Loading...
HomeMy WebLinkAbout2024-05-20 I13 Willard Garage_Site Plan AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 20, 2024 AGENDA ITEM: Consideration of approval of a resolution approving a site plan for Willard Garage (35 NE Venture Drive) FORMAT: Resolution SYNOPSIS INCLUDING PRO & CON: Five F / Brian Willard requests approval of a site plan to authorize the construction of Willard Garage, an automotive repair business. The site is located north of Hickman Road and east of North Warrior Lane. The building will be 12,980 square feet in area and will be 17’ 10” at the tallest point. There will be one access into the site, from NE Venture Drive. A pedestrian connection is provided into the site from the five-foot sidewalk that will be installed with this project. A total of 34 parking spaces are required and the applicant is providing 64 spaces including three accessible spaces. The site will be serviced with utilities that exist in the immediate vicinity of the property. Storm water detention is provided with a basin along the north side of the site. The elevations of the building are proposed to be constructed mainly of concrete Nichiha panels, CMU block, metal panels and storefront system. A monument sign will be located at the southwest corner of the site. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: COMMISSION/BOARD/COMMITTEE COMMENT: The Planning and Zoning Commission reviewed this project at the May 14, 2024, Commission Meeting and recommended approval: Item 7: Approval of a Site Plan for Willard Garage (35 NE Venture Drive) Bill Mettee, City Planner, introduced the request for approval of a site plan for an industrial warehouse building, as requested by Five F/Brian Willard, represented by Monte Applegate of Snyder & Associates. The subject property is located north of Hickman Road and east of North Warrior Lane, containing approximately 1.53-acres. The site plan identifies the construction of an automotive repair building that is 12,980 square feet in area. The building will be 17-feet in height. A monument sign and trash enclosure are shown on the site plan. One entrance will be provided from NE Venture Drive. A total of 34 parking spaces are required for this project, with the applicant providing 64 spaces including 3 accessible spaces. A five-foot sidewalk will be constructed on the north side of NE Venture Drive. A pedestrian sidewalk is shown to the site from the public sidewalk. The utilities will be serviced with all public utilities which are installed in the I13 immediate vicinity. Storm water detention will be provided with a basin located at the rear of the property. A minimum of 15% of the project area is required to be open space. The total amount of open space proposed is 26.4%. The plantings shown on the landscape plan meet the minimum requirements of the Landscape & Open Space Ordinance. The building is proposed to be constructed predominantly of concrete Nichiha panels, metal panels and storefront system. The trash enclosure will be constructed of CMU block. The site plan is in general conformance with the Zoning Ordinance, Site Plan Ordinance, and Comprehensive Plan. Staff recommends approval of the site plan for Willard Garage subject to remaining staff comments. Discussion as follows: • General discussion of parking and space required for this type of business. Motion by Commissioner Streit for approval of a site plan for Willard Garage, seconded by Commissioner Koelker. Ayes: Streit, Koelker, Beenken, Tessau, and Lohse. Nays: None. Motion carried. STAFF REVIEW AND COMMENT: Staff recommends approval of the site plan. RECOMMENDATION: Approve the resolution. ATTACHMENTS: I. Proposed Resolution II. Staff Report III. Site Plan & Elevations PREPARED BY: Bill Mettee, Planner REVIEWED BY: THE CITY OF WAUKEE, IOWA RESOLUTION 2024- APPROVING THE SITE PLAN FOR WILLARD GARAGE (35 NE VENTURE DRIVE) IN THE NAME AND BY THE AUTHORITY OF THE CITY OF WAUKEE, IOWA WHEREAS, the City of Waukee, Dallas County, State of Iowa, is a duly organized Municipal Organization; AND, WHEREAS, the City of Waukee Planning and Zoning Commission recommended approval of the Site Plan for Willard Garage on May 14, 2024; AND, WHEREAS, the Site Plan for Willard Garage is in general conformance with §160 – Site and Building Development Standards Ordinance of the Waukee Municipal Code; AND, WHEREAS, the Site Plan for Willard Garage is in general conformance with §161 – Landscaping and Open Space Ordinance of the Waukee Municipal Code; AND, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Waukee, Iowa on this 20th day of May, 2024 that the Site Plan for Willard Garage is approved. ____________________________ Courtney Clarke, Mayor Attest: ___________________________________ Rebecca D. Schuett, City Clerk RESULTS OF VOTE: AYE NAY ABSENT ABSTAIN R. Charles Bottenberg Chris Crone Rob Grove Anna Bergman Pierce Ben Sinclair PLANNING AND ZONING COMMISSION STAFF REPORT PROJECT: Willard Garage - Site Plan PREPARED BY: Bill Mettee – Planner REPORT DATE: May 10, 2024 MEETING DATE: May 14, 2024 GENERAL INFORMATION Applicant / Owner: Five F / Brian Willard Owner’s Representative: Monte Applegate, Snyder & Associates Request: The applicant is requesting approval of a site plan for an industrial warehouse building. Location and Size: Property is located north of Hickman Road and east of N Warrior Lane, containing approximately 1.53-acres. Property Address: 35 NE Venture Drive AREA MAP ABOVE: Aerial of subject property (outlined in RED) in relation to the surrounding area. May 10, 2024 2 of 3 LAND USES AND ZONING Location Existing Land Use Comprehensive Plan Current Zoning Property in Question Vacant – Undeveloped Community Commercial M-1 (Light Industrial District) North Waukee Community Church Community Commercial M-1 (Light Industrial District) South Storage Mart Mixed Use M-1 (Light Industrial District) East Warehouse Buildings Community Commercial M-1 (Light Industrial District West Multi-Tenant Office Building Community Commercial C-1 (Community and Highway Service Commercial District) PROJECT DESCRIPTION The site plan identifies the construction of an automotive repair building that is 12,980 square feet in area on a 1.53-acre lot. The building will be 17-feet in height. A monument sign is shown near the southeast corner of the site. The trash enclosure will be in the southwest corner of the site. Table 1 below summarizes the bulk regulations that are applicable to the proposed development. The site plan demonstrates compliance with the bulk regulations. Table 1: Bulk Regulations for the M-1 District Category M-1 (minimum) Front Yard Setback 30 feet Rear Yard Setback 30 feet, unless the rear lot line adjoins a railroad right-of- way, in which case, none required. Side Yard Setback None required except when adjacent to R or C-1 Districts or street right-of-way line, a side yard of 40-feet shall be required. Maximum Height | Stories 40-feet and 3-stories ACCESS AND PARKING One entrance will be provided off of NE Venture Drive. A total of 34 parking spaces are required for this project. The applicant is providing 64 spaces including three accessible spaces. The proposed site plan meets the parking requirements. SIDEWALKS/TRAILS A 5-foot-wide sidewalk will be constructed on the north side of NE Venture Drive, adjacent to the subject property. A pedestrian sidewalk is shown into the site from the public sidewalk. UTILITIES The site will be serviced with all public utilities, which are installed in the immediate vicinity of NE Venture Drive. Stormwater detention will be provided with a basin located at the rear of the property. May 10, 2024 3 of 3 LANDSCAPING & OPEN SPACE A minimum of 15% of the project area is required to be open space. The total amount of open space proposed is 26.4%. The plantings shown on the landscape plan meet the minimum requirements of the Landscape & Open Space Ordinance. ELEVATIONS Colored building elevations are included for review. The building is proposed to be constructed predominantly of concrete Nichiha panels and metal panels and storefront system. The trash enclosure will be constructed of CMU block. STAFF RECOMMENDATION The site plan is in general conformance with the Zoning Ordinance, Site Plan Ordinance, and Comprehensive Plan. Staff recommends approval of the site plan for Willard Garage. NE VENTURE DR N W A R R I O R L N HICKMAN RD NE SUNRISE DR NE D A R T M O O R D R V: \ P r o j e c t s \ 2 0 2 3 \ 1 2 3 . 