HomeMy WebLinkAbout2024-01-15 I05 The Nest Addition_Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: January 15, 2024 AGENDA ITEM: Consideration of approval of a resolution approving a site plan for The Nest Pediatric Dentistry Building Addition (1250 SE University Avenue) FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: Artemis Consortium, LLC requests approval of a site plan for a building addition to the existing The Nest Dentistry office located south of SE University Avenue and west of SE Waco Place / 98th Street. The building addition is approximately 2,471-square feet in area and 17-feet in height. The project will add 18 parking spaces. The building will be constructed primarily of stone, storefront system and Nichiha panels. The addition will match the existing structure. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this project at the January 9, 2024, Commission Meeting and recommended approval: Item 6: Approval of a Site Plan for The Nest Pediatric Dentistry Building Addition (1250 SE University Avenue) Melissa DeBoer, Planning Coordinator, introduced the request for approval of a site plan for a building addition to an existing dentistry office, as requested by Artemis Consortium, LLC, represented by Monte Applegate, PLA, Snyder & Associates. The property is generally located south of SE University Avenue and west of SE Waco Place/98th Street, containing approximately one (1) acre. The project includes the construction of an addition to an existing dental office building. The building is proposed to be approximately 2,471 square feet in area. The overall building square footage with the addition will be approximately 5,951 square feet. The main entrance to the building is located on the north side, facing SE University Avenue. The addition will have an access door on the south side of the building. The trash enclosure will remain at the southeast corner of the site and the monume nt sign will remain at the northeast corner of the site, along SE University Avenue. There are two accesses into this site from the public street, SE Bishop Drive. One access is located on the west side of the site and the other access is located on the south side of the site. There is also a shared access drive with the property to the east that can be accessed from SE University Avenue. A total of 24 parking spaces are required for this facility. The total amount of parking proposed is 42 spaces including two (2) accessible stalls. Eighteen (18) additional spaces are proposed with this site plan. The site plan also shows the four (4) bicycle parking spaces to remain along the north side of the building. The proposed site plan meets the parking requirements of the ordinance. I5 Five-foot-wide sidewalks have been installed along SE Bishop Drive on the south, SE Bishop Drive on the west, and SE University Avenue on the north. Sidewalks were also installed interior to the site to provide pedestrian connections from the parking lot to the building. The applicant is adding an additional sidewalk interior to the site to provide access to the addition. This site is serviced with all public utilities and will be extended as needed to service the building addition. Stormwater detention will continue to be provided with a detention basin located at the south side of the site. A minimum of 15% of the project area is required to be open space. The total amount of open space proposed is 45.25%. The landscape plan meets the requirements of the Landscape and Open Space Ordinance and the Kettlestone Design Guidelines. The elevations of the building are proposed to be constructed of stone, Nichiha panels, and aluminum storefront system. The addition will match the existing building. The applicant has stated that several existing light fixtures will be relocated on the site. All lighting fixtures were approved with the original site plan. The lighting plan meets the lighting requirements of the Site Plan Ordinance. The comprehensive plan classifies the subject property as Community Commercial. This classification provides a variety of uses that would serve the community and are located along minor or major arterials. The site plan is in general conformance with the Site Plan Ordinance and Comprehensive Plan. Staff recommends approval of the site plan for The Nest Pediatric Dentistry Building Addition. Discussion as follows: • Commissioner Streit asked about if there was always a plan to expand; Melissa responded yes, the request closely matches the original site plan Motion by Commissioner Broderick for approval of a site plan for The Nest Pediatric Dentistry Building Addition, seconded by Commissioner Lohse. Ayes: Beenken, Koelker, Broderick, Streit, Tessau, Lohse and Bankole. Nays: None. Motion carried. STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan & Elevations PREPARED BY: Bill Mettee, Planner Preparer Information: City of Waukee Community Development Department, 230 W. Hickman Rd., Waukee, IA 50263; 515-978-9533 Bill/Return Document to: City Clerk, City of Waukee, 230 W. Hickman Rd., Waukee, IA 50263; 515 -978-7904 THE CITY OF WAUKEE, IOWA RESOLUTION 2024- APPROVING THE SITE PLAN FOR THE NEST PEDIATRIC DENTISTRY BUILDING ADDITION (1250 SE UNIVERSITY AVENUE) IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for The Nest Pediatric Dentistry Building Addition on January 9, 2024; AND, WHEREAS, the Site Plan for The Nest Pediatric Dentistry Building is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for The Nest Pediatric Dentistry Building is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 15th day of January, 2024 that the Site Plan for The Nest Pediatric Dentistry Building is approved. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: The Nest Pediatric Dentistry Building – Addition – Site Plan PREPARED BY: Bill Mettee – Planner REPORT DATE: January 5, 2024 MEETING DATE: January 9, 2024 GENERAL INFORMATION Owner: Artemis Consortium, LLC Applicant: Artemis Consortium, LLC Owner’s Representative: Monte Applegate, PLA, Snyder & Associates Request: The applicant is requesting approval of a site plan for a building addition to an existing dentistry office. Location and Size: Property is generally located south of SE University Avenue and west of SE Waco Place / 98th Street, containing approximately 1 acre. Property Address: 1250 SE University Avenue AREA MAP ABOVE: Aerial of Property identifying the proposed plat (outlined in BLUE). January 5, 2024 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question The Nest Dentistry Office Community Commercial C-1 / PD-1 (Community and Highway Service Commercial District / Planned Development District) North Multi-Family Residential / Single Family Residential High Density Residential / Single Family Residential R-3 / PD-1 (Multi-Family Residential District / Planned Development District); C-1A (Neighborhood Commercial District) South Cove at Kettlestone Apartments / Townhomes Medium Density Residential C-1 / PD-1 (Community and Highway Service Commercial District / Planned Development District) East Elite Eye Care Community Commercial C-1 / PD-1 (Community and Highway Service Commercial District / Planned Development District) West Cove at Kettlestone Multi-Tenant Retail Building Community Commercial C-1 / PD-1 (Community and Highway Service Commercial District / Planned Development District) PROJECT DESCRIPTION The project includes the construction of an addition to an existing dental office building. The building is proposed to be approximately 2,471 square feet in area. The overall building square footage with the addition will be approximately 5,951 square feet. The main entrance to the building is located on the north side, facing SE University Avenue. The addition will have an access door on the south side of the building. The trash enclosure will remain at the southeast corner of the site and the monument sign will remain at the northeast corner of the site, along SE University Avenue. ACCESS AND PARKING There are two accesses into this site from the public street, SE Bishop Drive. One access is located on the west side of the site and the other access is located on the south side of the site. There is also a shared access drive with the property to the east that can be accessed from SE University Avenue. A total of 24 parking spaces are required for this facility. The total amount of parking proposed is 42 spaces including 2 accessible stalls. Eighteen (18) additional spaces are proposed with this site plan. The site plan also shows the 4 bicycle parking spaces to remain along the north side of the building. The proposed site plan meets the parking requirements of the ordinance. January 5, 2024 3 of 3 SIDEWALKS/TRAILS Five foot wide sidewalks have been installed along SE Bishop Drive on the south, SE Bishop Drive on the west, and SE University Avenue on the north. Sidewalks were also installed interior to the site in order to provide pedestrian connections from the parking lot to the building. The applicant is adding an additional sidewalk interior to the site to provide access to the addition. UTILITIES This site is serviced with all public utilities and those utilities will be extended as needed to service the building addition. Storm water detention will continue to be provided with a detention basin located at the south side of the site. LANDSCAPING & OPEN SPACE A minimum of 15% of the project area is required to be open space. The total amount of open space proposed is 45.25%. The landscape plan meets the requirements of the Landscape and Open Space Ordinance and the Kettlestone Design Guidelines. ELEVATIONS The elevations of the building are proposed to be constructed of stone, Nichiha panels, and aluminum storefront system. The addition will match the existing building. LIGHTING PLAN: The applicant has stated that several existing light fixtures will be relocated on the site. All lighting fixtures were approved with the original site plan. The lighting plan meets the lighting requirements of the Site Plan Ordinance. COMPREHENSIVE PLAN The comprehensive plan classifies the subject property as Community Commercial. The Community Commercial classification provides a variety of uses that would serve the community and are located along minor or major arterials. STAFF RECOMMENDATION The site plan is in general conformance with the Site Plan Ordinance and Comprehensive Plan. Staff recommends approval of the site plan for The Nest Pediatric Dentistry Building - Addition. SE UNIVERSITY AVE SE BISHOP DR 98 T H S T SE A L I C E ' S R D V: \ P r o j e c t s \ 2 0 2 3 \ 1 2 3 . 1 2 9 0 . 0 1 \ C A D D \ S P 0 1 _ 1 2 3 1 2 9 0 _ T I T L . d w g JA K E R . C A M P O S , TI T L E S H E E T , 20 2 4 / 0 1 / 0 3 , 1: 4 9 P M , AN S I F U L L B L E E D D ( 3 4 . 0 0 X 2 2 . 0 0 I N C H E S ) BY DA T E RE V I S I O N MA R K Sc a l e : Te c h n i c i a n : T- R - S : SN Y D E R & A S S O C I A T E S , I N C . | Ch e c k e d B y : En g i n e e r : Da t e : 1" = Pr o j e c t N o : Sh e e t Project No: Sheet 27 2 7 S . W . S N Y D E R B L V D AN K E N Y , I O W A 5 0 0 2 3 51 5 - 9 6 4 - 2 0 2 0 | w w w . s n y d e r - a s s o c i a t e s . c o m MA A TL S JR C 12 / 0 5 / 2 0 2 3 50 0 ' 12 3 . 1 2 9 0 . 0 1 C1 0 0 123.1290.01 C100 TH E N E S T P E D I A T R I C D E N T I S T R Y B U I L D I N G - A D D I T I O N TI T L E S H E E T WA U K E E , I O W A PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S 12 - 1 9 - 2 3 01 - 0 3 - 2 4 JR C JR C 12 TT N - R R W - S S SITE PLAN FOR THE NEST PEDIATRIC DENTISTRY BUILDING - ADDITION 1250 SE UNIVERSITY AVENUE CITY OF WAUKEE, DALLAS COUNTY, IOWA VICINITY MAP PROJECT LOCATION SCALE: 1" = 500' OWNER ARTEMIS CONSORTIUM, LLC 1250 SE UNIVERSITY AVENUE WAUKEE, IA 50263 DEVELOPER DOWNING CONSTRUCTION, INC 509 E SCENIC VALLEY AVENUE INDIANOLA, IA 50125 CONTACT: NICK WELTER PHONE: 515-961-5386 ENGINEER SNYDER & ASSOCIATES, INC 2727 SNYDER BOULEVARD ANKENY, IA 50023 CONTACT: MONTE APPELGATE, PLA PHONE: 515-964-2020 P E F RO S S O N LA I AC PNALCDS CARH E CE T TII A ETST F IO AW O License Expires: June 30, 2024 MONTE A. APPELGATE 342 LANDSCAPE ARCHITECT NO. Monte A. Appelgate, PLA License Number Pages or sheets covered by this seal: 342 Date I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and responsible charge. I am a duly licensed Professional Landscape Architect under the laws of the State of Iowa. I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. Jon L. Hanson, P.E.Date License Number P15562 My License Renewal Date is December 31, 2024 Pages or sheets covered by this seal: JON L. HANSON P15562 D P R O F E L NS E ICE IONAL EN G I N E ER AIOW SS Sheet List Table Sheet Number Sheet Title C100 TITLE SHEET C101 PROJECT INFORMATION C200 DIMENSION AND UTILITY PLAN C300 GRADING, EROSION, AND SEDIMENT CONTROL PLAN C301 GRADING DETAILS C400 PLANTING PLAN V: \ P r o j e c t s \ 2 0 2 3 \ 1 2 3 . 1 2 9 0 . 0 1 \ C A D D \ S P 0 1 _ 1 2 3 1 2 9 0 _ T I T L . d w g JA K E R . C A M P O S , PR O J E C T I N F O R M A T I O N , 20 2 4 / 0 1 / 0 3 , 1: 4 9 P M , AN S I F U L L B L E E D D ( 3 4 . 0 0 X 2 2 . 0 0 I N C H E S ) BY DA T E RE V I S I O N MA R K Sc a l e : Te c h n i c i a n : T- R - S : SN Y D E R & A S S O C I A T E S , I N C . | Ch e c k e d B y : En g i n e e r : Da t e : 1" = Pr o j e c t N o : Sh e e t Project No: Sheet 27 2 7 S . W . S N Y D E R B L V D AN K E N Y , I O W A 5 0 0 2 3 51 5 - 9 6 4 - 2 0 2 0 | w w w . s n y d e r - a s s o c i a t e s . c o m MA A TL S JR C 12 / 0 5 / 2 0 2 3 NO N E 12 3 . 1 2 9 0 . 