Loading...
HomeMy WebLinkAbout2024-05-06 I08 Above Par Tech_Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 6, 2024 AGENDA ITEM: Consideration of approval of a resolution approving a site plan for Above Par Tech (1625 NW Gettysburg Lane) FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: Above Par Tech of Iowa, LLC requests approval of a site plan to authorize the construction of an industrial building for the business Above Par Tech. The site is located north of Hickman Road and east of NW 17th Street. The building will be 5,000 square feet in area and will be 21’ at the tallest point. The parcel is 1.32 acres in area. There will be one access into the site from NW Gettysburg Lane A pedestrian connection is provided into the site from the public sidewalk. A total of seven parking spaces are required and the applicant is providing eight spaces including an accessible space. The site will be serviced with utilities that have been extended throughout the overall plat. Storm water detention is provided with the regional detention basin in the vicinity. The elevations of the building are proposed to be constructed mainly of brick masonry and insulated metal panels. No monument sign is proposed. The trash enclosure will be located on the east side of the parking lot near the center of the site. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this project at the March 26, 2024, Commission Meeting and recommended approval subject to remaining staff comments: Item 7: Approval of a Site Plan for Above Par Tech (1625 NW Gettysburg Lane) Bill Mettee, Planner, introduced the request for approval of a site plan for an industrial warehouse building, as requested by Above Par Tech of Iowa, LLC, and represented by Damion Spilman of SVPA Architects. The property is located north of Hickman Road and east of NW 17th Street, containing approximately 1.32-acres. The site plan identifies the construction of one building that is 5,000 square feet in area on a 1.32-acre lot. The building will be 21-feet in height. No monument signs are proposed. The trash enclosure will be on the east side of the parking area near the center of the site. One entrance will be provided from NW Gettysburg Lane. A total of seven (7) parking spaces are required for this project. The total amount of parking proposed is eight (8) including one accessible I8 space, which meets the parking requirements. A 5-foot-wide sidewalk will be constructed on the north side of NW Gettysburg Lane, adjacent to the subject property. A pedestrian sidewalk is shown into the site from the public sidewalk. The site will be serviced with all public utilities, which are installed in the immediate vicinity of NW Gettysburg Lane. Stormwater detention will be provided with the regional detention basins in the vicinity. A minimum of 15% of the project area is required to be open space, with the total amount of open space proposed at 77%. The plantings shown on the landscape plan meet the minimum requirements of the Landscape & Open Space Ordinance. A 40-foot landscape buffer is required along the north property line abutting the R-4 parcel to the north. The building is proposed to be constructed predominantly of brick masonry and insulated metal panels. Windows and doors are shown on the south and east elevations. The site plan is in general conformance