1 5 1 4 . 0 1 \ C A D D \ S P 0 1 _ 1 2 3 1 5 1 4 _ T I T L . d w g JA K E R . C A M P O S , TI T L E S H E E T , 20 2 4 / 0 5 / 0 8 , 9: 0 2 A M , AN S I F U L L B L E E D D ( 3 4 . 0 0 X 2 2 . 0 0 I N C H E S ) BY DA T E RE V I S I O N MA R K Sc a l e : Te c h n i c i a n : T- R - S : SN Y D E R & A S S O C I A T E S , I N C . | Ch e c k e d B y : En g i n e e r : Da t e : 1" = Pr o j e c t N o : Sh e e t Project No: Sheet 27 2 7 S . W . S N Y D E R B L V D AN K E N Y , I O W A 5 0 0 2 3 51 5 - 9 6 4 - 2 0 2 0 | w w w . s n y d e r - a s s o c i a t e s . c o m MA A JR C JL H 03 - 0 5 - 2 0 2 4 50 0 ' 12 3 . 1 5 1 4 . 0 1 C1 0 0 123.1514.01 C100 WI L L A R D G A R A G E TI T L E S H E E T WA U K E E , I O W A PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S 03 - 2 0 - 2 4 04 - 0 2 - 2 4 04 - 1 8 - 2 4 05 - 0 7 - 2 4 JR C JR C JR C JR C 1234 TT N - R R W - S S SITE PLAN FOR WILLARD GARAGE 35 NE VENTURE DRIVE CITY OF WAUKEE, DALLAS COUNTY, IOWA VICINITY MAP PROJECT LOCATION SCALE: 1" = 500' OWNER FIVE F 465 SE ALICE'S RD, SUITE G WAUKEE, IA 50263 CONTACT: BRIAN WILLARD PHONE: 515-987-9025 EMAIL: JETTECH401@GMAIL.COM APPLICANT DOWNING CONSTRUCTION 509 E SCENIC VALLEY AVE INDIANOLA, IA 51125 CONTACT: NICK WELTER PHONE: 515-961-5386 EMAIL: nickw@downingconstruct.com P E F RO S S O N LA I AC PNALCDS CARH E CE T TII A ETST F IO AW O License Expires: June 30, 2024 MONTE A. APPELGATE 342 LANDSCAPE ARCHITECT NO. Monte A. Appelgate, PLA License Number Pages or sheets covered by this seal: 342 Date I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and responsible charge. I am a duly licensed Professional Landscape Architect under the laws of the State of Iowa. I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. Jon L. Hanson, P.E.Date License Number P15562 My License Renewal Date is December 31, 2024 Pages or sheets covered by this seal: JON L. HANSON P15562 D P R O F E L NS E ICE IONAL EN G I N E ER AIOW SS Sheet List Table Sheet Number Sheet Title C100 TITLE SHEET C101 PROJECT INFORMATION C200 DIMENSION AND UTILITY PLAN C300 SITE GRADING AND EROSION CONTROL PLAN C301 DETAILED GRADING AND EROSION CONTROL PLAN C400 STORM SEWER PLAN C500 PLANTING PLAN V: \ P r o j e c t s \ 2 0 2 3 \ 1 2 3 . 1 5 1 4 . 0 1 \ C A D D \ S P 0 1 _ 1 2 3 1 5 1 4 _ T I T L . d w g JA K E R . C A M P O S , PR O J E C T I N F O R M A T I O N , 20 2 4 / 0 5 / 0 8 , 9: 0 2 A M , AN S I F U L L B L E E D D ( 3 4 . 0 0 X 2 2 . 0 0 I N C H E S ) BY DA T E RE V I S I O N MA R K Sc a l e : Te c h n i c i a n : T- R - S : SN Y D E R & A S S O C I A T E S , I N C . | Ch e c k e d B y : En g i n e e r : Da t e : 1" = Pr o j e c t N o : Sh e e t Project No: Sheet 27 2 7 S . W . S N Y D E R B L V D AN K E N Y , I O W A 5 0 0 2 3 51 5 - 9 6 4 - 2 0 2 0 | w w w . s n y d e r - a s s o c i a t e s . c o m MA A JR C JL H 03 - 0 5 - 2 0 2 4 NO N E 12 3 . 1 5 1 4 . 0 1 C1 0 1 123.1514.01 C101 WI L L A R D G A R A G E PR O J E C T I N F O R M A T I O N WA U K E E , I O W A PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S 03 - 2 0 - 2 4 04 - 0 2 - 2 4 04 - 1 8 - 2 4 05 - 0 7 - 2 4 JR C JR C JR C JR C 1234 TT N - R R W - S S UTILITY QUALITY SERVICE LEVELS QUALITY LEVELS OF UTILITIES ARE SHOWN IN THE PARENTHESES WITH THE UTILITY TYPE AND WHEN APPLICABLE, SIZE. THE QUALITY LEVELS ARE BASED ON THE CI / ASCE 38-02 STANDARD. QUALITY LEVEL (D) INFORMATION IS DERIVED FROM EXISTING UTILITY RECORDS OR ORAL RECOLLECTIONS. QUALITY LEVEL (C) INFORMATION IS OBTAINED BY SURVEYING AND PLOTTING VISIBLE ABOVE-GROUND UTILITY FEATURES AND USING PROFESSIONAL JUDGMENT IN CORRELATING THIS INFORMATION WITH QUALITY D INFORMATION. QUALITY LEVEL (B) INFORMATION IS OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE AND APPROXIMATE HORIZONTAL POSITION OF SUBSURFACE UTILITIES. QUALITY LEVEL (A) IS HORIZONTAL AND VERTICAL POSITION OF UNDERGROUND UTILITIES OBTAINED BY ACTUAL EXPOSURE OR VERIFICATION OF PREVIOUSLY EXPOSED SUBSURFACE UTILITIES, AS WELL AS THE TYPE, SIZE, CONDITION, MATERIAL, AND OTHER CHARACTERISTICS. UTILITY WARNING THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES OR SUBSURFACE FEATURES SHOWN COMPRISE ALL SUCH ITEMS IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UTILITIES OR SUBSURFACE FEATURES SHOWN ARE IN THE EXACT LOCATION INDICATED EXCEPT WHERE NOTED AS QUALITY LEVEL A. FEATURES EXISTING PROPOSED Spot Elevation Contour Elevation Fence (Barbed, Field, Hog) Fence (Chain Link) Fence (Wood) Fence (Silt) Tree Line Tree Stump Deciduous Tree \\ Shrub Coniferous Tree \\ Shrub Communication Overhead Communication Fiber Optic Underground Electric Overhead Electric Gas Main with Size High Pressure Gas Main with Size Water Main with Size Sanitary Sewer with Size Duct Bank Test Hole Location for SUE w/ID (*) Denotes the survey quality service level for utilities Sanitary Manhole Storm Sewer with Size Storm Manhole Single Storm Sewer Intake Double Storm Sewer Intake Fire Hydrant Fire Hydrant on Building Water Main Valve Water Service Valve Well Utility Pole Guy Anchor Utility Pole with Light Utility Pole with Transformer Street Light Yard Light Electric Box Electric Transformer Traffic Sign Communication Pedestal Communication Manhole Communication Handhole Fiber Optic Manhole Fiber Optic Handhole Gas Valve Gas Manhole Gas Apparatus Fence Post or Guard Post Underground Storage Tank Above Ground Storage Tank Sign Satellite Dish Mailbox Sprinkler Head Irrigation Control Valve LEGEND ○ 1 2 2 5 X 1225.25 ● X 1 2 2 5 1225.25 FEATURES FOUND SET Section Corner 1/2" Rebar, Cap # 11579 (Unless Otherwise Noted) ROW Marker ROW Rail Control Point Bench Mark Platted Distance P Measured Bearing & Distance M Recorded As R Deed Distance D Calculated Distance C Minimum Protection Elevation MPE Centerline Section Line 1/4 Section Line 1/4 1/4 Section Line Easement Line UTILITY CONTACT INFORMATION UTILITY CONTACT FOR MAPPING INFORMATION SHOWN AS RECEIVED FROM THE IOWA ONE CALL DESIGN REQUEST SYSTEM, TICKET NUMBER 552400032. FO1-FIBER OPTIC CENTURYLINK SADIE HULL (918)-547-0147 SADIE.HULL@LUMEN.COM NO RESPONSE MEDIACOM JERRY BROUGHTON (845)-587-2521 JBROUGHTON@MEDIACOMCC.COM FO14-FIBER OPTIC CONSOLIDATED COMMUNICATIONS PHILLIP WILLIAMS JR (515)-867-4769 PHILLIP.WILLIAMS@CONSOLIDATED.COM FO4-FIBER OPTIC AUREON NETWORK SERVICES Jeff Klocko (515)-830-0445 JEFF.KLOCKO@AUREON.COM UE1-UNDERGROUND ELECTRIC MIDAMER-ELEC JAMIE NEER (515)-252-6972 MECDSMDESIGNLOCATES@MIDAMERICAN.COM NO RESPONSE VERIZON INVESTIGATIONS (469)-886-4090 INVESTIGATIONS@VERIZON.COM NO RESPONSE MI-FIBER JUSTIN MILLER (515)-897-8802 JMILLER@MI-FIBER.NET NO RESPONSE WAUKEE, CITY OF TIM ROYER (515)-978-7920 TROYER@WAUKEE.ORG CLEAR PER EMAIL XENIA RURAL WATER DISTRICT LAIRD VAN DEE (515)-676-2117 LVANDEE@XENIAWATER.ORG CONTROL POINTS IOWA SOUTH STATE PLANE COORDINATE SYSTEM NAD83(2011)(EPOCH 2010.00) IARTN DERIVED - US SURVEY FEET CP1 N=589621.83 E=1539093.82 Z=1024.01 CUT "X" ON CURB 15' SOUTH OF THE NORTHWEST CORNER OF PARKING LOT TO REDLINE CROSSFIT, NORTHEAST SIDE OF SITE. CP2 N=589138.94 E=1539117.04 Z=1023.27 CUT "X" ON CURB RADIUS 15' EAST OF INTAKE AT ENTRANCE TO STORAGE MART, SOUTHEAST CORNER OF SITE. CP3 N=589141.47 E=1538851.47 Z=1021.37 CUT "X" ON CURB 3' NORTH OF SPEED LIMIT SIGN ON THE SOUTH SIDE OF VENTURE DRIVE, SOUTHWEST CORNER OF SITE. CP4 N=589380.28 E=1538885.52 Z=1023.40 CUT "X" ON CURB CORNER 30' SOUTHEAST OF BRICK BUILDING, WEST SIDE OF SITE. CP5 N=589589.30 E=1538960.55 Z=1022.52 CUT "X" ON EAST CURB CORNER OF PARKING LOT TO WAUKEE COMMUNITY CHURCH, NORTHWEST CORNER OF SITE. BENCHMARKS NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88 - GEOID12A) IARTN DERIVED - US SURVEY FEET BM500 N=589408.86 E=1538878.09 ELEV=1024.43 TRIANGLE AT SOUTHEAST CORNER OF CONCRETE TRANSFORMER PAD, WEST SIDE OF SITE. BM501 N=589128.26 E=1538972.05 ELEV=1023.97 BURY BOLT ON HYDRANT ON THE SOUTH SIDE OF VENTURE DRIVE SOUTH OF FOR SALE SIGN, SOUTH SIDE OF SITE. DATE OF SURVEY JANUARY 3, 2024 PROPERTY DESCRIPTION ENTERPRISE BUSINESS PARK PLAT 1, LOT 5 PROPERTY ADDRESS 35 NE VENTURE DR. WAUKEE, IOWA 50263 ZONING M-1: LIGHT-INDUSTRIAL DISTRICT BULK REGULATIONS MAX HEIGHT: 40 FEET BUILDING HEIGHT: 17 FEET 10.5 INCHES MAX # OF STORIES: 3 FRONT YARD SETBACK: 30 FEET REAR YARD SETBACK: 30 FEET SIDE YARD SETBACK: NONE, EXCEPT WHEN ADJACENT TO R OR C-1 DISTRICT OR STREET ROW THEN 40' TOTAL LOT AREA 66,704 SF