0 1 C1 0 1 123.1290.01 C101 TH E N E S T P E D I A T R I C D E N T I S T R Y B U I L D I N G - A D D I T I O N PR O J E C T I N F O R M A T I O N WA U K E E , I O W A PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S 12 - 1 9 - 2 3 01 - 0 3 - 2 4 JR C JR C 12 TT N - R R W - S S NOTES 1.NOTIFY UTILITY PROVIDERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES AND COORDINATE WITH UTILITY PROVIDERS AS NECESSARY DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXISTENCE, EXACT LOCATION, AND DEPTH OF ALL UTILITIES. PROTECT ALL UTILITY LINES AND STRUCTURES NOT SHOWN FOR REMOVAL OR MODIFICATION. ANY DAMAGES TO UTILITY ITEMS NOT SHOWN FOR REMOVAL OR MODIFICATION SHALL BE REPAIRED TO THE UTILITY OWNER'S SPECIFICATIONS AT THE CONTRACTOR'S EXPENSE. 2.CONSTRUCTION OF ALL STREET AND UTILITY IMPROVEMENTS SHALL CONFORM TO THE 2023 WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS AND 2023 SUDAS. 3.LENGTH OF UTILITIES SHOWN ON PLANS ARE DIMENSIONED FROM CENTERLINE OF STRUCTURE TO CENTERLINE OF STRUCTURE. 4.ALL TRAFFIC CONTROL SHALL BE PROVIDED IN ACCORDANCE WITH REQUIREMENTS SET FORTH IN THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). WHEN CONSTRUCTION ACTIVITIES OBSTRUCT PORTIONS OF THE ROADWAY, FLAGGERS SHALL BE PROVIDED. FLAGGERS SHALL CONFORM TO THE MUTCD IN APPEARANCE, EQUIPMENT AND ACTIONS. 5.NOTIFY OWNER, ENGINEER, CITY OF WAUKEE ENGINEERING DEPARTMENT, AND CITY OF WAUKEE AT LEAST 48 HOURS PRIOR TO BEGINNING WORK. 6.CONSTRUCT MANHOLES AND APPURTENANCES AS WORK PROGRESSES. BACKFILL WITH SUITABLE MATERIAL AND COMPACT TO 95% MAXIMUM DENSITY. 7.IN THE EVENT OF A DISCREPANCY BETWEEN THE QUANTITY ESTIMATES AND THE DETAILED PLANS, THE DETAILED PLANS SHALL GOVERN. 8.ALL FIELD TILES ENCOUNTERED DURING CONSTRUCTION SHALL BE RECONNECTED AND NOTED ACCORDINGLY ON THE AS-BUILT DOCUMENTS. 9.DIMENSIONS, BUILDING LOCATION, UTILITIES AND GRADING OF THIS SITE ARE BASED ON AVAILABLE INFORMATION AT THE TIME OF DESIGN. DEVIATIONS MAY BE NECESSARY IN THE FIELD. ANY SUCH CHANGES OR CONFLICTS BETWEEN THIS PLAN AND FIELD CONDITIONS ARE TO BE REPORTED TO THE ARCHITECT/ENGINEER PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT VERIFICATION OF ALL SITE IMPROVEMENTS PRIOR TO CONSTRUCTION. 10.CONTRACTOR TO LOAD AND TRANSPORT ALL MATERIALS CONSIDERED TO BE UNDESIRABLE TO BE INCORPORATED INTO THE PROJECT TO AN APPROVED OFF-SITE WASTE SITE. 11.CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. RESPREAD TO MINIMUM 8" DEPTH TO FINISH GRADES. 12.ALL PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN ARE FINISHED GRADES AND/OR TOP OF PAVING SLAB (GUTTER), UNLESS OTHERWISE NOTED. 13.THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM NEIGHBORING STREETS, DRIVEWAYS, AND SIDEWALKS CAUSED BY CONSTRUCTION ACTIVITIES AT THE END OF EACH WORK DAY AND PRIOR TO A RAIN EVENT. 14.THE ADJUSTMENT OF ANY EXISTING UTILITY APPURTENANCES TO FINAL GRADE IS CONSIDERED INCIDENTAL TO THE SITE WORK. 15.THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING EROSION CONTROL MEASURES AS NECESSARY. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR MAINTAINING ANY EXISTING EROSION CONTROL MEASURES ON SITE AT THE TIME OF CONSTRUCTION. GRADING AND SOIL EROSION CONTROL CODE REQUIREMENTS SHALL BE MET BY CONTRACTOR. 16.CONTRACTOR TO COORDINATE NATURAL GAS, ELECTRICAL, TELEPHONE AND ANY OTHER FRANCHISE UTILITY SERVICES WITH UTILITY SERVICE PROVIDER, CITY OF WAUKEE, AND THE OWNER PRIOR TO CONSTRUCTION. 17.CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS AND MAINTAIN MINIMUM 18" VERTICAL AND HORIZONTAL CLEARANCE BETWEEN UTILITIES. CONTRACTOR TO COORDINATE UTILITY ROUTING TO BUILDING AND VERIFY CONNECTION LOCATIONS AND INVERTS PRIOR TO CONSTRUCTION. 18.CITY SHALL APPROVE ALL CHANGES IN WRITING AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CHANGES MADE WITHOUT WRITTEN PERMISSION FROM THE COMMUNITY DEVELOPMENT DEPARTMENT. PROPERTY ADDRESS 1250 SE UNIVERSITY AVE COVE AT KETTLESTONE PLAT 2, LOT 1 ZONING PD - PLANNED DEVELOPMENT DISTRICT (OVERLAY) C-1 - COMMUNITY AND HIGHWAY SERVICE COMMERCIAL DISTRICT RECORDED IN BOOK 2015 PAGE 9498 GENERAL DENTAL CLINIC BULK REGULATIONS FRONT YARD SETBACK =NONE SIDE YARD SETBACK =NONE REAR YARD SETBACK =NONE PARKING REQUIREMENTS 1 SPACES PER 250 SF OF OFFICE/RETAIL 5,949 SF / 250 SF X 1 SPACE =24 SPACES REQUIRED =42 SPACES PROVIDED (INCLUDING 2 ACCESSIBLE SPACE) LOT AREA 43,638 SF (1.0 AC) SITE INFORMATION PROPOSED BUILDING HEIGHT =17'-11" EXISTING BUILDING =3,480 SF PROPOSED BUILDING ADDITION =2,471 SF TOTAL BUILDING AREA =5,949 SF EXISTING PAVEMENT AREA =16,093 SF PROPOSED PAVEMENT AREA =3,732 SF TOTAL PAVEMENT AREA =19,825 SF EXISTING IMPERVIOUS AREA =19,573 SF (INCLUDES BUILDING AND PAVEMENT) PROPOSED IMPERVIOUS AREA =6,203 SF (INCLUDES BUILDING AND PAVEMENT) TOTAL IMPERVIOUS AREA =25,776 SF (25,802 SF IN INITIAL BASIN DESIGN) OPEN SPACE =17,862 SF (40.9%) REQUIRED OPEN SPACE =6,546 SF (15.0%) NOTES 1.BUILDING LINES AND CORNERS ARE FOR USE IN PREPARING CIVIL SITE PLAN DOCUMENTS. BUILDING CORNERS AND BUILDING LINES SHOULD BE SPECIFICALLY VERIFIED, AS NECESSARY, PRIOR TO DESIGN FOR CONSTRUCTION OF ANY PROPOSED EXPANSION OR CONNECTION OF BUILDING COMPONENTS. 2.FOR CLARITY PURPOSES, SURVEY SPOT ELEVATIONS ARE NOT SHOWN ON THIS SURVEY, BUT ARE CONTAINED WITHIN THE DIGITAL CADD FILES. 3.FOR THE PURPOSE OF THIS SURVEY, STORM SEWER, SANITARY SEWER AND WATER MAIN LINES ARE ASSUMED TO FOLLOW A STRAIGHT LINE FROM STRUCTURE TO STRUCTURE. 4.UTILITY SERVICE LINES TO BUILDINGS ARE APPROXIMATE ONLY. AN INTERNAL BUILDING INVESTIGATION, EXCAVATION AND/OR SUBSURFACE LOCATING/DESIGNATING WOULD NEED TO BE PERFORMED TO DETERMINE THE LOCATION OF SERVICES ENTERING THE BUILDING. 5.UNDERGROUND PIPE MATERIALS AND SIZES ARE BASED UPON VISIBLE EVIDENCE VIEWED FROM ACCESS MANHOLES/STRUCTURES. DUE TO THE CONFIGURATION AND/OR CONSTRUCTION OF THE STRUCTURE, IT MAY BE DIFFICULT TO ACCURATELY DETERMINE THE PIPE MATERIAL AND/OR SIZE. THE SURVEYOR WILL USE THEIR JUDGMENT AND EXPERIENCE TO ATTEMPT TO DETERMINE, BUT COMPLETE ACCURACY CANNOT BE GUARANTEED. 