HomeMy WebLinkAbout2024-05-06 I01J_02 Public Safety Building_Change Order 2AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 6, 2024 AGENDA ITEM:Consideration of approval of Change Order No. 2 (Combined) for the Waukee Public Safety Building Project, increasing the contract in the amount of $15,620.04 FORMAT:Consent Agenda SYNOPSIS INCLUDING PRO & CON: Change Order No. 2 relates to certain changes affecting mechanical and plumbing systems as well as electrical service pathway changes to avoid conflicts with geothermal system and landscaping. The MidAmerican service had been budgeted at $50,000 and was outside of the scope of the original contract so while this looks like an add to the cost, it is actually a cost savings from the overall budget. Additionally, this change order includes a deduct of $11,860 in landscaping costs due to south property line and transformer pad location changes. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $15,620.04. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 2 PREPARED BY:Brad Deets, City Administrator REVIEWED BY: PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I1J2 Ryan Companies 111 East Grand Avenue, Suite 200 Des Moines, Iowa 50309 ph: 515-309-8500 ryancompanies.com April 30, 2024 Brad Deets, City Administrator City of Waukee 230 W. Hickman Road Waukee, IA 50263 Re: Waukee Public Safety Building: Change Order No. 2: Multiple Pricing Request Approvals Dear Brad: Change Order No. 2 for the Waukee Public Safety Building includes the following revisions: · WPS CR006: ASI-002: The vent and waste piping serving the oil/solid separators has been revised per discussion with the contractor. Roof flashing for sand/oil separator venting. Vent moved from exterior wall to roof. Value of $780.00 · WPS CR004: ASI-003 Structural Updates: Detailing changes and added steel material for structural updates. Value of $1,130.00 · WPS CR004: PR-02 changes to south property line, landscaping, and transformer pad location. Adjust planting counts and seeded areas. Value of ($11,860.00) Deduct. · WPS CR015: MidAm electrical service pathway changes to avoid conflicts with geothermal system and landscaping. Value of $25,570.04. Ryan Companies recommends approval of the Prime Contractors for Change Order No. 2 at a combined value of $15,620.04. Please see attached Change Order No. 2 individual change orders and associated back up for each individual change request (CR) for additional information. If you have any questions or comments regarding this information, please contact me at your convenience. Thank you. Sincerely, RYAN COMPANIES US, INC. Ryan Companies 111 East Grand Avenue, Suite 200 Des Moines, Iowa 50309 ph: 515-309-8500 ryancompanies.com Jill Boetger Project Manager Enclosed: WPS Prime CO No. 2_DRAFT CC: Matt Van Loon, Ryan Companies Ryan Pigneri, Ryan Companies Angie Pfannkuch, Sidekick Development Danielle Hermann, OPN Architects Aaron Twedt, OPN Architects Alex Streyffeler, OPN Architects AIA ® Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 1 PROJECT: (name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS) Contract For: Bid Package #7 Roofing Change Order Number: WPS CO 02 (Academy No. 2) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 05.06.2024 OWNER: (name and address) ARCHITECT: (name and address) CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) Academy Roofing & Sheet Metal Co. 6361 NE 14th Street Des Moines, IA 50313 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR006: ASI-002: The vent and waste piping serving the oil/solid separators has been revised per discussion with the contractor. Roof flashing for sand/oil separator venting. Vent moved from exterior wall to roof. Value of $780.00 The original Contract Sum was $ 998,000.00 Net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 998,000.00 The Contract Sum will be increased by this Change Order in the amount of $ 780.00 The new Contract Sum including this Change Order will be $ 998,780.00 The Contract Time will be increased by Zero (0) days. The Contractor’s Work shall be substantially complete on June 5, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name) CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Jill Boetger, Senior Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE: DATE: Academy Roofing & Sheet Metal Co. City of Waukee Iowa CONTRACTOR (Firm name) OWNER (Firm name) AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE: DATE: Waukee Public Safety - Change Request Summary 04.17.2024 Ryan Companies US, Inc. Change Request 006 Change Request Subcontractor Comments Cost Change 6.0 DDVI No response $0.00 6.1 Jordison Construction No response $0.00 6.2 Enterprise Precast No response $0.00 6.3 TSF Structures No response $0.00 6.4 Northwest Steel No response $0.00 6.5 Forman Ford No response $0.00 6.6 Academy Roofing Roof flashing for sand/oil separator venting. Vent moved from exterior wall to roof. $780.00 6.7 Ford Metro No response $0.00 6.8 Skold Door No response $0.00 6.9 Hilsabeck Schacht No cost impact $0.00 6.10 Elite Fire Sprinkler No response $0.00 6.11 Kruck Plumbing and Heating No response $0.00 6.12 Van Maanen No cost impact $0.00 6.13 TriCity Electric No cost impact $0.00 6.14 Wenthold No response $0.00 6.15 Absolute No response $0.00 6.16 Jordison Construction No response $0.00 6.17 Alpha Landscapes No response $0.00 6.18 Van Maanen Electric No response $0.00 6.19 Hilsabeck Schacht No response $0.00 6.20 Kruck Plumbing & Heating No cost impact $0.00 6.21 Tri-City Electric No response $0.00 6.22 Wenthold No cost impact $0.00 $780.00 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$25.35 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 Change Request 06 Cost Change Total $805.35 Summary: ASI-02 changes to vent and waste piping serving the oil/solid separators per discussion with the contractors. Change Request 06 Subtotal 03/06/24 X X ____________________________________________________________________________________________________ 6361 N.E. 14th Street | Des Moines, IA 50313 |Phone: 515-964-2345 | Fax: 515-964-5514 www.academyroofing.com 1 Des Moines, Iowa 50313 Phone: 515-964-2345 Fax: 515-964-5514 www.Academyroofing.com TO: Brooke Raasch 111 E Grand Ave, Des Moines, IA 50309 PH: 5153098500 DATE: March 7, 2024 RE: Waukee Public Safety Building 815 NW 20th St, Waukee, IA 50263 ASI 02 We hereby propose to furnish all labor, materials and equipment necessary to perform the following scope of work on the facility mentioned above, in accordance with manufactures specifications: Description of Change: SCOPE OF WORK: Additional VTR’s 1. Additional Material a. Additional Roof Flashing $600.00 2. Additional Labor a. 4 additional labor hours @ $90.00/ Hr. $90.00 3. 15% Mark-up on Materials as per bid. $90.00 4. SUBTOTAL $780.00 COST OF SERVICES: 1. Total Change Order Sum: Seven Hundred and Eighty Dollars $780.00 Notes: 1. If there is an increase in the actual cost of the labor or materials charge to Academy Roofing & Sheet Metal Co. (ARC) in the excess of 5% subsequent to making this agreement, the price set forth in this agreement shall be increased without the need for a written change order or amendment to the contract to reflect the price increase and additional cost to ARC. ARC will submit written documentation of the increased changes to the Prime Contractor/Ow ner upon request. As and additional remedy, if the actual cost of any line item increases more than 10% subsequent to the making of this agreement, ARC, at its sole discretion, may terminate the contract for convenience. 2. We reserve the right to update this proposal after 10 days. 3. TERMS: Final payment due at completion of project, Manufacture’s Warranty will be provided after final payment, 18% annual interest charged for all overdue balances. 4. This change order shall be subject to the same terms and conditions as the project contract between Ryan Companies and Academy Roofing & Sheet Metal Co. Acceptance of this proposal shall constitute a contract. GENERAL CONTRACTOR: SUBCONTRACTOR: ACCEPTED: Respectfully Submitted, PRINT NAME: DATE: ACADEMY ROOFING & SHEET METAL CO. w ARCHITECT’S SUPPLEMENTAL INSTRUCTION – ASI NO. 02 If, in your opinion, this instruction involves work that either increases or decreases the Contract Sum or Contract Time, you shall not proceed until you submit a Change Request and receive signed authorization to proceed. Proceeding with the Work prior to authorization indicates your acknowledgement that there will be no change in the Contract Sum or Contract Time. The following Architect’s Supplemental Instruction is issued to: Clarify drawings, specifications, and/or material selection Transmit drawings or documents for incorporation into the work, subject to the above statement. Description: 1. REVISE VENT AND WASTE PIPING SERVING OIL/SOLID SEPARATORS BASED ON REQUEST FROM CONTRACTOR A. M121A: Updated vent piping for OL-1 B. M121C: Updated vent piping for OL-2 C. P100A: Updated vent and waste piping for OL-1 D. P100C: Updated vent and waste piping for OL-2 E. P111A: Updated vent piping for OL-1 F. P111C: Updated vent piping for OL-2 G. P300: Updated vent and waste piping for OL-1 H. P302: Updated vent and waste piping for OL-2 I. P400: Updated Apparatus Bay Sand and Oil Interceptor Detail J. P400: Updated Parking Garage Sand and Oil Interceptor Detail Drawings Impacted: M121A, M121C, P100A, P100C, P111A, P111C, P300, P302, P400. Attachments: M121A, M121C, P100A, P100C, P111A, P111C, P300, P302, P400 By: OPN Architects, Inc. Date: 2-28-2024 Project: Waukee Public Safety Facility Project number: 21841001 Client: City of Waukee Construction Manager: Ryan Companies AIA ® Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 1 PROJECT: (name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS) Contract For: Bid Package #18 Landscape & Irrigation Change Order Number: WPS CO 02 (Alpha No. 2) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 05.06.2024 OWNER: (name and address) ARCHITECT: (name and address) CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) Alpha Landscapes LLC 31273 510th Ave Slater, IA 50244 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR004: PR-02 changes to south property line, landscaping, and transformer pad location. Adjust planting counts and seeded areas. Value