TOTAL DISTURBED AREA 66,704 SF PROPOSED BUILDING FOOTPRINT 12,980 SF PROPOSED PAVEMENTS 36,140 SF TOTAL IMPERVIOUS AREA (OVERALL)49,120 SF MINIMUM OPEN SPACE: 15% 66,704 SF X0.15 = 10,006 SF REQUIRED 17,584 SF PROVIDED (26.4%) GENERAL USE CONTRACTOR SUITES PARKING REQUIREMENTS 1.5 SPACES PER 1000 SF OF GROSS FLOOR AREA 22,400 SF/1000 x 1.5 PARKING STALLS= 34 STALLS REQUIRED =64 STALLS PROVIDED (INCLUDING 3 HANDICAP STALLS) GENERAL NOTES A. NOTIFY UTILITY PROVIDERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES AND COORDINATE WITH UTILITY PROVIDERS AS NECESSARY DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXISTENCE, EXACT LOCATION, AND DEPTH OF ALL UTILITIES. PROTECT ALL UTILITY LINES AND STRUCTURES NOT SHOWN FOR REMOVAL OR MODIFICATION. ANY DAMAGES TO UTILITY ITEMS NOT SHOWN FOR REMOVAL OR MODIFICATION SHALL BE REPAIRED TO THE UTILITY OWNER'S SPECIFICATIONS AT THE CONTRACTOR'S EXPENSE. B. CONSTRUCTION OF ALL STREET AND UTILITY IMPROVEMENTS SHALL CONFORM TO THE 2023 WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS, 2024 STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS) AND THE SOILS REPORTS PREPARED BY OTHERS. C. LENGTH OF UTILITIES SHOWN ON PLANS ARE DIMENSIONED FROM CENTERLINE OF STRUCTURE TO CENTERLINE OF STRUCTURE. D. ALL TRAFFIC CONTROL SHALL BE PROVIDED IN ACCORDANCE WITH REQUIREMENTS SET FORTH IN THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). WHEN CONSTRUCTION ACTIVITIES OBSTRUCT PORTIONS OF THE ROADWAY, FLAGGERS SHALL BE PROVIDED. FLAGGERS SHALL CONFORM TO THE MUTCD IN APPEARANCE, EQUIPMENT AND ACTIONS. THE CONTRACTOR SHALL NOTIFY THE CITY OF WAUKEE AT LEAST ONE WEEK PRIOR TO ANY ANTICIPATED LANE CLOSURE. E. NOTIFY OWNER, ENGINEER, CITY OF WAUKEE AT LEAST 48 HOURS PRIOR TO BEGINNING WORK. CONTRACTOR SHALL ALSO NOTIFY THE CITY OF WAUKEE PUBLIC WORKS DEPARTMENT AT LEAST 48 HOURS PRIOR TO ANY PLANNED WEEKEND OR HOLIDAY WORK. F. CONSTRUCT MANHOLES AND APPURTENANCES AS WORK PROGRESSES. BACKFILL WITH SUITABLE MATERIAL AND COMPACT TO 95% MAXIMUM DENSITY. G. IN THE EVENT OF A DISCREPANCY BETWEEN THE QUANTITY ESTIMATES AND THE DETAILED PLANS, THE DETAILED PLANS SHALL GOVERN. H. ALL FIELD TILES ENCOUNTERED DURING CONSTRUCTION SHALL BE RECONNECTED OR REPAIRED AND NOTED ACCORDINGLY ON THE AS-BUILT DOCUMENTS. I. DIMENSIONS, BUILDING LOCATION, UTILITIES AND GRADING OF THIS SITE ARE BASED ON AVAILABLE INFORMATION AT THE TIME OF DESIGN. DEVIATIONS MAY BE NECESSARY IN THE FIELD. ANY SUCH CHANGES OR CONFLICTS BETWEEN THIS PLAN AND FIELD CONDITIONS ARE TO BE REPORTED TO THE ARCHITECT/ENGINEER PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT VERIFICATION OF ALL SITE IMPROVEMENTS PRIOR TO CONSTRUCTION. CONTACT CITY OF WAUKEE FOR APPROVAL OF ANY CHANGES AND THAT ANY CHANGES COMPLETED WITHOUT APPROVAL ARE SUBJECT TO REMOVAL IN ORDER TO MEET THE CITY OF WAUKEE STANDARDS. J. CONTRACTOR TO LOAD AND TRANSPORT ALL MATERIALS CONSIDERED TO BE UNDESIRABLE TO BE INCORPORATED INTO THE PROJECT TO AN APPROVED OFF-SITE WASTE SITE. K. CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL FROM ALL AREAS TO BE CUT OR FILLED. RESPREAD TO FINISH GRADES TO MEET SUDAS SPECIFICATIONS SECTION 2010 FOR TOPSOIL. L. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN ARE FINISHED GRADES AND/OR TOP OF PAVING SLAB (GUTTER), UNLESS OTHERWISE NOTED. M. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING DIRT AND DEBRIS FROM NEIGHBORING STREETS, DRIVEWAYS, AND SIDEWALKS CAUSED BY CONSTRUCTION ACTIVITIES AT THE END OF EACH WORK DAY AND PRIOR TO A RAIN EVENT. N. THE ADJUSTMENT OF ANY EXISTING UTILITY APPURTENANCES TO FINAL GRADE IS CONSIDERED INCIDENTAL TO THE SITE WORK. O. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING EROSION AND SEDIMENT CONTROL MEASURES AS NECESSARY. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR MAINTAINING ANY EXISTING EROSION CONTROL MEASURES ON SITE AT THE TIME OF CONSTRUCTION. GRADING AND SOIL EROSION CONTROL CODE REQUIREMENTS SHALL BE MET BY CONTRACTOR. A COSESCO PERMIT IS REQUIRED FOR THIS PROJECT. P. CONTRACTOR TO COORDINATE NATURAL GAS, ELECTRICAL, TELEPHONE AND ANY OTHER FRANCHISE UTILITY SERVICES WITH UTILITY SERVICE PROVIDER, CITY OF WAUKEE, AND THE OWNER PRIOR TO CONSTRUCTION. Q. IF STORM SEWER CROSSES ABOVE WATER MAIN OR CROSSES LESS THAN 18" BELOW A WATER MAIN THEN STORM SEWER SHALL BE CONSTRUCTED OF REINFORCED CONCRETE WITH A FLEXIBLE O-RING GASKET RATED AT 13 PSI OR GREATER. O-RING GASKET JOINTS SHALL BE INSTALLED ON EACH SIDE OF THE CROSSING UNTIL THE NORMAL DISTANCE FROM THE WATER MAIN TO THE STORM SEWER IS AT LEAST TEN FEET. R. A PRE-CONSTRUCTION MEETING WITH THE CITY OF WAUKEE WILL BE REQUIRED A MINIMUM OF ONE WEEK PRIOR TO CONSTRUCTION ACTIVITIES BEGINNING. S. ALL STAKING SHALL BE DONE UNDER THE DIRECTION OF A LICENSED ENGINEER OR LAND SURVEYOR INCLUDING PEDESTRIAN FACILITIES. T. ANY CHANGES PROPOSED TO THE DRAWINGS DURING CONSTRUCTION SHALL BE APPROVED IN WRITING BY THE CITY OF WAUKEE COMMUNITY DEVELOPMENT DEPARTMENT PRIOR TO CONSTRUCTION. U. THE CONTRACTOR IS RESPONSIBLE FOR ANY CHANGES MADE DURING CONSTRUCTION THAT HAVE NOT BEEN GRANTED APPROVAL IN WRITING BY THE CITY OF WAUKEE COMMUNITY DEVELOPMENT DEPARTMENT. V. ALL SANITARY SEWER AND STORM SEWER SHALL BE CLEANED AND TELEVISED PRIOR TO PAVING. THE CITY OF WAUKEE SHALL WITNESS ALL CLEANING AND TELEVISING. COPIES OF THE REPORT AND VIDEO SHALL BE PROVIDED TO THE CITY OF WAUKEE. ALL SANITARY SEWER MANHOLES SHALL BE VACUUM TESTED. W. PLACE 3/4" EXPANSION JOINT BETWEEN ALL PCC PAVEMENT/SIDEWALKS AND BUILDINGS. PLACE 1/2" EXPANSION JOINT BETWEEN SIDEWALKS AND PCC PAVEMENT. THE PCC RAMP JOINT LOCATED AT THE BACK OF CURB AND ALL EXPANSION JOINTS SHALL BE SEALED. X. AS-BUILTS SHALL BE PROVIDED TO THE WAUKEE ENGINEERING DEPARTMENT INCLUDING ALL UTILITIES AND AS-BUILT GRADES FOR DRAINAGE SWALES, OVERFLOWS, ACCESSIBLE RAMPS AND DETENTION FACILITIES. THE CONTRACTOR SHALL PROVIDE INFORMATION TO THE DESIGN ENGINEER FOR INCLUSION ON THE RECORD AS-BUILT DRAWINGS. Y. ALL UTILITIES INCLUDING PRIVATE UTILITIES SHALL BE CONSTRUCTED TO THE CITY OF WAUKEE STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS AND ALL UTILITIES SHALL BE TESTED TO CITY STANDARDS. THE CITY SHALL WITNESS ALL TESTING. Z. CONSTRUCTION OPERATIONS SHALL PROTECT STORM SEWERS AND DRAINAGE WAYS FROM ALLOWING CONCRETE SLURRY FROM CONCRETE OPERATIONS TO DISCHARGE OFFSITE. AA. CONTRACTOR SHALL COORDINATE ALL TIE-IN TO UTILITIES WITH THE CITY OF WAUKEE ENGINEERING DEPARTMENT AND CITY OF WAUKEE ENGINEERING DEPARTMENT SHALL WITNESS ALL TIE-INS. BB. ALL FIRE HYDRANTS WILL BE REQUIRED TO HAVE 5-INCH STORZ FITTINGS. CC. CONTRACTOR IS TO PROVIDE SHOP DRAWING SUBMITTALS OF CONSTRUCTION MATERIALS PRIOR TO CONSTRUCTION. DD. PRIOR TO ANY LANE CLOSURE THE CONTRACTOR IS RESPONSIBLE FOR HAVING A DIGITAL MESSAGE BOARD NOTIFYING DRIVERS OF LANE CLOSURES AT LEAST ONE WEEK PRIOR TO ANY CLOSURE. CONTRACTOR IS TO COORDINATE ANY LANE/ROAD CLOSURES WITH THE CITY OF WAUKEE. EE. APPROVED FIRE APPARATUS ACCESS ROADS SHALL BE PROVIDED FOR EVERY FACILITY, BUILDING, OR PORTION OF A BUILDING AS SOON AS CONSTRUCTION COMMENCES. THE FIRE APPARATUS ACCESS ROAD SHALL COMPLY WITH THE REQUIREMENTS OF SECTION 503.2 AND THIS SECTION SHALL EXTEND TO WITHIN 100 FEET OF ALL PORTIONS OF THE EXTERIOR WALLS OF THE FIRST STORY OF THE BUILDING AS MEASURED BY AN APPROVED ROUTE AROUND THE EXTERIOR OF THE BUILDING OR FACILITY. FF. ALL SIGNAGE REQUIRES A SEPARATE PERMIT FROM THE CITY OF WAUKEE COMMUNITY DEVELOPMENT DEPARTMENT. 18 15 14 11 3 PROPOSED BUILDING (12,980 SF) FFE=1024.95 3 TRASH T Ex i s t i n g 1 5 ' D r a i n a g e E a s e m e n t (B k 7 8 9 , P g 3 6 6 - 3 8 2 ) 30 ' B u i l d i n g S e t b a c k 30 ' B u i l d i n g S e t b a c k 40' Building Setback S8 9 ° 5 7 ' 4 1 " W 2 0 0 . 0 0 ' N0°02'19"W 333.52' N8 9 ° 5 7 ' 4 1 " E 2 0 0 . 0 0 ' S0°02'19"E 333.52' LOT 5 Ex i s t i n g 1 5 ' P U E (B k 7 8 9 , P g 3 6 6 - 3 8 2 ) Ex i s t i n g 1 5 ' D r a i n a g e E a s e m e n t (B k 7 8 9 , P g 3 6 6 - 3 8 2 ) NE V e n t u r e D r Co n c r e t e Co n c r e t e S i d e w a l k Co n c r e t e S i d e w a l k Co n c r e t e Pa r k i n g Co n c r e t e Pa r k i n g Co n c r e t e Pa r k i n g Co n c r e t e Pa r k i n g In t a k e = 1 0 2 2 . 4 5 FL = 1 0 1 9 . 1 7 1 5 " R C P S E FL = 1 0 1 6 . 6 5 1 5 " R C P N In t a k e = 1 0 2 1 . 0 5 B/ W = 1 0 1 5 . 3 5 Ri m = 1 0 2 1 . 8 2 FL = 1 0 1 6 . 5 2 1 2 " R C P N W FL = 1 0 1 5 . 2 6 1 8 " R C P W FL = 1 0 1 5 . 