6.BOUNDARY LINES SHOWN ON THE EXISTING SITE SURVEY ARE TO FACILITATE DESIGN OR CONCEPT NEEDS AND ENABLE CREATION OF SAID CONSTRUCTION DOCUMENTS. THESE LINES DO NOT CONSTITUTE A CERTIFIED BOUNDARY SURVEY AND MISSING MONUMENTS WILL NOT BE SET. UTILITY QUALITY SERVICE LEVELS QUALITY LEVELS OF UTILITIES ARE SHOWN IN THE PARENTHESES WITH THE UTILITY TYPE AND WHEN APPLICABLE, SIZE. THE QUALITY LEVELS ARE BASED ON THE CI / ASCE 38-02 STANDARD. QUALITY LEVEL (D) INFORMATION IS DERIVED FROM EXISTING UTILITY RECORDS OR ORAL RECOLLECTIONS. QUALITY LEVEL (C) INFORMATION IS OBTAINED BY SURVEYING AND PLOTTING VISIBLE ABOVE-GROUND UTILITY FEATURES AND USING PROFESSIONAL JUDGMENT IN CORRELATING THIS INFORMATION WITH QUALITY D INFORMATION. QUALITY LEVEL (B) INFORMATION IS OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE AND APPROXIMATE HORIZONTAL POSITION OF SUBSURFACE UTILITIES. QUALITY LEVEL (A) IS HORIZONTAL AND VERTICAL POSITION OF UNDERGROUND UTILITIES OBTAINED BY ACTUAL EXPOSURE OR VERIFICATION OF PREVIOUSLY EXPOSED SUBSURFACE UTILITIES, AS WELL AS THE TYPE, SIZE, CONDITION, MATERIAL, AND OTHER CHARACTERISTICS. UTILITY WARNING THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES OR SUBSURFACE FEATURES SHOWN COMPRISE ALL SUCH ITEMS IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UTILITIES OR SUBSURFACE FEATURES SHOWN ARE IN THE EXACT LOCATION INDICATED EXCEPT WHERE NOTED AS QUALITY LEVEL A. FEATURES EXISTING PROPOSED Spot Elevation Contour Elevation Fence (Barbed, Field, Hog) Fence (Chain Link) Fence (Wood) Fence (Silt) Tree Line Tree Stump Deciduous Tree \\ Shrub Coniferous Tree \\ Shrub Communication Overhead Communication Fiber Optic Underground Electric Overhead Electric Gas Main with Size High Pressure Gas Main with Size Water Main with Size Sanitary Sewer with Size Duct Bank Test Hole Location for SUE w/ID (*) Denotes the survey quality service level for utilities Sanitary Manhole Storm Sewer with Size Storm Manhole Single Storm Sewer Intake Double Storm Sewer Intake Fire Hydrant Fire Hydrant on Building Water Main Valve Water Service Valve Well Utility Pole Guy Anchor Utility Pole with Light Utility Pole with Transformer Street Light Yard Light Electric Box Electric Transformer Traffic Sign Communication Pedestal Communication Manhole Communication Handhole Fiber Optic Manhole Fiber Optic Handhole Gas Valve Gas Manhole Gas Apparatus Fence Post or Guard Post Underground Storage Tank Above Ground Storage Tank Sign Satellite Dish Mailbox Sprinkler Head Irrigation Control Valve LEGEND ○ 1 2 2 5 X 1225.25 ● X 1 2 2 5 1225.25 FEATURES FOUND SET Section Corner 1/2" Rebar, Cap # 11579 (Unless Otherwise Noted) ROW Marker ROW Rail Control Point Bench Mark Platted Distance P Measured Bearing & Distance M Recorded As R Deed Distance D Calculated Distance C Minimum Protection Elevation MPE Centerline Section Line 1/4 Section Line 1/4 1/4 Section Line Easement Line UTILITY CONTACT INFORMATION UTILITY CONTACT FOR MAPPING INFORMATION SHOWN AS RECEIVED FROM THE IOWA ONE CALL DESIGN REQUEST SYSTEM, TICKET NUMBER 552306738. FO1-FIBER OPTIC CENTURYLINK SADIE HULL 918-547-0147 SADIE.HULL@LUMEN.COM NO RESPONSE CONSOLIDATED COMMUNICATIONS PHILLIP WILLIAMS JR 515-867-4769 PHILLIP.WILLIAMS@CONSOLIDATED.COM CLEAR PER MAP INTERNET CONSULTING SERVICES ADAM WOODARD 515-268-4045 LOCATES@ICS-LLC.NET FO4-FIBER OPTIC AUREON NETWORK SERVICES JEFF KLOCKO 515-830-0445 JEFF.KLOCKO@AUREON.COM OE1-OVERHEAD ELECTRIC MIDAMERICAN ENERGY UE1-UNDERGROUND ELECTRIC JAIME NEER 515-252-6972 MECDSMDESIGNLOCATES@MIDAMERICAN.COM NO RESPONSE MI-FIBER JUSTIN MILLER 515-897-8802 JMILLER@MI-FIBER.NET CLEAR PER EMAIL NEXGEN INTEGRATED COMMUNICATIONS RYAN ROLWES 515-369-7131 RYAN@NEXGENCOM.COM FO8-FIBER OPTIC UNITE PRIVATE NETWORKS JOE KILZER 816-425-3556 UPNGIS@UPNFIBER.COM FO3-FIBER OPTIC WINDSTREAM COMMUNICATIONS LOCATE DESK 800-289-1901 LOCATE.DESK@WINDSTREAM.COM ST1-STORM SEWER WAUKEE, CITY OF S1-SANITARY SEWER TIM ROYER G1-GAS MAIN 515-978-7920 W1-WATER MAIN TROYER@WAUKEE.ORG CONTROL POINTS IOWA SOUTH STATE PLANE COORDINATE SYSTEM NAD83(2011)(EPOCH 2010.00) IARTN DERIVED - US SURVEY FEET CP1 N=583023.26 E=1545554.63 Z=1060.72 SET CUT "X" ON TOP CURB LOCATED EAST SIDE DRIVE AT NORTH CURB DROP FOR ELITE EYE CARE ENTRANCE, +-100' NORTH OF BISHOP DRIVE. (AS SHOWN ON SURVEY) CP2 N=583207.73 E=1545584.72 Z=1061.15 SET CUT "X" AT TOP CURB LOCATED NE CORNER NORTH PARKING LOT FOR ELITE EYE CARE, +-40' SOUTH OF UNIVERSITY AVENUE, AND +-275' NORTH OF BISHOP DRIVE. (AS SHOWN ON SURVEY) CP3 N=583220.21 E=1545331.10 Z=1058.49 SET CUT "X" ON TOP OF CURB LOCATED WEST SIDE BISHOP DRIVE, +-5' SOUTH OF CURB DROP AND +-25' SOUTH OF UNIVERSITY AVENUE. (AS SHOWN ON SURVEY) CP4 N=583011.33 E=1545329.14 Z=1059.26 SET CUT "X" ON TOP CURB LOCATED WEST SIDE BISHOP DRIVE AT SOUTH CURB DROP TO CENTRAL STANDARD ENTRANCE, +-250' SOUTH OF UNIVERSITY AVENUE. (AS SHOWN ON SURVEY) BENCHMARKS NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88 - GEOID12A) IARTN DERIVED - US SURVEY FEET BM500 N=583160- E=1545523- Z=1061.83 BURY BOLT ON HYDRANT LOCATED IN NOSE OF PARKING LOT, +-50' NE OF BUILDING, +-150' EAST OF BISHOP DRIVE, AND +-100' SOUTH OF UNIVERSITY. (AS SHOWN ON SURVEY) DATE OF SURVEY OCTOBER 25TH, 2023 PROPOSED BUILDING (2,471 SF) FFE=1061.30 BM500 Trash Enclosure 10" Block Wall 6" Wood Planter Gravel Mulch/Tall Grass The Nest Pediatric Dentistry Large Sign FFE=1061.30 Intake=1059.39 F.L.=1055.01 15" RCP N Rim=1060.06 F.L.=1047.10 8" RCP SE F.L.=1037.36 10" RCP NE F.L.=1037.26 12" RCP SE F.L.=1037.18 8" RCP N Rim=1059.80 F.L.=1054.80 18" RCP E F.L.=1054.72 18" RCP N Intake=1060.61 F.L.=1058.08 6" CPP S Intake=1060.98 F.L.=1059.13 6" CPP NWIntake=1060.89 F.L.=1058.76 6" CPP N Intake=1057.38 F.L.=1054.58 15" RCP E North Rim=1057.80 South Rim=1057.90 Intake=1057.12 F.L.=1055.35 24" RCP NE F.L.=1054.27 15" RCP W F.L.=1054.17 18" RCP S Rim=1058.58 F.L.=1035.52 8" RCP E F.L.=1035.62 8" RCP S F.L.=1035.64 8" RCP W F.L.=1044.62 8" RCP W Rim=1059.58 F.L.=1054.18 24" RCP NE F.L.=1054.18 24" RCP SW F.L.=1054.04 15" RCP SE Rim=1059.56 F.L.=1034.06 8" RCP SW F.L.=1033.51 8" RCP N Rim=1058.43 Intake=1057.55 F.L.=1054.50 8" CMP E F.L.=1054.00 24" RCP S F.L.=1053.90 24" RCP N Concrete Sidewalk Co n c r e t e S i d e w a l k Concrete Sidewalk Co n c r e t e S i d e w a l k Concrete Sidewalk Concrete Parking Lot Co n c r e t e D r i v e Co n c r e t e D r i v e Concrete Drive Concrete Drive SE BISHOP DRIVE Concrete SE B I S H O P D R I V E Co n c r e t e SE UNIVERSITY AVENUE Concrete Concrete Flume Rim=1058.50 Sanitary Cleanout Rim=1061.29 Sanitary Cleanout Rim=1061.32 Sanitary Cleanout Rim=1061.26 Vertical Capped PVC Pipe Existing Building (3,480 SF) ST-3 F.L.=1055.58 15" CPP E ST-9 F.L.=1055.61 15" RCP S ST-2 F.L.=1055.74 12" CPP N ST-4 Rim=1060.22 EX-1 Rim=1059.93 Intake=1059.36 F.L.=1054.98 15" RCP NE F.L.=1054.95 18" RCP NW F.L.=1054.93 15" RCP S ST-1 Intake=1058.30 F.L.=1056.41 12" RCP S F.L.=1056.53 6" CPP N ST-10 Rim=1060.29 F.L.=1055.74 15" RCP N F.L.=1055.74 15" RCP SW ST-11 Rim=1060.94 F.L.=1054.07 15" RCP E F.L.=1054.02 15" RCP NW ST-5 Intake=1059.32 F.L.=1056.71 6" CPP N F.L.=1056.47 15" CPP S N0 ° 1 1 ' 2 0 " E 2 6 0 . 6 9 ' M & P S89°48'38"E 161.00' M&P S0 ° 1 1 ' 2 0 " W 2 7 1 . 1 9 ' M & P N89°48'40"W 150.50' M&P C 1 Existing 10' Electric Easement (Book 2017, Page 8718) 55' Detention Easement (Book 2019, Page 21469) 10' PUE (Book 2019, Page 21469) 7' Sidewalk Easement Book 2015 Page 20842 Sanitary Sewer Easement (Book 2015, Page 20843) Sanitary Sewer Easement (Book 2015, Page 20843) 20' Ingress-Egress Easement (Book 2019, Page 21469) Storm Sewer Easement (Book 2019, Page 21469) 2' 17 ' 9' TYP 6' 17 ' 9' TYP 8' 6' R5' R5' 6. 6 ' 7.5' R4 ' 2' 2B 1A 1A 1A1A 1B 1B 2B 3E2A 2B4ATYP 3C 7B 3A 12 12 12 6 3E2A 1B 5 3F6B 3A 7A 2C 3B 3D 3B 3C 4ATYP 2B 6A 6" PVC 6" PV C NYLOPLAST INTAKE RIM: 1060.25 6D 3G 6C 6C 22.4' 6C 6E 2' 13 . 