with the Zoning Ordinance, Site Plan Ordinance and Comprehensive Plan. Staff recommends approval of the site plan for Above Par Tech subject to remaining staff comments. Discussion as follows: No questions Motion by Commissioner Koelker for approval of a site Plan for Above Par Tech, 1625 NW Gettysburg Lane, seconded by Commissioner Bankole. Ayes: Streit, Koelker, Beenken, Tessau, and Bankole. Nays: None. Motion carried. STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan subject to remaining staff comments. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan & Elevations PREPARED BY: Bill Mettee, Planner REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 2024- APPROVING THE SITE PLAN FOR ABOVE PAR TECH (1625 NW GETTYSBURG LANE) IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Above Par Tech, subject to remaining staff comments on March 26, 2024; AND, WHEREAS, the Site Plan for Above Par Tech is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Above Par Tech is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 6th day of May, 2024 that the Site Plan for Above Par Tech is approved subject to remaining staff comments. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Above Par Tech - Site Plan PREPARED BY: Bill Mettee – Planner REPORT DATE: March 22, 2024 MEETING DATE: March 26, 2024 GENERAL INFORMATION Applicant / Owner: Above Par Tech of Iowa, LLC Owner’s Representative: Damion Spilman, SVPA Architects Request: The applicant is requesting approval of a site plan for an industrial warehouse building. Location and Size: Property is located north of Hickman Road and east of NW 17th Street, containing approximately 1.32-acres. Property Address: 1625 NW Gettysburg Lane AREA MAP ABOVE: Aerial of subject property (outlined in RED) in relation to the surrounding area. March 22, 2024 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant – Undeveloped Mixed Use M-1 (Light Industrial District) North Redwood at Waukee Mixed Use R-4 (Row Dwelling and Townhome Dwelling District) South Multi-Tenant Building Mixed Use M-1 (Light Industrial District) East ToyPlex Storage Buildings Mixed Use M-1 (Light Industrial District West Vacant - Undeveloped Mixed Use M-1 (Light Industrial District) PROJECT DESCRIPTION The site plan identifies the construction of one building that is 5,000 square feet in area on a 1.32-acre lot. The building will be 21-feet in height. No monument signs are proposed. The trash enclosure will be on the east side of the parking area near the center of the site. Table 1 below summarizes the bulk regulations that are applicable to the proposed development. The site plan demonstrates compliance with the bulk regulations. Table 1: Bulk Regulations for the M-1 District Category M-1 (minimum) Front Yard Setback 30 feet Rear Yard Setback 30 feet, unless the rear lot line adjoins a railroad right-of- way, in which case, none required. Side Yard Setback None required except when adjacent to R or C-1 Districts or street right-of-way line, a side yard of 40-feet shall be required. Maximum Height | Stories 40-feet and 3-stories ACCESS AND PARKING One entrance will be provided off of NW Gettysburg Lane. A total of seven (7) parking spaces are required for this project. The total amount of parking proposed is eight (8), including one accessible space. The proposed site plan meets