2 0 1 8 " R C P E Ri m = 1 0 2 4 . 3 4 In v = 1 0 0 7 . 6 5 8 " T r u s s E In v = 1 0 0 7 . 5 7 8 " T r u s s W In t a k e = 1 0 2 2 . 4 0 FL = 1 0 1 6 . 1 5 1 5 " R C P S Ri m = 1 0 2 3 . 1 5 FL = 1 0 1 6 . 1 5 1 8 " R C P W WA U K E E C O M M U N I T Y C H U R C H M-1 L I G H T I N D U S T R I A L D I S T R I C T IT'S A RU F F L I F E - D O G G Y D A Y C A R E , L L C C-1 COMM U N I T Y A N D H I G H W A Y S E R V I C E COMMERC I A L D I S T R I C T 1500 C L I V E L L C C-1 CO M M U N I T Y A N D H I G H W A Y SERVIC E C O M M E R C I A L D I S T R I C T DOWNIN G D E V E L O P M E N T , L T D M-1 LIGH T I N D U S T R I A L D I S T R I C T 5' 26 . 5 ' 20 . 5 ' 5' 9' TY P 5' 8' 9' TY P 18 ' 20 . 5 ' 9' TY P 9' TY P 4' 20.5'26'17.5' 9' TYP4' 5' 20.5' 5' 9' TYP7' 10' 5' 5' R20 ' R10 ' 15' 26 . 5 ' 15 . 8 ' 27 ' B / B 42.3' R5' R 5 ' R 5 ' R5' TYPTYP TYP TYPR 1 . 5 ' R2' 17.5'26' R5' 10 10 10 10 11A 11B 11C 11D 21' R5 ' R 5 ' INV: 1007.3 (VERIFY) INV: 1019.95 TYP TYP TYP TYP TYP TYP4A4A 4A4A 1 5 0 ' H Y D R A N T R A D I U S 153.0' 85 . 0 ' 20 7 ' C / L T O C / L D R I V E T O E A S T 98 ' C / L T O C / L D R I V E T O W E S T 63 LF 18 ' 13.5' 4' 5' R 5 0 ' R 2 5 ' R3' 1A 1B 1B 1C 1C 1C 1C 1C 1C 1C 1C 1C 1C 2A 1B 3A 3A 3A 3A 3C 3C 3D 3J 3B 3B3B 3B 3B 3B 3D 3D 3D 3D 3D 3D 3D 3E 3E 3F 4C 4C 4C 4C 4C 4C 3G 4B 4B 4A 4A 4A 4A 5D 3D 3D 3C3H 4C 3I3I 3I 3I 3I 3I 5A 5B 8A 8B 8C 8D 8E 9A 9D 9B 9L 9G 9F 9E 9I 9C 9G 9G 9J 9J9K 3B 3B 4C 4C 3I 3I 3G 3G 3G 3G 3G 12A 9H 3D 3J 3J 3J 3J 3D 3D 4C 20 . 5 ' 8D 8F 17.5' 17 . 5 ' 17.5' R2' 24 LF8B 18 LF 9J BP: 1015.2 18" ST TP: 1013.7 6" W 9J BP: 1016.0 6" W TP: 1007.7 8" SAN 3D 3F 12B 12C 12D 12E 12E EX MI-FIBER LINE CONTRACTOR TO COORDINATE RELOCATION OF THE MI-FIBER SERVICE AND PEDESTAL FOR PARKING LOT AND STORM SEWER INSTALLATION R 1 . 5 ' R3' R5' R5 ' R 5 ' V: \ P r o j e c t s \ 2 0 2 3 \ 1 2 3 . 1 5 1 4 . 0 1 \ C A D D \ S P 0 2 _ 1 2 3 1 5 1 4 _ D I M N . d w g JA K E R . C A M P O S , DI M E N S I O N A N D U T I L I T Y P L A N , 20 2 4 / 0 5 / 0 8 , 9: 0 3 A M , AN S I F U L L B L E E D D ( 3 4 . 0 0 X 2 2 . 0 0 I N C H E S ) BY DA T E RE V I S I O N MA R K Sc a l e : Te c h n i c i a n : T- R - S : SN Y D E R & A S S O C I A T E S , I N C . | Ch e c k e d B y : En g i n e e r : Da t e : 1" = Pr o j e c t N o : Sh e e t Project No: Sheet 27 2 7 S . W . S N Y D E R B L V D AN K E N Y , I O W A 5 0 0 2 3 51 5 - 9 6 4 - 2 0 2 0 | w w w . s n y d e r - a s s o c i a t e s . c o m MA A JR C JL H 03 - 0 5 - 2 0 2 4 20 ' 12 3 . 1 5 1 4 . 0 1 C2 0 0 123.1514.01 C200 WI L L A R D G A R A G E DI M E N S I O N A N D U T I L I T Y P L A N WA U K E E , I O W A PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S 03 - 2 0 - 2 4 04 - 0 2 - 2 4 04 - 1 8 - 2 4 05 - 0 7 - 2 4 JR C JR C JR C JR C 1234 TT N - R R W - S S FEET 0 20 DIMENSION PLAN CONSTRUCTION NOTES 1. EXISTING FEATURES, PROTECT THE FOLLOWING: A.PAVEMENT TO REMAIN. B.EXISTING UTILITIES. COORDINATE ANY RELOCATIONS OR ADJUSTMENTS WITH UTILITY SERVICE PROVIDER AS NECESSARY. C.EXISTING TREES. 2.DRIVEWAY: A.GRIND CURB AND CONSTRUCT TYPE "A" DRIVEWAY CONNECTION TO EXISTING PRIVATE DRIVE. 3.PAVEMENTS, PROVIDE THE FOLLOWING WHERE INDICATED ON PLAN: A.7" DEPTH PCC DRIVE ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR DENSITY. B.6" DEPTH PCC PARKING ON 12" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR DENSITY. C.5" DEPTH PCC SIDEWALK ON 6" DEPTH PREPARED SUBGRADE COMPACTED TO 95% STANDARD PROCTOR DENSITY D.6" HEIGHT STANDARD CURB. E.TAPER 5' SIDEWALK TO EXISTING IN ONE PANEL. F.6" PCC PEDESTRIAN RAMP WITH MAX SLOPE OF 8.33%. PROVIDE DETECTABLE PANELS WHERE SHOWN. G.WHEEL STOP. SEE DETAIL 5 ON THIS SHEET. H.STANDARD 6" PCC STEP. I.5'X5' FROST FOOTING(COORDINATE WITH STRUCTURAL AND ARCHITECTURAL PLAN). J.3" ROLLED CURB. 4.PAVEMENT MARKINGS, PROVIDE THE FOLLOWING: A.4" WIDE PAINTED PARKING STALL LINES. B.PAINTED STATE OF IOWA APPROVED ACCESSIBLE PARKING SYMBOL. C.ACCESSIBLE AISLE. 45° STRIPING AT 3' ON CENTER SPACING WHERE SHOWN. 5.SIGNS, PROVIDE THE FOLLOWING: A.PROVIDE VAN ACCESSIBLE PARKING SIGNAGE AS PER ADAAG REQUIREMENTS. MOUNT SIGN TO BUILDING. B.PROVIDE ACCESSIBLE PARKING SIGNAGE AS PER ADAAG REQUIREMENTS. MOUNT SIGN TO BUILDING. C.PROVIDE VAN ACCESSIBLE PARKING SIGNAGE AS PER ADAAG REQUIREMENTS. MOUNT SIGN TO POST. D.MONUMENT SIGN. 6.SITE LIGHTING, PROVIDE THE FOLLOWING: A.CONTRACTOR TO COORDINATE WITH THE UTILITY OWNER AND PROPERTY OWNER ALL ASPECTS OF ELECTRICAL SERVICE. SEE ELECTRICAL PLAN. 7.CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS AND MAINTAIN A MINIMUM OF 18" OF CLEARANCE BETWEEN UTILITIES. 8.SANITARY SEWER SERVICE, PROVIDE AND INSTALL THE FOLLOWING: A.CONNECT TO EXISTING SANITARY SEWER STUB. VERIFY LOCATION AND ELEVATION PRIOR TO CONSTRUCTION. B.6" PVC SANITARY SEWER SERVICE LINE AT 1.0% MIN SLOPE (1/8" PER FOOT). PROVIDE 1:1 RISER AS NECESSARY. C.COORDINATE THE EXACT LOCATION AND DEPTH WHERE SANITARY SEWER SERVICE LINE ENTERS THE BUILDING WITH THE ARCHITECTURAL AND MECHANICAL PLANS PRIOR TO CONSTRUCTION. D.SANITARY SEWER CLEANOUT. PROVIDE MANHOLE CASTING NEENAH R-1976 WHEN IN PAVEMENT. E.CRITICAL CROSSING. CONTRACTOR TO VERIFY EXACT DEPTH, LOCATION AND SIZE OF EXISTING UTILITIES PRIOR TO CONSTRUCTION. COORDINATE ANY RELOCATIONS OF EXISTING UTILITIES WITH UTILITY PROVIDER, OWNER AND CITY OF WAUKEE PRIOR TO CONSTRUCTION. MAINTAIN 18" OF VERTICAL SEPARATION BETWEEN UTILITIES. F.700 GALLON SAND/OIL SEPARATOR. REFER TO PLUMBING PLANS FOR DETAILS. 9.WATER SERVICE FROM CITY OF WAUKEE, PROVIDE THE FOLLOWING AS PER CITY REQUIREMENTS AND GUIDELINES: A.CONNECTION TO EXISTING WATER MAIN W/ TAPPING SLEEVE AND VALVE. COORDINATE WITH THE CITY OF WAUKEE WATER DEPARTMENT FOR EXACT LOCATION TO KEEP SEPARATION FROM EXISTING SERVICE. B.2" DOMESTIC WATER SERVICE LINE. C.REMOVE 2" CURB STOP AND ABANDON 2" SERVICE IN PLACE. DISCONNECT 2" WATER SERVICE AT MAIN. REMOVE CORPORATION VALVE AND INSTALL STAINLESS STEEL REPAIR BAND. D.COORDINATE THE EXACT LOCATION, SIZE AND ELEVATION WHERE WATER SERVICE LINE ENTERS THE BUILDING WITH THE ARCHITECTURAL AND MECHANICAL PLANS PRIOR TO CONSTRUCTION. E.FIRE HYDRANT ASSEMBLY. F.FIRE DEPARTMENT CONNECTION WITH LOCKING KNOX CAPS. G.6" WATER SERVICE. H.DIRECTIONAL DRILL 6" WATER SERVICE. I.6"x6" TEE. J.CRITICAL CROSSING. CONTRACTOR TO VERIFY EXACT DEPTH, LOCATION AND SIZE OF EXISTING UTILITIES PRIOR TO CONSTRUCTION. COORDINATE ANY RELOCATIONS OF EXISTING UTILITIES WITH UTILITY PROVIDER, OWNER AND CITY OF WAUKEE PRIOR TO CONSTRUCTION. MAINTAIN 18" OF VERTICAL SEPARATION BETWEEN UTILITIES. K.6" SHUT OFF VALVE. L.2" SHUT OFF VALVE. 10. BUILDING DOWNSPOUT LOCATION. 8" STORM PIPE AT 1% MINIMUM SLOPE. VERIFY WITH ARCHITECTURAL PLANS. CONTRACTOR TO COORDINATE DOWNSPOUT CONNECTION PRIOR TO CONSTRUCTION. 11.UTILITY SERVICE. COORDINATE WITH ARCHITECTURAL AND MECHANICAL PLANS. A.GAS SERVICE. B.GAS METER. C.ELECTRIC SERVICE. D.TRANSFORMER. 12.SITE FEATURES (REFER TO ARCHITECTURAL AND MECHANICAL PLANS): A.DUMPSTER AND SCREEN WALL WITH GATES. B.1,000 GALLON OIL STORAGE TANK. C.3.5 TON AC UNIT. D.5 TON AC UNIT. E.SCREENING WALL. PAVEMENT LEGEND 5" PCC SIDEWALK 6" PCC PAVEMENT 7" PCC PAVEMENT FORM GRADE ELEV. 6" SLOPE AS PER PLANS 4 1 2" 7 1 2" 2 C200 6-INCH STANDARD CURB NO SCALE R3" R3" 5 C200 TYPICAL PAVEMENT CROSS SECTIONS NO SCALE PCC PAVEMENT SECTION PCC SIDEWALK SECTION PCC PAVEMENT, SEE PLANS FOR THICKNESS & LOCATIONS 12" DEPTH PREPARED SUBGRADE 2 - 6" LIFTS UNLESS NOTED OTHERWISE SIDEWALK PAVEMENT, SEE PLANS FOR THICKNESS & LOCATIONS 6" DEPTH PREPARED SUBGRADE 6" W 2" W 2" DOMESTIC SERVICE 6" FIRE SERVICE TEE W 3 C200 WAUKEE STD.DWG.NO.53 NO SCALE 1 C200 DOWNSPOUT CONNECTION DETAIL NO SCALE NOTES: CONTRACTOR IS RESPONSIBLE FOR CONNECTING ROOF DRAIN TO INTAKES. SEE PLANS FOR ALL INVERTS. BUILDING BUILDING 12 " 4" 12 " 4" DOWNSPOUT. SEE ARCHITECTURAL PLANS 12" PVC PERIMETER SEALANT AT JOINT DOWNSPOUT 12" CAP WITH 8" SQUARE CUT O.C. TO STORM SEWER R 1 0 0 . 5 ' TOP 6" GALVANIZED (HEADED TYPE PIN ONLY) ANCHOR PINS: 3 8" MINIMUM DIA. SECTION A-A EITHER HEAED OR NON-HEADED TYPE ANCHOR PIN MAY BE USED 8" ± 1 4" 1" MIN; 2" MAX 6" ± 1 4" 3" M I N ; 4" M A X #15 BARS SECTION A-A (TYPE 2) THE TYPE 2 PRECAST CONCRETE CURB SHOULD BE USED FOR INSTALLATIONS WHERE NORMAL TYPE OF SERVICE IS ANTICIPATED.6 C200 WHEEL STOP NO SCALE 4 C200 3-INCH ROLLED CURB NO SCALE 2 1 2" 10 1 2" 3" 7" FINISHED GRADE OR SIDEWALK (SEE PLAN) 3" DROP CURB 2"R 1"R PROPOSED BUILDING (12,980 SF) FFE=1024.95 TRASH T Ex i s t i n g 1 5 ' D r a i n a g e E a s e m e n t (B k 7 8 9 , P g 3 6 6 - 3 8 2 ) 15 ' S T O R M S E W E R EA S E M E N T 30 ' B u i l d i n g S e t b a c k 30 ' B u i l d i n g S e t b a c k 40' Building Setback S8 9 ° 5 7 ' 4 1 " W 2 0 0 . 