Loading...
HomeMy WebLinkAbout2024-01-02 Resolution 2024-009_Accept Public Improvements, NW Douglas Pkwy Grade, Partial Pave, Joint Utility TrenchRESOLUTION 2024-009 RESOLUTION ACCEPTING THE NW DOUGLAS PARKWAY - GRADE, PARTIAL PAVE AND JUT WHEREAS, on the 15th day of August, 2022, the Mayor and Clerk of the City of Waukee, Iowa, entered into a construction contract with Concrete Technologies, Inc., of Grimes, IA, for the construction of certain public improvements generally described as the NW Douglas Parkway - Grade, Partial Pave and JUT; and WHEREAS, the contractor has fully completed the construction of the public improvements in accordance with the terms and conditions of the contract and plans and specifications, as shown by the certificate of the Engineer filed with the Clerk on December 22, 2023: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF WAUKEE, STATE OF IOWA: Section 1. That the report of the Engineer be and the same is hereby approved and adopted, and the public improvements are hereby approved and accepted as having been fully completed in accordance with the plans, specifications and form of contract and the total final construction cost thereof is hereby determined to be $1,375,177.67, as shown in the report of the Engineer. PASSED AND APPROVED this 2nd day of January, 2024. ATTEST: �J� v hAy&� City Clerk RESULTS OF VOTE: AYE R. Charles Bottenberg X Chris Crone X Rob Grove X Anna Bergman Pierce X Ben Sinclair X Mayor NAY ABSENT ABSTAIN