HomeMy WebLinkAbout2024-01-02 I01E_02 NW Douglas Pkwy Grade, Partial Pave, JUT_Change Order 3AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: January 2, 2024 AGENDA ITEM:Consideration of approval of Change Order No. 3 to Concrete Technologies, Inc. for the NW Douglas Parkway – Grade, Partial Pave and JUT project decreasing the contract amount by $30,465.88. FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 3 includes adjustment of plan quantities to match as-built conditions. It also removes the quantity of patching for the manhole adjustment that was not properly consolidated. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order decreases the contract price in the amount of $30,465.88. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 3 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1E2 2727 SW SNYDER BOULEVARD | P.O. BOX 1159 | ANKENY, IA 50023-0974 autofill v:\projects\2022\122.0091.01\construction\co_2023-12-22_changeorder03_letter.docm December 22, 2023 Ms. Sara Kappos, P.E. City of Waukee 805 University Avenue Waukee, IA 50263 RE: CHANGE ORDER NO. 03 NW DOUGLAS PARKWAY – GRADE, PARTIAL PAVE AND JUT Dear Sara: Enclosed is change order 03 for the NW Douglas Parkway – Grade, Partial Pave and JUT project. This change order includes adjustment of plan quantities to match as-built conditions. It also removes the quantity of patching for the manhole adjustment that was not properly consolidated. We recommend approval of Change Order 03 which results in a net deduct to the contract in the amount of ($30,465.88) to the prime contractor, Concrete Technologies, Inc. of Grimes, Iowa. There is no change to the substantial completion date with his change order. Please place this change order on the next available city council meeting agenda for approval. Sincerely, SNYDER & ASSOCIATES, INC. Nathan Carhoff, P.E. Project Manager Enclosure OWNER: City of Waukee PROJECT: NW Douglas Parkway - Grade, Partial Pave and JUT To: S&A PROJECT #: 122.0091 You are directed to make the following changes in this contract: 1. Description of change to be made: 2. Reason for Change: 3. Settlement for the cost of making the change shall be as follows: Item No. Item Description Quantity Unit Unit Price Total Price 2.4 Subgrade Treatment (Cement or Fly Ash) -519 SY $14.75 -$7,655.25 3.1 Trench Foundation -62 TON $47.75 -$2,960.50 4.8 Subdrain Cleanout, Type A1, 6 Inch -2 EACH $415.00 -$830.00 4.9 Subdrain Cleanout, Type B -1 EACH $1,245.00 -$1,245.00 5.2 Water Main, Trenched, PVC, 12 Inch -22 LF $77.75 -$1,710.50 5.3 Water Main, Trenchless, PVC, 12 Inch 44 LF $590.00 $25,960.00 5.8 Valve, Gate, 12 Inch -2 EACH $4,315.00 -$8,630.00 7.5 Shared Use Path, PCC, 6 Inch 20 SY $49.00 $980.00 8.1 Painted Pavement Markings, Durable 7.51 STA $171.00 $1,284.21 8.3 Grooves Cut for Pavement Markings 10.27 STA $88.00 $903.76 9.1 Hydraulic Seeding, Seeding, Fertilizing, and Mulching, Type 1 0.3 ACRE $5,280.00 $1,584.00 9.2 Hydraulic Seeding, Seeding, Fertilizing, and Mulching, Type 4 -4 ACRE $3,520.00 -$14,080.00 9.5 Filter Sock, 12 Inch -1779 LF $2.10 -$3,735.90 9.6 Filter Sock Removal -1954 LF $0.55 -$1,074.70 9.9 Silt Fence or Silt Fence Ditch Check -4200 LF $1.80 -$7,560.00 9.10 Silt Fence or Silt Fence Ditch Check Removal of Sediment -4200 LF $0.30 -$1,260.00 9.11 Silt Fence or Silt Fence Ditch Check Removal of Device -4200 LF $0.30 -$1,260.00 9.12 Stabilized Construction Entrance -245 SY $12.00 -$2,940.00 9.13 Inlet Protection Device, Drop-In 2 EACH $210.00 $420.00 9.14 Inlet Protection Device, Maintenance and Removal 2 EACH $26.00 $52.00 12.3 Full Depth Patches, PCC, 9 Inch -31.2 SY $215.00 -$6,708.00 TOTAL -$30,465.88 4. This change order will result in a net change in the contract completion time of 0 days and a net change in the cost of the project of -$30465.88 divided as follows: Contract Contract Amount Completion Date Approved funds and contract completion date as per (Engineer's Estimate, Contract or last approved C.O.) $1,405,643.55 August 11, 2023 Change due to this C.O. (+ or -) ($30,465.88) 0 Totals including this C.O.: $1,375,177.67 August 11, 2023 CHANGE ORDER NO. 3 City, State, Zip Concrete Technologies, Inc. Contractor 1001 SE 37th Street Grimes, IA 50111 Address Change Order to adjust project quantities as constructed. Adjust plan quantity to match as-built conditions. V:\Projects\2022\122.0091.01\Construction\CO_2023-12-22_ChangeOrder03.xlsx The change described herein is understood, and the terms of settlement are hereby agreed to: Concrete Technologies, Inc. CONTRACTOR By DATE: Snyder & Associates, Inc. ENGINEER By DATE: City of Waukee OWNER By DATE: V:\Projects\2022\122.0091.01\Construction\CO_2023-12-22_ChangeOrder03.xlsx 12/26/2023 December 22, 2023 Beau S. Sprouse Digitally signed by Beau S. Sprouse DN: C=US, E=bsprouse@cti-ia.com, O="Concrete Technologies, Inc.", OU=Director of Construction Operations, CN=Beau S. Sprouse Date: 2023.12.26 11:18:30-06'00'