the parking requirements. SIDEWALKS/TRAILS A 5-foot-wide sidewalk will be constructed on the north side of NW Gettysburg Lane, adjacent to the subject property. A pedestrian sidewalk is shown into the site from the public sidewalk. UTILITIES The site will be serviced with all public utilities, which are installed in the immediate vicinity of NW Gettysburg Lane. Stormwater detention will be provided with the regional detention basins in the vicinity. LANDSCAPING & OPEN SPACE A minimum of 15% of the project area is required to be open space. The total amount of open space proposed is 77%. The plantings shown on the landscape plan meet the minimum requirements of the March 22, 2024 3 of 3 Landscape & Open Space Ordinance. A 40-foot landscape buffer is required along the north property line abutting the R-4 parcel to the north. ELEVATIONS Colored building elevations are included for review. The building is proposed to be constructed predominantly of brick masonry and insulated metal panels. Windows and doors are shown on the south and east elevations. STAFF RECOMMENDATION The site plan is in general conformance with the Zoning Ordinance, Site Plan Ordinance, and Comprehensive Plan. Staff recommends approval of the site plan for Above Par Tech subject to remaining staff comments. Sc a l e : Dr a w n B y : # D a t e C o m m e n t s Revisions Ch e c k e d B y : Da t e : 3 / 2 1 / 2 0 2 4 Page M of 1 Wh i t n e y  Be a l s ,  Li g h t i n g  Sp e c i a l i s t 32 2 0  12 t h  St  SW Ce d a r  Ra p i d s ,  IA  52 4 0 4 P:  31 9 . 8 5 0 . 0 4 1 0 Ab o v e P a r T e c h Si t e L i g h t i n g L a y o u t Not to Scale PROPOSED BUILDING (5000 SF) TRASH ENCLOSURE 15' SANITARYS SEWER EASEMENT 250.00' N00%%17617'25"E 30' SETBACK 5' PEDESTRIAN ACCESS ROUTEn * H.C. SIGN EXISTINGELECTRIC 8.00' 20.00' 18.00' 10.00'(TYP.) 10.00' 1 3 . 6 2 ' 22.45' 10.00' 18.00' 18.00' 18.00' 18.00' 18.00' ) ) ) ) %% 1 3 0 %% 1 3 0 y ) 7 7 7 7 7 * W1 W1 W1 W1 0.4 0.3 0.2 0.2 0.1 0.5 0.4 0.3 0.2 0.1 0.6 0.5 0.3 0.2 0.1 2.0 1.9 1.8 1.6 1.3 1.0 0.7 0.5 0.4 0.2 0.1 2.6 2.6 2.2 1.9 1.5 1.1 0.8 0.6 0.4 0.2 0.1 3.3 3.0 2.5 2.1 1.7 1.3 0.9 0.6 0.4 0.3 0.2 4.0 3.8 3.4 2.9 2.5 1.9 1.4 1.0 0.7 0.5 0.3 0.2 4.1 3.9 3.8 3.2 2.8 2.2 1.6 1.1 0.8 0.5 0.3 0.2 4.2 4.2 4.1 3.5 3.0 2.4 1.7 1.2 0.8 0.5 0.3 0.2 4.6 4.5 4.3 3.7 3.1 2.5 1.8 1.3 0.9 0.6 0.3 0.2 5.0 4.8 4.5 3.8 3.2 2.5 1.9 1.3 0.9 0.6 0.4 0.2 4.8 4.7 4.5 3.9 3.4 2.6 1.9 1.4 0.9 0.6 0.4 0.2 4.6 4.7 4.6 4.0 3.4 2.6 1.9 1.4 0.9 0.6 0.4 0.2 4.8 4.7 4.5 3.9 3.3 2.6 1.9 1.4 0.9 0.6 0.4 0.2 4.9 4.8 4.4 3.7 3.2 2.5 1.9 1.3 0.9 0.6 0.4 0.2 4.5 4.4 4.2 3.6 3.1 2.4 1.8 1.3 0.9 0.6 0.3 0.2 4.1 4.1 4.0 3.4 3.0 2.3 1.7 1.2 0.8 0.5 0.3 0.2 3.9 3.8 3.6 3.1 2.7 2.1 1.5 1.1 0.7 0.5 0.3 0.2 3.9 3.7 3.3 2.7 2.3 1.8 1.4 1.0 0.7 0.5 0.3 0.2 3.1 3.0 2.9 2.4 2.0 1.6 1.2 0.9 0.6 0.4 0.3 0.2 2.3 2.4 2.3 2.1 1.8 1.4 1.1 0.8 0.6 0.4 0.2 0.1 1.6 1.7 1.8 1.7 1.5 1.2 0.9 0.7 0.5 0.3 0.2 0.1 1.3 1.4 1.4 1.4 1.2 1.0 0.8 0.6 0.4 0.3 0.2 0.1 1.0 1.1 1.1 1.1 0.9 0.8 0.6 0.5 0.4 0.3 0.2 0.1 0.7 0.8 0.8 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.2 0.1 Luminaire Schedule Symbol Qty Arrangement Description Tag Manufacturer Mounting Height 4 Single WDGE2 LED P4 40K 70CRI T4M W1 Lithonia Lighting 15 Calculation Summary Label CalcType Units Max Min Avg/Min Max/Min CalcPts_1 Illuminance Fc 5.0 0.1 16.70 50.00 LEVEL 1 0" LOW EAVE