0 0 ' N0°02'19"W 333.52' N8 9 ° 5 7 ' 4 1 " E 2 0 0 . 0 0 ' S0°02'19"E 333.52' N0°02'19"W 300.00' LOT 5 LOT 6 LOT 7 PARK P L A T 1 Ex i s t i n g 1 5 ' P U E (B k 7 8 9 , P g 3 6 6 - 3 8 2 ) Ex i s t i n g 1 5 ' D r a i n a g e E a s e m e n t (B k 7 8 9 , P g 3 6 6 - 3 8 2 ) Ma j o r F i b e r L i n e Pe r E m a i l F r o m Co n s o l i d a t e d C o m m . NE V e n t u r e D r Co n c r e t e Co n c r e t e S i d e w a l k Co n c r e t e S i d e w a l k Co n c r e t e Pa r k i n g Co n c r e t e Pa r k i n g Co n c r e t e Pa r k i n g Co n c r e t e Pa r k i n g Co n c r e t e Pa r k i n g In t a k e = 1 0 2 2 . 4 5 FL = 1 0 1 9 . 1 7 1 5 " R C P S E FL = 1 0 1 6 . 6 5 1 5 " R C P N In t a k e = 1 0 2 1 . 0 5 B/ W = 1 0 1 5 . 3 5 Ri m = 1 0 2 1 . 8 2 FL = 1 0 1 6 . 5 2 1 2 " R C P N W FL = 1 0 1 5 . 2 6 1 8 " R C P W FL = 1 0 1 5 . 2 0 1 8 " R C P E Ri m = 1 0 2 4 . 3 4 In v = 1 0 0 7 . 6 5 8 " T r u s s E In v = 1 0 0 7 . 5 7 8 " T r u s s W In t a k e = 1 0 2 2 . 4 0 FL = 1 0 1 6 . 1 5 1 5 " R C P S Ri m = 1 0 2 3 . 1 5 FL = 1 0 1 6 . 1 5 1 8 " R C P W In t a k e = 1 0 2 0 . 9 0 FL = 1 0 1 7 . 8 0 1 2 " R C P S E In t a k e = 1 0 2 2 . 3 9 FL = 1 0 2 1 . 6 4 4 " C P P W FL = 1 0 2 1 . 5 4 4 " C P P E B/ W = 1 0 2 1 . 3 7 WA U K E E C O M M U N I T Y C H U R C H M-1 L I G H T I N D U S T R I A L D I S T R I C T IT'S A RU F F L I F E - D O G G Y D A Y C A R E , L L C C-1 COMM U N I T Y A N D H I G H W A Y S E R V I C E COMMERC I A L D I S T R I C T 1500 C L I V E L L C C-1 CO M M U N I T Y A N D H I G H W A Y SERVIC E C O M M E R C I A L D I S T R I C T DOWNIN G D E V E L O P M E N T , L T D M-1 LIGH T I N D U S T R I A L D I S T R I C T 1024 1024 1024 1026 10 2 5 1025 1026 1026 10 2 4 10 2 3 10 2 5 10 2 4 1 0 2 3 1 0 2 3 10 2 0 10 1 5 10 1 0 10 2 5 10 2 2 10 2 4 102 4 10261025 10 2 4 10 2 4 1 0 2 4 -4.04% -4.04% -3.66% -3.94% ● ● ● ● ● ● ● ● ● ●●●● ●●●●●●●●●●● ●●● ● ● ● ● ● ● ● 1023. 8 0 1024. 3 0 1023. 8 0 1024. 3 0 1023. 7 0 1023. 8 3 1024. 1 0 1023. 9 5 1023 . 6 8 10 2 4 . 7 2 1024.55 1024.34 1024. 0 0 1024.60 1024. 2 5 1023.851024.061024.45 1024.62 1024.23 1024.22 1024.90 1024.90 1024.55 1023.50 FFE=1024.95 (1 0 2 1 . 2 1 ) 1024.60 1024.60 1024.60 1024 . 6 0 1024.601024 . 6 0 1024.95 1024.90 1024.60 1023 . 7 4 1023 . 8 5 1024.95 1024.901024.55 1024.00 1023.751024.20 1024.45 1024.50 1023.50 1024.25 1024.20 1024.60 1024.60 1024.60 1024.60 1024.60 1024.60 1024.55 1024.95 1024.901024.95 1024.90 1023.70 1024.52 1024.60 1023 . 3 5 1024 . 3 5 1023 . 7 0 1024 . 2 7 1024 . 0 5 1023 . 9 8 1022 . 6 8 1025 . 2 0 1024.75 (102 4 . 6 5 ) (102 4 . 7 0 ) 1025 . 1 2 (1 0 2 1 . 2 9 ) (1 0 2 1 . 6 2 ) (1 0 2 3 . 0 9 ) (1 0 2 3 . 1 2 ) (102 1 . 9 9 ) (102 1 . 9 4 ) 1024 . 6 2 1024.62 1024.60 1024.60 15 TONS CLASS D RIP RAP 15'L X 10'W X 1.5'D NORMAL POOL: 1010.25 100-YR: 1016.00 SILT FENCE (TYP.) SILT FENCE (TYP.) SILT FENCE (TYP.) SEDIMENT BASKET (TYP.) CRITICAL CROSSING BP: 1021.5 4" ST TP: 1016.6 18" ST 22 2 2 2 2 2 1 1 1 3 (102 2 . 0 0 ) (102 4 . 1 1 ) (102 3 . 0 5 ) (1 0 2 4 . 1 6 ) (1 0 2 4 . 0 2 ) (102 3 . 1 9 ) (1 0 2 4 . 5 2 ) (1024.78) (1025.60) 1024 . 2 7 ULTIMATE DISCHARGE TO REGIONAL DETENTION BASIN LIMIT OF DISTURBANCE LIMIT OF DISTURBANCE LIMIT OF DISTURBANCE LIMIT OF DISTURBANCE 102 3 10 2 2 10 2 2 10 2 3 10 2 4 1022 . 4 2 1022 . 4 8 (1 0 2 1 . 4 7 ) 1022 . 6 2 10251024.18 1023.83 SEDIMENT BASKET (TYP.) WASTE MATERIALS INCLUDING PORTABLE RESTROOM FACILITY 1024 . 1 0 1024 . 2 0 CONCRETE WASHOUT STAGING AND MATERIAL STORAGE AREA TOPSOIL STOCKPILE STABILIZED CONSTRUCTION ENTRANCE/EXIT -1.99% -3. 5 4 % -2.77% -1.7 7 % - 1 . 8 8 % -2 . 4 5 % -2 . 6 9 % -3.04 % -3.03% -1.63 % -0.91% -4.51 %-1 . 1 2 % -1 . 9 2 % -1 . 3 7 % -2 . 1 5 % -1.6 3 % - 2 . 9 1 % -32.81% -33.33% -36.17% -1 6 . 1 0 % -4 6 . 5 8 % -9.22% - 1 8 . 3 2 % -4.59% -3.89% -5 . 3 5 % -2 . 9 9 % -10. 6 5 % - 3 . 1 2 % 4 4 4 4 4 4 1024.901024.90 1024.90 -5.17 % -5. 8 3 % -7. 4 8 % -29.81% -1. 6 0 % 102310231022 -36.76% 1023.50 TOP OF BERM 100-YR ELEV: 1022.77 1025.40 10 1 9 10 2 0 10 2 1 10 2 2 10 2 3 10 1 9 10 2 0 10 2 1 10 2 2 10 2 3 10 2 4 1 0 2 4 10 1 9 10 2 0 10 2 1 10 2 2 10 2 3 10 2 4 10 2 4 10 2 3 10 2 2 10 2 1 10 2 0 10 1 9 0. 0 0 % 0. 0 0 % 1 0 2 3 8'X8' FLOW TRANSITION MAT 1023 10231022 100-YR ELEV. 1022.72 1023.05 OVERFLOW1023.05OVERFLOW 1023.50 TOP OF BERM 1023.50 TOP OF BERM -1.00%-1.00% ENGINEERED SOIL MEDIA LIMIT -7.11% -7.00%-1.50% -1.50% -1 . 5 0 % -1 . 5 0 % -1 . 3 6 % -0 . 7 5 % -2.65% -3.43% -1 . 3 5 % -1 . 5 0 % -1 . 3 5 % -7.00% -7.00% -1 . 3 5 % 1023 1023 1023 1023 102 3 ●●●●●● ● ● ● ● ● ● 1022 . 8 4 10 2 2 . 9 1 10 2 2 . 9 9 1022 . 9 1 10 2 3 . 1 0 1023 . 0 4 1022.35 10 2 3 . 1 8 1023 . 1 1 (1 0 2 3 . 0 9 ) (1 0 2 3 . 1 2 ) 1023 . 6 5 1023 . 5 8 1022 . 6 2 1022 . 6 8 1022 . 4 2 1022 . 4 8 -1 . 4 1 % -1.50% -1.50% 1022 . 5 8 1022 . 5 1 -4.04% 0. 0 0 % 0. 0 0 % -0 . 0 1 % 0. 0 0 % -3.66% -4.04%-3.94%1022.65 1023.65 1023.651023.15 1022.65 1023.65 1023.651023.151022.66 1023.15 1023.151022.65 -4.62%1023 . 9 8 1023 . 9 7 1024 . 0 5 1024 . 0 5 1024 . 5 6 1024 . 5 6 -4.62%-4.62% -1.50% 0. 0 0 % -1.50% -0 . 0 0 % 0. 0 0 % -1.39% -0.96% V: \ P r o j e c t s \ 2 0 2 3 \ 1 2 3 . 1 5 1 4 . 0 1 \ C A D D \ S P 0 3 _ 1 2 3 1 5 1 4 _ G R D G . d w g JA K E R . C A M P O S , SI T E G R A D I N G A N D E R O S I O N C O N T R O L P L A N , 20 2 4 / 0 5 / 0 8 , 9: 0 3 A M , AN S I F U L L B L E E D D ( 3 4 . 0 0 X 2 2 . 0 0 I N C H E S ) BY DA T E RE V I S I O N MA R K Sc a l e : Te c h n i c i a n : T- R - S : SN Y D E R & A S S O C I A T E S , I N C . | Ch e c k e d B y : En g i n e e r : Da t e : 1" = Pr o j e c t N o : Sh e e t Project No: Sheet 27 2 7 S . W . S N Y D E R B L V D AN K E N Y , I O W A 5 0 0 2 3 51 5 - 9 6 4 - 2 0 2 0 | w w w . s n y d e r - a s s o c i a t e s . c o m MA A JR C JL H 03 - 0 5 - 2 0 2 4 30 ' 12 3 . 1 5 1 4 . 0 1 C3 0 0 123.1514.01 C300 WI L L A R D G A R A G E SI T E G R A D I N G A N D E R O S I O N C O N T R O L P L A N WA U K E E , I O W A PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S 03 - 2 0 - 2 4 04 - 0 2 - 2 4 04 - 1 8 - 2 4 05 - 0 7 - 2 4 JR C JR C JR C JR C 1234 TT N - R R W - S S FEET 0 30 GRADING PLAN GENERAL NOTES A.CONTRACTOR TO STRIP AND STOCKPILE TOPSOIL ON ALL AREAS TO BE CUT OR FILLED. RESPREAD TO MINIMUM 8" DEPTH TO FINISH GRADES. B.ANY EXCESS CUT TO BE SPREAD ON SITE AS DIRECTED BY ENGINEER DURING CONSTRUCTION. PLACE TOPSOIL OVER ALL AREAS DISTURBED. C.PROVIDE INTERIM TEMPORARY SEEDING TO DISTURBED AREAS. D.EROSION CONTROL: PLACE SILT FENCE AND MAINTAIN IN PROBLEM AREAS AFTER GROUND COVER HAS BEEN ESTABLISHED. COMPLY WITH EROSION CONTROL LAW. E.PROVIDE BELOW GRADE INLET PROTECTION IN PAVED AREAS FOLLOWING PAVING OPERATIONS. CONSTRUCTION NOTES 1.SILT FENCE 2.SEDIMENT BASKET 3.RIP RAP 4.SOD ALL OPEN AREAS WHERE DISTURBANCE OCCURS. QUANITIES TEMPORARY SEEDING AND MULCHING (SUDAS TYPE 4) =0.35 AC. SILT FENCE = 750 LF. SEDIMENT BASKET = 8 EA. SOD = 0.5 AC DISTURBED AREA AREA =1.75 AC. BENCHMARKS NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88 - GEOID12A) IARTN DERIVED - US SURVEY FEET BM500 N=589408.86 E=1538878.09 ELEV=1024.43 TRIANGLE AT SOUTHEAST CORNER OF CONCRETE TRANSFORMER PAD, WEST SIDE OF SITE. BM501 N=589128.26 E=1538972.05 ELEV=1023.97 BURY BOLT ON HYDRANT ON THE SOUTH SIDE OF VENTURE DRIVE SOUTH OF FOR SALE SIGN, SOUTH SIDE OF SITE. NE VENTURE DRIVE DETAIL SCALE: 1" = 5' DETAILS OF SILT FENCE ON LONGITUDINAL SLOPES ATTACHMENT TO POSTTYPICAL SILT FENCE DITCH CHECK FLOW BAC K S L O P E FOR E S L O P E 1 1 2 TYPICAL SILT FENCE ISTALLATION ON LONGITUDINAL SLOPES (Profile View) TYPICAL SILT FENCE ISTALLATION ON LONGITUDINAL SLOPES (Plan View) 'T ' S T E E L FE N C E P O S T 4' - 0 " M I N SEE PLANS FOR SPACING 200'-0" MAX LENGTH PER SECTION 600'-0" IF SLOPE IS FLATTER THAN 5% 36 " 24 " 8'-0" SPACING VARIABLE (20'-0" FOR A NORMAL 10'-0" WIDE DITCH) POST SPACING (5'-0" MAX) POST SPACING 5'-0" MAX) 2" MI N 20 " M I N 2 C300 SILT FENCE DETAIL NO SCALE 1 INSERT 12 INCHES OF FABRIC A MINIMUM OF 6 INCHES DEEP (FABRIC MAY BE FOLDED BELOW THE GROUND LINE. 2 REDUCE POST SPACING TO 5'-0" AT WATER CONCENTRATION AREAS, OR AS REQUIRED TO ADEQUATELY SUPPORT FENCE. GROUND LINE FABRIC GROUND CONTOURS INSTALL "J-HOOK" AT EACH END OF AN INDIVIDUAL SECTION OF SILT FENCE INSTALL PARALLEL TO GROUND CONTOUR FABRICGROUND LINE FABRIC POST WIRE OR CABLE TIES 2 2 NORTH STAIR DETAIL SCALE: 1" = 5' N N SOUTH SIDEWALK CONNECTION DETAIL SCALE: 1" = 5' NOTES: 1. CONTRACTOR TO PROVIDE PHOTO DOCUMENTATION AS EACH MEDIA LAYER IS INSTALLED TO SUBMIT TO THE CITY FOR FINAL ACCEPTANCE. 