of ($11,860.00) Deduct. The original Contract Sum was $ 653,784.00 Net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 653,784.00 The Contract Sum will be increased by this Change Order in the amount of $ -11,860.00 The new Contract Sum including this Change Order will be $ 641,924.00 The Contract Time will be increased by Zero (0) days. The Contractor’s Work shall be substantially complete on June 5, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name) CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Jill Boetger, Senior Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE: DATE: Alpha Landscapes LLC City of Waukee Iowa CONTRACTOR (Firm name) OWNER (Firm name) AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE: DATE: Waukee Public Safety - Change Request Summary 4/24/2024 Ryan Companies US, Inc. Change Request 014 Change Request Subcontractor Comments Cost Change 14.0 DDVI No response $0.00 14.1 Jordison Construction No response $0.00 14.2 Enterprise Precast No response $0.00 14.3 TSF Structures No response $0.00 14.4 Northwest Steel No response $0.00 14.5 Forman Ford No response $0.00 14.6 Academy Roofing No response $0.00 14.7 Ford Metro No response $0.00 14.8 Skold Door No response $0.00 14.9 Hilsabeck Schacht No response $0.00 14.10 Elite Fire Sprinkler No response $0.00 14.11 Kruck Plumbing and Heating No response $0.00 14.12 Van Maanen No response $0.00 14.13 TriCity Electric No response $0.00 14.14 Wenthold No cost impact $0.00 14.15 Absolute No response $0.00 14.16 Jordison Construction No response $0.00 14.17 Alpha Landscapes Adjust planting counts and seeded areas -$11,860.00 ($11,860.00) Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)($385.45) CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 Change Request 14 Cost Change Total ($12,245.45) Summary: PR-02 changes to south property line, landscaping, and transformer pad location. Change Request 14 Subtotal April 2, 2024 CR#014 Waukee Public Safety Building Job #6173-000 DDVI – General Construction Hilsabeck Schacht - Framing, Drywall & Ceilings Jordison Construction – Building Concrete Elite Fire Sprinkler – Fire Protection Enterprise Precast – Precast Material Kruck Plumbing and Heating - Mechanical & Plumbing TSF Structures - Steel Material & Misc. Metals Van Maanen Electric – Electrical & Communications Northwest Steel - Precast & Steel Erection TriCity Electric – Audio-Visual Forman Ford – Metal Panels Wenthold Excavating – Earthwork & Utilities Academy Roofing – Roofing Absolute Group - SWPPP Ford Metro – Glass & Glazing Jordison Construction – Site Concrete Skold Door – Overhead Doors Alpha Landscapes – Landscape & Irrigation Dear Prime Contractors: We are forwarding this Change Request, briefly described as follows, for your review and response: PR 02 includes the following revisions: The south property line on the Landscape drawings is being revised to match Civil drawings. Resulting in modifications to plant and tree schedules. This Change Request is further defined by the following attached documents: Drawings: L100, L200, L202, L300, L301, L302, L303, L304, L400 Spec Sections: n/a Please mark the appropriate “Status” below, sign and re turn one copy of this Change Request to Ryan Companies US, Inc. no later than 04/10/2024. Attach a detailed proposal itemizing any cost or schedule impacts resulting from this change. Include reference to this Change Request, quantities (add or deduct), unit prices for labor and materials, and the latest date the proposal may be accepted. A lack of response by the date required above will indicate no change to your Prime Contract Agreement. Your timely response to the Change Request will be appreciated. Please call if you have any questions, or if you need additional information. DO NOT PROCEED; SUBMIT QUOTATION ONLY PROCEED WITH WORK PROCEED WITH WORK NOT TO EXCEED $ AND SUBMIT QUOTATION PROCEED WITH WORK; NO ADDITIONAL COST ANTICIPATED PROCEED WITH WORK; SUBMIT QUOTATION OTHER Sincerely, Acknowledged: RYAN COMPANIES US, INC. By: Company: Date: Status: Proposal attached Jill Boetger No impact on cost or schedule Project Manager II More information or discussion required Andrew Doyle Alpha Landscapes 4/10/2024 ALPHA Landscapes, LLC (515) 984-2651 Riley@AlphaLandscapesIA.com 31273 510th Ave, Slater, IA, 50244 Project:Waukee Public Safety PR-02 Date of Proposal:4/10/2024 Date of Plans:N/A Addendum # & Date:N/A Tax Included Y/N Y DB/Prevailing Wage Y/N N Quantity Unit Unit Price Extended Price -1 Planting LS $5,500.00 -$5,500.00 4 Black Tupelo 2" 3 American Sycamore 2" 6 American Linden 2" 2 Paperbark Maple 8' 1 Autumn Brilliance Serviceberry 8' 5 White Pine 8' 1 Eastern White Pine 8' -53000 Tall Grass Prairie Mix SF $0.05 -$2,650.00 -53000 Hydromulch SF $0.07 -$3,710.00 Change Order 1 Total -$11,860.00 General Notes, Inclusions & Exclusions ***All notes, details and exclusions stated within this proposal override project specifications. ***This proposal must be reviewed thoroughly prior to its acceptance. - Pricing is good for 30 days from transmittal, Pricing subject to change after 30 days - Any soil disturbance outside of above takeoff limits is subject to additional seed/sod charges - Bid assumes landscape scope will be completed in one mobilization, addional mobilization charges will apply - All line items are tied unless otherwise noted - Warranties shall on be honored when Alpha Landscapes is completing plant watering or where plants are covered by automatic irrigation - ALPHA will not be held responsible for tampering or damage to irrigation systems or resulting plant damage - Assumes all landscaped, seeded, and sodded areas are to recieve minimum 6" of topsoil. ALPHA will not be responsible poor seed/plant growth/health due to substandard or water-laiden soils. - Alpha will call in public locates prior to work; GC is responsible for marking all private utilities - Clerical errors are subject to correction - All notes in this proposal shall supercede any project specs, please read notes carefully - No removal of existing material from site included, this includes exisitng turf, weeds, ect. Landscape areas with weed growth shall be removed by others - All grades shall be left to +/- 0.1' of final elevations before landscape work is completed, ALPHA is not respobsible for modifying grades more than 0.1' -No bond cost included. Add 1.875% to contract value if needed. If a two year warranty, add an additional 0.25% - Deduct if tree staking is omitted: $0 Planting - Tree staking posts shall remian property of ALPHA Landscapes and will be reclaimed approximately one year after install - Includes 1 year warranty for only things that fall under Alpha's assumed duties such as meeting the plant quality, proper install, and maintenance (if applicable) - For warranty to be honored, assumes planting install will be in compliance with SUDAS' and/or plan specified planting window - Assumes specified species are zone tolerant and will thrive in the specified locations onsite, will not warranty if design error is demonstrable - Will not warranty if there's evidence of neglect, theft, vandalism, acts of God, or any factor not related Alpha's duties and responsibilities - ONE warranty walk-through and replacement to be included. Replacements will be made in nearest SUDAS specified window after the date one-year from plant installation. - Warranty replacements may be completed before end of warranty period, but remainder of warranty period will be vacated - No replacements shall be provided between initial installation and competion of warranty period - No further warranty is provided on warranty replacements, Owner to provide watering/maintenance per instructions on replacements - Does not include maintenance, or extended watering beyond initial install unless "temp plant material watering" item is selected - Assumes proposed irrigation system will cover all landscaped & sod areas if situation applies, owner/GC responsible to maintain system settings - Assumes the reuse of native topsoil for planting backfill, does not include amended soils, unless otherwise noted - Research has proven removing burlap & wire cages have no impact on tree health, removal of these items is not included - All boxwood varieties and emerald green arborvitaes will not be warrantied Finish Grading + Sod Installation - All areas to be sodded shall be rough graded (+/- 0.1’) prior to arrival; Alpha will provide finish grading (minor tweaks to grade) if needed - All Swales, Ditches, ect to be in place by grading contractor before mobilization - Alpha will remove up to 100 lbs/ acre of sticks and rocks over 1" diameter; any larger quantity will be attributed to error by earthworks contractor - No topsoil installation or soil amendments included unless otherwise noted - Includes sodding all areas specified on plans, additional areas disturbed to be sodded will be billed additional at specified sqft price - Does not include continual watering or mowing, unless otherwise noted - Watering will be covered by irrigation system, if situation applies - Use sqft price as required, contact for clarification if large discrepancy exists - Typical KGB bluegrass sod unless otherwise noted - Tree drainage wells are not included in planting pricing, if they are required due to poor drainiage they may be installed at $125/tree Seeding - All areas to be seeded shall be rough graded (+/- 0.1’) prior to arrival - All Swales, Ditches, ect to be in place by grading contractor before mobilization - Alpha will remove up to 100 lbs/ acre of sticks and rocks over 1" diameter; anything larger will be attributed to error by earthworks contractor - No topsoil installation or amending of topsoil is included - No continual maintenance included, such as mowing or watering, unless noted otherwise - Assumes seeding will be in compliance with SUDAS' recommended planting window - There is no warranty included on any seeding unless otherwise noted Erosion Blanket - Install single net straw blanket, per takeoff - Includes staples, per SUDAS spec - Installed on all slopes over 3:1, or slopes over 30' in length Retaining Walls - Global Stability by others - Subgrade courses included in bid sqft - Includes light excavation of wall area, site expexted to be cut to back of wall backfill zone (3'+ from