HEIGHT 18' -0" HIGH EAVE HEIGHT 20' -1" 1/2" / 1'-0" BRK WDW IMP-1 MTLF SSMR GU DS HOSE BIBB DIMENSIONAL LETTERS LOGO WDW LEVEL 1 0" HIGH EAVE HEIGHT 20' -1" BRK SF IMP-1 IMP-2 IMP-2 HMDFOHDOHD MTLF SSMR WALL PACK WALL PACK WALL PACK WALL PACK IMP-2 LEVEL 1 0" LOW EAVE HEIGHT 18' -0" DS GU SSMR MTLF BRK IMP-1 DS DS DS DS TO STORM, TYP OF 5 LEVEL 1 0" LOW EAVE HEIGHT 18' -0" HIGH EAVE HEIGHT 20' -1" 1/2" / 1'-0" IMP-1 MTLF SSMR GU DS EXTERIOR MATERIALS WAUKEE ZONING SECTION 160.07 SITE AND BUILDING DESIGN STANDARDS 1. BUILDINGS SHALL BE COMPATIBLE IN ARCHITECTURAL STYLE OR THEME WITH SURROUNDING BUILDINGS. 2. BUILDINGS SHALL BE DESIGNED WITH EMPHASIS PLACED UPON PROMOTING INTEREST ON THOSE FACADES FACING A PUBLIC STREET RIGHT-OF-WAY AND BREAKING UP LONG EXPANSES OF CONTINUOUS WALLS WITH SPECIFIC CONSIDERATION GIVEN TO THE TREATMENT OF ENTRANCES, DOORS, AND WINDOW AREAS. 3. BUILDINGS WITHIN THE INDUSTRIAL DISTRICT SHALL BE DESIGNED UTILIZING PRIMARY MATERIALS ON THOSE ELEVATIONS FACING A PUBLIC STREET RIGHT-OF-WAY INCLUDING: A. ALUMINUM COMPOSITE MATERIALS B. BRICK C. CAST STONE D. GLASS E. PLATE CLADDING SYSTEM F. PRECAST CONCRETE PANELS G. FIBER CEMENT SIDING 4. SECONDARY MATERIALS USED ON THE REMAINDER OF THE BUILDING AND COMPROMISING NOT MORE THAN 40 PERCENT OF ALL ELEVATIONS SHALL INCLUDE BUT NOT BE LIMITED TO: A. ARCHITECTURAL METALS (INSULATED METAL PANELS, CORRUGATED METAL PANELS OR SIMILAR MATERIALS) B. EIFS C. SPLIT FACED BRICK D. STRUCTURAL COMPOSITE SANDWICH PANELING E. TILING F. THOSE MATERIALS LISTED AS PRIMARY MATERIALS EXTERIOR MATERIALS: SF & PERCENTAGE BRICK VENEER 171 NORTH SOUTH EAST WEST SF % SF % SF % SF % 18 CLASS CLASS CLASS CLASS P 100 S 199 P 337 P12 19 INSULATED METAL PANELS 962 730 1308 147476 81 81S S S GLASS 100 P764 P6 TOTALS 100 965 100 1607 100 1811 100962 EXTERIOR MATERIALS IMP-1 BRK BRICK MASONRY INSULATED METAL PANEL IMP-2 INSULATED METAL PANEL ABBREVIATION MATERIAL COLOR MANUFACTURER* SIOUX CITY BRICKEBONITE VELOUR CENTRIALIMESTONE CENTRIACHARCOAL GRAY MODEL/STYLE UTILITY FORMAWALL DIMENSION FORMAWALL DIMENSION OHD OVERHEAD DOOR SSMR STANDING SEAM METAL ROOF NUCORCHARCOAL CFR OVERHEAD DOORGRAY THERMACORE 596 HMDF HOLLOW METAL DOOR AND FRAME GU METAL GUTTER DS METAL DOWNSPOUT *MANUFACTURERS LISTED ARE BASIS OF DESIGN. OTHER EQUIVALENT MANUFACTURERS MAY BE USED. CHARCOAL CHARCOAL CHARCOAL COLOR TO MATCH ROOF COLOR TO MATCH ROOF COLOR TO MATCH ROOF MTLF METAL FASCIA CHARCOAL COLOR TO MATCH ROOF SF ALUMINUM FRAMED STOREFRONT KAWNEERBLACK 2" X 4 1/2" FRAMING WDW ALUMINUM FRAMED WINDOW KAWNEERBLACK 2" X 4 1/2" FRAMING PROJECT NUMBER NO T F O R CO N S T R U C T I O N THESE DOCUMENTS HAVE BEEN PREPARED SPECIFICALLY FOR THE ABOVE REFERENCED PROJECT. THEY ARE NOT SUITABLE FOR USE ON OTHER PROJECTS OR IN OTHER LOCATIONS WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF SVPA ARCHITECTS INC. REPRODUCTION IS PROHIBITED. REVISIONS ISSUANCE Au t o d e s k D o c s : / / 2 4 0 0 3 _ A b o v e P a r T e c h / 2 4 0 0 3 _ A B O V E P A R T E C H _ A R C H _ R 2 3 . r v t 4/ 3 / 2 0 2 4 9 : 2 8 : 3 8 A M A200 EXTERIOR ELEVATIONS 24003 02/02/2024 CITY SUBMITTAL 2024 ABOVE PAR TECH WAREHOUSE 1625 NW GETTYSBURG LN WAUKEE, IA 50263 SCALE:1/8" = 1'-0"2 EXTERIOR ELEVATION - SOUTH SCALE:1/8" = 1'-0"1 EXTERIOR ELEVATION - EAST SCALE:1/8" = 1'-0"3 EXTERIOR ELEVATION - WEST SCALE:1/8" = 