2.MODIFIED SOIL LAYER TO CONSIST OF A UNIFORM MIXTURE OF 75-90% WASHED CONCRETE SAND, 0-10% APPROVED ORGANIC MATERIAL, 0-25% TOPSOIL. EXTEND MODIFIED SOIL LAYER UP SIDE SLOPE TO ELEVATION 1020.00'. 3.CHOKER AGGREGATE LAYER TO CONSIST OF DURABLE 3 8 INCH DIAMETER CHIP. 4.STONE AGGREGATE SUBBASE LAYER TO CONSIST OF CLEAN 1-2 INCH DIAMETER STONE AGGREGATE. 5.THE FOOTPRINT AREA OF THE BIORETENTION DETAIL = 2,060 SF 1 C300 BASIN BIORETENTION DETAIL NO SCALE 6" PERFORATED SUBDRAIN PIPE INV: 1015.75' 15' STONE AGGREGATE SUBBASE LAYER 3: 1 M A X 18 " 12 " NATIVE SOIL CHOKER AGGREGATE LAYER MODIFIED SOIL LAYER 2" FILTER SOCK ADJACENT UNTIL SIDE SLOPE VEGETATION ESTABLISHED 1. 2. 3. 4. BOTTOM BASIN 1018.25' 5' 1020.00' 1015.60' MAINTENANCE REQUIREMENTS: A.ROUTINE LANDSCAPE MAINTENANCE - REMOVAL OF UNDESIRABLE AND DEAD VEGETATION. B.REMOVAL OF ACCUMULATED SEDIMENT IN PRETREATMENT AREAS. PROPOSED BUILDING (12,980 SF) FFE=1024.95 TRASH T 30 ' B u i l d i n g S e t b a c k 40' Building Setback N0°02'19"W 333.52' S0°02'19"E 333.52' LOT 5 Ex i s t i n g 1 5 ' P U E (B k 7 8 9 , P g 3 6 6 - 3 8 2 ) Co n c r e t e Pa r k i n g 10 2 3 10 2 4 -1.71% -1.71% -1.71% -1.71% -1.71% -1.71% ●●● ● ● ●● ● ● ● ●●●●●●●●●●●●●●●●●●●●●●●●●●●●●●●● ●●●● 1023. 8 0 1024. 3 0 O V E R F L O W 1023. 8 0 1024. 3 0 O V E R F L O W 1023. 7 0 1023. 8 3 1024. 1 0 O V E R F L O W 1023. 9 5 1023 . 6 8 1024.721024.55 1024. 0 0 1024. 2 5 O V E R F L O W 1023.801024.02 1024.45 1024.62 1024.40 O V E R F L O W 1023.80 1022.83 1024.90 1024.90 1024.55 1023.50 1024.60 1024.60 1024 . 6 0 1024.601024.601024 . 6 0 1024.95 1024.90 1024.60 1023.74 1023 . 8 5 1024.95 1024.00 1023.751024.20 1024.45 1023.50 1024.25 1024.20 OVERFLOW 1024.60 1024.60 1024.60 1024.60 1024.60 1024.60 1024.55 1024.95 1024.90 1024.95 1024.90 1023.70 G 1024.52 1024.60 1024 . 1 0 1023.351023 . 7 0 1022 . 6 8 1024.60 1024.60 1024.60 1024.60 1024.60 1024.90 1024.90 1024.90 1024.90 1024.90 (1025. 0 9 T C ) (1025. 9 9 T C ) (1026. 6 3 T C ) (1026. 6 6 T C ) 1024.731024.69 1024.69 1024.90 1024.90 1024.90 1024.69 1024.90 1024.661024.55 1024.90 1024.601024.60 1024.901024.90 1024.65 1024.90 1024.30 1024.41 1024.62 1024.33 1024.37 1024.20 100-YEAR ELV.=1023.75 100-YEAR ELV.=1023.86100-YEAR ELV.=1023.88 100-YEAR ELV.=1023.53 100-YEAR ELV.=1023.80 100-YEAR ELV.=1023.90 100-YEAR ELV.=1023.80 SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET SEDIMENT BASKET -2 . 1 2 % -5.1 2 % -2 . 5 0 % -3 . 5 3 % -6.10%-2 . 1 2 % -5.60% -4 . 3 8 % - 2 . 5 1 % -2 . 5 6 % 1024.95 1024.90 1024.95 1024.601024.60 1024.601024.60 1024. 6 0 1024.601024.60 1024.60 -4.62%1024 . 5 6 1024 . 5 6 -4.62%-4.62%0. 0 0 % -1.39% -0.96% 1024.62 1024.06 1024.45 -1.99% -3.03 % -2.77% -1.7 7 % - 1 . 8 8 % -2 . 4 5 % -2 . 6 9 % -3.04 % -3.03% -1.63 % -0.91% -4.51 % -1 . 1 2 % -1 . 9 2 % -1 . 3 7 % -2 . 1 5 % -1.6 3 % - 2 . 9 1 % -1 6 . 1 0 % -4 6 . 5 8 % -9.22% - 1 8 . 3 2 % -4.59% -3.89% -5 . 3 5 % -2 . 9 9 % - 3 . 1 2 % 1024.70 TC 1024.45 G 1025.00 TC 1024.50 G 1024.75 TC 1024.90 1024.33 1024.39 -1 . 2 5 % 0. 0 0 % -0 . 6 2 % 100-YR ELEV: -2.52 % 1023.95 TC ULTIMATE OVERFLOW -1 . 7 1 % -1 . 7 1 % -1.71% -1 . 7 1 % -1 . 7 1 % -1.71% -2.92% 1024.60 1024.60 V: \ P r o j e c t s \ 2 0 2 3 \ 1 2 3 . 1 5 1 4 . 0 1 \ C A D D \ S P 0 3 _ 1 2 3 1 5 1 4 _ G R D G . d w g JA K E R . C A M P O S , DE T A I L E D G R A D I N G A N D E R O S I O N C O N T R O L P L A N , 20 2 4 / 0 5 / 0 8 , 9: 0 3 A M , AN S I F U L L B L E E D D ( 3 4 . 0 0 X 2 2 . 0 0 I N C H E S ) BY DA T E RE V I S I O N MA R K Sc a l e : Te c h n i c i a n : T- R - S : SN Y D E R & A S S O C I A T E S , I N C . | Ch e c k e d B y : En g i n e e r : Da t e : 1" = Pr o j e c t N o : Sh e e t Project No: Sheet 27 2 7 S . W . S N Y D E R B L V D AN K E N Y , I O W A 5 0 0 2 3 51 5 - 9 6 4 - 2 0 2 0 | w w w . s n y d e r - a s s o c i a t e s . c o m MA A JR C JL H 03 - 0 5 - 2 0 2 4 10 ' 12 3 . 1 5 1 4 . 0 1 C3 0 1 123.1514.01 C301 WI L L A R D G A R A G E DE T A I L E D G R A D I N G A N D E R O S I O N C O N T R O L P L A N WA U K E E , I O W A PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S 03 - 2 0 - 2 4 04 - 0 2 - 2 4 04 - 1 8 - 2 4 05 - 0 7 - 2 4 JR C JR C JR C JR C 1234 TT N - R R W - S S FEET 0 10 18 15 14 11 3 PROPOSED BUILDING (12,980 SF) FFE=1024.95 3 TRASH T Ex i s t i n g 1 5 ' D r a i n a g e E a s e m e n t (B k 7 8 9 , P g 3 6 6 - 3 8 2 ) 15 ' S T O R M S E W E R EA S E M E N T 30 ' B u i l d i n g S e t b a c k 30 ' B u i l d i n g S e t b a c k 40' Building Setback S8 9 ° 5 7 ' 4 1 " W 2 0 0 . 0 0 ' N0°02'19"W 333.52' N8 9 ° 5 7 ' 4 1 " E 2 0 0 . 0 0 ' S0°02'19"E 333.52' N0°02'19"W 300.00' LOT 5 LOT 6 LOT 7 ENTERP R I S E B U S I N E S S PARK P L A T 1 Ex i s t i n g 1 5 ' P U E (B k 7 8 9 , P g 3 6 6 - 3 8 2 ) Ex i s t i n g 1 5 ' D r a i n a g e E a s e m e n t (B k 7 8 9 , P g 3 6 6 - 3 8 2 ) Ma j o r F i b e r L i n e Pe r E m a i l F r o m Co n s o l i d a t e d C o m m . NE V e n t u r e D r Co n c r e t e Co n c r e t e S i d e w a l k Co n c r e t e S i d e w a l k Co n c r e t e Pa r k i n g Co n c r e t e Pa r k i n g Co n c r e t e Pa r k i n g Co n c r e t e Pa r k i n g Co n c r e t e Pa r k i n g In t a k e = 1 0 2 2 . 4 5 FL = 1 0 1 9 . 1 7 1 5 " R C P S E FL = 1 0 1 6 . 6 5 1 5 " R C P N In t a k e = 1 0 2 1 . 0 5 B/ W = 1 0 1 5 . 3 5 Ri m = 1 0 2 1 . 8 2 FL = 1 0 1 6 . 5 2 1 2 " R C P N W FL = 1 0 1 5 . 2 6 1 8 " R C P W FL = 1 0 1 5 . 2 0 1 8 " R C P E Ri m = 1 0 2 4 . 3 4 In v = 1 0 0 7 . 6 5 8 " T r u s s E In v = 1 0 0 7 . 5 7 8 " T r u s s W In t a k e = 1 0 2 2 . 4 0 FL = 1 0 1 6 . 1 5 1 5 " R C P S Ri m = 1 0 2 3 . 1 5 FL = 1 0 1 6 . 1 5 1 8 " R C P W In t a k e = 1 0 2 5 . 1 9 FL = 1 0 2 0 . 8 4 1 5 " R C P W FL = 1 0 2 0 . 8 1 1 5 " R C P N W In t a k e = 1 0 2 0 . 9 0 FL = 1 0 1 7 . 8 0 1 2 " R C P S E In t a k e = 1 0 2 2 . 3 9 FL = 1 0 2 1 . 6 4 4 " C P P W FL = 1 0 2 1 . 5 4 4 " C P P E B/ W = 1 0 2 1 . 3 7 10 2 2 10 2 5 102 5 1 0 2 3 10 2 4 10 2 4 1025 1026 1026 1026 10 2 3 1 0 2 3 102 2 102 3 1 0 2 4 10 1 5 10 1 0 1 0 2 0 10 2 4 10 2 4 10 2 6 WA U K E E C O M M U N I T Y C H U R C H M-1 L I G H T I N D U S T R I A L D I S T R I C T IT'S A RU F F L I F E - D O G G Y D A Y C A R E , L L C C-1 COMM U N I T Y A N D H I G H W A Y S E R V I C E COMMERC I A L D I S T R I C T 1500 C L I V E L L C C-1 CO M M U N I T Y A N D H I G H W A Y SERVIC E C O M M E R C I A L D I S T R I C T DOWNIN G D E V E L O P M E N T , L T D M-1 LIGH T I N D U S T R I A L D I S T R I C T ST-9A, MANHOLE, SW-401 (48'') RIM: 1019.82 INV: 1014.79 (IN S) INV: 1010.42 (OUT N) ST-6, SW-501 INTAKE T/C: 1024.30 INV: 1019.74 (IN S) INV: 1019.64 (OUT N) ST-5, SW-501 INTAKE T/C: 1024.20 INV: 1020.27 (IN SW) INV: 1020.17 (OUT N) ST-3, SW-501 INTAKE T/C: 1024.30 INV: 1019.18 (IN S) INV: 1019.08 (OUT NE) ST-2, SW-501 INTAKE T/C: 1024.30 INV: 1019.86 (IN S) INV: 1019.76 (OUT N) ST-1, SW-501 INTAKE T/C: 1023.33 INV: 1020.35 (OUT N) ST-7, SW-511 INTAKE T/C: 1024.30 INV: 1019.04 (IN S) INV: 1018.94 (OUT W) ST-4, SW-501 INTAKE T/C: 1023.85 INV: 1020.58 (OUT NE) ST-8, SW-511 INTAKE RIM: 1023.50 INV: 1018.53 (IN SW) INV: 1018.53 (IN E) INV: 1018.43 (OUT N) ST-9B, 18'' FES INV: 1010.25 P - 4 7 9 L F O F 1 2 " S T @ 0 . 4 0 % P-5 86 LF OF 15" ST @ 0.50% P-6 85 LF OF 15" ST @ 0.70% P-1 98 LF OF 12" ST @ 0.50%P-2 115 LF OF 12" ST @ 0.50% P - 3 1 1 0 L F O F 1 2 " S T @ 0 . 5 0 % P- 7 8 1 L F O F 1 5 " S T @ 0 . 5 0 % 216 LF OF 12" HDPE CORRUGATED @ 0.40% P-9A 33 LF OF 18" ST @ 0.50% INV: 1021.45INV: 1021.45 46 L F O F 8 " S T @ 1 % M I N 46 L F O F 8 " S T @ 1 % M I N 46 L F O F 8 " S T @ 1 % M I N 46 L F O F 8 " S T @ 1 % M I N 46 L F O F 8 " S T @ 1 % M I N 46 L F O F 8 " S T @ 1 % M I N 46 L F O F 8 " S T @ 1 % M I N P-8 36 LF OF 24" RCP @ 0.50% ST-8A, 24'' FES INV: 1018.25 ST-9, SW-513 INTAKE, 4' X 4' INSIDE WALL RIM: 1023.50 THROAT: 1021.50 (OPEN W) 3" DIA OPENING: 1021.00 (OPEN W) INV: 1015.75 (IN W) INV: 1015.65 (OUT N) 14 7 L F O F 6 " S U B D R A I N @ 0 % CLEANOUT RIM: 1021.50 INV: 1016.75 V: \ P r o j e c t s \ 2 0 2 3 \ 1 2 3 . 1 5 1 4 . 