/2" Cal Understory 4 DP Dogwood, Pagoda Cornus Alternifolia 24"-36" Understory 4 SW Oxydendrum Arboretum Sourwood 36"-240" Understory 7 RE Redbud, Eastern Cercis Canadensis 36"-48" Understory 5 Concrete Bunker: • The concrete bunker dimensions at our current business are 20’deep x 21’wide x 6’tall. • The concrete pieces to build the bunkers: • large piece 2’wide x 2’tall and 6’long • small cube piece 2’wide x 2’tall x 3’long # D a t e D e s c r i p t i o n 6 1 1 / 0 8 / 2 3 R e v i s i o n 6 5 1 0 / 1 1 / 2 3 R e v i s i o n 4 4 0 9 / 2 9 / 2 3 R e v i s i o n 3 3 0 9 / 1 8 / 2 3 R e v i s i o n 2 2 0 8 / 2 4 / 2 3 R e v i s i o n 1 Landscaping Requirement: Open space Trees: 17,120 sf / 1,000 = 18 trees required 18 trees * .5 = 9 overstory trees 18 trees * .25 = 5 Evergreen trees Shrubs: 1 shrub Req / 1000sf openspace 17,120 sf / 1,000 = 18 shrubs required Parking Buffer: 108lin feet / 40 = 2.7 = 3 shade tree required each side Landscape Buffer: 250' / 50' = 5 5 * 2 overstory = 10 5 * 4 evergreen = 20 5 * 3 ornamental = 15 trees per 50-linear feet of buffer Su b m i t t a l D a t e s All disturbed areas, including the ROW, are required to be sodded Overstory trees shall be a minimum of 8-feet and evergreen and ornamental trees shall be a minimum of 6-feet at time of planting Note that if areas beyond the property are used for staging they will need to be seeded back and provide mix information Planting Notes xp xp xp xp xp xp xp xp EX ST 42" EX ST 42" EX ST 42" E X ST 42" E X ST 42" E X ST 42" E X ST 42" E X ST 42" E X ST 42" E X ST 42" E X ST 42" EX ST 42" EX S A 8 " EX S A 8 " EX S A 8 " EX S A 8 " EX S A 8 " EX S A 8 " EX S A 8 " EX S A 8 " EX S A 8 " EX S A 8 " EX S A 8 " EX S A 8 " EX SA 8"EX SA 8"EX SA 8"EX SA 8"EX SA 8"EX SA 8"EX SA 8"EX SA 8"EX SA 8"EX SA 8"EX SA 8"EX SA 8" EX ST 30"EX ST 30"EX ST 30"EX ST 30"EX ST 30"EX ST 30" xc xcxc E X S A 8 " E X S A 8 " E X S A 8 " E X S A 8 "W 6"W 6"W 6"EX S T 2 4 " EX S T 2 4 " EX ST 42"EX ST 42" G 4"G 4"G 4" G 4 " G 4 " G 4 " G 4" G 4" G 4" xpxpxpxpxpxpxpxpxp W 6"W 6"W 6"W 6" EX W 8"EX W 8"EX W 8"EX W 8" G 4 " G 4 " G 4 " xp xp xp xpxp xp xp E E E 12 " S T 12 " S T 18" ST 18" ST 18" ST 18" ST 15" ST 15" ST15" ST 10" ST 10" ST 15" ST 15" ST 15" ST 15" ST 15" ST 1 5 " S T 1 5 " S T 1 5 " S T 1 5 " S T 1 5 " S T 1 5 " S T 1 5 " S T 1 5 " S T SA 6 " SA 6 " SA 6 " SA 6 " 12" ST 12" ST12" ST 12" ST 89° 53' 57"S W 302.29' 0° 06' 03" S E 325.07' 45° 34' 09"79.13' N W 0° 06' 03" N W 269.58' 89° 53' 57"N E 358.70' Ga s Bunker Bunker Bunker Bunker Existing Intake Ga s Se c u r i t y G a t e light pole light pole 6328 SF Gravel Building Storm Water intake located as designed by building manufacturer 8.05' Fire Riser Room w/ 4" water connection Sand Oil Separator FDC Connection 6" pipe 55' -Fittings and pipe as required by code 6" PVC pipe 75' -Fittings as required by code -1% slope Existing service stub & Existing Cleanout EL: 1019.66' Existing water service stub connection, Remove temp blow off hydrant Floor Elevation = 1028.66 1023.33 Transformer - verify location with Mid-American 3'-0" 150' Hydrant Radius This is a Walk door - see legend Hydrant See STD DWG 53 Rev1 for water service connection - See Storm Sewer layout plan for utilities in this area Sanitary sewer General Notes 1. The site contractor to install pipe to within five (5) feet of the building. 