CITY OF WAUKEE, IOWA
CITY COUNCIL MEETING COMMUNICATION
MEETING DATE: January 2, 2024
AGENDA ITEM:Consideration of approval of Change Order No. 3 to Concrete
Technologies, Inc. for the NW Douglas Parkway – Grade, Partial Pave
and JUT project decreasing the contract amount by $30,465.88.
FORMAT:Consent Agenda
SYNOPSIS INCLUDING PRO & CON: Change Order No. 3 includes adjustment of plan
quantities to match as-built conditions. It also removes the quantity of patching for the manhole
adjustment that was not properly consolidated.
FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this
Change Order decreases the contract price in the amount of $30,465.88.
COMMISSION/BOARD/COMMITTEE COMMENT:
STAFF REVIEW AND COMMENT:
RECOMMENDATION: Approve the change order.
ATTACHMENTS: I. Change Order No. 3
II. Letter of Recommendation
PREPARED BY:Beth Richardson
REVIEWED BY:Sara Kappos SKK
PUBLIC NOTICE INFORMATION –
NAME OF PUBLICATION:
DATE OF PUBLICATION:
I1E2
2727 SW SNYDER BOULEVARD | P.O. BOX 1159 | ANKENY, IA 50023-0974
autofill
v:\projects\2022\122.0091.01\construction\co_2023-12-22_changeorder03_letter.docm
December 22, 2023
Ms. Sara Kappos, P.E.
City of Waukee
805 University Avenue
Waukee, IA 50263
RE: CHANGE ORDER NO. 03
NW DOUGLAS PARKWAY – GRADE, PARTIAL PAVE AND JUT
Dear Sara:
Enclosed is change order 03 for the NW Douglas Parkway – Grade, Partial Pave and JUT
project. This change order includes adjustment of plan quantities to match as-built conditions. It
also removes the quantity of patching for the manhole adjustment that was not properly
consolidated.
We recommend approval of Change Order 03 which results in a net deduct to the contract in the
amount of ($30,465.88) to the prime contractor, Concrete Technologies, Inc. of Grimes, Iowa.
There is no change to the substantial completion date with his change order. Please place this
change order on the next available city council meeting agenda for approval.
Sincerely,
SNYDER & ASSOCIATES, INC.
Nathan Carhoff, P.E.
Project Manager
Enclosure
OWNER: City of Waukee PROJECT: NW Douglas Parkway - Grade, Partial Pave
and JUT
To: S&A PROJECT #: 122.0091
You are directed to make the following changes in this contract:
1. Description of change to be made:
2. Reason for Change:
3. Settlement for the cost of making the change shall be as follows:
Item No. Item Description Quantity Unit Unit Price Total Price
2.4 Subgrade Treatment (Cement or Fly Ash) -519 SY $14.75 -$7,655.25
3.1 Trench Foundation -62 TON $47.75 -$2,960.50
4.8 Subdrain Cleanout, Type A1, 6 Inch -2 EACH $415.00 -$830.00
4.9 Subdrain Cleanout, Type B -1 EACH $1,245.00 -$1,245.00
5.2 Water Main, Trenched, PVC, 12 Inch -22 LF $77.75 -$1,710.50
5.3 Water Main, Trenchless, PVC, 12 Inch 44 LF $590.00 $25,960.00
5.8 Valve, Gate, 12 Inch -2 EACH $4,315.00 -$8,630.00
7.5 Shared Use Path, PCC, 6 Inch 20 SY $49.00 $980.00
8.1 Painted Pavement Markings, Durable 7.51 STA $171.00 $1,284.21
8.3 Grooves Cut for Pavement Markings 10.27 STA $88.00 $903.76
9.1 Hydraulic Seeding, Seeding, Fertilizing, and
Mulching, Type 1
0.3 ACRE
$5,280.00 $1,584.00
9.2 Hydraulic Seeding, Seeding, Fertilizing, and
Mulching, Type 4
-4 ACRE
$3,520.00 -$14,080.00
9.5 Filter Sock, 12 Inch -1779 LF $2.10 -$3,735.90
9.6 Filter Sock Removal -1954 LF $0.55 -$1,074.70
9.9 Silt Fence or Silt Fence Ditch Check -4200 LF $1.80 -$7,560.00
9.10 Silt Fence or Silt Fence Ditch Check Removal
of Sediment
-4200 LF
$0.30 -$1,260.00
9.11 Silt Fence or Silt Fence Ditch Check Removal
of Device
-4200 LF
$0.30 -$1,260.00
9.12 Stabilized Construction Entrance -245 SY $12.00 -$2,940.00
9.13 Inlet Protection Device, Drop-In 2 EACH $210.00 $420.00
9.14 Inlet Protection Device, Maintenance and
Removal
2 EACH
$26.00 $52.00
12.3 Full Depth Patches, PCC, 9 Inch -31.2 SY $215.00 -$6,708.00
TOTAL -$30,465.88
4. This change order will result in a net change in the contract completion time of 0 days and a net change
in the cost of the project of -$30465.88 divided as follows:
Contract Contract
Amount Completion Date
Approved funds and contract completion date as per (Engineer's
Estimate, Contract or last approved C.O.) $1,405,643.55 August 11, 2023
Change due to this C.O. (+ or -) ($30,465.88) 0
Totals including this C.O.: $1,375,177.67 August 11, 2023
CHANGE ORDER NO. 3
City, State, Zip
Concrete Technologies, Inc.
Contractor
1001 SE 37th Street
Grimes, IA 50111
Address
Change Order to adjust project quantities as constructed.
Adjust plan quantity to match as-built conditions.
V:\Projects\2022\122.0091.01\Construction\CO_2023-12-22_ChangeOrder03.xlsx
The change described herein is understood, and the terms of settlement are hereby agreed to:
Concrete Technologies, Inc.
CONTRACTOR
By DATE:
Snyder & Associates, Inc.
ENGINEER
By DATE:
City of Waukee
OWNER
By DATE:
V:\Projects\2022\122.0091.01\Construction\CO_2023-12-22_ChangeOrder03.xlsx
12/26/2023
December 22, 2023
Beau S. Sprouse
Digitally signed by Beau S. Sprouse
DN: C=US, E=bsprouse@cti-ia.com, O="Concrete
Technologies, Inc.", OU=Director of Construction Operations,
CN=Beau S. Sprouse
Date: 2023.12.26 11:18:30-06'00'