HomeMy WebLinkAbout2024-03-18 I01H_08 T Ave Corridor, W Hickman Rd to NW Douglas Pkwy_Change Order 3AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: March 18, 2024 AGENDA ITEM:Consideration of approval of Change Order No. 3 to All-Star Concrete, LLC for the T Avenue Corridor Improvements – W Hickman Road to NW Douglas Parkway Project decreasing the contract amount by $24,237.25. FORMAT:Motion SYNOPSIS INCLUDING PRO & CON: Plan change 4 revised the advanced warning on Hickman per the Iowa Department of Transportation’s (IDOT)’s request. The west bound advanced warning flashers have been omitted along with the conduit, wiring, pull tape, handhole and tracer needed for that run. This is reflected in the adjustment of the traffic signalization lump sum. Posts and signage will be installed in its place. The contractor was not able to re-stock the flashers so the city has agreed to take possession of the 2 and accept a credit adjustment for the labor and footings that are not needed. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order decreases the contract price in the amount of $24,237.25. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 3 II. Letter of Recommendation PREPARED BY:Beth Richardson REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1H8 8191 Birchwood Court, Suite L Johnston, IA 50131 Phone: (515) 254-1393 March 8, 2024 Sara Kappos, P.E. Assistant Public Works Director 805 University Avenue Waukee, IA 50263 RE: Change Order #3 T Avenue Corridor Improvements – W Hickman Road to NW Douglas Parkway Dear Mrs. Kappos: Attached please find a detailed Change Order for City Council approval on March 18, 2024. Change Description: Plan Change 4 revised the advanced warning on Hickman per the IDOT's request. The west bound advanced warning flashers have been omitted along with the conduit, wiring, pull tape, handhole and tracer needed for that run. This is reflected in the adjustmen t of the traffic signalization lump sum. Posts and signage will be installed in its place. The contractor was not able to re-stock the flashers so the city has agreed to take possession of the 2 and accept a credit adjustment for the labor and footings that are not needed.. We have reviewed the submitted quotes from All - Star and they appear to be in order with current industry pricing. If City Staff concurs with this pricing, we recommend the City of Waukee Decrease the contract price in the amount of $24,237.25 to complete the additional work associated with Change Order #3. If you have any questions, please contact me. Sincerely, Foth Infrastructure & Environment, LLC Rob Kline, P.E. Lead Civil Engineer Encl: Change Order #3 dated 3/8/2024 CHANGE ORDER 03 Distribution: Owner - Finance ____ Owner - Public Works ____ Engineer ____ Contractor ____ Contractor:All-Star Concrete LLC. 4989 NW Johnston Dr. Johnston, Iowa 50131 $10,683,619.98 August 7, 2023 8.1 Division 1 8010-A-1000 LS -$21,887.25 1.00 ($21,887.25) 8.7 Division 1 Special EA $275.00 4.00 $1,100.00 8.8 Division 1 Special SF $50.00 25.00 $1,250.00 8.22 Division 1 Special LS -$4,700.00 1.00 ($4,700.00) ($24,237.25) $10,683,619.98 $68,346.39 $10,751,966.37 ($24,237.25) $10,727,729.12 0 Days Recommended By: All-Star Concrete LLC. Signature: Name: Bryan Sprigs Title: Project Manager Date: Owner:City of Waukee □ ≤$500 Department Director X_______________________________________Date___________________ □ $501 to $2,500 City Administrator X_______________________________________Date___________________ □ Date___________________ □ >$2,501 City Council approved or ratified at Council meeting on Date___________________ Item No. POSTS FOR SIGNS, STEEL Signature: The Contract Sum will be increased by this Change Order in the amount of Net Change by previously authorized Change Orders Foth Infrastructure & Environment, LLC The Contract Sum prior to This Change Order was TYPE A SIGNS ADVANCED FLASHER LABOR AND FOOTING DEDUCTION Division Item Code TRAFFIC SIGNALIZATION Quantity AdjustmentUnit Price City of Waukee Description Unit Value Adjustment Date: Name: Brad Deets Checked By: Prepared By: Date: The Contract Time will be increased by CHANGE ORDER SUMMARY NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER The Original Contract Sum was Title: Lead Civil Engineer Title: City Administrator Name: Rob Kline, P.E. The new Contract Sum including this Change Order will be Signature: Department of Public Works 805 University Avenue Waukee, IA 50263 (515) 987-7920 Fax (515) 987-3979 THE CONTRACT IS CHANGED AS FOLLOWS: Plan Change 4 revised the advanced warning on Hickman per the IDOT's request. The west bound advanced warning flashers have been omitted along with the conduit, wiring, pull tape, handhole and tracer needed for that run. This is reflected in the adjustment of the traffic signalization lump sum. Posts and signage will be installed in its place. The contractor was not able to re-stock the flashers so the city has agreed to take possession of the 2 and accept a credit adjustment for the labor and footings that are not needed. T Avenue Corridor Improvements W Hickman Rd to NW Douglas Pkwy 3 22W007.00 Waukee Project File Number March 7, 2024 Foth Project File Number Orig. Contract Amount & Date Date Change Order Number Project Title CO3-2024-0307-Waukee T Avenue.xlsx Change Order 1 Page 1 of 1