face of wall) - Assumes Anchor Diamond Pro 8" retaining wall blocks & 4" cap, unless notated otherwise - Assumes, 2' aggregate drain backfill, with grid lengths no longer than face height of wall, and use of onsite soils, or soils provided by other for backfill - Includes engineering for walls over 4' above-ground sqft. Irrigation -City utilities will be called in prior to installation; however, we're not responsible for locating private utilities, or other underground objects that can be impacted during the irrigation installation. We WILL NOT be held liable for any damages incurred for these being unmarked. -Proposal assumes project will be completed in one mobilization. Additional mobilization charges will apply if the project is phased out, or the site is not ready when scheduled. -Proposal excludes damages or tampering with system components caused by other trades. This cause voids warranty. Any repairs will be billed on a time & material basis. Not Included/Exclusions -Any items related to the fence or handrail (if required) -Any items related to the design of the fence connection and/or any items related to overturning of wall system by fencing system (If required) -Fill material other than that described below -Rough grading or finish grading post construction of the walls -Mass excavation +/- 1’ from bottom of wall and ~5 ’ from front face to back cut -Any items related to site restoration -Geotechnical Testing of any type (M&D, Bearing, and/or Proctor) ALPHA Landscapes, LLC (Subcontractor)Contractor: _____________________ By: ___________________________By: ___________________________ Title: President Title: ___________________________ Date: _________________________Date: __________________________ April 2, 2024 CR#014 Waukee Public Safety Building Job #6173-000 DDVI – General Construction Hilsabeck Schacht - Framing, Drywall & Ceilings Jordison Construction – Building Concrete Elite Fire Sprinkler – Fire Protection Enterprise Precast – Precast Material Kruck Plumbing and Heating - Mechanical & Plumbing TSF Structures - Steel Material & Misc. Metals Van Maanen Electric – Electrical & Communications Northwest Steel - Precast & Steel Erection TriCity Electric – Audio-Visual Forman Ford – Metal Panels Wenthold Excavating – Earthwork & Utilities Academy Roofing – Roofing Absolute Group - SWPPP Ford Metro – Glass & Glazing Jordison Construction – Site Concrete Skold Door – Overhead Doors Alpha Landscapes – Landscape & Irrigation Dear Prime Contractors: We are forwarding this Change Request, briefly described as follows, for your review and response: PR 02 includes the following revisions: The south property line on the Landscape drawings is being revised to match Civil drawings. Resulting in modifications to plant and tree schedules. This Change Request is further defined by the following attached documents: Drawings: L100, L200, L202, L300, L301, L302, L303, L304, L400 Spec Sections: n/a Please mark the appropriate “Status” below, sign and re turn one copy of this Change Request to Ryan Companies US, Inc. no later than 04/10/2024. Attach a detailed proposal itemizing any cost or schedule impacts resulting from this change. Include reference to this Change Request, quantities (add or deduct), unit prices for labor and materials, and the latest date the proposal may be accepted. A lack of response by the date required above will indicate no change to your Prime Contract Agreement. Your timely response to the Change Request will be appreciated. Please call if you have any questions, or if you need additional information. DO NOT PROCEED; SUBMIT QUOTATION ONLY PROCEED WITH WORK PROCEED WITH WORK NOT TO EXCEED $ AND SUBMIT QUOTATION PROCEED WITH WORK; NO ADDITIONAL COST ANTICIPATED PROCEED WITH WORK; SUBMIT QUOTATION OTHER Sincerely, Acknowledged: RYAN COMPANIES US, INC. By: Company: Date: Status: Proposal attached Jill Boetger No impact on cost or schedule Project Manager II More information or discussion required Henry Alliger Wenthold Excavating, LLC No civil scope impact is shown in revised plans. If changes to grades or scope are intended, please advise. w PROPOSAL REQUEST – PR NO. 02 Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein. This is not a Change Order, a Construction Change Directive or a direction to proceed with the w ork described in the proposed modifications. Proceeding with the Work prior to authorization indicates your acknowledgement that there will be no change in the Contract Sum or Contract Time. Description: The south property line on the Landscape drawings is being revised to match Civil drawings. Resulting modifications to plant and tree schedules are described below. 1. Sheet L100 • REVISE L.O.W. line and property line at south boundary. • REVISE Demolition legend from “CLEAR AND GRU (APPROX. 29.26 AC.) to read “CLEAR AND GRUB (APPROX. 28.05 AC.) 2. Sheet L200 • REVISE L.O.W. line and property line at south boundary. 3. Sheet L202 • REVISE L.O.W. line and property line at south boundary. 4. Sheet L300 • REVISE L.O.W. line and property line at south boundary. • REVISE Tree location in south and east buffer to align with updated L.O.W. line and property line • REVISE QTY in OVERALL PLANT SCHEDULE for NS-Nyssa sylvatica-Black Tupelo from 10 to “6” • REVISE QTY in OVERALL PLANT SCHEDULE for PO to Plantus occidentalis American Sycamore from 23 to “20” • REVISE QTY in OVERALL PLANT SCHEDULE for TA Tila americana American Linden from 15 to “9” • REVISE QTY in OVERALL PLANT SCHEDULE for PM Acer griseum Paperbark Maple from 33 to “31” • REVISE QTY in OVERALL PLANT SCHEDULE for AG Amelanchier x grandiflora ‘Autumn Brilliance’ Autumn Brilliance Serviceberry from 32 to “31” • REVISE QTY in OVERALL PLANT SCHEDULE for PG to Picea glauca ‘Densata’ White Spruce from 31 to “26” • REVISE QTY in OVERALL PLANT SCHEDULE for PS to Pinus strobus Eastern White Pine from 41 to “40” Date: 03/14/2024 Project: Waukee Public Safety Facility Project number: 21841001 Client: City of Waukee Construction Manager: Ryan Companies w 5. Sheet L301 • REVISE L.O.W. line and property line at south boundary. • REVISE plant hatch associated with the Tall Grass Prairie Seeding to meet revised L.O.W. Line • REVISE SQ. FT. QTY in Ground Cover Schedule from “568,726” to “515,513” 6. Sheet L302 • REVISE L.O.W. line and property line at south boundary. • REVISE Plant Schedule title “TREE & SHRUB SCHEDULE (L301 & L302)” to “TREE & SHRUB SCHEDULE (L302 & L303)” • REVISE QTY in OVERALL PLANT SCHEDULE for NS-Nyssa sylvatica-Black Tupelo from 10 to “6” • REVISE QTY in OVERALL PLANT SCHEDULE for PO to Plantus occidentalis American Sycamore from 23 to “20” • REVISE QTY in OVERALL PLANT SCHEDULE for TA Tila americana American Linden from 15 to “9” • REVISE QTY in OVERALL PLANT SCHEDULE for PM Acer griseum Paperbark Maple from 33 to “31” • REVISE QTY in OVERALL PLANT SCHEDULE for AG Amelanchier x grandiflora ‘Autumn Brilliance’ Autumn Brilliance Serviceberry from 32 to “31” • REVISE QTY in OVERALL PLANT SCHEDULE for PG to Picea glauca ‘Densata’ White Spruce from 31 to “26” • REVISE QTY in OVERALL PLANT SCHEDULE for PS to Pinus strobus Eastern White Pine from 41 to “40” 7. Sheet L303 • REVISE L.O.W. line and property line at south boundary. • REVISE Tree location in south and east buffer to align with updated L.O.W. line and property line • REVISE Plant Schedule title “TREE & SHRUB SCHEDULE (L301 & L302)” to “TREE & SHRUB SCHEDULE (L302 & L303)” • REVISE QTY in OVERALL PLANT SCHEDULE for NS-Nyssa sylvatica-Black Tupelo from 10 to “6” • REVISE QTY in OVERALL PLANT SCHEDULE for PO to Plantus occidentalis American Sycamore from 23 to “20” • REVISE QTY in OVERALL PLANT SCHEDULE for TA Tila americana American Linden from 15 to “9” • REVISE QTY in OVERALL PLANT SCHEDULE for PM Acer griseum Paperbark Maple from 33 to “31” • REVISE QTY in OVERALL PLANT SCHEDULE for AG Amelanchier x grandiflora ‘Autumn Brilliance’ Autumn Brilliance Serviceberry from 32 to “31” • REVISE QTY in OVERALL PLANT SCHEDULE for PG to Picea glauca ‘Densata’ White Spruce from 31 to “26” • REVISE QTY in OVERALL PLANT SCHEDULE for PS to Pinus strobus Eastern White Pine from 41 to “40” 8. Sheet L304 • REVISE Location of Plantings around transformer. 9. Sheet L400 • REVISE L.O.W. line and property line at south boundary. OPN Architects, Inc. AIA ® Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 1 PROJECT: (name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS) Contract For: Bid Package #4 Structural & Misc. Steel Material Change Order Number: WPS CO 02 (TSF No. 2) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 05.06.2024 OWNER: (name and address) ARCHITECT: (name and address) CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) TSF Structures, Inc. 6410 7th St Ct SW Cedar Rapids, IA 52404 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR004: ASI-003 Structural Updates: Detailing changes and added steel material for structural updates.Value of $1,130.00 The original Contract Sum was $ 1,932,100.00 Net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 1,932,100.00 The Contract Sum will be increased by this Change Order in the amount of $ 1,130.00 The new Contract Sum including this Change Order will be $ 1,933,230.00 The Contract Time will be increased by Zero (0) days. The Contractor’s Work shall be substantially complete on June 5, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name) CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Jill Boetger, Senior Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE: DATE: TSF Structures, Inc. City of Waukee Iowa CONTRACTOR (Firm name) OWNER (Firm name) AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE: DATE: Waukee Public Safety - Change Request Summary 4/24/2024 Ryan Companies US, Inc. Change Request 010 Change Request Subcontractor Comments Cost Change 10.0 DDVI No response $0.00 10.1 Jordison Construction No response $0.00 10.2 Enterprise Precast No response $0.00 10.3 TSF Structures Detailing changes and added steel material for structural updates.