3 ' 41.0' 67 . 0 ' 5' 5' 5'4B R5 ' 8.4' V: \ P r o j e c t s \ 2 0 2 3 \ 1 2 3 . 1 2 9 0 . 0 1 \ C A D D \ S P 0 2 _ 1 2 3 1 2 9 0 _ D I M N . d w g JA K E R . C A M P O S , DI M E N S I O N A N D U T I L I T Y P L A N , 20 2 4 / 0 1 / 0 3 , 1: 4 9 P M , AN S I F U L L B L E E D D ( 3 4 . 0 0 X 2 2 . 0 0 I N C H E S ) BY DA T E RE V I S I O N MA R K Sc a l e : Te c h n i c i a n : T- R - S : SN Y D E R & A S S O C I A T E S , I N C . | Ch e c k e d B y : En g i n e e r : Da t e : 1" = Pr o j e c t N o : Sh e e t Project No: Sheet 27 2 7 S . W . S N Y D E R B L V D AN K E N Y , I O W A 5 0 0 2 3 51 5 - 9 6 4 - 2 0 2 0 | w w w . s n y d e r - a s s o c i a t e s . c o m MA A TL S JR C 12 / 0 5 / 2 0 2 3 20 ' 12 3 . 1 2 9 0 . 0 1 C2 0 0 123.1290.01 C200 TH E N E S T P E D I A T R I C D E N T I S T R Y B U I L D I N G - A D D I T I O N DI M E N S I O N A N D U T I L I T Y P L A N WA U K E E , I O W A PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S 12 - 1 9 - 2 3 01 - 0 3 - 2 4 JR C JR C 12 TT N - R R W - S S FEET 0 20 PAVEMENT LEGEND 5" PCC SIDEWALK 6" PCC PAVEMENT DIMENSION PLAN CONSTRUCTION NOTES 1.EXISTING FEATURES, PROTECT THE FOLLOWING: A.PAVEMENTS TO REMAIN. B.PROTECT EXISTING UTILITIES, ANY DAMAGE TO THE EXISTING UTILITIES THAT ARE NOT SCHEDULED FOR MODIFICATION OR DEMOLITION SHALL BE REMEDIED AT THE CONTRACTORS EXPENSE WITH WORK BEING PREFORMED TO THE UTILITY OWNER'S SPECIFICATION. 2. DEMOLITION, REMOVE THE FOLLOWING: A.FULL DEPTH SAWCUT EXISTING CURB SECTION TO WIDTH OF 24". ADJUST LIMITS OF REMOVAL TO MATCH EXISTING JOINT LOCATIONS. PROTECT EXISTING PAVEMENT EDGE DURING REMOVAL. B.REMOVE AND RELOCATE EXISTING SITE LIGHTING POLE TO LOCATION IDENTIFIED. PROTECT EXISTING ELECTRIC CONDUIT DURING DEMOLITION. COORDINATE WITH SITE ELECTRICAL PLAN. C.REMOVE AND RELOCATE EXISTING IRRIGATION EQUIPMENT AS REQUIRED TO BE LOCATED OUTSIDE THE NEW PAVEMENT LIMITS. 3.PAVEMENTS, PROVIDE THE FOLLOWING: A.PCC PARKING, 6" DEPTH PAVEMENT ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR DENSITY. B.PCC SIDEWALKS, 5" DEPTH PAVEMENT. C.6" STANDARD CURB. SEE DETAIL THIS SHEET. D.5" PCC INTEGRAL SIDEWALK AND CURB. SEE DETAIL THIS SHEET. E.CONNECT TO EXISTING PAVEMENT USING DRIVE 'TYPE A' CONNECTION. F.PCC STOOP. REFER TO ARCHITECTURAL AND STRUCTURAL PLANS. G.PEDESTRIAN RAMP WITH A MAXIMUM SLOPE OF 8.33%. . 4.PAVEMENT MARKINGS, PROVIDE THE FOLLOWING: A.4" WIDE PAINTED PARKING STALL LINES. B.45° STRIPING AT 3' ON CENTER SPACING WHERE SHOWN. 5.COORDINATE BUILDING WITH ARCHITECTURAL PLANS. 6.SITE AMENITIES, PROVIDE THE FOLLOWING: A.BICYCLE RACK. SEE DETAIL THIS SHEET. B.SURFACE MOUNTED HANDRAIL. C.3' LONG PCC SPLASH BLOCK AT DOWNSPOUT LOCATION. D.SIGN "RESERVE PATIENT PARKING". E.AC UNIT. SEE ARCHITECTURAL AND MECHANICAL PLANS. 7.SITE UTILITIES, PROVIDE THE FOLLOWING: A.ADJUST IRRIGATION CONTROL VALVE TO BE LOCATED OUTSIDE OF THE PROPOSED SIDEWALK AREA. B.REPLACE MANHOLE CASTING WITH 3-PIECE ADJUSTABLE CASTING. 3 C200 TYPICAL PAVEMENT CROSS SECTIONS NO SCALE PCC PAVEMENT SECTION PCC SIDEWALK SECTION PCC PAVEMENT, SEE PLANS FOR THICKNESS & LOCATIONS 12" DEPTH PREPARED SUBGRADE 2 - 6" LIFTS UNLESS NOTED OTHERWISE SIDEWALK PAVEMENT, SEE PLANS FOR THICKNESS & LOCATIONS 6" DEPTH PREPARED SUBGRADE FORM GRADE ELEV. 6" 2 C200 INTEGRAL SIDEWALK AND CURB DETAIL NO SCALE ADJACENT PAVEMENT SIDEWALK 5" M I N SLOPE AS PER PLANS 2% MAX 4 1 2" 7 1 2" 6" 12"18" 1 C200 6-INCH STANDARD CURB NO SCALE R3" R3" 1" RADIUS SEALED 'E' JOINT 4 C200 LOOP BIKE RACK NO SCALE R 8 1 4" NOTES: 1.INSTALL AS PER MANUFACTURER'S RECOMMENDATIONS AND REQUIREMENTS. 2.1 2"x3 3 4" EXPANSION ANCHOR BOLTS PROVIDED FOR SURFACE MOUNT. FINISH OPTIONS: COATED WITH ZINC RICH EPOXY THEN FINISHED WITH POLYESTER COATING. COLOR AS PER OWNER. 16 1 2" 35 1 2" 4 1 2" DIA ANCHOR CIRCLE 6" DIA 8 1 8" DIA 10 GA. STL. SPINNING SURFACE MOUNT (ONLY) 2" RS 40 GALV. PIPE (2 3 8" O.D.) 5 8"x1 1 2" S.STL. FLT. SKT HD CAP SCREW 3 8"x6" DIA STL. PLATE 1 2 3 4 BM500 Intake=1059.39 F.L.=1055.01 15" RCP N Rim=1060.06 F.L.=1047.10 8" RCP SE F.L.=1037.36 10" RCP NE F.L.=1037.26 12" RCP SE F.L.=1037.18 8" RCP N Rim=1059.80 F.L.=1054.80 18" RCP E F.L.=1054.72 18" RCP N Intake=1060.61 F.L.=1058.08 6" CPP S Intake=1060.98 F.L.=1059.13 6" CPP NWIntake=1060.89 F.L.=1058.76 6" CPP N Intake=1057.38 F.L.=1054.58 15" RCP E North Rim=1057.80 South Rim=1057.90 Intake=1057.12 F.L.=1055.35 24" RCP NE F.L.=1054.27 15" RCP W F.L.=1054.17 18" RCP S Rim=1058.58 F.L.=1035.52 8" RCP E F.L.=1035.62 8" RCP S F.L.=1035.64 8" RCP W F.L.=1044.62 8" RCP W Rim=1059.58 F.L.=1054.18 24" RCP NE F.L.=1054.18 24" RCP SW F.L.=1054.04 15" RCP SE Rim=1059.56 F.L.=1034.06 8" RCP SW F.L.=1033.51 8" RCP N Rim=1058.43 Intake=1057.55 F.L.=1054.50 8" CMP E F.L.=1054.00 24" RCP S F.L.=1053.90 24" RCP N SE BISHOP DRIVE SE B I S H O P D R I V E SE UNIVERSITY AVENUE Rim=1058.50 Sanitary Cleanout Rim=1061.29 Sanitary Cleanout Rim=1061.32 Sanitary Cleanout Rim=1061.26 Vertical Capped PVC Pipe Existing Building (3,480 SF) ST-3 F.L.=1055.58 15" CPP E ST-9 F.L.=1055.61 15" RCP S ST-2 F.L.=1055.74 12" CPP N ST-4 Rim=1060.22 EX-1 Rim=1059.93 Intake=1059.36 F.L.=1054.98 15" RCP NE F.L.=1054.95 18" RCP NW F.L.=1054.93 15" RCP S ST-1 Intake=1058.30 F.L.=1056.41 12" RCP S F.L.=1056.53 6" CPP N ST-10 Rim=1060.29 F.L.=1055.74 15" RCP N F.L.=1055.74 15" RCP SW ST-11 Rim=1060.94 F.L.=1054.07 15" RCP E F.L.=1054.02 15" RCP NW ST-5 Intake=1059.32 F.L.=1056.71 6" CPP N F.L.=1056.47 15" CPP S N0 ° 1 1 ' 2 0 " E 2 6 0 . 6 9 ' M & P S89°48'38"E 161.00' M&P S0 ° 1 1 ' 2 0 " W 2 7 1 . 1 9 ' M & P N89°48'40"W 150.50' M&P C 1 Existing 10' Electric Easement (Book 2017, Page 8718) 55' Detention Easement (Book 2019, Page 21469) 10' PUE (Book 2019, Page 21469) 7' Sidewalk Easement Book 2015 Page 20842 Sanitary Sewer Easement (Book 2015, Page 20843) Sanitary Sewer Easement (Book 2015, Page 20843) 20' Ingress-Egress Easement (Book 2019, Page 21469) Storm Sewer Easement (Book 2019, Page 21469) PROPOSED BUILDING (2,471 SF) FFE=1061.30 (1059.29) (1059.31) (1059.80) (1059.24) 1059.25 1059.75 (1059.76) (1060. 1 0 ) (1060.06) (1 0 6 0 . 6 8 ) (1060.53) 1060.80 1061.05 1060.91 1061.301059.87 1060.20 TC 1059.70 FL 1060.30 (1 0 5 9 . 1 5 ) ( 1 0 5 9 . 1 8 ) (1 0 5 9 . 2 6 ) (1 0 5 9 . 3 0 ) (1 0 5 9 . 2 1 ) (1 0 5 9 . 1 4 ) 1061.30 (1060.28) (1060.81) (1061.18) (1061.59) (1 0 6 0 . 6 7 ) (1 0 6 0 . 4 2 ) (1 0 6 0 . 8 2 ) 1060.40 1060.90 1060.551061.40 1061 . 2 5 1061.75 106 1 1061 1061 1061 1060 10 5 9 106 0 1060 1060 105910 5 9 1 0 6 0 1061 1061 1061 1060 1061.19 1060.98 1060.69 ●● ● ● ● ● ● ● ●● ● ● ●●●●●●●●● ● ● FILTER SOCK FILTER SOCK (1061.19)(1060.9 0 )(1060.95)(1061.05) (1060.04) (1059.95) (1060.10) (1060.53) 10 6 1 . 0 0 1061 . 0 0 1061 . 0 0 1061 . 0 0 1061 . 0 0 1061 . 0 0 (1060.25) 106 0 . 2 0 T C 105 9 . 7 0 F L 105 9 . 5 5 105 9 . 6 5 -7.21% -4.57%1061.20 ( 1 0 5 9 . 1 9 ) 105 9 . 