2. The contractor shall install all fitting and appurtenance as required by plumbing code, whether shown or not. 3. All backfill shall be compacted to a 95% standard proctor. 4. All services connected to the sanitary sewer pipe. No connection to existing sanitary sewer manholes allowed. 5. The 6" sanitary sewer service line shall be SDR-23.5 following urban standard specifications 6. Sanitary sewer cleanouts shall be provided at all bends in the pipe. No sanitary sewer service line shall exceed 100 linear feet without a cleanout. Water Service & Main General Notes 1. Pipe material for a 6" water main shall be AWWA C900 Class 150 PVC. 2. Pipe material for a 2" water service line shall be copper. 3. Provide riser rod on all curb stops. Water main tapping shall be by a contractor approved by the City for such purpose. 4. The contractor shall work with the City public works department when operating existing valves. Water shall not be turned on without prior approval of the City. 5. AY McDonald 76100 shutoff for new 1" & 1 1/2" service lines shall consist of a" T" handle, quarter-turn curb stop ball valve, Mueller Oriseal Mark II 1/4 turn, flared copper nut (both ends), or approved equal. 6. Stop boxes for 1" through 2" water service lines shall include a stainless steel self-centering rod with stainless steel cotter pin within the stop box housing with a 1%" extendable upper section and lid with one pentagonal plug. All stop box installations shall be completed in such a manner that the cap is allowed to raise with the frost and lower if driven over without damage to the curb valve. 7. Contractors shall arrange for and pay for any required taps to mains. 8. Site contractor to install pipe to within five (5) feet of building and temporarily cap the pipe. 9. The contractor shall comply with all city codes. 10. The water main shall be PVC C900 DR18. 11. The plumbing contractor shall install the required tees, fittings, and valves for the domestic service within 5' of the building from the termination point of the site contractor's work. 12. All backfill shall be compacted to a 95% standard proctor. 13. Stop boxes to be provided for both water lines entering building. Property Line Building Setback Line Easement Line Road Centerline Paving Tree Sanitary Sewer LineEX SA Water LineEX Ww Topography100' SA Demo Existing Barbed wire fencexcxc New 6'-0" Tall privacy fence 80% opaque - see detail 4 on sheet C106 xpxp Indicates Existing utility line Walk Door or Sectional uplifting door see plan for indication Cr e a t i v e C o n c e p t s Ar c h i t e c t u r e , P L C 30 1 3 N E 1 5 8 t h A v e n u e | C a m b r i d g e , I o w a 5 0 0 4 6 51 5 2 3 0 1 3 5 8 m a t t @ c r e a t i v e c o n c e p t s a r c h . c o m SHEET: TITLE: PROJECT NUMBER: Th i s d r a w i n g i s p r o v i d e d a s a n i n s t r u m e n t o f s e r v i c e b y t h e A r c h i t e c t a n d i s i n t e n d e d f o r u s e o n t h i s pr o j e c t o n l y . A n y r e p r o du c t i o n , u s e , o r d i s c l o s u r e o f i n f o r m a t i o n c o n t a i n e d h e r e i n w i t h o u t t h e p r i o r w r i t t e n c o n s e n t o f t h e A rc h i t e c t i s s t r i c t l y p r oh i b i te d . ( C ) C o p y r i g h t 2 0 2 2 b y C r e a t i v e C o n c e p t s A r c h i t ec t u r e , P L C . 