$1,130.00 10.4 Northwest Steel No cost impact $0.00 10.5 Forman Ford No response $0.00 10.6 Academy Roofing No response $0.00 10.7 Ford Metro No response $0.00 10.8 Skold Door No response $0.00 10.9 Hilsabeck Schacht No response $0.00 10.10 Elite Fire Sprinkler No response $0.00 10.11 Kruck Plumbing and Heating No response $0.00 10.12 Van Maanen No response $0.00 10.13 TriCity Electric No response $0.00 10.14 Wenthold No response $0.00 10.15 Absolute No response $0.00 10.16 Jordison Construction No response $0.00 10.17 Alpha Landscapes No response $0.00 $1,130.00 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$36.73 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 Change Request 10 Cost Change Total $1,166.73 Summary: ASI-003 Structural Updates. Change Request 10 Subtotal w c. ADD T/WALL elevation and detail callout 1/S303 for wall at gridline N.1 and between gridlines 18 and 19 on A/S303. d. REVISE joist bearing elevations at gridlines 18 and 19 on A/S303. e. ADD column callouts for generator enclosure steel on A/S303. f. ADD dimensions to generator enclosure steel off gridlines V, U, and Y on A/S303. g. ADD detail callout 18/S405 on A/S303. h. ADD detail 1/S303. 8. SHEET S311 – HIGH ROOF FRAMING PLAN a. ADD T/STEEL elevations at apparatus bay roof trusses on A/S311. b. REVISE precast wall loading at gridlines 2 and 11 on A/S311. c. REVISE beam dimensions between gridlines 3 and 5 on B/S311. 9. SHEET S402 – FRAMING DETAILS a. REVISE detail 9/S402 column tag. b. REVISE detail 10/S402 deck bearing angle size. 10. SHEET S403 – FRAMING DETAILS a. REVISE detail 3/S403 deck bearing angle weld information. b. REVISE detail 7/S403 joist girder seat angle weld information. c. REVISE detail 9/S403 dimension at top of HSS column. d. REVISE detail 14/S403 precast embeds, support angles, and weld information. e. REVISE detail 15/S403 HSS post size callout. 11. SHEET S405 – FRAMING DETAILS a. ADD details 16,17 & 18/S405. 12. SHEET A111B – FLOOR PLAN – AREA B a. REVISE depressed slab dimension at SAUNA 126 to match structure update. b. ADD keynote for Knox Box location near gridline M-2 Attachments: Drawings listed above By: OPN Architects, Inc. w ARCHITECT’S SUPPLEMENTAL INSTRUCTION – ASI NO. 03 If, in your opinion, this instruction involves work that either increases or decreases the Contract Sum or Contract Time, you shall not proceed until you submit a Change Request and receive signed authorization to proceed. Proceeding with the Work prior to authorization indicates your acknowledgement that there will be no change in the Contract Sum or Contract Time. The following Architect’s Supplemental Instruction is issued to: Clarify drawings, specifications, and/or material selection Transmit drawings or documents for incorporation into the work, subject to the above statement. Description: Miscellaneous structural clarifications. This ASI reflects adjustments and clarifications resulting from steel and precast shop drawing review. 1. SHEET S101 – FOUNDATION PLAN – AREA A a. ADD detail callout 13/S201 “SIM.” at mezzanine stair on A/S101. b. ADD detail callout 3/S101 at column located at grid line intersection E-3 on A/S101. c. ADD detail callout 3/S101 at posts adjacent to precast walls on B/S101. d. REVISE dimensions to posts adjacent to precast walls on B/S101. e. ADD detail 3/S101. 2. SHEET S102 – FOUNDATION PLAN – AREA B a. ADD detail callout 3/S101 at column located at grid line intersection E-3 on A/S102. b. REVISE depressed slab dimension near gridline intersection M.1-8 on A/S102. 3. SHEET S103 – FOUNDATION PLAN – AREA C a. ADD dimensions to generator enclosure steel off gridlines V, U, and Y on A/S103. 4. SHEET S201 – FOUNDATION DETAILS a. REVISE base plate schedule on detail 7/S201. 5. SHEET S301 – LOW ROOF FRAMING PLAN – AREA A a. REVISE and REMOVE wall loading at precast walls on gridlines A, B, 2, and 11 on A/S301. b. ADD dimension to HSS column at gridline E and between gridlines 5 and 7 on A/S301. 6. SHEET S302 – LOW ROOF FRAMING PLAN – AREA B a. ADD dimension to HSS column at gridline E and between gridlines 5 and 7 on A/S302. b. ADD dimension to HSS column at gridline M and between gridlines 5 and 7 on A/S302. c. REVISE HSS beam size at gridline 8 between gridlines G and K on A/S302. d. ADD plan note at beam connection located at gridline intersection M.1 -9 on A/S302. e. ADD detail callout 17/S405 at gridline intersection R -9 on A/S302. f. REVISE joist bearing elevation along precast wall location on gridline R on A/S302. 7. SHEET S303 – LOW ROOF FRAMING PLAN – AREA C a. ADD roof ridge line callout and dimensions between gridlines 17 and 19 on A/S303. b. REVISE joist spacing dimension for joists adjacent to gridline N.1 and between gridlines 17 and 19 on A/S303. Date: 03-12-2024 Project: Waukee Public Safety Facility Project number: 21841001 Client: City of Waukee Construction Manager: Ryan Companies March 26, 2024 CR#010 Waukee Public Safety Building Job #6173-000 DDVI – General Construction Hilsabeck Schacht - Framing, Drywall & Ceilings Jordison Construction – Building Concrete Elite Fire Sprinkler – Fire Protection Enterprise Precast – Precast Material Kruck Plumbing and Heating - Mechanical & Plumbing TSF Structures - Steel Material & Misc. Metals Van Maanen Electric – Electrical & Communications Northwest Steel - Precast & Steel Erection TriCity Electric – Audio-Visual Forman Ford – Metal Panels Wenthold Excavating – Earthwork & Utilities Academy Roofing – Roofing Absolute Group - SWPPP Ford Metro – Glass & Glazing Jordison Construction – Site Concrete Skold Door – Overhead Doors Alpha Landscapes – Landscape & Irrigation Dear Prime Contractors: We are forwarding this Change Request, briefly described as follows, for your review and response: ASI 003 Miscellaneous structural clarifications. This ASI reflects adjustments and clarifications resulting from steel and precast shop drawing review. This Change Request is further defined by the following attached documents: Drawings: S101, S102, S103, S201, S301, S302, S303, S311, S402, S403, S405, A11B Spec Sections: n/a Please mark the appropriate “Status” below, sign and re turn one copy of this Change Request to Ryan Companies US, Inc. no later than 04/2/2024. Attach a detailed proposal itemizing any cost or schedule impacts resulting from this change. Include reference to this Change Request, quantities (add or deduct), unit prices for labor and materials, and the latest date the proposal may be accepted. A lack of response by the date required above will indicate no change to your Prime Contract Agreement. Your timely response to the Change Request will be appreciated. Please call if you have any questions, or if you need additional information. DO NOT PROCEED; SUBMIT QUOTATION ONLY PROCEED WITH WORK PROCEED WITH WORK NOT TO EXCEED $ AND SUBMIT QUOTATION PROCEED WITH WORK; NO ADDITIONAL COST ANTICIPATED PROCEED WITH WORK; SUBMIT QUOTATION OTHER Sincerely, Acknowledged: RYAN COMPANIES US, INC. By: Company: Date: Status: Proposal attached Jill Boetger No impact on cost or schedule Project Manager II More information or discussion required Austin ResslerTSF Structures, Inc.4/1/2024 X TSF Structures, Inc Page 1 of 1 Date: 4/1/2024 CO #: 1 Job #: 1798 Waukee Public Safety Building 6410 7th Street Court SW Suite C Cedar Rapids, IA 52404 Phone: (319)365-7133 Fax: (319)365-2410 Change Order Request Ryan Companies Des Moines 111 East Grand Suite 200 Des Moines, IA 50309 Phone: (515) 309-8500 To:Jill Boetger Subject:ASI #03 - Structural Revisions Change Requested By:Austin Ressler Sent Via:Email Description of Change: Revised joist bearing elevation, added CMU bracing in Area C, revised lintel bearing notes. Change order includes, material, detailing, labor. The change will cause an increase of $1,130.00 to the contract amount. TSF Structures, Inc A signature below indicates acceptance of all changes shown herein . Any work associated with this change will begin upon receipt of a signed copy of this C.O. in our office. Please respond by 4/5/2024. If the requested response time is not met, the project may be delayed. Accepted By Austin Ressler Jill Boetger Ryan Companies Des Moines 4" C O N C R E T E T O P P P I N G w / # 4 @ 1 2 " O . C . E A . W A Y OV E R 1 2 " P R E C A S T H O L L O W C O R E 2 9 11 R F J 1 12 Y 13 14 15 16 4' - 0"6' - 2"6' - 3"6' - 3"6' - 0"6' - 2"6' - 2"6' - 2"6' - 2"6' - 0"6' - 4"6' - 6"6' - 6"6' - 6"6' - 6"6' - 4"6' - 4"6' - 4"6' - 4"6' - 4"6' - 0"6' - 0"6' - 0"6' - 0"6' - 0"6' - 0"6' - 0"6' - 0"6' - 0"6' - 0"6' - 2"6' - 2"6' - 2"5' - 0"5' - 0"1' - 0" 1' - 0" 3" Z 83 E.1 F.1 H K.2 L.2 X T 15.1 Q 5.2 S M V W 6 6' - 8 " 31 ' - 8 " 7' - 8 1 / 4 " 29 ' - 3 1 / 2 " 7' - 1 0 1 / 2 " 26 ' - 1 1 3 / 4 " 4' - 6 " 4' - 0 " 17 ' - 1 0 1 / 4 " 7' - 9 3 / 4 " 1' - 0 " 3' - 8 " 6' - 0 " 4' - 0 " 6' - 4 " 3' - 8 " 6' - 8 " 1' - 1 0 " 1' - 6 " 13 ' - 4 " 1' - 6 " 8' - 6 " 10 ' - 0 " 4' - 0 " 6' - 0 " 3' - 8 " 7' - 2"3' - 6"19' - 2"29' - 4"7' - 4"2' - 8"7' - 9 3/4"1' - 2 1/2"26' - 3 3/4"8"10' - 0"3' - 10"11' - 6"30' - 0"30' - 0"18' - 0"12' - 0" 220' - 6" 3' - 8 1 / 2 " 3 1 / 2 " 1 S401 TYP. -------------------------------------------------------------------------------------------------------------------2 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 5 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 7 S401 TYP. ------------------------------------------------------------------------------------------------------------------- BRACED FRAME 3' - 8 1 / 2 " 3 1 / 2 " 9 S401 ------------------------------------------------------------------------------------------------------------------- 5 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 4' - 0"6' - 2"6' - 3"6' - 3"6' - 0"6' - 2"6' - 2"6' - 2"4' - 10"5' - 0"5' - 0"6' - 0"6' - 0"6' - 0"6' - 0"6' - 0"6' - 0" P D -1 D -1 D -1 D -1 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K C S 4 30 K 9 30 K 9 30 K 9 30 K 9 30 K 9 30 K 9 30 K 9 30 K 9 30 K 9 30 K 9 26 K 8 26 K 8 26 K C S 4 26 K C S 4 26 K C S 2 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K C S 2 26 K C S 4 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 30 K 9 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 30 K 7 30 K 7 24 K C S 2 24 K C S 2 24 K C S 2 24 K C S 2 24 K C S 2 24 K C S 2 24 K C S 2 24 K C S 2 24 K C S 2 24 K C S 2 26 K 8 24 K C S 2 24 K C S 2 2 S402 ------------------------------------------------------------------------------------------------------------------- L E __________________________________ S302 C 22 6 ' - 0 " 7 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 1 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 