6 3 105 9 . 7 0 106 0 . 3 0 1059 . 7 5 1061 . 3 0 1061 . 3 0 1061 . 3 0 1061 . 3 0 1061 . 3 0 10 6 1 . 3 0 1061 . 3 0 -4.05% - 5 . 1 4 % -9.96% -7 . 4 8 % -1 0 . 2 7 % -6.1 8 % -10.89% -5 . 6 9 % 10 6 0 1061 10 6 1 1 0 6 1 1061 -2 5 . 0 1 % -2 5 . 0 1 % INTAKE PROTECTION INTAKE PROTECTION 1060.25 (1059.74)(1059.62) INTAKE PROTECTION 2 1 1 V: \ P r o j e c t s \ 2 0 2 3 \ 1 2 3 . 1 2 9 0 . 0 1 \ C A D D \ S P 0 3 _ 1 2 3 1 2 9 0 _ G R D G . d w g JA K E R . C A M P O S , GR A D I N G , E R O S I O N , A N D S E D I M E N T C O N T R O L P L A N , 20 2 4 / 0 1 / 0 3 , 1: 4 9 P M , AN S I F U L L B L E E D D ( 3 4 . 0 0 X 2 2 . 0 0 I N C H E S ) BY DA T E RE V I S I O N MA R K Sc a l e : Te c h n i c i a n : T- R - S : SN Y D E R & A S S O C I A T E S , I N C . | Ch e c k e d B y : En g i n e e r : Da t e : 1" = Pr o j e c t N o : Sh e e t Project No: Sheet 27 2 7 S . W . S N Y D E R B L V D AN K E N Y , I O W A 5 0 0 2 3 51 5 - 9 6 4 - 2 0 2 0 | w w w . s n y d e r - a s s o c i a t e s . c o m MA A TL S JR C 12 / 0 5 / 2 0 2 3 20 ' 12 3 . 1 2 9 0 . 0 1 C3 0 0 123.1290.01 C300 TH E N E S T P E D I A T R I C D E N T I S T R Y B U I L D I N G - A D D I T I O N GR A D I N G , E R O S I O N , A N D S E D I M E N T C O N T R O L P L A N WA U K E E , I O W A PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S 12 - 1 9 - 2 3 01 - 0 3 - 2 4 JR C JR C 12 TT N - R R W - S S FEET 0 20 POLLUTION PREVENTION NOTES A.POLLUTION PREVENTION AND EROSION PROTECTION 1. CODE COMPLIANCE: THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL POTENTIAL POLLUTION AND SOIL EROSION CONTROL REQUIREMENTS OF THE IOWA CODE, THE U.S. CLEAN WATER ACT AND ANY LOCAL ORDINANCES. THE CONTRACTOR SHALL TAKE ALL NECESSARY STEPS TO PROTECT AGAINST EROSION AND POLLUTION FROM THIS PROJECT SITE AND ALL OFF-SITE BORROW OR DEPOSIT AREAS DURING PERFORMANCE OR AS A RESULT OF PERFORMANCE. 2.DAMAGE CLAIMS: THE CONTRACTOR WILL HOLD THE OWNER AND ARCHITECT / ENGINEER HARMLESS FROM ANY AND ALL CLAIMS OF ANY TYPE WHATSOEVER RESULTING FROM DAMAGES TO ADJOINING PUBLIC OR PRIVATE PROPERTY, INCLUDING REASONABLE ATTORNEY FEES INCURRED TO OWNER. FURTHER, IF THE CONTRACTOR FAILS TO TAKE NECESSARY STEPS TO PROMPTLY REMOVE EARTH SEDIMENTATION OR DEBRIS WHICH COMES ONTO ADJOINING PUBLIC OR PRIVATE PROPERTY, THE OWNER MAY, BUT NEED NOT, REMOVE SUCH ITEMS AND DEDUCT THE COST THEREOF FROM AMOUNTS DUE TO THE CONTRACTOR. B.POLLUTION PREVENTION PLAN 1. THERE IS NOT A SWPPP OR GENERAL PERMIT #2 PERMIT ON THIS PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL EROSION CONTROL LAW REQUIREMENTS, INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING BMP'S UNLESS INFEASIBLE OR NOT APPLICABLE: a.INSTALL PERIMETER AND FINAL SEDIMENT CONTROL MEASURES SUCH AS SILT BARRIERS, DITCH CHECKS, DIVERSION BERMS, OR SEDIMENTATION BASINS DOWNSTREAM OF SOIL DISTURBING ACTIVITIES PRIOR TO SITE CLEARING AND GRADING OPERATIONS. b.PRESERVE EXISTING VEGETATION IN AREAS NOT NEEDED FOR CONSTRUCTION AND LIMIT TO A MINIMUM THE TOTAL AREA DISTURBED BY CONSTRUCTION OPERATIONS AT ANY TIME. c.MAINTAIN ALL TEMPORARY AND PERMANENT EROSION CONTROL MEASURES IN WORKING ORDER, INCLUDING CLEANING, REPAIRING, REPLACEMENT, AND SEDIMENT REMOVAL THROUGHOUT THE PERMIT PERIOD. CLEAN OR REPLACE SILT CONTROL DEVICES WHEN THE MEASURES HAVE LOST 50% OF THEIR ORIGINAL CAPACITY. d.PREVENT ACCUMULATION OF EARTH AND DEBRIS FROM CONSTRUCTION ACTIVITIES ON ADJOINING PUBLIC OR PRIVATE PROPERTIES, INCLUDING STREETS, DRIVEWAYS, SIDEWALKS, DRAINAGEWAYS, OR UNDERGROUND SEWERS. REMOVE ANY ACCUMULATION OF EARTH OR DEBRIS IMMEDIATELY AND TAKE REMEDIAL ACTIONS FOR FUTURE PREVENTION. e.INSTALL NECESSARY CONTROL MEASURES SUCH AS SILT BARRIERS, EROSION CONTROL MATS, MULCH, DITCH CHECKS OR RIPRAP AS SOON AS AREAS REACH THEIR FINAL GRADES AND AS CONSTRUCTION OPERATIONS PROGRESS TO ENSURE CONTINUOUS RUNOFF CONTROL. PROVIDE INLET AND OUTLET CONTROL MEASURES AS SOON AS STORM SEWERS ARE INSTALLED. f.RESPREAD A MINIMUM OF 8 INCHES OF TOPSOIL (INCLUDING TOPSOIL FOUND IN SOD) ON ALL DISTURBED AREAS, EXCEPT WHERE PAVEMENT, BUILDINGS OR OTHER IMPROVEMENTS ARE LOCATED. g.STABILIZE UNDEVELOPED, DISTURBED AREAS WITH MULCH, TEMPORARY SEED MIX, PERMANENT SEED MIX, SOD, OR PAVEMENT IMMEDIATELY AS SOON AS POSSIBLE UPON COMPLETION OR DELAY OF GRADING OPERATIONS. INITIATE STABILIZATION MEASURES IMMEDIATELY AFTER CONSTRUCTION ACTIVITY IS FINALLY COMPLETED OR TEMPORARILY CEASED ON ANY PORTION OF THE SITE AND WHICH WILL NOT RESUME FOR A PERIOD EXCEEDING 14 CALENDAR DAYS. h.COORDINATE LOCATIONS OF STAGING AREAS WITH THE GENERAL CONTRACTOR. UNLESS NOTED OTHERWISE, STAGING AREAS SHOULD CONTAIN THE FOLLOWING: JOB TRAILERS, FUELING / VEHICLE MAINTENANCE AREA, TEMPORARY SANITARY FACILITIES, MATERIALS STORAGE, AND CONCRETE WASHOUT FACILITY. CONTROL RUNOFF FROM STAGING AREAS WITH DIVERSION BERMS AND/OR SILT BARRIERS AND DIRECT TO A SEDIMENT BASIN OR OTHER CONTROL DEVICE WHERE POSSIBLE. CONCRETE WASHOUT MUST BE CONTAINED ONSITE. GRADING NOTES 1.CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL ON ALL AREAS TO BE CUT OR FILLED. RESPREAD TO MINIMUM 8" DEPTH TO FINISH GRADES. 2.ANY EXCESS CUT TO BE SPREAD ON SITE AS DIRECTED BY OWNER DURING CONSTRUCTION IF POSSIBLE. PLACE TOPSOIL OVER ALL AREAS DISTURBED. 3.EROSION CONTROL: SEED THE SITE AFTER ROUGH GRADING HAS BEEN COMPLETED WITH TYPE 4 SEED MIX. PLACE SILT FENCE AND MAINTAIN IN PROBLEM AREAS AFTER GROUND COVER HAS BEEN ESTABLISHED. COMPLY WITH IDNR GENERAL PERMIT #2.. 4.PROVIDE BELOW GRADE INLET PROTECTION IN PAVED AREAS FOLLOWING PAVING OPERATIONS. INLETS NEED TO BE PROTECTED PRIOR TO PAVING AS WELL. QUANTITIES FILTER SOCK = 330 LF INTAKE PROTECTION = 3 EA DISTURBED AREA = 0.25 AC SOD = 0.05 AC BENCHMARKS NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88 - GEOID12A) IARTN DERIVED - US SURVEY FEET BM500 N=583160- E=1545523- Z=1061.83 BURY BOLT ON HYDRANT LOCATED IN NOSE OF PARKING LOT, +-50' NE OF BUILDING, +-150' EAST OF BISHOP DRIVE, AND +-100' SOUTH OF UNIVERSITY. (AS SHOWN ON SURVEY) 1061.30 1059.75 10 6 1 . 3 0 1060.91 1060 . 8 1 1061 . 2 0 1060.25 G 1060.25 1059.65 1060.15 ●● 1059.43 1059.93 1059.87 1059.25 1059.87 TC 1059.37 G -4.66% -4.66% -2 . 0 0 % -2 . 0 0 % 0.00% (1059.40) 1059.70 1059.63 1059.65 1059.55 1060.30 1060.20 TC 1059.70 G 1059.23 1059.751059.20 -1 . 2 2 % -1.00% -1.60% -1 . 6 7 % -7.22% -7.22% -1 . 6 9 % -2 . 2 8 % -1 . 9 0 % -0.68% (1059.76) (1060.27) (1059.74) 1061.20 TC (1059.24) 1059.77 1059.55 1059.65 -1 . 6 7 % 1061.051060.80 -3 . 0 4 % -1 . 7 4 % 1059.26 -1 . 6 4 % -1.67% 2 1 1 (1060.10) 1060.30 1060.20 TC 1060.35 1060.441060.37 1060.22 (1 0 6 0 . 0 6 ) (1060.68)(106 0 . 5 3 ) -1.50% -2 . 2 5 % -3 . 2 9 % -1.50% -3 . 2 1 % -3 . 7 3 % -1 . 5 0 % -3.78% -3.53% -1 . 6 7 % -1 . 5 0 % (1061.53) 1061.591061.70 (1061.64) V: \ P r o j e c t s \ 2 0 2 3 \ 1 2 3 . 1 2 9 0 . 