11/23/2023 10:24:12 AM C104 Utility Plan 2306Q KL M P r o p e r t y I n v e s t m e n t s 15 8 5 N W V i c k s b u r g C o u r t | W a u k e e , I o w a 5 0 2 6 3 Ne w F a c i l i t y 1" = 30'-0"C104 Site - Utility Plan 1 No r t h 0 15 30 60 1" = 3 0 ' - 0 " S c a l e i n F e e t Utility Notes # D a t e D e s c r i p t i o n 6 1 1 / 0 8 / 2 3 R e v i s i o n 6 5 1 0 / 2 7 / 2 3 R e v i s i o n 5 4 1 0 / 1 1 / 2 3 R e v i s i o n 4 3 0 9 / 1 8 / 2 3 R e v i s i o n 2 2 0 8 / 2 4 / 2 3 R e v i s i o n 1 Site Legend Su b m i t t a l D a t e s X X X X X XXXX X X X X X X X X X X XXX X X X X Reflectorized Accessibility Sign 2"x1/4" Handel Gothic B.T. Font - Maintain charactor spacing of 3/16" - 1/2" 6" Square Minimum International symbol of accessibility Reflectorized VAN ACCESSIBLE Signage As noted on site plan 2" dia Galvanized steel pipe Notes: 1. Sign shall be constructed of 0.062" thick aluminum Minimum. 2. Lettering, Symbol and Border shall be reflective white, on blue background. with standard 3M Scotchlite sign face #R7-32. or equivalent 3. Place in front of each Accessible parking stall within clear view, but not to obstruct passsage from parking stall or any walkway. 2 1/2" Dia. Pipe Sleeve - Hot dip galvanized Frost protected concrete footing Drill 7/16" holes in pipe sleeve for 1/2" bolt 6" 2' - 0 " 1'-0" 9" 1" 3' - 6 " 1'-0" Slope Top 5' - 0 " RESERVED PARKING VAN ACCESSIB 7 1/2" 6" Se e P l a n Va r r i e s Form Grade (FG) 4 1/2"Top of Curb 1" R2" R 1'-0" 8"1'-0" 4" 6" 1" R Top of Curb (TC) Sealed Joint Form Grade (FG) 2% Slope Max Pavement Sidewalk Sidewalk Curb Parking Curb Tree or Shrub Set Root collar and root flare 2" above finish grade. Do not place mulch within 2" of trunk. root collar is not always located at the top of root ball Minimum 6' diameter, 3" depth of mulch 3" height water retention berm beyond edge of root ball Finish Grade Scarify sides of pit Remove all non-biodegradable material, containers or other material that will impede the growth of the plant material. Remove all Twine. For balled and burlap (B&B) plants remove minimum top 1/2 of burlap and wire basket minimum. Place root ball on undisturbed soil Minimum for trees 2x root ball for shrubs Existing Slope2:1 Maximum transition slope begin transition at edge of root ball De p t h o f r o o t b a l l or c o n t a i n e r r o o t sy s t e m Slope Planting Pit Detail 3x Root Ball . Tree or Shrub Set Root collar and root flare 2" above finish grade. Do not place mulch within 2" of trunk. root collar is not always located at the top of root ball Minimum 6' diameter, 3" depth of mulch 3" height water retention berm beyond edge of root ball Finish Grade Scarify sides of pit Remove all non-biodegradable material, containers or other material that will impede the growth of the plant material. Remove all Twine. For balled and burlap (B&B) plants remove minimum top 1/2 of burlap and wire basket minimum. Place root ball on undisturbed soil Minimum for trees 2x root ball for shrubs 2:1 Maximum transition slope begin transition at edge of root ball Typical Planting Pit