1'-0"4 EXTERIOR ELEVATION - NORTH 02/21/2024 2ND CITY SUBMITTAL 03/07/2024 3RD CITY SUBMITTAL 03/21/2024 4TH CITY SUBMITTAL 04/03/2024 5TH CITY SUBMITTAL A201 2 A201 4 A2015 A201 3 6 A201 A201 8 7 A201 CONC BOLLARD, TYP OF 5 1' - 0 " 1 0 ' - 0 " 1 ' - 0 " 8 YD DUMPSTER 7' X 7' X 6.5'H 7' - 0 " 7' - 0" TYP 6" 10' - 0" 12 ' - 0 " 1' - 0" 6" 1' - 0" 6" TRASH ENCLOSURE -1' -6" 7 A201 STRUCTURAL BRICK - MATCH WAINSCOT METAL COPING CONC BOLLARD, PAINTED, TYP 6' - 8 " PREFINISHED METAL LOUVER - SHADOW 80% BY AMETCO TRASH ENCLOSURE -1' -6" TRASH ENCLOSURE -1' -6" TRASH ENCLOSURE -1' -6" STRUCTURAL BRICK SEALANT (4) HEAVY DUTY HINGES WELD TO GATE AND FRAME METAL LATCH PIN AND SLEEVE W/ WELD PLATE PROVIDE HOLE IN CONCRETE AT CLOSED POSITION AND METAL SLEEVE RECEPTOR IN CONCRETE AT OPEN POSITION. PREFINISHED STEEL LOUVER GALV. HSS6X4X1/4 STEEL TUBE CLOSE TOP END OF FRAME HOLD OFF SLAB 8" - PAINT GALV. 3/8" X 6" CONT. WELD PLATE W/ 1/2" DIA. EMBED ANCHOR AT 24" O.C. GALV. HSS4X2X1/4 STEEL TUBE GROUT SOLID TOP OF CONC SLAB (0'-0" A.F.F) EMBEDDED STEEL PLATE - SEE DETAIL HEAVY DUTY HINGE - SEE DETAIL TOP OF CMU (+6'-8" A.F.F)12 GAUGE GALVANIZED METAL DOORS (PAINTED) GRADE-SEE SITE GALVANIZED STEEL TUBE. PAINT FINISH. SEE DETAIL. 18" DIA. CONCRETE FOOTING 3'-6" DEEP 6" DIA. - 3/8" STEEL BOLLARD - FILL W/ CONCRETE (PRIME AND PAINT YELLOW) ROUND TOP OF CONCRETE AND PAINT 4" PREFINISHED METAL COPING OVER TREATED WOOD BLOCKING EXPANSION BOARD WITH SEALANT AT PERIMETER PREFINISHED METAL LOUVER - SHADOW 80% BY AMETCO SEE PLAN FOR FOUNDATION OPTION 8" STRUCTURAL BRICK - UTILITY - MATCH WAINSCOT 8" 3' - 6 " 3 ' - 6 " 1-1/8" O.D. TUBE W/ 1/8" THICK WALL CONTINUOUS FILLET WELD TO DOOR FRAME 3/4" DIA. SOLID ROD LATCH BOLT 1-1/4" X 1/2" DIA. SOLID ROD LATCH REST WITH 3/4" SHOULDER (X2 PER DOOR) STAINLESS STEEL RECEIVER SLEEVE RECESSED INTO CONCRETE SLAB DOOR FRAME 3/4" DIA. SOLID ROD HANDLE 4"X2"X1/4" STEEL TUBE DASHED LINE INDICATES LATCH BOLT IN CLOSED POSITION CONCRETE PAVING - SEE CIVIL FILLET WELD AND GRID SMOOTH PRIOR TO PAINTING 3/16" DIAMETER ANTI-THEFT PIN INSERTED THROUGH LATCH BOLT AFTER INSTALLATION - TACK WELD IN PLACE PRIOR TO PAINTING HANDLE LATCH 2" 4 " 3 " 5 " 4" 2 1/4" 1/ 4 " 2 " 1 / 8 " 1/4" 1 3/8" 1/4" 7/8" R 1 " 2 1/4" 1' - 0 " R 1 " T Y P PROJECT NUMBER NO T F O R CO N S T R U C T I O N THESE DOCUMENTS HAVE BEEN PREPARED SPECIFICALLY FOR THE ABOVE REFERENCED PROJECT. THEY ARE NOT SUITABLE FOR USE ON OTHER PROJECTS OR IN OTHER LOCATIONS WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF SVPA ARCHITECTS INC. REPRODUCTION IS PROHIBITED. REVISIONS ISSUANCE Au t o d e s k D o c s : / / 2 4 0 0 3 _ A b o v e P a r T e c h / 2 4 0 0 3 _ A B O V E P A R T E C H _ A R C H _ R 2 3 . r v t 4/ 3 / 2 0 2 4 9 : 2 8 : 3 9 A M A201 TRASH ENCLOSURE PLAN, ELEVATIONS AND DETAILS 24003 02/02/2024 CITY SUBMITTAL 2024 ABOVE PAR TECH WAREHOUSE 1625 NW GETTYSBURG LN WAUKEE, IA 50263 SCALE:1/2" = 1'-0"1 TRASH ENCLOSURE FLOOR PLAN SCALE:1/2" = 1'-0"2 WEST ELEVATION SCALE:1/2" = 1'-0"3 SOUTH ELEVATION SCALE:1/2" = 1'-0"4 NORTH ELEVATION SCALE:1/2" = 1'-0"5 EAST ELEVATION SCALE:3" = 1'-0"8 TRASH ENCLOSURE DOOR DETAILS SCALE:1/2" = 1'-0"6 TRASH ENCLOSURE SECTION SCALE:1 1/2" = 1'-0"7 HANDLE / LATCH DETAILS 02/21/2024 2ND CITY SUBMITTAL 03/07/2024 3RD CITY SUBMITTAL 03/21/2024 4TH CITY SUBMITTAL 04/03/2024 5TH CITY SUBMITTAL