0 1 \ C A D D \ S P 0 3 _ 1 2 3 1 2 9 0 _ G R D G . d w g JA K E R . C A M P O S , GR A D I N G D E T A I L S , 20 2 4 / 0 1 / 0 3 , 1: 5 0 P M , AN S I F U L L B L E E D D ( 3 4 . 0 0 X 2 2 . 0 0 I N C H E S ) BY DA T E RE V I S I O N MA R K Sc a l e : Te c h n i c i a n : T- R - S : SN Y D E R & A S S O C I A T E S , I N C . | Ch e c k e d B y : En g i n e e r : Da t e : 1" = Pr o j e c t N o : Sh e e t Project No: Sheet 27 2 7 S . W . S N Y D E R B L V D AN K E N Y , I O W A 5 0 0 2 3 51 5 - 9 6 4 - 2 0 2 0 | w w w . s n y d e r - a s s o c i a t e s . c o m MA A TL S JR C 12 / 0 5 / 2 0 2 3 5' 12 3 . 1 2 9 0 . 0 1 C3 0 1 123.1290.01 C301 TH E N E S T P E D I A T R I C D E N T I S T R Y B U I L D I N G - A D D I T I O N GR A D I N G D E T A I L S WA U K E E , I O W A PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S 12 - 1 9 - 2 3 01 - 0 3 - 2 4 JR C JR C 12 TT N - R R W - S S FEET 0 5 3 C301 EXISTING SIDEWALK TIE-IN DETAIL 1" = 5' 4 C301 SOUTH EXIT GRADING DETAIL 1" = 5' 2 C301 BIKE RACK DETAIL 1" = 5' DISTURBED AREA DIR E C T I O N O F F L O W TYPICAL PLACEMENT OF BERM OR SOCK FILTER SOCK FILTER BERM 1 1 10 ' - 0 " M A X 1 C301 FILTER SOCK DETAIL NO SCALE 20 0 ' - 0 " M A X L E N G T H P E R S E C T I O N (6 0 0 ' - 0 " I F S L O P E I S F L A T T E R T H A N 5 % ) 3' M I N OV E R L A P BERM SHOWN IS TYPICAL FOR SLOPES FLATTER THAN 3:1. FOR STEEPER SLOPES, INCREASE BERM SIZE AS DIRECTED BY THE ENGINEER. PLACE BERM IN UNCOMPACTED WINDOW PERPENDICULAR TO THE SLOPE AT LOCATIONS SPECIFIED IN THE CONTRACT DOCUMENTS. FILTER SOCK DIAMETER AS SPECIFIED IN THE CONTRACT DOCUMENTS. WATER FLOW WATER FL O W WATER FL O W SECTION VIEW AT STREET (for perimeter control along street) 2'-0" 24" 12 " PLAN VIEW OF SLOPE (for sediment and slope control) FILTER MATERIAL STAKE FILL MATERIAL CONSTRUCT "J-HOOK" AT EACH END ON AN INDIVIDUAL SECTION OF SOCK OR BERM PLACE BERM ON SOCK PERPENDICULAR TO SLOPE STAKES (TYP) AREA TO BE PROTECTED 5 C301 PEDESTRIAN RAMP WITH HANDRAILS NO SCALE NOTE: CONTRACTOR TO SUBMIT SHOP DRAWINGS SHOWING LAYOUT, DIMENSIONS AND JOINT LOCATIONS FOR ALL HANDRAILS, FOR ENGINEER'S REVIEW PRIOR TO CONSTRUCTION. 8'-0" 1'-0" 18 " 18 " 36 " O V E R A L L H E I G H T 2" TUBULAR STEEL HANDRAIL BLACK POWDER COAT 5"x5"x1 4" THICK STEEL MOUNTING PLATE WELDED TO HANDRAIL UPRIGHTS SECURE HAND RAIL TO TOP OF RETAINING WALL USING 3 8"x3- 3 4" CONCRETE WEDGE ANCHORS. (MIN 4 PER MOUNTING PLATE) 1 PROVIDE 30.8' OF EXPANSION JOINT BETWEEN SIDEWALK AND FILLET 2 PROVIDE 15.9' OF EXPANSION JOINT BETWEEN BUILDING FOUNDATION AND SIDEWALK 1060 106 0 1058 1058 1059 1059 1060 1060 1059 1060 1060 106 1 1 0 6 1 10 6 1 10 6 1 10 6 1 1061 10 6 1 1061 1061 1060 10 5 9 1059 10 5 9 10 5 9 10 5 9 1 0 6 0 1060 1060 1057 1057 1060 1060 1060 1 BM500 Trash Enclosure 10" Block Wall 6" Wood Planter Gravel Mulch/Tall Grass The Nest Pediatric Dentistry Large Sign FFE=1061.30 Intake=1059.39 F.L.=1055.01 15" RCP N Intake=1060.61 F.L.=1058.08 6" CPP S Intake=1060.98 F.L.=1059.13 6" CPP NWIntake=1060.89 F.L.=1058.76 6" CPP N Rim=1059.58 F.L.=1054.18 24" RCP NE F.L.=1054.18 24" RCP SW F.L.=1054.04 15" RCP SE Rim=1059.56 F.L.=1034.06 8" RCP SW F.L.=1033.51 8" RCP N Rim=1058.43 Intake=1057.55 F.L.=1054.50 8" CMP E F.L.=1054.00 24" RCP S F.L.=1053.90 24" RCP N Concrete Sidewalk Co n c r e t e S i d e w a l k Concrete Sidewalk Co n c r e t e S i d e w a l k Concrete Sidewalk Concrete Parking Lot Co n c r e t e D r i v e Co n c r e t e D r i v e Concrete Drive SE BISHOP DRIVE Concrete SE UNIVERSITY AVENUE Concrete Concrete Flume Rim=1058.50 Sanitary Cleanout Rim=1061.29 Sanitary Cleanout Rim=1061.32 Sanitary Cleanout Rim=1061.26 Vertical Capped PVC Pipe Existing Building (3,480 SF) ST-3 F.L.=1055.58 15" CPP E ST-9 F.L.=1055.61 15" RCP S ST-2 F.L.=1055.74 12" CPP N EX-1 Rim=1059.93 Intake=1059.36 F.L.=1054.98 15" RCP NE F.L.=1054.95 18" RCP NW F.L.=1054.93 15" RCP S ST-1 Intake=1058.30 F.L.=1056.41 12" RCP S F.L.=1056.53 6" CPP N ST-10 Rim=1060.29 F.L.=1055.74 15" RCP N F.L.=1055.74 15" RCP SW ST-11 Rim=1060.94 F.L.=1054.07 15" RCP E F.L.=1054.02 15" RCP NW ST-5 Intake=1059.32 F.L.=1056.71 6" CPP N F.L.=1056.47 15" CPP S N0 ° 1 1 ' 2 0 " E 2 6 0 . 6 9 ' M & P S89°48'38"E 161.00' M&P S0 ° 1 1 ' 2 0 " W 2 7 1 . 1 9 ' M & P N89°48'40"W 150.50' M&P C 1 55' Detention Easement (Book 2019, Page 21469) 10' PUE (Book 2019, Page 21469) 7' Sidewalk Easement Book 2015 Page 20842 Sanitary Sewer Easement (Book 2015, Page 20843) 20' Ingress-Egress Easement (Book 2019, Page 21469) Storm Sewer Easement (Book 2019, Page 21469) PROPOSED BUILDING (2,471 SF) FFE=1061.30 8 - CK 5 - CK 7 - CK G G 2' 3' 2' 4' 3' 5 - PW F 4' F F F H H 5 - CK 5 - PW 5 - CK H H H H H 3 - SB I 1 1 1 2 F V: \ P r o j e c t s \ 2 0 2 3 \ 1 2 3 . 1 2 9 0 . 0 1 \ C A D D \ S P 0 5 _ 1 2 3 1 2 9 0 _ L A N D . d w g JA K E R . C A M P O S , PL A N T I N G P L A N , 20 2 4 / 0 1 / 0 3 , 1: 5 0 P M , AN S I F U L L B L E E D D ( 3 4 . 0 0 X 2 2 . 0 0 I N C H E S ) BY DA T E RE V I S I O N MA R K Sc a l e : Te c h n i c i a n : T- R - S : SN Y D E R & A S S O C I A T E S , I N C . | Ch e c k e d B y : En g i n e e r : Da t e : 1" = Pr o j e c t N o : Sh e e t Project No: Sheet 27 2 7 S . W . S N Y D E R B L V D AN K E N Y , I O W A 5 0 0 2 3 51 5 - 9 6 4 - 2 0 2 0 | w w w . s n y d e r - a s s o c i a t e s . c o m MA A TL S JR C 12 / 0 5 / 2 0 2 3 20 ' 12 3 . 1 2 9 0 . 0 1 C4 0 0 123.1290.01 C400 TH E N E S T P E D I A T R I C D E N T I S T R Y B U I L D I N G - A D D I T I O N PL A N T I N G P L A N WA U K E E , I O W A PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S 12 - 1 9 - 2 3 01 - 0 3 - 2 4 JR C JR C 12 TT N - R R W - S S ## FEET 0 20 PLANTING PLAN GENERAL NOTES A.UTILITY WARNING: THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEY FURTHER DOES NOT WARRANT THAT THE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED. B.NOTIFY UTILITY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXISTENCE, EXACT LOCATION AND DEPTH OF ALL UTILITIES. AVOID DAMAGE TO UTILITIES AND SERVICES DURING CONSTRUCTION. ANY DAMAGE DUE TO THE CONTRACTOR'S CARELESSNESS SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. COORDINATE AND COOPERATE WITH UTILITY COMPANIES DURING CONSTRUCTION. C.ALL PLANT MATERIAL SHALL AT LEAST MEET MINIMUM REQUIREMENTS SHOWN IN THE "AMERICAN STANDARDS FOR NURSERY STOCK" (ANSI Z60.1-LATEST EDITION). D.CONTRACTOR SHALL GUARANTEE ALL PLANT MATERIAL FOR A PERIOD OF ONE YEAR FROM DATE OF INSTALLATION. E.PROVIDE 3-INCH DEPTH SHREDDED HARDWOOD MULCH IN A MIN 3-FOOT PERIMETER RING AROUND ALL INDIVIDUAL TREES. F.PROVIDE 2-INCH RIVER GRAVEL PLACED TO A DEPTH OF 4-INCHES WITH WEED BARRIER FABRIC UNDERLAYMENT AND 6-INCH BLACK STEEL EDGER WITH STAKES IN PLANT BED AREAS SHOWN ON PLAN. G.SOD ALL AREAS DISTURBED BY CONSTRUCTION, INCLUDING ROW. H.SPADE REMOVE OVERSTORY TREES (5 - HORNBEAM ALONG SE UNIVERSITY AND 3 - LINDEN ALONG EAST PRIVATE DRIVE), STORE OFF SITE AT APPROVED NURSERY, AND REPLANT AT SPECIFIED LOCATION AT APPROPRIATE PLANTING SEASON. I.INSTALL BOULDERS. SIZE AND LOCATION TO BE COORDINATED WITH OWNER. J.MINIMUM NURSERY PLANT SIZE REQUIREMENTS: DECIDUOUS OVER-STORY TREES 8-FT B&B EVERGREEN OVERSTORY TREES 6-FT B&B DECIDUOUS ORNAMENTAL TREES 6-FT B&B 1 C400 DECIDUOUS TREES STAKING DETAIL NO SCALE STAKING PLAN (TREES 2 1/2" DIA OR SMALLER) STAKING PLAN (TREES LARGER THAN 2 1/2" DIA) 2 C400 PLANTING PIT DETAILS NO SCALE TYPICAL PLANTING PIT DETAIL SLOPE PLANTING PIT DETAIL 1 WRAP TRUNK FROM GROUND TO FIRST BRANCH. 