Detail 3x Root Ball 3" . . De p t h o f r o o t b a l l o r co n t a i n e r r o o t s y s t e m 3" . Critical root radius is the distance in feet equal to the DBH in inches. This is the desired distance from the tree trunk at which fencing is installed. Diameter at breast height, the diameter of the tree trunk in inches at a height of 4'-6" above the natural ground. Minimum sign dimensions: Laminated cardboard - 11"x17" Metal - 12"x18" Sign Detail Black letters on Orange background KEEP OUT TREE PROTECTION ZONE UP TO $600 PENALTY Work Zone Limit CRR Tree Trunk Tree Drip Line Work Area 6' Orange Construction Fence to protect tree or group of trees CRR = DBH = DBH Fence supports 6' Orange Construction Fence Install Sign as follows: For individual tree protection : Install at least 2 signs at each location and at a maximum spacing of 16' on center For linear tree protection: Install a sign at each end of the tree protection fence and at a maximum spacing of 50' on center Note 1: Spacing as required to prevent sagging, 8' maximum. .2'-0" CRR .4'-6" Work Zone Limit C R R Tree Trunk Tree Drip Line Work Area 6' Orange Construction Fence to protect tree or group of trees Border Area Work Zone Area Height (2'-0" Min.) 1/4 to 1/3 Tree Grometted Nylon Strap Flagging Material - tie to arbor tie 6" St e e l P o s t St e e l P o s t Top 2/3 burlap removed Place on stake to Southwest Staking Plan (Tree 2 1/2" inch in diameter or smaller) If necessary, place 2 opposing steel T-stakes outside the root ball, with Arbor Tire securing tree. Ties preferred in the lower 1/2 of the trunk to allow movement Staking Plan (Tree 2 1/2" inch in diameter or Larger) Wrap trunk from ground line to first branch. Place on stake to Southwest DO NOT set top of root ball at finished grade. It is essential that the root flare be exposed brfore planting, so the tree can be set to show root flare at finished grade 2"-4" Mulch Keep Mulch 2"-3" from trunk Root flare Use water to settle soil. DO NOT use feet or shovel handle to pack soil. Sloping Sides Hole 2-3 Times Widerthanr Root ball Step 1 - peel back rope/burlap/cage and remove sufficient soil to expose root flare. Step 2 - measure from root flare to bottom of root ball. Step 3 - dig hole to depth where topmost roots are buried 1-2 inches and the root flare sits slightly above ground level. Dig a hole 2-3 times wider than the diameter of the root ball with sloping sides to allow for proper root growth. Step 4 - remove lower third of wire cage. Step 5 - set tree in hole. Support with some soil. Ensure that it’s straight, then remove entire wire cage and top Two-thirds of burlap. Step 6 - backfill with two-thirds of loose native soil (unless it’s all clay) and use water to settle. Do not tamp Or step on soil. Step 7 - backfill balance and water again. Excess soil may be used to create a berm/saucer outside of root ball. Step 8 - add 2-4 inches of wood mulch, leaving a 1- to 2-inch clearance between the mulch and the trunk. Step 9 - water a final time. Step 10 - if necessary, place two opposing steel t-stakes outside the root ball with arbor tie securing tree. Ties preferred on lower half of trunk to allow movement. Dome Post Cap 3" Dia Round end & corner posts 1 5/8" Dia Brace Rail Centered for fence height of 6'-0"+ Tension Bar Finish Grade 1 5/8" Dia Bottom Rail at fence height of 6'-0"+ Adjustable Truss Rod Turn Buckel 8" Dia Frost Protected Concret footing -Typical EQ EQ 4' - 8 " General notes: 1 Footing width to be 8”diameter by 42”deep. 2 All material to meet federal spec RR- F-191G-1F. 3 All galvanized fittings to meet ASTM-A153. 