HomeMy WebLinkAbout2024-01-02 I01E_01 T Ave Corridor, W Hickman Rd to NW Douglas Pkwy_Change Order 2AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: January 2, 2024 AGENDA ITEM:Consideration of approval of Change Order No. 2 to All-Star Concrete, LLC for the T Avenue Corridor Improvements – W Hickman Road to NW Douglas Parkway Project increasing the contract amount by $14,419.39. FORMAT:Motion SYNOPSIS INCLUDING PRO & CON: Plan change 3 increased the length of P-50 by 54 LF to accommodate extra fill. Storm Structure S-64 was changed from a 96” MH to a 120” MH to accommodate the size of pipe in the plan stubbed inside. The street name has been updated to NW 20th from T Avenue south of Douglas and has changed the signage planned on the signal arms at Hickman. The City has requested the change from the Gridsmart system to the “No Traffic” system resulting in a credit to the contract. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $14,419.39. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 2 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1E1 8191 Birchwood Court, Suite L Johnston, IA 50131 Phone: (515) 254-1393 December 15, 2023 Sara Kappos, P.E. Assistant Public Works Director 805 University Avenue Waukee, IA 50263 RE: Change Order #2 T Avenue Corridor Improvements – W Hickman Road to NW Douglas Parkway Dear Mrs. Kappos: Attached please find a detailed Change Order for City Council approval on January 2, 2024. Change Description: Plan Change 3 increased the length of P-50 by 54 LF to accommodate extra fill. Storm Structure S-64 was changed from a 96" MH to a 120" MH to accommodate the size of pipe in the plan stubbed inside. The street name has been updated to NW 20th from T Avenue south of Douglas and has changed the signage planned on the signal arms at Hickman. The city has requested the change from the Gridsmart system to the "No Traffic" system resulting in a credit to the contract. We have reviewed the submitted quotes from All - Star and they appear to be in order with current industry pricing. If City Staff concurs with this pricing, we recommend the City of Waukee Increase the contract price in the amount of $14,419.39 to complete the additional work associated with Change Order #2. If you have any questions, please contact me. Sincerely, Foth Infrastructure & Environment, LLC Rob Kline, P.E. Lead Civil Engineer Encl: Change Order #2 dated 12/15/2023 CHANGE ORDER 02 Distribution: Owner - Finance ____ Owner - Public Works ____ Engineer ____ Contractor ____ Contractor:All-Star Concrete LLC. 4989 NW Johnston Dr. Johnston, Iowa 50131 $10,683,619.98 August 7, 2023 4.17 Division 2 4020-A-1524 LF $117.00 54.00 $6,318.00 6.9 Division 1 6010-A-1596 EA $15,000.00 -1.00 ($15,000.00) 6.27 Division 1 6010-A-15120 EA $31,925.39 1.00 $31,925.39 8.20 Division 1 Special LS $3,176.00 1.00 $3,176.00 8.21 Division 1 Special LS -$12,000.00 1.00 ($12,000.00) $14,419.39 $10,683,619.98 $53,927.00 $10,737,546.98 $14,419.39 $10,751,966.37 0 Days Recommended By: All-Star Concrete LLC. Signature: Name: Bryan Sprigs Title: Project Manager Date: Owner:City of Waukee □ ≤$500 Department Director X_______________________________________Date___________________ □ $501 to $2,500 City Administrator X_______________________________________Date___________________ □ Date___________________ □ >$2,501 City Council approved or ratified at Council meeting on Date___________________ MANHOLE, STORM SEWER, SW-401, 120 IN. Traffic Signal Street Sign Modifications Division Item Code Gridsmart to No-Traffic System Value Adjustment The new Contract Sum including this Change Order will be Signature: Quantity AdjustmentUnit Price City of Waukee Description UnitItem No. STORM SEWER, TRENCHED, RCP, CLASS V, 24 IN. Signature: The Contract Sum will be increased by this Change Order in the amount of Net Change by previously authorized Change Orders Foth Infrastructure & Environment, LLC The Contract Sum prior to This Change Order was MANHOLE, STORM SEWER, SW-401, 96 IN. Date: Name: Brad Deets Checked By: Prepared By: Date: The Contract Time will be increased by CHANGE ORDER SUMMARY NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER The Original Contract Sum was Title: Lead Civil Engineer Title: City Administrator Name: Rob Kline, P.E. Department of Public Works 805 University Avenue Waukee, IA 50263 (515) 987-7920 Fax (515) 987-3979 THE CONTRACT IS CHANGED AS FOLLOWS: Plan Change 3 increased the length of P-50 by 54 LF to accommodate extra fill. Storm Structure S-64 was changed from a 96" MH to a 120" MH to accommodate the size of pipe in the plan stubbed inside. The street name has been updated to NW 20th from T Avenue south of Douglas and has changed the signage planned on the signal arms at Hickman. The city has requested the change from the Gridsmart system to the "No Traffic" system resulting in a credit to the contract. T Avenue Corridor Improvements W Hickman Rd to NW Douglas Pkwy 2 22W007.00 Waukee Project File Number December 15, 2023 Foth Project File Number Orig. Contract Amount & Date Date Change Order Number Project Title CO2-2023-1215-Waukee T Avenue.xlsx Change Order 1 Page 1 of 1