0 1 \ C A D D \ S P 0 4 _ 1 2 3 1 5 1 4 _ S T R M . d w g JA K E R . C A M P O S , ST O R M S E W E R P L A N , 20 2 4 / 0 5 / 0 8 , 9: 0 3 A M , AN S I F U L L B L E E D D ( 3 4 . 0 0 X 2 2 . 0 0 I N C H E S ) BY DA T E RE V I S I O N MA R K Sc a l e : Te c h n i c i a n : T- R - S : SN Y D E R & A S S O C I A T E S , I N C . | Ch e c k e d B y : En g i n e e r : Da t e : 1" = Pr o j e c t N o : Sh e e t Project No: Sheet 27 2 7 S . W . S N Y D E R B L V D AN K E N Y , I O W A 5 0 0 2 3 51 5 - 9 6 4 - 2 0 2 0 | w w w . s n y d e r - a s s o c i a t e s . c o m MA A JR C JL H 03 - 0 5 - 2 0 2 4 30 ' 12 3 . 1 5 1 4 . 0 1 C4 0 0 123.1514.01 C400 WI L L A R D G A R A G E ST O R M S E W E R P L A N WA U K E E , I O W A PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S 03 - 2 0 - 2 4 04 - 0 2 - 2 4 04 - 1 8 - 2 4 05 - 0 7 - 2 4 JR C JR C JR C JR C 1234 TT N - R R W - S S FEET 0 30 BENCHMARKS NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88 - GEOID12A) IARTN DERIVED - US SURVEY FEET BM500 N=589408.86 E=1538878.09 ELEV=1024.43 TRIANGLE AT SOUTHEAST CORNER OF CONCRETE TRANSFORMER PAD, WEST SIDE OF SITE. BM501 N=589128.26 E=1538972.05 ELEV=1023.97 BURY BOLT ON HYDRANT ON THE SOUTH SIDE OF VENTURE DRIVE SOUTH OF FOR SALE SIGN, SOUTH SIDE OF SITE. SECTION A-A 1 C400 ST-9, SW-513 OPEN-SIDED AREA INTAKE (48"X48" INSIDE WALL DIMENSION) NO SCALE STRUCTURE MAY BE BUILT WITH OPENINGS ON ANY OR ALL SIDES. PROVIDE OPENINGS AND ORIENTATION AS SPECIFIED IN THE CONTRACT DOCUMENTS. ADJACENT WALLS MAY HAVE DIFFERENT WIDTHS BASED UPON PIPE CONFIGURATION, BUT STRUCTURE MUST BE RECTANGULAR. 1 CONSTRUCT INLET OPENINGS WITH #4 EPOXY-COATED BARS AT 8 INCHES ON CENTER. EMBED BARS A MINIMUM OF 3 INCHES INTO WALLS AND TOP AT ALL OPENINGS. 2 GRADE TO INLET ELEVATION ON OPEN SIDES. GRADE TO TOP ELEVATION ON CLOSED SIDES. 3 CORNER PIER REQUIRED BETWEEN OPENINGS OF TWO ADJACENT WALLS. EXTEND WALL REINFORCING VERTICALLY THROUGH PIER. INSTALL ONE ADDITIONAL 15-INCH #4 BAR IN PIER. 4 CENTER PIER REQUIRED AT CENTER OF ANY INLET OPENING WITH LENGTH OF 5 FEET OR GREATER. EXTEND WALL REINFORCING VERTICALLY THROUGH PIER. INSTALL ONE ADDITIONAL 15-INCH #4 BAR IN PIER. 5 WALL WIDTHS VARY WITH PIPE DIAMETER. PROVIDE 6 INCHES OF WALL WIDTH (MINIMUM) EACH SIDE OF PIPING OPENING. MINIMUM WALL WIDTH IS 36 INCHES. MAXIMUM WALL WIDTH IS 72 INCHES. 6 CAST-IN-PLACE BASE SHOWN. IF BASE IS PRECAST INTEGRAL WITH WALL, THE FOOTPRINT OF BASE IS NOT REQUIRED TO EXTEND BEYOND THE OUTER EDGE OF THE WALLS. 7 INSTALL FOUR #4 DIAGONAL BARS AT ALL PIPE OPENINGS. 8 12" MINIMUM WALL HEIGHT ABOVE ALL PIPES. 6" DE P T H ( 7 ' - 0 " M A X ) 6"48" WALL WIDTH 6" 4"4" 8" MI N 6" MIN 5 8 GRADE TO TOP 2 SW-602 TYPE 'G' CASTING 1021.50 18"x48" INLET (OPEN WEST) 1 8" MIN. CLASS 1 BEDDING MATERIAL #4 BARS @ 12" O.C.EACH WAY BASE6 12" OUTLET PIPE 1015.65 1023.00 BOT. LID 1021.00 1023.50 TOP BERM (MIN) 1023.05 SPILLWAY 18" MODIFIED SOIL 2" CHOKER LAYER 12" STONE LAYER 6" PERFORATED TILE @ 0% 1015.75 1022.00 CLEANOUT RIM 1018.25 WQV STORAGE VOLUME (4,418 CF) 100 YR = 1022.77 1020.90 3" Ø ORIFICE 3 1 1023.50 LID 18 15 14 11 3 3 TRASH T Ex i s t i n g 1 5 ' D r a i n a g e E a s e m e n t (B k 7 8 9 , P g 3 6 6 - 3 8 2 ) NE V e n t u r e D r Co n c r e t e S i d e w a l k Co n c r e t e S i d e w a l k Co n c r e t e Pa r k i n g Co n c r e t e Pa r k i n g Co n c r e t e Pa r k i n g Co n c r e t e Pa r k i n g In t a k e = 1 0 2 2 . 4 5 In t a k e = 1 0 2 1 . 0 5 Ri m = 1 0 2 1 . 8 2 FL = 1 0 1 6 . 5 2 1 2 " R C P N W FL = 1 0 1 5 . 2 6 1 8 " R C P W FL = 1 0 1 5 . 2 0 1 8 " R C P E Ri m = 1 0 2 4 . 3 4 In v = 1 0 0 7 . 6 5 8 " T r u s s E In v = 1 0 0 7 . 5 7 8 " T r u s s W In t a k e = 1 0 2 2 . 4 0 FL = 1 0 1 6 . 1 5 1 5 " R C P S Ri m = 1 0 2 3 . 1 5 FL = 1 0 1 6 . 1 5 1 8 " R C P W 10 2 2 10 2 5 102 5 10 2 4 10 2 4 1025 1026 1026 1026 10 2 6 1 - QB 1 - AR 1 - GA 1 - UC 1 - PM 1 - AR 1 - GA 1 - QB 1 - PM 1 - UC 5 - SH 5 - SH 2B 1B 5 - PW 7 - CK 7 - PK 7 - CK 1A 1A1A1A 1A 1A 1A 2A TYP. 1A 2A TYP. 1A 2A TYP. 4 - CK 2B1B NE V e n t u r e D r 5 - PW 4 - CK 4 - CK V: \ P r o j e c t s \ 2 0 2 3 \ 1 2 3 . 1 5 1 4 . 0 1 \ C A D D \ S P 0 5 _ 1 2 3 1 5 1 4 _ L A N D . d w g JA K E R . C A M P O S , PL A N T I N G P L A N , 20 2 4 / 0 5 / 0 8 , 9: 0 3 A M , AN S I F U L L B L E E D D ( 3 4 . 0 0 X 2 2 . 0 0 I N C H E S ) BY DA T E RE V I S I O N MA R K Sc a l e : Te c h n i c i a n : T- R - S : SN Y D E R & A S S O C I A T E S , I N C . | Ch e c k e d B y : En g i n e e r : Da t e : 1" = Pr o j e c t N o : Sh e e t Project No: Sheet 27 2 7 S . W . S N Y D E R B L V D AN K E N Y , I O W A 5 0 0 2 3 51 5 - 9 6 4 - 2 0 2 0 | w w w . s n y d e r - a s s o c i a t e s . c o m MA A JR C JL H 03 - 0 5 - 2 0 2 4 20 ' 12 3 . 1 5 1 4 . 0 1 C5 0 0 123.1514.01 C500 WI L L A R D G A R A G E PL A N T I N G P L A N WA U K E E , I O W A PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S PE R C I T Y C O M M E N T S 03 - 2 0 - 2 4 04 - 0 2 - 2 4 04 - 1 8 - 2 4 05 - 0 7 - 2 4 JR C JR C JR C JR C 1234 TT N - R R W - S S FEET 0 20 LANDSCAPE PLAN CONSTRUCTION NOTES 1.MULCH BED, PROVIDE THE FOLLOWING: A.3-INCH DEPTH SHREDDED HARDWOOD MULCH A MIN 3-FOOT PERIMETER RING AROUND ALL TREES. DO NOT USE WEED-BARRIER FABRIC AS AN UNDERLAY. TAPER MULCH DEPTH TOWARDS BED EDGING AND/OR PAVEMENT EDGE, EXPOSING 1-INCH HEIGHT OF EDGE. B.2-INCH RIVER GRAVEL PLACED TO A DEPTH OF 4-INCHES WITH WEED BARRIER FABRIC UNDERLAYMENT IN AREAS SHOWN. 2.LANDSCAPE EDGING, PROVIDE THE FOLLOWING: A.SPADE-CUT. CUT VERTICALLY TO A DEPTH OF 4-INCHES. B.6-INCH BLACK STEEL EDGER WITH STAKES. LANDSCAPE PLAN GENERAL NOTES A.THE UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND/OR RECORDS OBTAINED. THE SURVEYOR MAKES NO GUARANTEE THAT THE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEY FURTHER DOES NOT WARRANT THAT THE UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED. B.NOTIFY UTILITY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR DETERMINING EXISTENCE, EXACT LOCATION AND DEPTH OF ALL UTILITIES. AVOID DAMAGE TO UTILITIES AND SERVICES DURING CONSTRUCTION. ANY DAMAGE DUE TO NEGLIGENCE SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. COORDINATE AND COOPERATE WITH UTILITY COMPANIES DURING CONSTRUCTION. C.ALL PLANT MATERIAL SHALL AT LEAST MEET MINIMUM REQUIREMENTS SHOWN IN THE "AMERICAN STANDARDS FOR NURSERY STOCK" (ANSI Z60.1-LATEST EDITION). D.IF IMPERVIOUS SOILS ARE DISCOVERED. CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT. IF TREE DRAINAGE WELLS ARE NEEDED, REFER TO IOWA STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS) 9030.103. E.CONTRACTOR SHALL WARRANTY ALL PLANT MATERIAL FOR FOR ONE YEAR AFTER INITIAL ACCEPTANCE, UNLESS SPECIFIED OTHERWISE. F.FOR TREES NOT LOCATED IN DESIGNATED BEDS, MULCH RINGS TO A MINIMUM DIAMETER OF 4-FEET WILL BE REQUIRED. G.PRIOR TO PLANTING, CHECK FOR CIRCLING ROOTS IN ROOT BALL. IF THERE'S EVIDENCE OF CIRCLING ROOTS, THE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT FOR REVIEW. PLANTS WITH CIRCLING ROOTS MAY BE REJECTED. H.VERIFY LOCATION OF ROOT COLLAR PRIOR TO PLANTING. NOTIFY LANDSCAPE ARCHITECT IF ROOT COLLAR IS NOT LOCATED AT THE TOP OF THE ROOT BALL. PLANTS THAT SHOW EVIDENCE OF BURIED ROOT COLLARS MAY BE REJECTED. I.CONFIRM LOCATION OF ROOT COLLAR AND FLARE PRIOR TO PLANTING. REMOVE EXCESS SOIL TO EXPOSE ROOT FLARE. THIS WILL DETERMINE PROPER PIT DEPTH. REFER TO DETAILS ON FOR FURTHER INSTRUCTIONS. J.WHEN PLANTING, REMOVE ALL NON-BIODEGRADABLE, SYNTHETIC MATERIAL. EXAMPLES SUCH AS CONTAINERS, SYNTHETIC BURLAP, STRAPPING, PLASTIC, OR OTHER MATERIAL THAT WILL IMPEDE THE GROWTH OF THE PLANT MATERIAL. FOR NATURAL FIBER BURLAP, REMOVE MINIMUM TOP HALF OF BURLAP AND WIRE BASKET. K.UNLESS SPECIFIED OTHERWISE, BACKFILL PITS WITH LOOSE, NATIVE TOPSOIL. WHEN EACH PIT IS TWO THIRDS FULL, WATER ROOT BALL AND ALLOW THE WATER TO COMPLETELY SOAK INTO SOIL BEFORE PLACING REMAINING BACKFILL. DO NOT TAMP OR STEP ON SOIL. ADD REMAINING SOIL AND WATER A SECOND TIME. L.DURING THE WARRANTY PERIOD, COORDINATE WITH OWNER ON A COMPREHENSIVE MAINTENANCE AND WATERING STRATEGY. M.SET ALL PLANTS PLUMB. MAINTAIN THROUGHOUT WARRANTY. THIS SHALL INCLUDE PRUNING BROKEN BRANCHES, DEAD, AND/OR POOR BRANCHING. TREE PRUNING SHALL BE CONDUCTED BY A CERTIFIED ARBORIST AND TO BE IN ACCORDANCE WITH ANSI STANDARDS. IF APPLICABLE TO PROJECT, TREES SHOULD BE TRIMMED TO PROVIDE AT LEAST A 7' HT. CLEARANCE ALONG STREETS AND SIDEWALKS. REMOVE ALL FLAGGING AND LABELS AFTER OWNER APPROVAL. N.UNLESS SPECIFIED OTHERWISE, SOD ALL AREAS DISTURBED BY CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR SODDING ANY ADDITIONAL AREAS THAT ARE NOT INDICATED ON THE PLANS. O.MINIMUM PLANTING HEIGHTS. EVERGREEN TREES: 6' UNDERSTORY TREES: 6' DECIDUOUS OVERSTORY: 8' LANDSCAPE PLAN CALCULATIONS PER CITY OF WAUKEE OPEN SPACE AREA: REQUIREMENT: MINIMUM OPEN SPACE OF 15% OF OVERALL PROPERTY --TOTAL LOT AREA: 66,704 SF. --TOTAL MINIMUM OPEN SPACE REQUIREMENT: 10,006 SF. --TOTAL BUILT AREA: 49,236 SF. --TOTAL OPEN PROVIDED SPACE: 66,704 - 49,236 = 17,468 SF. --PROVIDED OPEN SPACE RATIO TO OVERALL LOT: 26.19%. OPEN SPACE LANDSCAPING: REQUIREMENTS: 1 TREE PER 1,000 SF OF REQUIRED OPEN SPACE. 