2 S401 TYP. ------------------------------------------------------------------------------------------------------------------- G K E.2 L.1 5 7 N D -3 24 K C S 2 24 K C S 2 30 K 9 24 K C S 2 26 K 8 26 K 8 18 K 7 18 K 7 7.3 [ 16' - 8 5/8" ] W18X35 [ 16' - 3 5/8" ][ 16' - 3 5/8" ] W27X84 [ 15' - 5 1/2" ][ 15' - 8 5/8" ] W18X35 [ 16' - 5 3/4" ] 1 S402 ------------------------------------------------------------------------------------------------------------------- BR A C E D F R A M E 5 S402 ------------------------------------------------------------------------------------------------------------------- BRACED FRAME 4 S402 ------------------------------------------------------------------------------------------------------------------- W2 4 X 5 5 W18X35 (28) W24X55 (28) W2 1 X 5 0 ( 1 6 ) W1 4 X 2 2 ( 1 6 ) W1 4 X 2 2 ( 1 6 ) W1 4 X 2 2 ( 1 6 ) W24X55 [ 16' - 7" ] W18X35 [ 16' - 7" ] W24X55 [ 16' - 7" ] W27X84 [ 15' - 0" ] W27X84 [ 15' - 0" ] W18X35 [ 15' - 0" ] W21X44 [ 15' - 0" ] W24X55 [ 15' - 0" ] W24X55 [ 15' - 0" ] W24X55 [ 15' - 0" ] W27X84 [ 15' - 7 3/8" ] W27X84 [ 15' - 7 3/8" ] W21X44 [ 15' - 7 3/8" ] W24X55 [ 15' - 7 3/8" ] W24X55 [ 15' - 7 3/8" ] W16X26 [ 16' - 7" ] W21X55 [ 15' - 11 7/8" ] W30X99 [ 15' - 11 7/8" ] W18X35 [ 15' - 11 7/8" ] 4 S402 ------------------------------------------------------------------------------------------------------------------- 4 3/8" 3" 3 1/2" 4 S402 ------------------------------------------------------------------------------------------------------------------- HS S 8 X 6 X 1 / 2 ( L S H ) [ 18 ' - 0 " ] HS S 8 X 6 X 1 / 2 ( L S H ) [ 18 ' - 0 " ] HS S 8 X 6 X 1 / 2 ( L S H ) [ 18 ' - 0 " ] HS S 8 X 6 X 1 / 2 ( L S H ) [ 10 ' - 6 " ] HS S 8 X 6 X 1 / 2 ( L S H ) [ 10 ' - 6 " ] HS S 8 X 6 X 1 / 2 ( L S H ) [ 10 ' - 6 " ] HS S 8 X 6 X 1 / 2 ( L S H ) [ 10 ' - 6 " ] HS S 8 X 6 X 1 / 2 ( L S H ) [ 10 ' - 6 " ] HS S 8 X 6 X 1 / 2 ( L S H ) [ 18 ' - 0 " ] HS S 8 X 6 X 1 / 2 ( L S H ) [ 18 ' - 0 " ] __________________________________ S302 B W18X35 [ 15' - 7 3/8" ] 1 S402 ------------------------------------------------------------------------------------------------------------------- BR A C E D F R A M E 17 S403 TYP. ------------------------------------------------------------------------------------------------------------------- 4 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 4 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 4 S401 TYP. ------------------------------------------------------------------------------------------------------------------- M.1 24 K C S 2 26 K 8 26 K 8 1' - 1 0 " W24X84 (34) W16X26 [ 16' - 7" ] W16X26 [ 16' - 7" ] W21X44 [ 16' - 7" ] 4 S403 -------------------------------------------------------------------------------------------------------------------3' - 8 1 / 2 " 3 1 / 2 " W12X19 [ 15' - 9 5/8" ] 18 K 7 26 K 8 26 K 8 W24X55 [ 15' - 7 3/8" ] [ 16' - 4 1/4" ] W12X19[ 16' - 4 1/4" ] W12X19 W12X19 [ 16' - 4 1/4" ] 2C 8 X 1 1 . 5 2C 8 X 1 1 . 5 2C 8 X 1 1 . 5 2C 8 X 1 1 . 5 2C 8 X 1 1 . 5 2C 8 X 1 1 . 5 2C 8 X 1 1 . 5 2C 8 X 1 1 . 5 2C 8 X 1 1 . 5 2C 8 X 1 1 . 5 2C 8 X 1 1 . 5 TYP. TYP. 7.2 [ 15' - 5 1/2" ] W16X26 [ 15' - 8 5/8" ] 9 S403 TYP. ------------------------------------------------------------------------------------------------------------------- 15 S401 TYP. -------------------------------------------------------------------------------------------------------------------HSS6X6X3/8 (ABOVE) 13 S403 TYP. ------------------------------------------------------------------------------------------------------------------- 8 S401 ------------------------------------------------------------------------------------------------------------------- W18X35 (18) W18X35 (18) W1 4 X 2 2 ( 1 6 ) W14X22 (16) 7' - 4" 7' - 4" 7' - 4" 7' - 4" 7' - 4" 5' - 7 1/8" 5' - 6 5/8" HS S 6 X 6 X 3 / 8 [ 13 ' - 1 1 1 / 2 " ] HS S 6 X 6 X 3 / 8 [ 13 ' - 1 1 1 / 2 " ] HS S 6 X 6 X 3 / 8 [ 13 ' - 1 1 1 / 2 " ] HS S 6 X 6 X 3 / 8 [ 13 ' - 1 1 1 / 2 " ] K.3 W14X22 W14X22 W1 4 X 2 2 ( 1 0 ) W1 4 X 2 2 ( 6 ) 9 S402 ------------------------------------------------------------------------------------------------------------------- BRACED FRAME 12 S402 ------------------------------------------------------------------------------------------------------------------- K.1 2C 8 X 1 1 . 5 4 S402 ------------------------------------------------------------------------------------------------------------------- MC18X42.7 [ 15 ' - 1 1 7 / 8 " ] W1 8 X 3 5 [ 16 ' - 8 " ] [ 16 ' - 2 3 / 8 " ] W1 8 X 3 5 [ 15 ' - 4 3 / 4 " ] 4 S403 ------------------------------------------------------------------------------------------------------------------- C1 5 X 3 3 . 9 C1 5 X 3 3 . 9 C1 5 X 3 3 . 9 C1 5 X 3 3 . 9 16' - 5 1/2" MC18X42.7 L5 X 3 X 5 / 1 6 L5 X 3 X 5 / 1 6 4" 2" 6" 3 1 / 2 " 3' - 8 1 / 2 " C1 5 X 3 3 . 9 C1 5 X 3 3 . 9 [ 15 ' - 2 5 / 8 " ] W1 8 X 3 5 [ 15 ' - 9 7 / 8 " ] [ 16 ' - 7 " ] W1 8 X 3 5 [ 15 ' - 9 7 / 8 " ] [ 16 ' - 0 3 / 8 " ] W2 4 X 5 5 [ 15 ' - 2 3 / 8 " ] 3' - 8 1/2" 3' - 8 1/2" W - 1 0 K I P S E - 1 0 K I P S W - 2 0 K I P S E - 1 5 K I P S W - 1 5 K I P S E - 1 0 K I P S W - 15 KIPS E - 10 KIPS W - 15 KIPS E - 10 KIPS W - 2 0 K I P S E - 1 5 K I P S 18' - 0" 18' - 0" 18 ' - 0 " 18' - 0" 9 S401 ------------------------------------------------------------------------------------------------------------------- 18' - 0" 18' - 0" 18' - 0" 18 ' - 0 " 18 ' - 0 " 14 S404 ------------------------------------------------------------------------------------------------------------------- 10 S404 ------------------------------------------------------------------------------------------------------------------- 13 S404 ------------------------------------------------------------------------------------------------------------------- 7 S404 ------------------------------------------------------------------------------------------------------------------- 5 S404 ------------------------------------------------------------------------------------------------------------------- 2C 8 X 1 1 . 5 11 S404 -------------------------------------------------------------------------------------------------------------------2C 8 X 1 1 . 5 11 S404 ------------------------------------------------------------------------------------------------------------------- 1 S405 TYP. ------------------------------------------------------------------------------------------------------------------- 1 S405 TYP. ------------------------------------------------------------------------------------------------------------------- W1 8 X 3 5 ( 1 2 ) W1 4 X 2 2 ( 1 2 ) W1 4 X 2 2 ( 1 2 ) W1 4 X 2 2 ( 1 2 ) W1 4 X 2 2 ( 1 2 ) W1 8 X 3 5 ( 1 2 ) 4 S402 ------------------------------------------------------------------------------------------------------------------- 4 S402 ------------------------------------------------------------------------------------------------------------------- 3" 3" 3" HSS4x4x1/4 HSS4x4x1/4 HSS4x4x1/4 HSS4x4x1/4 HSS4x4x1/4 HSS4x4x1/4 HSS4x4x1/4 HSS4x4x1/4 HSS4x4x1/4 HSS4x4x1/4 HSS4x4x1/4 HSS4x4x1/4 HSS4x4x1/4 HSS4x4x1/4 HSS4x4x1/4 HSS4x4x1/4 HSS4x4x1/4HSS4x4x1/4 HSS4x4x1/4 HSS4x4x1/4 1' - 8 1 / 2 " 4 1 / 2 " 8 S404 ------------------------------------------------------------------------------------------------------------------- 2' - 0 " 3' - 8"4' - 0" 1' - 6" 2' - 6"4' - 0"4' - 0"4' - 0" 9' - 2 " 3' - 4 " 3' - 3 " 3' - 3 " 3' - 4 " 9 S404 ------------------------------------------------------------------------------------------------------------------- 4 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 3 S405 ------------------------------------------------------------------------------------------------------------------- 13 S404 ------------------------------------------------------------------------------------------------------------------- 5 S404 ------------------------------------------------------------------------------------------------------------------- 6 S404 ------------------------------------------------------------------------------------------------------------------- OPP. 6 S404 ------------------------------------------------------------------------------------------------------------------- C1 5 X 3 3 . 9 HSS6X6X3/8 (ABOVE) 3" 8 S405 TYP. ------------------------------------------------------------------------------------------------------------------- 9 1/4" __________________________________ S405 17 03 ASI 4' - 6 " REPLACE WT7X19 @ BEAM TO PRECAST CONNECTION w/ L8x4x1/2 03 ASI 03 ASI 19' - 8"19' - 8" 19' - 8"19' - 8" 03 ASI 03 ASI 15' - 10 3/4" 03 ASI DECKING SCHEDULE 1 1/2" -20 GA. TYPE B ROOF DECK SEE S0.1, NOTE SD4D -1 -- MARK TYPE DETAILS NOTES 1 1/2" -20 GA. TYPE B ACOUSTIC ROOF DECK --D -1A 3" -20 GA. TYPE N ACOUSTIC ROOF DECK AT MECHANICAL MEZZ. & AT CMU ENCLOSURE D -2A EPICORE ENVISTA FN7.9A 18 GA. ACOUSTIC CELLULAR ROOF DECK CUSTOM FACTORY FINISH, SEE ARCH D -4 SEE S0.1, NOTE SD4 SEE S0.1, NOTE SD4 SEE S0.1, NOTE SD4 SEE S0.1, NOTE SD4 2" -18 GA. COMPOSITE FLOOR DECK + 4-1/2" N.W. CONCRETE TOPPING (6-1/2" TOTAL THICKNESS) w/ WWF6x6-W2.1xW2.1 D -3 --- AT APPARATUS BAY ROOF --3" -20 GA. TYPE N ROOF DECKD -2 SEE S0.1, NOTE SD4 1.0C x 24 GA. FORMDECKD -5 SEE S0.1, NOTE SD4 AT LOBBY VESTIBULE TYPICAL FRAMING DESIGNATION STEEL COLUMN STEEL BEAM MOMENT CONNECTION CONNECTION SYMBOLS BEAM OVER COLUMN OWJ OR BEAM SIZE TOP OF STEEL OR TOP OF JOIST ELEVATION END REACTION (SERVICE) # OF HEADED STUDS REQ'D CAMBER [ 18' -6" ] W18X35 (20) C = 3/4"5k 5kW" x H" WEB OPENING SEE 2/S404 9 T 6 P 38' - 8" 12 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 12 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 13 S401 ------------------------------------------------------------------------------------------------------------------- 13 S401 ------------------------------------------------------------------------------------------------------------------- 13 S401 ------------------------------------------------------------------------------------------------------------------- 53 ' - 4 " W - 1 2 K I P S E - 6 K I P S W - 18 KIPS E - 6 KIPS W - 1 2 K I P S E - 6 K I P S W - 18 KIPS E - 6 KIPS 12' - 9" 11' - 4 1/2" 11' - 4 1/2" 12' - 9" 12 ' - 9 " 12 ' - 9 " 12 ' - 9 " J 1 3 H D -5 HSS5X5X1/4 HSS5X5X1/4 HS S 5 X 5 X 1 / 4 HS S 5 X 5 X 1 / 4 HS S 5 X 5 X 1 / 4 13 ' - 4 " 10' - 8" 9 1 / 4 " 11 S402 TYP. ------------------------------------------------------------------------------------------------------------------- 9 1 / 4 " 3' - 0"4' - 1 3/4" 2' - 1 3/4"6' - 11 3/4"1' - 6 1/2" 1- 1 / 2 " Ø 1" Ø 1" Ø 1" Ø 1" Ø EQ . 