1 2 T O 2 3 T R E E H E I G H T (4 ' - 0 " M I N ) 1 4 TO 1 3 TREE HEIGHT (2'-0" MIN) 6" 3X ROOTBALL MINIMUM FOR TREES 2X ROOTBAL MINIMUM FOR SHRUBSDE P T H O F RO O T B A L L OR C O N T A I N E R RO O T S Y S T E M 3X ROOTBALL MINIMUM FOR TREES 2X ROOTBAL MINIMUM FOR SHRUBS DE P T H O F RO O T B A L L OR C O N T A I N E R RO O T S Y S T E M SEE PLANTING PIT DETAILS GARDEN HOSE FLAGGING MATERIAL 1 PLACE ON STAKE TO SOUTHWEST PLACE ON STAKE TO SOUTHWEST SET ROOT COLLAR AND ROOT FLARE 2" ABOVE FINISH GRADE. DO NOT PLACE MULCH WITHIN 2" OF TRUNK. ROOT COLLAR IS NOT ALWAYS LOCATED AT TOP OF ROOTBALL MINIMUM 6' DIAMETER, 3" DEPTH MULCH RING 3" HEIGHT WATER RETENTION BERM BEYOND EDGE OF ROOT BALL FINISH GRADE SCARIFY SIDES OF PIT REMOVE ALL NON-BIODEGRADABLE MATERIAL, CONTAINERS OR OTHER MATERIAL THAT WILL IMPEDE THE GROWTH OF THE PLANT MATERIAL. REMOVE ALL TWINE. FOR BALLED AND BURLAP (B&B) PLANTS REMOVE MINIMUM TOP 1 2 OF BURLAP AND WIRE BASKET MINIMUM. PLACE ROOT BALL ON UNDISTURBED SOIL 2:1 MAXIMUM TRANSITION SLOPE. BEGIN TRANSITION AT EDGE OF ROOT BALL EXISTING SLOPE TREE OR SHRUB SCARIFY SIDES OF PIT REMOVE ALL NON-BIODEGRADABLE MATERIAL, CONTAINERS OR OTHER MATERIAL THAT WILL IMPEDE THE GROWTH OF THE PLANT MATERIAL. REMOVE ALL TWINE. FOR BALLED AND BURLAP (B&B) PLANTS REMOVE MINIMUM TOP 1 2 OF BURLAP AND WIRE BASKET MINIMUM. PLACE ROOT BALL ON UNDISTURBED SOIL FINISH GRADE 3" HEIGHT WATER RETENTION BERM BEYOND EDGE OF ROOT BALL MINIMUM 6' DIAMETER, 3" DEPTH MULCH RING SET ROOT COLLAR AND ROOT FLARE 2" ABOVE FINISH GRADE. DO NOT PLACE MULCH WITHIN 2" OF TRUNK. ROOT COLLAR IS NOT ALWAYS LOCATED AT TOP OF ROOT BALL PLANTING PLAN REQUIREMENTS LANDSCAPE REQUIREMENTS AND CALCULATIONS: (AS PER CITY OF WAUKEE SITE PLAN OPEN SPACE AND LANDSCAPING REQUIREMENTS) OPEN SPACE REQUIREMENTS: 43,638 SF (1.00 AC) OVERALL PROPERTY X 20% MINIMUM OPEN SPACE =8,727.6 SF OPEN SPACE REQUIRED TOTAL HARD SURFACE (DRIVES, PARKING AND BUILDING)=19,747 SF (43,638 SF) = 45.25% TOTAL OPEN SPACE PROVIDED OPEN SPACE LANDSCAPE REQUIREMENTS: 8,727.6 SF/1000 SF =8.73 PLANT UNITS REQUIRED 8.73 PU X 1 TREES =8.73 TREES REQUIRED (23 EXISTING [11 EVERGREEN], 0 PROVIDED) 8.73 PU X 1 SHRUBS =8.73 SHRUBS REQUIRED (56 EXISTING, 43 PROVIDED) OFF STREET PARKING REQUIREMENT: ONE TREE PER ISLAND. MINIMUM OF ONE OVERSTORY DECIDUOUS TREE PER 50 LF OF FRONTAGE. 161 LF OF FRONTAGE / 50 = 3.22 TREES REQUIRED. (5 PROVIDED) STREET TREE REQUIREMENTS: 1 TREE PER 40 LF OF FRONTAGE 161 LF / 40 LF = 4.03 TREES REQUIRED (5 PROVIDED) CODE QTY BOTANICAL NAME COMMON NAME SIZE CONTAINER SHRUBS PW 10 Pinus mugo 'White Bud'White Bud Mugo Pine 2` Ht.Pot SB 3 Spiraea betulifolia 'Tor Gold' TM Glow Girl Birchleaf Spirea 1.5` Ht.Pot GRASSES CK 30 Calamagrostis x acutiflora 'Karl Foerster'Karl Foerster Feather Reed Grass 1 gal.Pot PLANT SCHEDULE BID ALTERNATE 1 REMOVE EXISTING MULCH AND REPLACE WITH 2-INCH RIVER GRAVEL PLACED TO A DEPTH OF 4-INCHES WITH WEED BARRIER FABRIC UNDERLAYMENT. PROVIDE 6-INCH BLACK STEEL EDGER WITH STAKES IN PLANT BED AREAS AS SHOWN. 1 2 MAIN LEVEL 0" MAIN LEVEL 0" T.O. PEAK 18' -10 1/2" T.O. PEAK 18' -10 1/2" T.O. WINDOW 9' -0" T.O. WINDOW 9' -0" TRUSS BEARING. 16' -4" EXISTING NEW STN-1 STN-2 SF SF SF SF SF SF SF SF STN-1 STN-2 PNL PNL STN-2 SF PNLSF ST N - 1 ST N - 2 FAS SILL G&S FASFAS FAS FAS G&S SILL G&S PNL AC UNIT LOCATION MAIN LEVEL 0" MAIN LEVEL 0" T.O. PEAK 18' -10 1/2" T.O. PEAK 18' -10 1/2" T.O. WINDOW 9' -0" T.O. WINDOW 9' -0" TRUSS BEARING. 16' -4" EXISTINGNEW ST N - 1 ST N - 2 STN-2 PNL STN-1 SF SF SF SFSF SF SF STN-2 PNL FAS FAS FAS STN-1 STN-2 PNL STN-2 SF SFSF SF SF FAS G&S SILLSILLSILLSILL PNL SF SILLG&S FAS FAS STN-1 STN-2 SILL SILL MAIN LEVEL 0" MAIN LEVEL 0" T.O. PEAK 18' -10 1/2" T.O. PEAK 18' -10 1/2" T.O. WINDOW 9' -0" T.O. WINDOW 9' -0" STN-1 SF SF STN-2 SF SFSF PNL STN-2 ST N - 2 ST N - 1 PN L PNL PNL STN-2 SILL FAS FAS G&S G&S FASFAS EXISTING NEW AC UNIT LOCATION MAIN LEVEL 0" MAIN LEVEL 0" T.O. PEAK 18' -10 1/2" T.O. PEAK 18' -10 1/2" T.O. WINDOW 9' -0" T.O. WINDOW 9' -0" TRUSS BEARING. 16' -4" TRUSS BEARING. 16' -4" STN-1 STN-2 SF SF SF SF SF SFSFSF STN-2 SILL PNL FAS FAS FAS FAS PNL STN-2 PNL ST N - 1 ST N - 2 SILLSILL EXISTINGNEW f: 515.961.0468 THIS PLAN IS THE PROPERTY OF DOWNING CONSTRUCTION INC. ANY USE WITHOUT WRITTEN PERMISSION IS STRICTLY PROHIBITED! PLAN NO. = DWG. LIST REVISIONS ISSUED DATE: PROJECT DESIGNER-INTERIOR www.downingconstruct.com www.downingplanroom.com 509 East Scenic Valley Ave. Indianola, Iowa 50125 p: 515.961.5386 BI D S E T - N O T F O R C O N S T R U C T I O N DE L I V E R C O M M I T D E V E L O P DI S C O V E R / A N A L Y Z E REV #DESCP.DATE C: \ U s e r s \ s i r i n a r \ O n e D r i v e - D o w n i n g \ D o c u m e n t s \ R 2 3 - T he N e s t P e d i a t r i c D e n t i s t r y A d d i t i o n - W a u k e e _ s i r i n ar . r v t 12 / 1 4 / 2 0 2 3 3 : 1 9 : 4 8 P M A-202 Th e N e s t P e d i a t r i c D e n t i s t r y - A d d i t i o n 12 5 0 S E U n i v e r s i t y A v e Wa u k e e , I A 5 0 2 6 3 90-177 12/14/2023 COLOR EXTERIOR ELEVATIONS SSR - AS SCALE:3/16" = 1'-0"1 COLOR - SOUTH ELEVATION SCALE: 3/16" = 1'-0" 2 COLOR - NORTH ELEVATION SCALE: 3/16" = 1'-0" 3 COLOR - WEST ELEVATION SCALE: 3/16" = 1'-0" 4 COLOR - EAST ELEVATION MATERIAL LEGEND MARK MATERIAL DESCRIPTION CONC. SMOOTH CONCRETE FINISH: NATURAL COLOR FAS PRE-FINISHED METAL FASCIA - DARK BRONZE G&S PRE-FINISHED METAL GUTTER & DOWNSPOUT - DARK BRONZE PNL ARCHITECTURAL CONC. PANEL: NICHIHA; VINTAGEWOOD - BARK; HORITZ. INSTALL SF ANODIZED ALUMINUM STOREFRONT - DARK BRONZE W/ GLAZING TO MATCH EXISTING SILL ADHERED STONE SILL: TO MATCH EXISTING PROFILE; COLOR: TO MATCH "STN-1" STN-1 ADHERED STONE; ELDORADO STONE; LEDGECUT33 COLOR: BIRCH STN-2 ADHERED STONE; ELDORADO STONE; MARQUEE24; COLOR: DOVETAIL MATERIAL PERCENTAGE WEST ELEVATION (STREET FACING) EAST ELEVATION SOUTH ELEVATION TOTAL SF: 1,705 %100 PNL SF: 436 % 25 SF SF: 505 % 30 SILL SF: 11 % 01 STN-1 SF: 277 % 16 STN-2 SF: 476 % 28 NORTH ELEVATION (FRONT) TOTAL SF: 1,167 %100 PNL SF: 465 % 39 SF SF: 125 % 11 SILL SF: 06 % 01 STN-1 SF: 160 % 14 STN-2 SF: 411 % 35 TOTAL SF: 1,277 %100 PNL SF: 410 % 32 SF SF: 291 % 23 SILL SF: 07 % 01 STN-1 SF: 96 % 07 STN-2 SF: 473 % 37 TOTAL SF: 1,690 %100 PNL SF: 395 % 23 SF SF: 392 % 23 SILL SF: 09 % 01 STN-1 SF: 370 % 21 STN-2 SF: 524 % 32