1 SHRUB PER 1,000 SF OF REQUIRED OPEN SPACE. --TOTAL MINIMUM TREES: 10,006 / 1,000 = 10. 10 PROVIDED. --TOTAL MINIMUM SHRUBS: 10,006 / 1,000 = 10. 45 PROVIDED.. 1 C500 DECIDUOUS TREE SINGLE-TRUNK DETAIL NO SCALE 6" 2-STAKE PLAN *USE IF LESS THAN 4" CALIPER SIZE 3-STAKE PLAN *USE IF GREATER THAN 4" CALIPER SIZE MINIMUM 3X ROOT BALL OF TREE OR 4' DIAMETER 2" 2 C500 PERENNIAL PLANTING BED DETAIL NO SCALE MINIMUM 2X ROOTBALL REFER TO PLAN FOR SPACING CODE QTY BOTANICAL NAME COMMON NAME SIZE UNIT MIN. HT.SPACING TRUNK STYLE MATURE HT. OVERSTORY TREES AR 2 ACER RUBRUM RED MAPLE 2.0-IN. CAL.CONTAINER 10-FT.N/A SINGLE 100-FT. GA 2 GINKGO BILOBA 'AUTUMN GOLD'AUTUMN GOLD MAIDENHAIR TREE 2.0-IN. CAL.CONTAINER 10-FT.N/A SINGLE 50-FT. PM 2 PLATANUS X ACERIFOLIA 'MORTON CIRCLE'EXCLAMATION!™ LONDON PLANE TREE 2.0-IN. CAL.CONTAINER 8-FT.N/A N/A 60-FT. QB 2 QUERCUS BICOLOR SWAMP WHITE OAK 2.0-IN. CAL.CONTAINER 8-FT.N/A SINGLE 70-FT. UC 2 ULMUS X 'FRONTIER'FRONTIER ELM 2.0-IN. CAL.CONTAINER 8-FT.N/A SINGLE 40-FT. CODE QTY BOTANICAL NAME COMMON NAME SIZE UNIT MIN. HT.SPACING MATURE HT. SHRUBS CK 26 CALAMAGROSTIS X ACUTIFLORA 'KARL FOERSTER'KARL FOERSTER FEATHER REED GRASS #3 CONTAINER 36-IN.5-FT. O.C.3-FT. PK 7 PHYSOCARPUS OPULIFOLIUS 'UMNHARPELL'FIRST EDITIONS® FIRESIDE® NINEBARK #3 CONTAINER N/A 5-FT. O.C.3-FT. PW 10 PINUS MUGO 'WHITE BUD'WHITE BUD MUGO PINE #3 CONTAINER N/A 5-FT. O.C.2-FT. SH 10 SPOROBOLUS HETEROLEPIS PRAIRIE DROPSEED #3 CONTAINER N/A 2.5-FT O.C.2-FT. PLANT SCHEDULE NOTE: SCHEDULE IS FOR CONTRACTOR'S CONVENIENCE ONLY. CONTRACTOR SHALL VERIFY FINAL PLANT QUANTITIES PRIOR TO BIDDING. SHOULD THERE BE ANY DISCREPANCIES REGARDING QUANTITIES AND SPACING WITH COMPARISON TO WHAT'S DRAWN AND LABELED ON PLAN, THE PLAN SHALL GOVERN. 8' ROLLED STEEL FENCE POST FLAGGING MATERIAL N PLACE ON STAKE TO SOUTHWEST PLACE ON STAKE TO SOUTHWEST N 6" LONG POLYROPYLENE OR POLYETHYLENE, 40 MIL. THICK AND AND 1.5" WIDE STRAPS. ATTACH 10 GA. WIRE OR APPROVED EQUAL BACKFILL MIX AS SPECIFIED SHREDDED HARDWOOD MULCH @ 3" MAX. DEPTH. TAPER DEPTH IN AREAS AS SHOWN. 3-INCH HEIGHT WATER RETENTION BERM BEYOND EDGE OF ROOT BALL BREAK BOTTOM QUARTER OF ROOT BALL AND PLACE ATOP ROOTBALL DEBRIS. COMBINE WITH EXCAVATED SOIL AND TAMP A SMALL AMOUNT OF SOIL AROUND BASE OF ROOT BALL. APPLY FIRMLY WITH FOOT PRESSURE TO STABILZE THE ROOT BALL. WRAP TRUNK FROM GROUND-LINE TO FIRST BRANCH SPADE-CUT EDGE AT 4-INCH DEPTH ALONG CIRCUMFERENCE OF TREE PIT SCARIFY SIDES OF PIT SET ROOT COLLAR AND ROOT FLARE 2 INCHES ABOVE FINISH GRADE. DO NOT PLACE MULCH WITHIN 6 INCHES OF TRUNK. CONFIRM LOCATION OR ROOT COLLAR PRIOR TO PLANTING. SEE NOTES ON LANDSCAPE PLAN. NOTE: REMOVE STAKES AFTER ONE YEAR OF ESTABLISHMENT FREE ANY GIRDLING ROOTS PRIOR TO BACK FILL BY SLICING ROOTS AND BREAKING UP ROOT BALL FINISH GRADE BACKFILL MIX AS SPECIFED SHREDDED HARDWOOD MULCH @ 4-INCH DEPTH EDGE OF PAVEMENT OR BUILDING, OR MIRROR THE OPPOSITE SIDE WITH SAME EDGING TYPE. SEE PLAN. 4-INCH DEPTH SPADE-CUT EDGING SCARIFY SIDES OF PIT BREAK BOTTOM QUARTER OF ROOT BALL AND PLACE ATOP ROOTBALL DEBRIS. COMBINE WITH EXCAVATED SOIL. MAIN LEVEL 0" MAIN LEVEL 0" LOW EAVE 19' -3 3/4" HIGH EAVE 22' -10 1/4" SIGNAGE BY OWNER 1/2" 12" 10 ' - 8 " 11' - 4" PRE-FINISHED DARK BRONZE, PRE-FAB. METAL CANOPY, 3.5' DEEP; MAPES. HOLLOW METAL DOORS TO BE PAINTED TO MATCH ADJACENT MATERIAL, TYP. 101 111a OH-1 OH-2 OH-3 PNL-3 PNL-1 PNL-2 SF SF COP-1 CONC. FILLED BOLLARDS w/ PLASTIC SLEEVE COVERS (SAFETY WHITE FINISH) AT ALL O.H. DOOR OPENINGS MAIN LEVEL 0" MAIN LEVEL 0" LOW EAVE 19' -3 3/4" HIGH EAVE 22' -10 1/4"1/2" 12" MTL-1 PNL-3 COP-1 1' - 6" OH-12 OH-11 OH-10 111e OH-18 HOLLOW METAL DOORS TO BE PAINTED TO MATCH ADJACENT MATERIAL, TYP. O.H. DOOR TRIM TO BE PAINTED TO MATCH ADJACENT MATERIAL, TYP. CONC. FILLED BOLLARDS w/ PLASTIC SLEEVE COVERS (SAFETY WHITE FINISH) AT ALL O.H. DOOR OPENINGS MAIN LEVEL 0" LOW EAVE 19' -3 3/4" 6' - 6 " UTILITY SCREEN HOLLOW METAL DOORS TO BE PAINTED TO MATCH ADJACENT MATERIAL, TYP. 2"x4.5" BLACK STOREFRONT w/ 1" INSULATED CLEAR GLAZING W/ LOW-E, TYP. MTL-1 MTL-1 MTL-3 MTL-1 SF PNL-3 G&S G&S O.H. DOOR TRIM TO BE PAINTED TO MATCH ADJACENT MATERIAL, TYP. 1' - 6" CONC. FILLED BOLLARDS w/ PLASTIC SLEEVE COVERS (SAFETY WHITE FINISH) AT ALL O.H. DOOR OPENINGS MAIN LEVEL 0" HIGH EAVE 22' -10 1/4" PRE-FINISHED DARK BRONZE, PRE-FAB. METAL CANOPY, 3'-11" DEEP; MAPES. 10 ' - 0 " 4' - 0 " 6' - 0 " 12' - 0"12' - 0" UTILITY SCREEN COP-1 PNL-1 PNL-2 SF SF PN L - 1 PN L - 1 PN L - 1 PNL-3 SF HOLLOW METAL DOORS TO BE PAINTED TO MATCH ADJACENT MATERIAL, TYP. MTL-1 10 ' - 8 " CMU COP-2 MTL-2 6' - 8 " CMU COP-2 COP-2 CMU f: 515.961.0468 THIS PLAN IS THE PROPERTY OF DOWNING CONSTRUCTION INC. ANY USE WITHOUT WRITTEN PERMISSION IS STRICTLY PROHIBITED! PLAN NO. = DWG. LIST REVISIONS ISSUED DATE: PROJECT DESIGNER-INTERIOR www.downingconstruct.com www.downingplanroom.com 509 East Scenic Valley Ave. Indianola, Iowa 50125 p: 515.961.5386 CO N S T R U C T I O N D O C U M E N T S E T - P L A N S F O R C O N S T R U C T I O N DE L I V E R CO M M I T DE V E L O P DI S C O V E R / A N A L Y Z E REV #DESCP.DATE C: \ U s e r s \ c h r i s l \ D o c u m e n t s \ R 2 4 - W i l l a r d G a r a g e _ C h r i s L y o n 2 5 7 8 . r v t 3/ 2 0 / 2 0 2 4 1 0 : 2 3 : 0 9 A M A-201 Wi l l a r d G a r a g e 35 N E V e n t u r e D r . Wa u k e e , I A 5 0 2 6 3 90-180 03/20/2024 COLOR EXTERIOR ELEVATIONS CGL-AKS SCALE:1/8" = 1'-0"3 COLOR - SOUTH ELEVATION SCALE: 1/8" = 1'-0" 4 COLOR - NORTH ELEVATION SCALE: 1/8" = 1'-0" 1 COLOR - EAST ELEVATION SCALE: 1/8" = 1'-0" 2 COLOR - WEST ELEVATION SCALE: 1/4" = 1'-0" 5 TRASH ENCLOSURE - COLOR ELEVATION - FRONT SCALE: 1/4" = 1'-0" 6 TRASH ENCLOSURE - COLOR ELEVATION - BACK SCALE: 1/4" = 1'-0" 7 TRASH ENCLOSURE - COLOR ELEVATION - SIDE MATERIAL LEGEND MARK MATERIAL DESCRIPTION CMU SPLIT FACE CMU; 8"x8"x16"; INSTALLED: RUNNING BOND; COLOR: TBD COP-1 COPING: PRE-FINISHED METAL COPING; COLOR: TO MATCH ADJACENT FACADE MATERIAL COP-2 COPING: PRE-FINISHED METAL COPING; COLOR: DARK BRONZE G&S GUTTER & DOWNSPOUT; PRE-FINISHED METAL TO MATCH "MTL-1" MTL-1 METAL PANEL: PRE-FINISHED, 26GA. VEE RIBBED METAL PANEL; MANUF.:VP; COLOR: COOL GRANITE GRAY MTL-2 METAL PANEL: METAL DECK GALVANIZED; INSTALLED: VERTICAL; COLOR DARK BRONZE MTL-3 METAL PANEL: STANDING SEAM METAL ROOFING PANELS; COLOR GALVALUME PNL-1 CONCRETE PANEL: MANUF.: NICHIHA; SERIES: INDUSTRIAL BLOCK; INSTALLED: STACKED; VERTICALLY PNL-2 CONCRETE PANEL: MANUF.: NICHIHA; SERIES: VINTAGEWOOD; COLOR: SPRUCE; INSTALLED: STACKED; HORTIZONTAL PNL-3 CONCRETE PANEL: MANUF.: NICHIHA; SERIES: ARCHITECTURAL BLOCK; COLOR: MOCHA; INSTALLED: STAGGERED; VERTICALLY SF STOREFRONT; PRE-FINISHED ALUMINUM STOREFRONT; COLOR: DARK BRONZE; GLAZING; CLEAR W/ LOW E PEMB FINISH NOTE: ALL PEMB EXTERIOR FINISHES TO BE KYNAR FINISH CHANGE TO: MTL-3: SSR GALVALUME EAST ELEVATION: TOTAL SF: 2,960 TOTAL SF OF PRIMARY MATERIAL: 125 - MTL-1 @ 1,767 SF = 99% (OF THIS SIDE OF BUILDING) - PNL-3 @ 28 SF = 1% (OF THIS SIDE OF BUILDING) WEST ELEVATION: TOTAL SF: 3,500 TOTAL SF OF PRIMARY MATERIAL: 3,500 - PNL-1 @ 808 SF = 23% (OF THIS SIDE OF BUILDING) - PNL-2 @ 96 SF = 3% (OF THIS SIDE OF BUILDING) - PNL-3 @ 2,596 SF = 74% (OF THIS SIDE OF BUILDING) SOUTH ELEVATION: TOTAL SF: 1,795 TOTAL SF OF PRIMARY MATERIAL: 31 - PNL-1 @ 567 SF = 32% (OF THIS SIDE OF BUILDING) - PNL-2 @ 45 SF = 2% (OF THIS SIDE OF BUILDING) - PNL-3 @ 1,183 SF = 66% (OF THIS SIDE OF BUILDING) NORTH ELEVATION: TOTAL SF: 1,795 TOTAL SF OF PRIMARY MATERIAL: 1,795 - MTL-1 @ 1,767 SF = 98% (OF THIS SIDE OF BUILDING) - PNL-3 @ 34 SF = 2% (OF THIS SIDE OF BUILDING) TOTAL SF: 10,050 TOTAL SF OF PRIMARY MATERIAL: 5,451 BUILDING TOTAL PERCENTAGE OF PRIMARY MATERIAL: 54% EXTERIOR MATERIAL CALCS.