4 All fence components to be vinyl coated. Vinyl coating color to be black. No aluminum ties shall be permitted. 5 Post and rail sizes may require modification to meet specific project requirements. 6 12" Wide Mow Strip beneath Fence where appliable -verify with owner. Tension Wier where no bottom rail is specified -with Hog Rings as required Line Post Tie typical 2 3/8" Dia. Line Post typical 1 5/8" Dia. Top Rail Line Post Loop Cap Chain Link Fabric Rail Tie Knuckle Selvage Top Bottom .8'-0" on center Provide tight knit fabric mesh for privacy over black coated chain link fabric 6' - 0"Line Post Tie typical 1. Provide a minimum 2 foot width of detectable warning surfaces in the direction of pedestrian travel across the full width of the curb ramp or turning space, exclusive of curbs or flares. 2. Provide a minimum of 6 inches of concrete below the detectable warning panel. 3. Minimum 4 feet by 4 feet. Target cross slope of 1.5% with a maximum cross slope of 2.0%. 4. If normal sidewalk elevation cannot be achieved with the perpendicular ramp between the street and landing due to limited ramp length, provide a parallel ramp to make up the elevation difference between the landing and the standard sidewalk. 5. The length of the parallel ramp is not required to exceed 15 feet, regardless of the resulting slope. Do not exceed 8.3% slope for parallel ramps shorter than 15 feet. Pavement 1'-0"1'-6" 1/2" Expansion Joint or KT-1 or BT-3 Joint 5% Max Cross Slope Note 1 Note 2 6.25% (Target) 8.3% (Max) 6" Min Thickness 6" Min Thickness Note 3 4" Min Thickness Slope Varries Note 4 When KT or BT Joist is installed as the back of curb Provide 1/2" expansion joint at each side of turning space Length Varies Perpendictular Curb Ramp 5'-0"x5'-0" Min Turning Space If Required Parallel Curb Ramp Standard Sidewalk 1/2" Max Ba k o f C u r b Gutter Line Level Line Enlarged Curb cut detail See Enlarged Curb cut detail Refer to SUDAS Division 7 section 7030 for further information on Sidewalks, shared use paths Cr e a t i v e C o n c e p t s Ar c h i t e c t u r e , P L C 30 1 3 N E 1 5 8 t h A v e n u e | C a m b r i d g e , I o w a 5 0 0 4 6 51 5 2 3 0 1 3 5 8 m a t t @ c r e a t i v e c o n c e p t s a r c h . c o m SHEET: TITLE: PROJECT NUMBER: Th i s d r a w i n g i s p r o v i d e d a s a n i n s t r u m e n t o f s e r v i c e b y t h e A r c h i t e c t a n d i s i n t e n d e d f o r u s e o n t h i s pr o j e c t o n l y . A n y r e p r o du c t i o n , u s e , o r d i s c l o s u r e o f i n f o r m a t i o n c o n t a i n e d h e r e i n w i t h o u t t h e p r i o r w r i t t e n c o n s e n t o f t h e A rc h i t e c t i s s t r i c t l y p r oh i b i te d . ( C ) C o p y r i g h t 2 0 2 2 b y C r e a t i v e C o n c e p t s A r c h i t ec t u r e , P L C . 