1' - 6 " 1' - 6 " 1' - 6 " 1' - 6 " EQ . A 19181716151413121110987654 B C D E F G H J K L M N P Q PR I N T E D : R S T U 20 21 22 23 24 25 Sheet Name Key Plan 321 19181716151413121110987654 20 21 22 23 24 25321 Sheet Number Sheet Issue Date OPN Project No. 26 26 27 27 28 28 29 29 V W X Y Owner All reports, plans, specifications, computer files, field data, notes and other documents and instruments prepared by OPN Architects, Inc. as instruments of service shall remain the property of OPN Architects, Inc. OPN Architects, Inc. shall retain all common law, statutory and other reserved rights, including the copyright thereto. © 2022 OPN Architects, Inc. 100 Court Ave., Suite 100 Des Moines, IA 50309 P: 515-309-0722 www.opnarchitects.com RYAN COMPANIES 111 E GRAND AVENUE, SUITE 200 DES MOINES, IA 50309 P. 515-309-8500 Project Construction Manager FOTH 8191 BIRCHWOOD COURT, SUITE L JOHNSTON, IA 50131 P. 515-254-1393 Civil Engineer RAKER RHODES ENGINEERING 4717 GRAND AVENUE DES MOINES, IA 50313 P. 515-277-0275 Structural Engineer MORRISSEY ENGINEERING 4940 NORTH 118TH STREET OMAHA, NE 68164 P. 402-491-4144 MEPT Engineer CONFLUENCE 525 17TH STREET DES MOINES, IA 50309 P. 515-288-4875 Landscape Architect B 3/ 1 2 / 2 0 2 4 2 : 3 3 : 5 7 P M S302 LOW ROOF FRAMING PLAN - AREA B 21841001 CONSTRUCTION SET 11/21/2023 WAUKEE PUBLIC SAFETY BUILDING ADDRESS TBD WAUKEE, IA 50263 CITY OF WAUKEE 230 W. HICKMAN ROAD WAUKEE, IA 50263 NORTH LOW ROOF FRAMING PLAN - AREA B 1/8" = 1'-0"A NOTES: 1. GRAVITY AND LATERAL FORCES SHOWN ON PLAN ARE SERVICE LEVEL. 2. LATERAL SEISMIC LOAD, E, INCLUDES SELF-WEIGHT OF PRECAST WALL PANELS. 3. SEE STRUCTURAL NOTES SHEET FOR OUT-OF-PLANE DESIGN CRITERIA FOR PRECAST WALL PANELS. 4. SEE ARCH AND MEP SHEETS FOR REQUIRED OPENINGS IN PRECAST PANELS. 5. PRECAST PANEL REINFORCEMENT IS TO BE DESIGNED BY CONTRACTOR. 6. T/STEEL = 13'-5 1/2" U.N.O. 7. NOT ALL DECK PENETRATIONS ARE SHOWN. CONTRACTOR IS RESPONSIBLE FOR COORDINATION SIZES AND LOCATIONS w/ MEP & ARCH DRAWINGS. SEE 6/S401 FOR TYPICAL OPENING DETAIL. NORTH 1/8" = 1'-0"C STORM SHELTER ROOF FRAMING PLAN - AREA B NORTH 3/8" = 1'-0"B VESTIBULE ROOF FRAMING PLAN - AREA B Revision Description Date ASI 03 ASI 03-12-2024 Joist bearing elevation modified. H1 Y 16 16.2 17 19 5' - 0"1' - 0"6' - 6"6' - 0"6' - 0"6' - 0"6' - 0"6' - 0"5' - 6"5' - 6"5' - 6"5' - 6"5' - 6"5' - 6"6' - 6"6' - 6"6' - 6"5' - 6"5' - 6"6' - 5"6' - 5"6' - 5"6' - 5"6' - 5"6' - 5" 1' - 0"6' - 6"6' - 0"6' - 0"6' - 0"6' - 0"6' - 0"5' - 6"5' - 6"5' - 6"5' - 6"5' - 6"5' - 6"5' - 6"5' - 6"5' - 6"5' - 6"5' - 6"5' - 6"6' - 0"6' - 0"6' - 0"6' - 0"6' - 0"6' - 0" Z D -1 D -1 D -1 D -1 D - 1A D - 1A 18 U X S 16.516.1 16.3 16.4 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 3 " 5' - 9 " 6' - 0 " 6' - 0 " 3' - 8 " 6' - 0 " 6' - 0 " 6' - 0 " 6' - 0 " 4' - 0 " V W 208' - 0"17' - 8" 36' - 0"33' - 0"19' - 0"11' - 6"2' - 6"36' - 0"46' - 8"23' - 4" 6' - 8 " 31 ' - 8 " 7' - 8 1 / 4 " 5' - 1 3 / 4 " 24 ' - 1 3 / 4 " 34 ' - 1 0 1 / 4 " 15 ' - 6 " 19 ' - 0 " D -1A D -1A 7 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 10 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 1 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 2 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 9 S401 ------------------------------------------------------------------------------------------------------------------- 5 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 10 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 7 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 7 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 7 S401 TYP. ------------------------------------------------------------------------------------------------------------------- N 14 4 ' - 8 " 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 30 K 9 30 K 8 26 K 8 30 K 9 30 K 9 30 K 9 30 K 9 30 K 9 30 K 9 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 8 14K4 14K4 14K4 14K4 14K4 18 K 7 26 K 6 26 K 6 DBP 45LH 300/150 DBP 45LH 300/150 DBP 45LH 300/150 DBP 45LH 300/150 DBP 45LH 300/150 DBP 45LH 300/150 DBP 45LH 300/150 DBP 45LH 300/150 DBP 45LH 300/150 DBP 45LH 300/150 DBP 45LH 300/150 DBP 45LH 300/150 DBP 45LH 300/150 DBP 45LH 300/150 DBP 45LH 300/150 DBP 45LH 300/150 DBP 45LH 300/150 DBP 33LH 300/150 DBP 33LH 300/150 DBP 33LH 300/150 DBP 33LH 300/150 DBP 33LH 300/150 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 26 K 6 18 K 7 30 K 9 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 26 K 8 26 K 8 26 K 8 26 K 8 26 K 8 18 K 7 18 K 7 18 K 7 18 K 7 18 K 7 30 K 9 30 K 9 30 K 9 30 K 9 30 K 9 W24X76 [ 15' - 7 3/8" ] W24X62 [ 15' - 7 3/8" ] W24X55 [ 15' - 7 3/8" ][ 15' - 7 3/8" ] W24X76 [ 15' - 9 1/2" ] W24X76 W24X62 [ 15' - 9 1/2" ] W24X62 [ 15' - 9 1/2" ][ 15' - 9 1/2" ] W24X76 16' - 7" TYP. 15' - 11" TYP. 18 K 7 26 K 8 26 K 8TYP.16' - 7" TYP. 7 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 16' - 5 1/4" TYP.9 S401 ------------------------------------------------------------------------------------------------------------------- 9 S401 ------------------------------------------------------------------------------------------------------------------- 16' - 5" TYP. TYP. 10 S401 TYP. ------------------------------------------------------------------------------------------------------------------- 16' - 2 5/8" W3 0 X 9 0 [ 15 ' - 8 1 / 2 " ] 8" 7 S403 ------------------------------------------------------------------------------------------------------------------- 9 S401 ------------------------------------------------------------------------------------------------------------------- 26 K 8 26 K 8 26 K 8 D - 35 S403 TYP. ------------------------------------------------------------------------------------------------------------------- 10 S403 ------------------------------------------------------------------------------------------------------------------- 11 S403 ------------------------------------------------------------------------------------------------------------------- 12 S403 ------------------------------------------------------------------------------------------------------------------- 14 S403 ------------------------------------------------------------------------------------------------------------------- 15' - 0 7/8" 8' - 8 " 15' - 8 1/2" 15' - 8 1/2" W - 1 0 K I P S E - 1 0 K I P S W - 10 KIPS E - 8 KIPS W - 2 0 K I P S E - 1 5 K I P S K.4 4" 2" 6" 15' - 0" [ 15 ' - 2 5 / 8 " ] W1 8 X 3 5 [ 15 ' - 9 7 / 8 " ] [ 16 ' - 7 " ] W1 8 X 3 5 [ 15 ' - 9 7 / 8 " ] [ 16 ' - 0 3 / 8 " ] W2 4 X 5 5 [ 15 ' - 2 3 / 8 " ] W - 2 0 K I P S E - 1 5 K I P S W - 15 KIPS E - 10 KIPS W - 10 KIPS E - 8 KIPS 15' - 1" 18 ' - 0 " 18 ' - 0 " 18' - 0" 9 S401 ------------------------------------------------------------------------------------------------------------------- 18' - 0" 18 ' - 0 " 18 ' - 0 " 18' - 0" 15 ' - 0 " 4 S404 ------------------------------------------------------------------------------------------------------------------- 17' - 6" 16' - 7 1/2" 7 S404 ------------------------------------------------------------------------------------------------------------------- 13 S404 ------------------------------------------------------------------------------------------------------------------- 15 S404 ------------------------------------------------------------------------------------------------------------------- N.1 16 S404 ------------------------------------------------------------------------------------------------------------------- HSS6X4X1/4 (LSH) [ 12' - 0" ] HSS6X4X1/4 (LSH) [ 12' - 0" ] 36 V G 7 N 8 K [ 15 ' - 8 1 / 2 " ] __________________________________ S401 6 TYP. 3 S405 ------------------------------------------------------------------------------------------------------------------- 13 S404 ------------------------------------------------------------------------------------------------------------------- 6 S404 ------------------------------------------------------------------------------------------------------------------- OPP. 6 S404 ------------------------------------------------------------------------------------------------------------------- C1 5 X 3 3 . 9 35' - 0"35' - 0" 225' - 8" 10 ' - 3 " 21 ' - 5 " 13 ' - 3 " 10 ' - 1 0 3 / 4 "HSS6x6x1/4HSS6x6x1/4HSS6x6x1/4HSS6x6x1/4HSS6x6x1/403 ASI 03 ASI 03 ASI 03 ASI 03 ASI 03 ASI 03 ASI ROOF RIDGE LINE 03 ASI 03 ASI 03 ASI 03 ASI 18 S405 ------------------------------------------------------------------------------------------------------------------- 12' - 8 1/2" 03 ASI 1 S303 ------------------------------------------------------------------------------------------------------------------- 03 ASI 03 ASI DECKING SCHEDULE 1 1/2" -20 GA. TYPE B ROOF DECK SEE S0.1, NOTE SD4D -1 -- MARK TYPE DETAILS NOTES 1 1/2" -20 GA. TYPE B ACOUSTIC ROOF DECK --D -1A 3" -20 GA. TYPE N ACOUSTIC ROOF DECK AT MECHANICAL MEZZ. & AT CMU ENCLOSURE D -2A EPICORE ENVISTA FN7.9A 18 GA. ACOUSTIC CELLULAR ROOF DECK CUSTOM FACTORY FINISH, SEE ARCH D -4 SEE S0.1, NOTE SD4 SEE S0.1, NOTE SD4 SEE S0.1, NOTE SD4 SEE S0.1, NOTE SD4 2" -18 GA. COMPOSITE FLOOR DECK + 4-1/2" N.W. CONCRETE TOPPING (6-1/2" TOTAL THICKNESS) w/ WWF6x6-W2.1xW2.1 D -3 --- AT APPARATUS BAY ROOF --3" -20 GA. TYPE N ROOF DECKD -2 SEE S0.1, NOTE SD4 1.0C x 24 GA. FORMDECKD -5 SEE S0.1, NOTE SD4 AT LOBBY VESTIBULE TYPICAL FRAMING DESIGNATION STEEL COLUMN STEEL BEAM MOMENT CONNECTION CONNECTION SYMBOLS BEAM OVER COLUMN OWJ OR BEAM SIZE TOP OF STEEL OR TOP OF JOIST ELEVATION END REACTION (SERVICE) # OF HEADED STUDS REQ'D CAMBER [ 18' -6" ] W18X35 (20) C = 3/4"5k 5kW" x H" WEB OPENING SEE 2/S404 BOLTED OWJ CONNECTION BOLTED OWJ CONNECTION w/ B.C. EXTENSION MOMENT CONNECTION OWJ CONNECTION SYMBOLS H1 LOAD-BEARING CMU HEADER SCHEDULE -- MARK SIZE NOTESGEOMETRY (2) COURSE BOND BEAM (2) #5 CONT. BARS 2 MAX SLOPE 1 L5x5x3/8x0'-5" L3x3x1/4 @ 6'-0" O.C. (9'-0" MAX. LENGTH) 1/4 ROOF DECK, SEE PLAN EMBED PLATE BY CONTRACTOR PRECAST WALL BY CONTRACTOR OWJ, SEE PLAN 1/4EA. LEG 1/4 2 @ EA. END PL5x5x3/8 OWJ, SEE PLAN SEE PLAN T/ WALL A 19181716151413121110987654 B C D E F G H J K L M N P Q PR I N T E D : R S T U 20 21 22 23 24 25 Sheet Name Key Plan 321 19181716151413121110987654 20 21 22 23 24 25321 Sheet Number Sheet Issue Date OPN Project No. 26 26 27 27 28 28 29 29 V W X Y Owner All reports, plans, specifications, computer files, field data, notes and other documents and instruments prepared by OPN Architects, Inc. as instruments of service shall remain the property of OPN Architects, Inc. OPN Architects, Inc. shall retain all common law, statutory and other reserved rights, including the copyright thereto. © 2022 OPN Architects, Inc. 100 Court Ave., Suite 100 Des Moines, IA 50309 P: 515-309-0722 www.opnarchitects.com RYAN COMPANIES 111 E GRAND AVENUE, SUITE 200 DES MOINES, IA 50309 P. 515-309-8500 Project Construction Manager FOTH 8191 BIRCHWOOD COURT, SUITE L JOHNSTON, IA 50131 P. 515-254-1393 Civil Engineer RAKER RHODES ENGINEERING 4717 GRAND AVENUE DES MOINES, IA 50313 P. 515-277-0275 Structural Engineer MORRISSEY ENGINEERING 4940 NORTH 118TH STREET OMAHA, NE 68164 P. 402-491-4144 MEPT Engineer CONFLUENCE 525 17TH STREET DES MOINES, IA 50309 P. 515-288-4875 Landscape Architect C 3/ 1 2 / 2 0 2 4 2 : 3 3 : 5 8 P M S303 LOW ROOF FRAMING PLAN - AREA C 21841001 CONSTRUCTION SET 11/21/2023 WAUKEE PUBLIC SAFETY BUILDING ADDRESS TBD WAUKEE, IA 50263 CITY OF WAUKEE 230 W. HICKMAN ROAD WAUKEE, IA 50263 NORTH LOW ROOF FRAMING PLAN - AREA C 1/8" = 1'-0"A NOTES: 1. GRAVITY AND LATERAL FORCES SHOWN ON PLAN ARE SERVICE LEVEL. 