HomeMy WebLinkAbout2024-05-20 I15A T Ave Corridor, W Hickman Rd to NW Douglas Pkwy_Change Order 6AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: May 20, 2024 AGENDA ITEM:Consideration of approval of Change Order No. 6 to All-Star Concrete, LLC for the T Avenue Corridor Improvements – W Hickman Road to NW Douglas Parkway Project increasing the contract amount by $98,171.80. FORMAT:Motion SYNOPSIS INCLUDING PRO & CON: The existing hydrant and valve on Douglas were low and needed adjustment. Sanitary Manhole 11 was shown as an internal drop and needed to be external. The change order added the external drop and deducted the internal drop. The access road to the Public Safety site needed additional stabilization measures in place to maintain access. The current traffic under site conditions were rutting the proposed granular driveway. FISCAL IMPACT INCLUDING COST/BENEFIT ANALYSIS: The net result of this Change Order increases the contract price in the amount of $98,171.80. COMMISSION/BOARD/COMMITTEE COMMENT: STAFF REVIEW AND COMMENT: RECOMMENDATION: Approve the change order. ATTACHMENTS: I. Change Order No. 6 II. Letter of Recommendation PREPARED BY:Sara Kappos REVIEWED BY:Sara Kappos SKK PUBLIC NOTICE INFORMATION – NAME OF PUBLICATION: DATE OF PUBLICATION: I15A 8191 Birchwood Court, Suite L Johnston, IA 50131 Phone: (515) 254-1393 April 30, 2024 Sara Kappos, P.E. Assistant Public Works Director 805 University Avenue Waukee, IA 50263 RE: Change Order #6 T Avenue Corridor Improvements – W Hickman Road to NW Douglas Parkway Dear Mrs. Kappos: Attached please find a detailed Change Order for City Council approval on May 20, 2024. Change Description: The existing hydrant and valve on Douglas were low and needed adjustment. Sanitary Manhole 11 was shown as an internal drop and needed to be external. Added the external drop and deducted the internal drop. The access road to the Public Safety site needed additional stabilization measures in place to maintain access. The current traffic under site conditions were rutting the proposed granular driveway. We have reviewed the submitted quotes from All - Star and it appears to be in order with current industry pricing. If City Staff concurs with this pricing, we recommend the City of Waukee Increase the contract price in the amount of $98,171.80 to complete the additional work associated with Change Order #6. If you have any questions, please contact me. Sincerely, Foth Infrastructure & Environment, LLC Rob Kline, P.E. Lead Civil Engineer Encl: Change Order #6 dated 4/30/2024 CHANGE ORDER 06 Distribution: Owner - Finance ____ Owner - Public Works ____ Engineer ____ Contractor ____ Contractor:All-Star Concrete LLC. 4989 NW Johnston Dr. Johnston, Iowa 50131 $10,683,619.98 August 7, 2023 4.45 Division 1 Special LF $229.00 20.00 $4,580.00 5.19 Division 1 Special EA $440.00 1.00 $440.00 5.20 Division 1 Special EA $1,650.00 1.00 $1,650.00 6.23 Division 1 6010-C-1012 EA $10,000.00 -1.00 ($10,000.00) 6.29 Division 1 Special LS $16,850.00 1.00 $16,850.00 7.19 Division 1 Special TON $62.25 100.00 $6,225.00 7.20 Division 1 Special TON $68.50 1097.00 $75,144.50 7.21 Division 1 Special SY $3.15 1042.00 $3,282.30 $98,171.80 $10,683,619.98 $62,958.14 $10,746,578.12 $98,171.80 $10,844,749.92 0 Days Recommended By: All-Star Concrete LLC. Signature: Name: Bryan Sprigs Title: Project Manager Date: Owner:City of Waukee □ ≤$500 Department Director X_______________________________________Date___________________ □ $501 to $2,500 City Administrator X_______________________________________Date___________________ □ Date___________________ Value Adjustment Granular Surfacing, 3" Roadstone Type 2 Geogrid Item No. Signature: The Contract Sum will be increased by this Change Order in the amount of Net Change by previously authorized Change Orders Foth Infrastructure & Environment, LLC The Contract Sum prior to This Change Order was Division Item Code Sanitary Sewer, DIP, 12 IN Quantity AdjustmentUnit Price City of Waukee Description Unit Valve Box Extension Hydrant Extension Drop Connection, Sanitary Sewer, Internal, 12 IN Drop Connection, Sanitary Sewer, External, 12 IN Granular Surfacing, 1.5" Special Backfill Prepared By: Date: The Contract Time will be increased by CHANGE ORDER SUMMARY NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE (if applicable) AND OWNER The Original Contract Sum was Title: Lead Civil Engineer Title: City Administrator Name: Rob Kline, P.E. The new Contract Sum including this Change Order will be Signature: Date: Name: Brad Deets Checked By: Department of Public Works 805 University Avenue Waukee, IA 50263 (515) 987-7920 Fax (515) 987-3979 THE CONTRACT IS CHANGED AS FOLLOWS: The existing hydrant and valve on Douglas were low and needed adjustment. Sanitary Manhole 11 was shown as an internal drop and needed to be external. Added the external drop and deducted the internal drop. The access road to the Public Safety site needed additional stabilzation measures in place to maintain access. The current traffic under site conditions were rutting the proposed granular driveway. T Avenue Corridor Improvements W Hickman Rd to NW Douglas Pkwy 6 22W007.00 Waukee Project File Number April 30, 2024 Foth Project File Number Orig. Contract Amount & Date Date Change Order Number Project Title CO6-2024-0423-Waukee T Avenue.xlsx Change Order 1 Page 1 of 1