11/23/2023 10:24:13 AM C106 Site Details 2306Q KL M P r o p e r t y I n v e s t m e n t s 15 8 5 N W V i c k s b u r g C o u r t | W a u k e e , I o w a 5 0 2 6 3 Ne w F a c i l i t y 1/2" = 1'-0"C106 ADA Parking Sign1 1" = 1'-0"C106 Curb Detail3 1 1/2" = 1'-0"C106 Shrub Planting5 1" = 1'-0"C106 Planting Protection6 1" = 1'-0"C106 Tree Planting7 # D a t e D e s c r i p t i o n 3 0 9 / 1 8 / 2 3 R e v i s i o n 2 2 0 8 / 2 4 / 2 3 R e v i s i o n 1 1 0 8 / 1 6 / 2 3 N o t f o r C o n s t r u c t i o n 1/2" = 1'-0"C106 Chain Link Fence2 1/2" = 1'-0"C106 Sidewalk Slope4 Main Level 100'-0" Eave 116'-0" 1/2" 1'-0" Main Level 100'-0" Mezzanine 110'-0" Eave 116'-0" 1/2" 1'-0" Gray / Black stack Stone 1 A108 8' - 0 " 3' - 0 " Main Level 100'-0" Mezzanine 110'-0" Eave 116'-0" 8'-0"5'-0"5'-0"8'-0" 15 ' - 0 " Main Level 100'-0" Eave 116'-0" 3' - 0 " 20 ' - 1 " 3'-0" 6' - 0 " 74'-0" Cr e a t i v e C o n c e p t s Ar c h i t e c t u r e , P L C 30 1 3 N E 1 5 8 t h A v e n u e | C a m b r i d g e , I o w a 5 0 0 4 6 51 5 2 3 0 1 3 5 8 m a t t @ c r e a t i v e c o n c e p t s a r c h . c o m SHEET: TITLE: PROJECT NUMBER: Th i s d r a w i n g i s p r o v i d e d a s a n i n s t r u m e n t o f s e r v i c e b y t h e A r c h i t e c t a n d i s i n t e n d e d f o r u s e o n t h i s pr o j e c t o n l y . A n y r e p r o du c t i o n , u s e , o r d i s c l o s u r e o f i n f o r m a t i o n c o n t a i n e d h e r e i n w i t h o u t t h e p r i o r w r i t t e n c o n s e n t o f t h e A rc h i t e c t i s s t r i c t l y p r oh i b i te d . ( C ) C o p y r i g h t 2 0 2 2 b y C r e a t i v e C o n c e p t s A r c h i t ec t u r e , P L C . 11/23/2023 10:24:23 AM C202 Exterior Elevations 2306Q KL M P r o p e r t y I n v e s t m e n t s 15 8 5 N W V i c k s b u r g C o u r t | W a u k e e , I o w a 5 0 2 6 3 Ne w F a c i l i t y 1/8" = 1'-0"C202 East Elevation1 1/8" = 1'-0"C202 West Elevation2 1/8" = 1'-0"C202 North Elevation3 1/8" = 1'-0"C202 South Elevation4 North Windows 110 SF Grand total: 3 110 SF 4.5% Total Wall Area 2,414 SF 100% South Windows 137 SF Grand total: 7 137 SF 2.9% Total Wall Area 4,810 SF 100% 23.3% Total Wall Area 1,421 SF 100% West Windows 331 SF Grand total: 5 331 SF Wall Material - East Material Area Percent East Composite Siding 1399 SF 99% Cut Stone - Gray 8 SF 1% Grand total: 2 1407 SF Wall Material - South Material Area Percent South Composite Siding 3811 SF 91% Cut Stone - Gray 359 SF 9% Grand total: 11 4170 SF Wall Material - West Material Area Percent West Composite Siding 1114 SF 82% Cut Stone - Gray 237 SF 18% Grand total: 2 1351 SF Wall Material - North Material Area Percent North Composite Siding 1801 SF 99% Cut Stone - Gray 10 SF 1% Grand total: 2 1811 SF Roof: Metal Black Siding:Composite siding Slate Gray Stone: Dry Stack, Cut Stone Gray / Black # D a t e D e s c r i p t i o n 3 0 9 / 1 8 / 2 3 R e v i s i o n 2 2 0 8 / 2 4 / 2 3 R e v i s i o n 1 1 0 8 / 1 6 / 2 3 N o t f o r C o n s t r u c t i o n Su b m i t t a l D a t e s 1" = 10'-0"C202 Bunker Elevation5 Wall Material - Overall Material Area Percent East Composite Siding 1399 SF 16% Cut Stone - Gray 8 SF 0% North Composite Siding 1801 SF 21% Cut Stone - Gray 10 SF 0% South Composite Siding 3811 SF 44% Cut Stone - Gray 359 SF 4% West Composite Siding 1114 SF 13% Cut Stone - Gray 237 SF 3% Grand total: 17 8740 SF