2. LATERAL SEISMIC LOAD, E, INCLUDES SELF-WEIGHT OF PRECAST WALL PANELS. 3. SEE STRUCTURAL NOTES SHEET FOR OUT-OF-PLANE DESIGN CRITERIA FOR PRECAST WALL PANELS. 4. SEE ARCH AND MEP SHEETS FOR REQUIRED OPENINGS IN PRECAST PANELS. 5. PRECAST PANEL REINFORCEMENT IS TO BE DESIGNED BY CONTRACTOR. 6. NOT ALL DECK PENETRATIONS ARE SHOWN. CONTRACTOR IS RESPONSIBLE FOR COORDINATION SIZES AND LOCATIONS w/ MEP & ARCH DRAWINGS. SEE 6/S401 FOR TYPICAL OPENING DETAIL. Revision Description Date ASI 03 ASI 03-12-2024 03 ASI 03 ASI 03 ASI 03 ASI 3/4" = 1'-0"1 NON-LOAD BEARING PRECAST @ ROOF 03 ASI Kicker arrangement added along one wall. 24'-0" 1 23' - 2" 11' - 2" HSS12x4x1/4 (LSH), TYP. LOUVER SHADING SYSTEM, SEE ARCH 1 M HSS BEAM, SEE PLAN HSS BEAM, SEE PLAN 3/8" PLATE, TYP. DECK EDGE ANGLE, TYP. WF BEAM, SEE PLAN WF BEAM, SEE PLAN 1/4TYP. SE E P L A N 45.00° SE E P L A N SEE PLAN TYP. 5" 6" 6" 1/ 2 " 9" 9" TYP. 6"TYP. 1/2" 1/4 TYP. 1/4 TYP. L4x4x3/8 x 0'-8", TYP. NOTE: BOLTED/WELDED SHEAR TABS NOT SHOWN FOR CLARITY, BY CONTRACTOR. 1/4 TYP. 16 (2) -3/4"Ø A325 BOLTS w/ 3/16" PLATE WASHERS IN LONG SLOT HOLES 1/4" FRP SLIDE BEARING PLATE SEE PLAN T/ STEEL 1/4 3 - 24 TYP. L5x3x1/4 (LLH, CONT.) ROOF DECK, SEE PLAN WF BEAM, SEE PLAN OWJ, SEE PLAN ROOF DECK, SEE PLAN 3 3/4"6"1 1/2" 1' - 0" 1 1/2" EQ.EQ. 1/2" x 7" STIFFENER BEARING PLATE PRECAST EMBED PLATE & WT SHEAR CONNECTION SEE DETAIL /11 S401 TOP PL1/2x6x0'-7" w/ PL1/2x6x1'-2" BUILT-UP STIFFENED BEARING SEAT 1/4 2"6"6" PRECAST WALL PANEL, SEE PLAN BY CONTRACTOR 5/16 5.1 MOMENT CONNECTION CAP PLATE, SEE FOR DIMENSIONS AND WELDS /5 S405 HSS COLUMN, SEE PLAN WF BEAM, SEE PLAN ROOF DECK, SEE PLAN WOOD LOUVERS, SEE ARCH HSS BEAM, SEE PLAN L6x4x3/8 x 0'-6" (LLH), TYP. 1/4TYP. 1/4TYP. SEE FOR MORE INFORMATION ON CONNECTION HSS BEAM, SEE PLAN /19 S401 HSS BEAM, SEE PLAN HSS BEAM, SEE PLAN __________________________________ S401 15 TYP. HSS COLUMN, SEE PLAN WOOD LOUVER, SEE ARCH WF BEAM, SEE PLAN ROOF DECK, SEE PLAN HSS BEAM, SEE PLAN L4x4x3/8 x 0'-5", TYP. 1/4TYP. 1/4TYP. 1/4TYP. HSS6x6x1/4 HSS6X4X1/4 (LSH) HSS6X4X1/4 (LSH) GATE HINGE HARDWARE, SEE ARCH __________________________________ S403 8 TYP. SEE DETAIL FOR MORE INFORMATION (SIM.), TYP. /19 S401 23' - 2" 19' - 4" SEE PLAN T/ STEEL D 5.1 1/43 SIDES, TYP. TY P . 5" TYP. 9 1/2"HSS BEAM, SEE PLAN HSS COLUMN w/ 3/8" CAP PLATE, SEE PLAN 3/8" PLATE WF BEAM, SEE PLAN 1/4 1/4UNDERSIDE OF PL HSS BEAM, SEE PLAN TYP. 1/2" 1 F.1 TY P . 8 1 / 2 " 1' - 0" TYP. 1/2" 5" 8" 1/4 3-SIDES, TYP. 1/4 1/4 UNDERSIDE OF PL WF BEAM, SEE PLAN HSS COLUMN w/ 3/8" CAP PLATE, SEE PLAN HSS BEAM, SEE PLAN HSS BEAM, SEE PLAN 3/8" PLATE NOTE: BOLTED/WELDED SHEAR TABS NOT SHOWN FOR CLARITY, BY CONTRACTOR. 8 CEILING, SEE ARCH CURTAIN WALL, SEE ARCH SOFFIT, SEE ARCH WF BEAM, SEE PLAN DASHED LINE INDICATES AREA TO RECEIVE TNEMEC AEROLON THERMAL PAINT. PAINT IS TO BE APPLIED 18" TO THE INTERIOR AND 18" TO THE EXTERIOR FROM THE DEW POINT (CURTAIN WALL). AREA TO RECEIVE PAINT SHALL NOT BE GALVANIZED. ROOF DECK, SEE PLAN WF BEAM, SEE PLAN AISC SHEAR CONNECTION BY CONTRACTOR, TYP. WF GIRDER, SEE PLAN SEE PLAN T/ STEEL E SEE PLAN OWJ, SEE PLAN ROOF DECK, SEE PLAN WF BEAM, SEE PLAN AISC SHEAR CONNECTION BY CONTRACTOR, TYP. SEE ARCH CW BEARING SEE PLAN T/ STEEL SEE PLAN T/ STEEL CURTAIN WALL, SEE ARCH L8x6x1/2 CONT. (LLV) PAINTED w/ TNEMEC AEROLON SANDWICH 3/8" ARMATHERM B/W PL12x8x1/2" & L8x6x1/2 w/ (4) -3/4" A325N BOLTS 1/4 HSS4x4x1/4 1/4 HSS COLUMN, SEE PLAN WF BEAM, SEE PLAN L5x3x1/4 (LLH) DECK EDGE ANGLE 1/4 3-12 SEE PLAN SEE ARCH D 4 SE E P L A N SEE PLAN PLAN SEE 9 1 / 2 " 6" 1/ 2 " 6" HSS BEAM, SEE PLAN 3/8" PLATE, TYP.HSS BEAM, SEE PLAN WF BEAM, SEE PLAN TYP. 8"TYP. 1/2" 1/4TYP. WF BEAM, SEE PLAN DECK EDGE ANGLE, TYP. SE E P L A N 1/4 TYP. 1/4 TYP. L4x4x3/8 x 0'-8", TYP. 1/4 TYP. NOTE: BOLTED/WELDED SHEAR TABS NOT SHOWN FOR CLARITY, BY CONTRACTOR. WF BEAM, SEE PLAN WF BEAM, SEE PLAN SP A N SE E P L A N BE A M S P A C I N G NOTES (IF CHANNELS ARE INSTALLED PRIOR TO CONCRETE POUR): 1. CONTRACTOR TO COORDINATE SIZE AND LOCATIONS OF OPENINGS w/ ARCH AND MEP DRAWINGS. 5. DECK TO BE CONTINUOUS OVER OPENING, DO NOT CUT DECK UNTIL 14 DAYS MIN. AFTER CONCRETE PLACEMENT. 2. DECK TO BE WELDED TO CHANNELS, SEE GENERAL STRUCTURAL NOTES FOR WELD REQUIREMENTS. 6. ACCEPTABLE TO OMIT ADD'L REINFORCING BARS IF EDGE OF OPENING IS WITHIN 6" OF CENTERLINE OF STEEL BEAM. 3. TRIM WWF SLAB REINFORCEMENT AROUND SLAB OPENING. EXTEND TO WITHIN 2" OF OPENING ON ALL SIDES. 7. NOTIFY EOR FOR SPECIAL CONDITIONS WHERE TYPICAL DETAIL IS NOT APPLICABLE. 4. MAXIMUM DIMENSION "L" SHALL BE ≤ 6' - 0". SEE PLAN FOR OPENINGS > 6' - 0".8. PROVIDE DECK MANUFACTURER'S TYPICAL DECK CLOSURE AROUND OPENINGS. NOTES (IF CHANNELS ARE INSTALLED AFTER CONCRETE POUR): 1. CONTRACTOR TO COORDINATE SIZE AND LOCATIONS OF OPENINGS w/ ARCH AND MEP DRAWINGS. 5. DO NOT ADD OPENING OR CUT SLAB WITHOUT PRIOR APPROVAL OF STRUCTURAL ENGINEER. 2. INSTALL CHANNELS TIGHT TO UNDERSIDE OF DECK AND GROUT ALL GAPS.6. DO NOT SAW CUT BEYOND CORNERS. CHIP OUT CORNERS. 3. INSTALL CHANNELS PRIOR TO CUTTING SLAB. 7. NOTIFY EOR FOR SPECIAL CONDITIONS WHERE TYPICAL DETAIL IS NOT APPLICABLE. 4. MAXIMUM DIMENSION "L" SHALL BE ≤ 6' - 0". SEE PLAN FOR OPENINGS > 6' - 0". TYP. 2""L"TYP. 2""L" C8x11.5 C8x11.5 C8 x 1 1 . 5 C8 x 1 1 . 5 C8x11.5 C8x11.5 C8 x 1 1 . 5 C8 x 1 1 . 5 C8x11.5 TYP. PL 3/8x4x5 1/2 w/ (2) 3/4" Ø A325 BOLTS, TYP. 1/4 TYP. SEE PLAN T/ STEEL SEE PLAN T/ SLAB FLOOR DECK SEE PLAN POUR STOP BY CONTRACTOR TYP. 2" WF BEAM, TYP. A A A A SECTION A - A B __________________________________ S401 7 TYP. EMBED PLATE DESIGNED AND SUPPLIED BY CONTRACTOR MIN. 2 PER PANEL 1/4 4 @ EA. EMBED L4x4x3/8 CONT. ROOF DECK, SEE PLAN SEE PLAN T/ WALL PRECAST WALL BY CONTRACTOR DECK BEARING VARIES SOFFIT, SEE ARCH M AISC SHEAR CONNECTION BY CONTRACTOR L6x4x3/8 x 0'-5" (LLH), TYP. 1/4 3 SIDES, TYP. 1/4 4 SIDES, TYP. WF BEAM, SEE PLAN CUT BEAM TO MATCH SOFFIT PROFILE, SEE ARCH SOFFIT, SEE ARCH ROOF DECK, SEE PLAN HSS BEAM, SEE PLAN L6x4x3/8x0'-4" (LLH) w/ 3/8" THICK STIFFENER (L5x3x1/4 DECK EDGE ANGLE BEYOND) PL10x5x3/8 1/43-SIDES, TYP. WF BEAM, SEE PLAN AISC SHEAR CONNECTION BY CONTRACTOR HSS COLUMN, SEE PLAN ROOF DECK, SEE PLAN 1/4 SEE PLAN T/ STEEL SEE PLAN T/ STEEL SEE PLAN ANGLE BEARING L4x3x1/4 CONT. (LLH) DECK EDGE ANGLE 1/4 3 SIDES 2"8" 1/4 1/43 SIDES M AISC SHEAR CONNECTION BY CONTRACTOR L6x4x3/8 x 0'-5" (LLH) 1/4 3 SIDES WF BEAM, SEE PLAN CUT BEAM TO MATCH SOFFIT PROFILE, SEE ARCH SOFFIT, SEE ARCH ROOF DECK, SEE PLAN HSS BEAM, SEE PLAN L5x3x1/4 (LLH) DECK EDGE ANGLE 3/8" PLATE, SEE FOR DIMENSIONS AND WELDS 1/4 1/4 3-24 WF BEAM, SEE PLAN AISC SHEAR CONNECTION BY CONTRACTOR 1/4 L4x4x3/8x0'-4" HSS COLUMN, SEE PLAN ROOF DECK, SEE PLAN 1/4 SEE PLAN ANGLE BEARING L4x3x1/4 CONT. (LLH) DECK EDGE ANGLE 1/4 4 SIDES /5 S405 DASHED LINE INDICATES AREA TO RECEIVE TNEMEC AEROLON THERMAL PAINT. PAINT IS TO BE APPLIED 18" TO THE INTERIOR AND 18" TO THE EXTERIOR FROM THE DEW POINT (CURTAIN WALL). AREA TO RECEIVE PAINT SHALL NOT BE GALVANIZED. 1/4TYP. PL10x8x1/4 ON INNER FACE OF HSS, TYP. 4 SIDES OF HSS TUBE HSS TRUSS CHORD, SEE FOR MORE INFORMATION /1 S404 HSS TRUSS CHORD, SEE FOR MORE INFORMATION /1 S404 PL10x8x1/4 ON INNER FACE OF HSS, TYP. 4 SIDES OF HSS TUBE GRIND SMOOTH 4"4" ELEVATIONSECTION PLAN PLAN PERPENDICULAR TO WALL PARALLEL TO WALL CUT CMU AT BEARING AS REQ'D FOR T/ STEEL PL 3/8x7x0'-9" w/ (2) 5/8" Ø x 0'-8" ANCHOR BOLTS (1 1/2" PROJECTION) PL 3/8x7x0'-7" w/ (2) 5/8" Ø x 0'-8" ANCHOR BOLTS (1 1/2" PROJECTION) 6" CONTINUOUS JAMB CELL REINFORCING, TYP. SEE TYP. CMU REINF. DETAIL NOTE: 1. PROVIDE WALL AND JAMB CELL REINFORCING PER TYP. CMU REINF. DETAIL. 2. BEGIN JAMB REINFORCING AT 2ND CELL FROM EDGE OF OPENING. 3. PROVIDE SINGLE LAYER OF ROOFING FELT BETWEEN BOTTOM FLANGE AND BEARING PLATE. 4. INFILL BEAM POCKETS w/ SOAP SHELLS AFTER BUILDING IS ENCLOSED AND CONDITIONED. WF BEAM (TOP FLANGE NOT SHOWN FOR CLARITY) w/ 2 1/2" LONG SLOTTED HOLES IN FLANGE 1/2" 5" 3" 1/2" EQEQ #4x2'-6" w/ STD 180° HOOK @ EA. ANCHOR 3" M A X . PE R A I S C WO R K A B L E GA G E JOIST OWJ, SEE PLAN L6x6x1/2 x 1'-0" w/ (2) 3/8" STIFFENER PLATES (STIFFENERS 4" O.C.) 4"8" PRECAST PANEL FRAMING BY CONTRACTOR, SEE PLAN NOTE:SEE FOR INFO. NOT GIVEN 5/16 5/16 /7 S401 17 SEE PLAN T/ STEEL SEE PLAN T/ WALL NOTE: ROOF DECK AND ARCH COMPONENTS NOT SHOWN FOR CLARITY. 1/4 EMBED PLATE BY CONTRACTOR PRECAST WALL BY CONTRACTOR WF BEAM, SEE PLAN CONTRACTOR BLOCK OUT PRECAST WALL PANEL AS REQ'D A 19181716151413121110987654 B C D E F G H J K L M N P Q PR I N T E D : R S T U 20 21 22 23 24 25 Sheet Name Key Plan 321 19181716151413121110987654 20 21 22 23 24 25321 Sheet Number Sheet Issue Date OPN Project No. 26 26 27 27 28 28 29 29 V W X Y Owner All reports, plans, specifications, computer files, field data, notes and other documents and instruments prepared by OPN Architects, Inc. as instruments of service shall remain the property of OPN Architects, Inc. OPN Architects, Inc. shall retain all common law, statutory and other reserved rights, including the copyright thereto. © 2022 OPN Architects, Inc. 100 Court Ave., Suite 100 Des Moines, IA 50309 P: 515-309-0722 www.opnarchitects.com RYAN COMPANIES 111 E GRAND AVENUE, SUITE 200 DES MOINES, IA 50309 P. 515-309-8500 Project Construction Manager FOTH 8191 BIRCHWOOD COURT, SUITE L JOHNSTON, IA 50131 P. 515-254-1393 Civil Engineer RAKER RHODES ENGINEERING 4717 GRAND AVENUE DES MOINES, IA 50313 P. 515-277-0275 Structural Engineer MORRISSEY ENGINEERING 4940 NORTH 118TH STREET OMAHA, NE 68164 P. 402-491-4144 MEPT Engineer CONFLUENCE 525 17TH STREET DES MOINES, IA 50309 P. 515-288-4875 Landscape Architect A B C 3/ 1 2 / 2 0 2 4 2 : 3 4 : 1 2 P M S405 FRAMING DETAILS 21841001 CONSTRUCTION SET 11/21/2023 WAUKEE PUBLIC SAFETY BUILDING ADDRESS TBD WAUKEE, IA 50263 CITY OF WAUKEE 230 W. HICKMAN ROAD WAUKEE, IA 50263 3/8" = 1'-0"1 LOBBY/FITNESS SUNSHADE SUPPORT 3/4" = 1'-0"9 AREA B HIGH ROOF CORNER PLAN VIEW 1" = 1'-0"3 STEEL WF GIRDER FRAMING DETAIL @ EXPANSION JOINT1 3/4" = 1'-0"4 HSS ROOF BEAM TO COLUMN CONNECTION 3/4" = 1'-0"6 LOUVER GATE DETAIL 1 1/2" = 1'-0"5 MOMENT CONNECTION AT 6" HSS COLUMN - PLAN VIEW 1 1/2" = 1'-0"7 MOMENT CONNECTION AT 12" HSS COLUMN - PLAN VIEW 1" = 1'-0"2 THERMAL BREAK @ LOBBY/FITNESS 3/4" = 1'-0"8 CLERESTORY NORTH CW 3/4" = 1'-0"10 AREA A HIGH ROOF CORNER PLAN VIEW 3/8" = 1'-0"11 TYP. OPENINGS IN COMPOSITE SLABS ≤ 6' - 0" 3/4" = 1'-0"12 AREA A - GRID LINE B - HIGH ROOF DECK BEARING 1" = 1'-0"13 EYEBROW AT HSS BEAM OVER COLUMN 02 ADD 1" = 1'-0"14 EYEBROW @ COLUMN 02 ADD Revision Description Date ADD 02 Addendum 10-31-2023 ADD 03 Addendum 11-14-2023 ASI 03 ASI 03-12-2024 1" = 1'-0"15 TRUSS CHORD SPLICE DETAIL 03 ADD N.T.S.16 TYP. BEAM BEARING @ CMU 03 ASI 1" = 1'-0"17 JOIST BEARING @ PRECAST CORNER 3/4" = 1'-0"18 GIRDER BEARING AT PRECAST Lintel bearing detail added. 1 Jill Boetger From:Austin Ressler <aressler@tsf-structures.com> Sent:Thursday, April 18, 2024 10:45 AM To:Jill Boetger Subject:RE: Folder: ASI 03_Structural Updates EXTERNAL EMAIL: If unknown sender, DO NOT click links/attachments. NEVER give out your user ID or password. Jill – see below in red. 1. S302: Joist Bearing Elevation Modification a. Is the cost here a detailing change? What’s driving this? Elevation changed from 15’-10 ¾” to 16-0 ¼”. – we had a total of 15 hours of detailing to revise the entire ASI 03. There is no material or labor change for the joist bearing modification. 2. S303: Kicker arrangement added along one wall. a. I see one kicker. Agreed? Added material, labor, detailing? – there is one callout for detail 1/S303. The angle is 6’-0” on center and has (2) 3/8” plates per angle. The wall is around 24’ long. I had (5) angle kickers and (10) added plates. 3. S405: Lintel bearing detail added a. You always owned the lintel, the details were added to support design/detailing on your end. What am I missing? – we had the lintels themselves, technically the only information provided for the lintels was the lintel schedule that called for a bottom plate. Nothing about a bearing plate or anchor bolts that the new detail provided. Ultimately all I charged for in this CO was the detailing time, looking back I probably could have charged for the bearing plates and anchor bolts as well. Let me know if you have any other questions. Thanks. Austin Ressler Estimating Manager & Project Manager Direct (319)320-6221 Office (319)365-7133, ext. 121 Cell (319)640-8927 Fax (319)365-2410 aressler@tsf-structures.com Visit our website at www.tsf-structures.com March 26, 2024 CR#010 Waukee Public Safety Building Job #6173-000 DDVI – General Construction Hilsabeck Schacht - Framing, Drywall & Ceilings Jordison Construction – Building Concrete Elite Fire Sprinkler – Fire Protection Enterprise Precast – Precast Material Kruck Plumbing and Heating - Mechanical & Plumbing TSF Structures - Steel Material & Misc. Metals Van Maanen Electric – Electrical & Communications Northwest Steel - Precast & Steel Erection TriCity Electric – Audio-Visual Forman Ford – Metal Panels Wenthold Excavating – Earthwork & Utilities Academy Roofing – Roofing Absolute Group - SWPPP Ford Metro – Glass & Glazing Jordison Construction – Site Concrete Skold Door – Overhead Doors Alpha Landscapes – Landscape & Irrigation Dear Prime Contractors: We are forwarding this Change Request, briefly described as follows, for your review and response: ASI 003 Miscellaneous structural clarifications. This ASI reflects adjustments and clarifications resulting from steel and precast shop drawing review. This Change Request is further defined by the following attached documents: Drawings: S101, S102, S103, S201, S301, S302, S303, S311, S402, S403, S405, A11B Spec Sections: n/a Please mark the appropriate “Status” below, sign and re turn one copy of this Change Request to Ryan Companies US, Inc. no later than 04/2/2024. Attach a detailed proposal itemizing any cost or schedule impacts resulting from this change. Include reference to this Change Request, quantities (add or deduct), unit prices for labor and materials, and the latest date the proposal may be accepted. A lack of response by the date required above will indicate no change to your Prime Contract Agreement. Your timely response to the Change Request will be appreciated. Please call if you have any questions, or if you need additional information. DO NOT PROCEED; SUBMIT QUOTATION ONLY PROCEED WITH WORK PROCEED WITH WORK NOT TO EXCEED $ AND SUBMIT QUOTATION PROCEED WITH WORK; NO ADDITIONAL COST ANTICIPATED PROCEED WITH WORK; SUBMIT QUOTATION OTHER Sincerely, Acknowledged: RYAN COMPANIES US, INC. By: Company: Date: Status: Proposal attached Jill Boetger No impact on cost or schedule Project Manager II More information or discussion required AIA ® Document G731™ – 2019 Change Order, Construction Manager as Adviser Edition AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 1 PROJECT: (name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Waukee Public Safety Facility (WPS) Contract For: Bid Package #13 Electrical & Communications Change Order Number: WPS CO 02 (Van Maanen No. 2) 815 NW 20th Street Waukee, IA 50263 Date: 12.18.2023 Date: 05.06.2024 OWNER: (name and address) ARCHITECT: (name and address) CONSTRUCTION MANAGER: (name and address) City of Waukee OPN Architects Ryan Companies US, Inc. 230 W Hickman Road Waukee, IA 50263 100 Court Avenue, #100 Des Moines, IA 50309 111 East Grand Avenue, Des Moines, IA 50309 CONTRACTOR: (name and address) Van Maanen Electric, Inc. 500 Iowa Speedway Dr. Newton, IA 50208 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Scope modifications will include: WPS CR015: MidAm electrical service pathway changes to avoid conflicts with geothermal system and landscaping. Value of $25,570.04 The original Contract Sum was $ 4,711,425.00 Net change by previously authorized Change Orders $ 30,650.00 The Contract Sum prior to this Change Order was $ 4,742,075.00 The Contract Sum will be increased by this Change Order in the amount of $ 25,570.04 The new Contract Sum including this Change Order will be $ 4,767,645.04 The Contract Time will be increased by Zero (0) days. The Contractor’s Work shall be substantially complete on June 5, 2025. NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONSTRUCTION MANAGER, CONTRACTOR, AND OWNER. OPN Architects Ryan Companies US, Inc. ARCHITECT (Firm name) CONSTRUCTION MANAGER (Firm name) SIGNATURE SIGNATURE Danielle Hermann, Principal Jill Boetger, Senior Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE: DATE: Van Maanen Electric, Inc. City of Waukee Iowa CONTRACTOR (Firm name) OWNER (Firm name) AIA Document G731™ – 2019 (formerly G701™CMa – 1992). Copyright © 1992 and 2019 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This draft was produced by AIA software at 12:27:48 ET on 09/23/2021 under Order No.2200100983 which expires on 03/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA4A) 2 SIGNATURE SIGNATURE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Brad Deets, City Administrator DATE: DATE: Waukee Public Safety - Change Request Summary 4/24/2024 Ryan Companies US, Inc. Change Request 015 Change Request Subcontractor Comments Cost Change 15.0 Van Maanen Electric The original pathway for electrical service had conflicts with geothermal system and landscaping that caused concern for its long term performance. The original pathway had (2) conduits roughly 520-ft that the electrician had to run, with the rest of the pathway being on public property where MidAm would perform the rest of the work. The new pathway has (1) conduit roughly 1,950-ft that the electrician has to run, with majority of it being on private property where MidAm cannot perform the work. The new layout does not conflict with any other systems on the project. $25,570.04 $25,570.04 Builders Risk (.23% Cost of Work (Estimated)) Excluded per City $0.00 CMa Fee on Cost of Work (3.25%)$831.03 CMa Project Manager Time $0.00 CMa Project Superintendent Time $0.00 Change Request 15 Cost Change Total $26,401.07 Summary: MidAm service pathway changes. PR04 was issued to reflect these changes in the primary electrical routing. Change Request 15 Subtotal w PROPOSAL REQUEST – PR NO. 04 Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein. This is not a Change Order, a Construction Change Directive or a direction to proceed with the w ork described in the proposed modifications. Proceeding with the Work prior to authorization indicates your acknowledgement that there will be no change in the Contract Sum or Contract Time. Description: Revise routing of primary electrical service on utility plans per agreement with MEC. Sheets impacted: C200, C201, C202, C203, C204 OPN Architects, Inc. Date: 04/17/2024 Project: Waukee Public Safety Facility Project number: 21841001 Client: City of Waukee Construction Manager: Ryan Companies REFER TO PREVIOUS PAGE FOR CREDIT APPLIED TO OVERALL CHANGE REQUEST FUTURE WATER TOWER SAND/O IL SEPARATOR SAND/O IL SEPARATOR FUTURE BUILDING 19 20 4/0 AL PARA 4/0 AL PARA 4/0 AL PARA 4 / 0 A L P A R A EM211 EM211 EM211 E M 2 1 1      200E             01PE2451 01PE2452 01PE2453                01T43973 ABC PHS 1500 KVA 480/277 1 2 34 5 67 8 9 10 1112 1314 15 16 REFER TO SUBSEQUENT PAGES